Page 1: Guidelines for Registration of Contractors

Online Contractor Registration

Page 1 of 17

Guidelines for

Registration of Contractors

Materials & ContractsDepartment

Chennai Petroleum Corporation LimitedManali, Chennai - 6000068.

Tamilnadu – INDIA.

Page 2: Guidelines for Registration of Contractors

Online Contractor Registration

Page 2 of 17

Contents

1.General Information

About CPCL

About OCR

2. Instructions to Contractors

3. Requirements for a contractor

Mandatory

Qualifying

General Requirements

4. Categories of works

Civil

Mechanical

Electrical

Instrumentation

5. Checklist for enclosures

Page 3: Guidelines for Registration of Contractors

Online Contractor Registration

Page 3 of 17

General Information

About CPCL

Chennai Petroleum Corporation Limited (CPCL), formerly known as Madras Refineries

Limited (MRL) was formed as a joint venture in 1965 between the Government of India

(GOI), AMOCO and National Iranian Oil Company (NIOC) having a share holding in the ratio

74%: 13%: 13% respectively.CPCL has two refineries with a combined refining capacity of

11.5 Million Tonnes Per Annum (MMTPA). The Manali Refinery has a capacity of 10.5

MMTPA and is one of the most complex refineries in India with Fuel, Lube, Wax and

Petrochemical feedstocks production facilities. CPCL's second refinery is located at Cauvery

Basin at Nagapattinam. This unit was set up in Nagapattinam with a capacity of 1.0

MMTPA. The main products of the company are LPG, Motor Spirit, Superior Kerosene,

Aviation Turbine Fuel, High Speed Diesel, Naphtha, Bitumen, Lube Base Stocks, Paraffin

Wax, Fuel Oil, Hexane and Petrochemical feed stocks.

About OCR

CPCL intends to register/enlist competent agencies with sound technical and financial

capabilities, fulfilling our requirements stated in the application, for various crafts, to carryout

Operation & Maintenance of the Refinery and new projects. The various categories of works

that are used in the Refinery are listed in the following pages . The procedure for registration

of firms for works / services (Contracts) is detailed below. The contractors are requested to

read the “Instructions to Contractors” listed carefully before taking Online registration.

Page 4: Guidelines for Registration of Contractors

Online Contractor Registration

Page 4 of 17

Instructions to Contractors

Applicants who are interested in registering with CPCL for works / services

(Contracts) shall complete this online form ensuring their meeting all our

requirements. Contractors who fulfill our requirements shall select the craft from

various disciplines/ Category of works, listed for which they intend to register along

with description and code no. and the same to be indicated

Follow up by any means or influencing through internal / external sources shall make

the application summarily rejected.

Based on the details / documents furnished, further assessment would be done by

obtaining feed back from their clients for whom they already executed the works and

the infrastructure available, depending upon the need. Misinformation, if any, will

make the registration liable for cancellation.

Contractor who fulfills the criteria required for registration shall be issued with

registration letter and their name would be kept in the “Master Contractor list” (MCL).

Registration shall be for the purpose of inclusion of contractor’s name in CPCL's

“Master Contractor List” (MCL) and shall in no way guarantee regular issue of

contracts.

Retention of Contractor’s firm in Master Contractor List (MCL) shall be subject to

satisfactory performance on execution of works.

In case of unsatisfactory execution of works on account of quality, completion period,

infrastructure facilities, over loading, financial / liquidity crunch, labour unrest, strike,

lockout etc., Contractor’s firm shall be put on “Holiday”, and the same would be

reviewed on the basis of progress / improvement at works.

Registration will be cancelled at any time, if the firm repeatedly not responding to our

enquiries.

CPCL reserves the right to cancel the registration process without assigning any

reasons and prior notice and no further correspondence shall be entertained in this

regard.

Page 5: Guidelines for Registration of Contractors

Online Contractor Registration

Page 5 of 17

Requirements for a Contractor

Contractor / who is interested in registering with CPCL for Works / Services shall fulfill

the following requirements:

Mandatory requirements

Qualifying requirements

General requirements

1. Mandatory requirements:

The following information shall be treated as mandatory requirements, which also forms part

of the qualifying criteria. The Contractor who do not meet the mandatory requirements

will not be considered for further scrutiny and their application would be summarily

rejected without any notice. Hence it’s Contractor’s responsibility to furnish the relevant

document in order to comply with the mandatory requirement in the first instance itself.

ESI Registration. details

Registration number

Date of registration

Issuing authority

EPF Registration details

Registration number

Date of registration

Issuing authority

Service Tax Registration. details

Registration number

Date of registration

Issuing authority

Particulars of the latest IT return:-

Date of IT return

Place of return

IT return for the year

Page 6: Guidelines for Registration of Contractors

Online Contractor Registration

Page 6 of 17

2. Qualifying requirements:

Applicant shall produce copies of contracts of maximum order values for the applied craft,

which have been successfully executed and completed during the preceding 7 years.

