Page 1: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

SUGGESTED GUIDELINES

FOR REFRIGERATION

PLANT MAINTENANCE

SEPTEMBER, 2003

Page 2: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

ONTARIO RECREATION FACILITIES ASSOCIATION INC.1185 EGLINTON AVENUE EAST, SUITE 402NORTH YORK, ONTARIO

CANADA M3C 3C6T.416.426.7062F.416.426.73851.800.661.6732 (TOLL FREE IN ONTARIO)[email protected]

COPYRIGHT © 2003 ONTARIO RECREATION FACILITIES ASSOCIATION INC.

All rights reserved. No part of this publication may be reproduced, stored in aretrieval system, or transmitted in any form or by any means, electronic, mechanical,photocopied, recorded or otherwise, without the prior written permission of theOntario Recreation Facilities Association Inc.

The information contained in this reference material is distributed as a guide only; itis generally current to the best of our knowledge as to the revision date, having beencompiled from sources believed to be reliable and to represent the best current opinionon the subject. No warranty, guarantee or representation is made by O.R.F.A. as tothe absolute correctness or sufficiency of any representation contained in this referencematerial and O.R.F.A. assumes no responsibility in connection therewith; nor can itbe assumed that all acceptable safety and health measures are contained in this refer-ence material, or that other or additional measures may not be required in particularor exceptional conditions or circumstances.

While O.R.F.A. does not undertake to provide a revision service or guarantee accuracy,we shall be pleased to respond to your individual requests for information at any time.

Reference to companies and products are not intended by the publisher as an endorse-ment of any kind.

HUMAN

RESOURCESJohn MiltonExecutive Director

[email protected]

Helen MorrisonActing Administrative Assistant

[email protected]

Rebecca RussellFacilities Librarian

[email protected]

Terry PicheTechnical Director

[email protected]

Hubie BasilioPublic Relations &

Communications Coordinator

[email protected]

Monica GurpersaudOffice Assistant

[email protected]

Page 3: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

2004

Page 4: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Introduction .................................................................................................................2 Terminology.................................................................................................................2 Procedures for Developing Your Program ...............................................................3 Refrigeration Plant Maintenance Program Policy....................................................6 Ice Plant Start-up Procedure Checklist.....................................................................7 Maintenance Program Procedures............................................................................8

Daily Maintenance....................................................................................................8 Weekly Maintenance................................................................................................10 Monthly Maintenance ...............................................................................................10 Bi-Annual Maintenance ............................................................................................11 Annual Maintenance ................................................................................................12 Five Year Maintenance ............................................................................................13

Troubleshooting Guide...............................................................................................14

Compressor fails to start ..........................................................................................14 Compressor “short-cycles” .......................................................................................15 Suction pressure too high ........................................................................................16 Suction pressure too low..........................................................................................16 Discharge pressure too low......................................................................................17 Discharge pressure too high ....................................................................................17 System short of capacity ..........................................................................................18 Compressor or system noisy....................................................................................18 Compressor runs continuously.................................................................................19

Plant Maintenance Inspection Report .......................................................................20

Job Function Checklist .............................................................................................21 System Condition and Recommendation Form .......................................................26 Refrigeration Maintenance and Repair Record........................................................29

Refrigeration Plant Maintenance Program

Page 5: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

2

INTRODUCTION The purpose of this document is to assist Facility Managers, Supervisors and/or Operators develop a general maintenance program for a registered unattended refrigeration plant. Any registered refrigeration plant is required by legislation to operate under the Technical Standards and Safety Act – Operating Engineers Regulation, Boilers and Pressure Vessels Regulation, CSA-51-97 Boiler, Pressure Vessel and Pressure Piping Code and the CSA-B52-99 Mechanical Refrigeration Code. The Operating Engineers regulation requires that owners/operators for any registered unattended refrigeration plant develop and implement a maintenance program. To ensure the safety of the public and staff, it is required that owners/users of these refrigeration plants clearly understand and comply with the requirements as prescribed by the Operating Engineers Regulation 219/01 and the CSA B52-99 Mechanical Refrigeration Code. It is therefore the responsibility of the owner/operator to develop the maintenance program to at least include the manufacturer maintenance and service recommendations and to ensure such recommendations are performed. Some of these recommendations may apply to one type of refrigeration system and not another type. For example, one troubleshooting recommendation might apply to a DX unit cooler type of system while others might apply to a flooded type of chiller. The maintenance shall be performed by one of:

• Certified Operating Engineer or Refrigeration Operator • Person acceptably trained in the maintenance specifics of the equipment • Contracted person or company that is acceptably trained, experience and

equipped to perform the maintenance. Through a process of log entries, contract wording, work reports and equipment inspection, the Operating Engineer will be able to verify satisfactory attendance to the required maintenance. For further information, contact the O.R.F.A. office at 416-426-7062 or the Technical Standards Authority 416-325-2000 Toll-Free (outside Toronto): 1-877-682-8772. NOTE: INTERPRETATION (as defined by O.R. 219/01) “unattended”, in relation to a guarded plant or guarded installation, means that the plant or installation may be operated,

(a) without the appointment of a chief operating engineer or chief operator, and (b) without an operating engineer or operator on shift duty providing supervision;

“attendance”, in relation to shift coverage, means the physical presence of a person for the purpose of mandatory shift coverage by an operating engineer or operator for the operation of the plant as set out in this Regulation and "attended" has a corresponding meaning; “operator” means a holder of a subsisting certificate of qualification as an operator;

Page 6: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

3

“owner” means the person to whom or which the plant is registered but does not mean the operating engineer or operators who operate, control or maintain the plant; “refrigeration plant” means an installation comprised of one or more refrigeration compressors, prime movers, equipment, pressure vessels and any associated piping; Please ensure that you complete the following steps and procedures for your refrigeration plant maintenance program. Complete the O.R.F.A. (S.A.F.E.R.) Refrigeration Safety Inspection Checklist for

your refrigeration plant. Make sure your document is complete with accurate information. If you do not have the information, please have your refrigeration mechanic assist you.

Make sure you list in your logbook or maintenance document the names of the individuals who are permitted to enter your refrigeration room. (Recommend keeping logbook in your vestibule).

Be sure to post your TSSA Plant Registration Certificate and a copy of your insurance certificate document in your vestibule.

Ensure you have all staff qualifications, certificates and record of training posted in your refrigeration room vestibule.

Ensure that all emergency telephone procedures are posted in your vestibule and in

your staff office close to the telephone.

Ensure a copy of your written emergency procedures and emergency evacuation plan is kept in your vestibule and in your staff office.

Ensure that all doors leading into and out of your refrigeration room(s), pieces of

equipment and all refrigeration piping are clearly labeled and properly colour coded. All doors should remain locked and signage shall be posted to restrict entry to authorized personnel only.

Place a wall file folder at the location of all motors so that you can keep accurate records when equipment is serviced and/or maintained. When any piece of equipment is serviced or worked on by facility staff, electrician or refrigeration mechanic, the refrigeration maintenance and repair record (log sheet) must be filled out and completed by the individual completing the work and a copy placed into the wall file folder. It is recommended that a copy of the work completed be kept in another location for safe keeping as well. (Such as Managers or Supervisors office).

Page 7: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

4

Keep refrigeration room and vestibule organized and clean at all time.

Ensure all personal protective equipment is labeled and in place. E.g. Hearing protection, eye protection, face shield, work gloves, neoprene gloves, SCBA (self contained breathing apparatus), ammonia air mask, emergency eye wash/shower station, ammonia detection, neoprene apron, rope, etc.

Ensure all staff have been provided with the proper training and that they have a clear understanding of your written refrigeration operations, maintenance procedures, emergency procedures, the Occupational Health & Safety Act and its regulations.

Do you meet all code and regulation requirements under the Technical Standards and Safety Act, Operating Engineers regulations, Boiler and Pressure vessels regulations, and the CSA-B52-99 Mechanical Refrigeration Code and Regulations.

Ensure that you have a hardbound, page numbered logbook. If you have an electronic log, does it conform to the new regulations and requirements?

All refrigeration plant logs are to be available for three (3) years. It is strongly recommended that you keep a copy of the Technical Standards and