The maximum financial limit for the agency in the applied craft would be arrived based on

the copies of order produced, which complies with both Technical and financial capabilities

as detailed below.

Valu

eca

tego

ryN

o.

Value limitin Rs.

Qualification requirements

Technical & Financial

Value of completed work during the preceding 7 years. &

The averageannual

financial turnoverof the last 3

financial years.

1 Up to 2Lakh

One work ofvalue notless than

Rs.1.6 Lakh

OR

Two works ofvalue not less

than Rs. 1 Lakheach

OR

Three works ofvalue not less

than Rs. 0.8Lakh each

&Should be notless than Rs. 2

Lakh

2 Up to 5Lakh

One work ofvalue notless thanRs.4 Lakh

OR

Two works ofvalue not lessthan Rs.2.5Lakh each

OR

Three works ofvalue not less

than Rs. 2.0Lakh each

&Should be notless than Rs. 5

Lakh

3 Up to 15Lakh

One work ofvalue notless than

Rs.12 Lakh

OR

Two works ofvalue not lessthan Rs.7.5Lakh each

OR

Three works ofvalue not less

than Rs. 6.0Lakh each

&Should be notless than Rs. 15

Lakh

4Up to 25

Lakh

One work ofvalue

Rs.20 LakhOR

Two works ofvalue not lessthan Rs. 12.5Lakh each

OR

Three works ofvalue not less than

Rs.10Lakh each

&Should be notless than Rs. 25

Lakh

5 Up to 50Lakh

One work ofvalue notless than

Rs. 40 Lakh

OR

Two works ofvalue not lessthan Rs. 25Lakh each

ORThree works of

value not less thanRs.20 Lakh each

&Should be notless than Rs.50

Lakh

6 Above 50Lakh

One work ofvalue aboveRs.40 Lakh

OR

Two works ofvalue not less

than aboveRs.25 Lakh each

OR

Three works ofvalue not less than

above Rs. 20Lakh each

& Should be morethan Rs.50 Lakh

Page 7: Guidelines for Registration of Contractors

Online Contractor Registration

Page 7 of 17

3. General RequirementsThe proof documents for the following are also need to be enclosed.

PAN No.

Audited balance sheet

Min. acceptable tender value

ECS details

HSE policy

Quality Policy

Categories of Works

Civil

Sl. No. Code No. Description

1 C1 Construction of Residential / Industrial Buildings.

2 C2 Construction of Roads & Culverts.

3 C3 Civil & Structural Works.

4 C4 Painting of buildings.

5 C5 Refractory – Acid/Alkali proof tiles lining works /Epoxy lining/coating on RCC structures.

6 C6 Repair / Maintenance of buildings / plant equipmentfoundations /roads / OWS / SWS & Plumbing works.7 C7 Plant / Building housekeeping and sanitation works.

8 C8 Pre & post constructional – anti termite treatment, pest controland rodent control.

9 C9 Interior Decorative works (aluminium / wooden partitioning /false ceiling / wall paneling etc.)

10 C10 Machinery Hirers (Excavators / Dozers / Pocalin)

11 C11 Site grading work

12 C12 Pile foundation work

13 C13 Grass cutting in tank farm area / cleaning of culverts & drains /cleaning of storage ponds / reservoirs.

14 C14 Architect

15 C15 Soil investigation & testing

16 C16 Water proofing for building

Page 8: Guidelines for Registration of Contractors

Online Contractor Registration

Page 8 of 17

Mechanical

Sl. No. Code No. Description

1 M-1 Fabrication & Erection of Piping – CS / SS / AS (Non-IBR)& Equipment Erection.

2 M-2Fabrication & Erection of Piping – CS / SS / AS (IBR) &EquipmentErection. [IBR Approved Agencies only)

3 M-3 Overhauling / Repair & Maintenance of rotary machinery / Filters/ Pumps / Compressor / Turbine / fans / related Equipment etc.,

4 M-4 Rubber lining of pipes & Vessels.

5 M-5 FRP / Epoxy Lining of Pipes and Vessels.

6 M-6 Supply & Erection of HDPE/PVC/UPVC/PP/GRP piping.

7 M-7 Online leak arresting of steam/hydrocarbon/water/air/solvent etc.,

8 M-8 Chemical Cleaning / Hydro-blasting / testing of Heat exchanger/ Cooler / Condensers / Re-Boiler.

9 M-9 Re-Tubing of Exchangers / condensers / coolers.

10 M-10 Servicing of Fire Trucks /Jeeps / Forklifts / grabbersincluding supply of spares.

11 M-11 Overhauling/repair and testing of safety valves / motorizedvalves all other types valves.

12 M-12 Repairs / maintenance of Columns /Vessels/Drums

13 M-13 Repair / maintenance of special equipment in FCCU Reactor/ Regenerator, Orifice Chamber / Slide valves.

14 M-14 Repair/ Maintenance of Boiler /Re-Boiler/Re-formers/Airpre- heaters.

15 M-15 Repair/maintenance of Furnace /Heater Internals.

16 M-16 Catalyst loading in reactors/vessels/columns/reformers.

17 M-17 Fire Retardant coating for pipe lines / Structural.

18 M-18 Machining / Reconditioning of Machinery / special coatingof equipment spares / Balancing.

19 M-19

Stamping/Servicing of weighing machine including Mechanical /Electronic weigh bridges up to 60 Tons.(The agency applyingto this job shall be an authorized agent of any of the originalequipment manufactures like Avery etc., and also approved bythe State Government.

Page 9: Guidelines for Registration of Contractors

Online Contractor Registration

Page 9 of 17

20 M-20Overhauling of Machine Tools such as Lathes, Drilling /shaping/balancing machine / hydraulic press /weldingmachine etc.,

21 M-21 Preparing CAD drawings for Engineering equipment / Spares.

22 M-22 Overhauling of Diesel Engine Drives.

23 M-23Repair & maintenance of Hydrocarbon storage vessels likeSpheres / Bullets to meet statutory requirement (CCE Approvedagencies)

24 M-24 Re-babating of bearings/casting of spare parts / Aluminum,cast iron, bronzes / Aluminum welding etc.,

25 M-25 Product storage tank up to 31 Mtrs. Dia (both Cone/FloatingRoof) Repairs and Maintenance.

26 M-26 Product storage tank above 31 Mtrs and up to 59 Mtrs. Dia (bothCone/Floating Roof) Repairs and Maintenance

27 M-27 Product storage tank above 61 Mtrs Dia (both Cone/FloatingRoof) Repairs and Maintenance

28 M-28 Plant Shutdown - Mechanical Jobs

29 M-29 Radiography

30 M-30 Ultrasonic flaw detection / metallographic examination / otherNDT

31 M-31 Third party inspection agency for carrying out statutoryexamination as per CCE

32 M-32 Cathodic protection survey

33 M-33 Failure analysis / remaining life assessment studies

34 M-34 Thickness gauging job

35 M-35 Drafting / preparation of data card / history updation etc.,

36 M-36 Third party inspection agency for material inspection

37 M-37 Load testing / statutory certification of EOT/ HOT / Mobile cranes(Certified by Weights & Measures)

38 M-38 Load testing / statutory certification of lifting tools & tackles, slingsetc., (Certified by Weights & Measures)

Page 10: Guidelines for Registration of Contractors

Online Contractor Registration

Page 10 of 17

Electrical

Sl. No. Code No. Description

1 E-1 Operation & Maintenance of central Air Conditioning plants.

2 E-2 Maintenance of window Air conditioners, Coolers.

3 E-3 Repair & maintenance of transformers, welding generator(AC/DC)

4 E-4 Rewinding &Testing of LT Motors

5 E-5 Rewinding & testing of HT Motors.

6 E-6 Providing, Installation, repair & Maintenance of electrical heattracing

7 E-7 Electrification of building

8 E-8 Rewinding and testing of Fans / Coolers.

9 E-9Electrical Works Like-Cable laying, testing of earth pits, Installation ofelectrical equipment’s in hazardous location like Refinery,Petrochemical, LPG Plant etc.,

10 E-10 Operation /Maintenance of Electrical System of Substation /buildings

Instrumentation

Sl. No. Code No. Description

1 I -1Installation, Calibration, testing of all types of Instruments /Panels, Fabrication, erection of Impulse piping, laying of trays &cabling.

2 I -2Preventative break down maintenance jobs for Instrumentsincluding cleaning calibration, testing and installation ofInstruments and Instruments panels. etc.,

3 I -3 Instrumentation jobs in control room involving hard ware &software jobs on DCS and PLC.

Page 11: Guidelines for Registration of Contractors

Online Contractor Registration

Page 11 of 17

Check List for EnclosuresThe applicant shall ensure enclosure of proof documents for the following.

Mandatory requirements:

ESI Registration

EPF Registration

Service Tax Registration

Latest ITCC / IT return acknowledgement / Refund order

Qualifying requirements:

Copies of work order

Copies of completion certificate for the referred work order

Annual turnover for the three preceding years

General requirements:

PAN NO.

Audited Balance sheet for the three preceding years

NSIC (Applicable for Small Scale Industries)

Enrollment as “Registered Contractors” in other firms

Solvency certificate with various credit limits by banker

ECS

Minimum acceptable tender value

Details of “Quality Policy”

HSE Policy

Page 12: Guidelines for Registration of Contractors

Online Contractor Registration

Page 12 of 17

Screenshots

Page 13: Guidelines for Registration of Contractors

Online Contractor Registration

Page 13 of 17

Page 14: Guidelines for Registration of Contractors

Online Contractor Registration

Page 14 of 17

Page 15: Guidelines for Registration of Contractors

Online Contractor Registration

Page 15 of 17

Page 16: Guidelines for Registration of Contractors

Online Contractor Registration

Page 16 of 17

Page 17: Guidelines for Registration of Contractors

Online Contractor Registration

Page 17 of 17

Summary Sheet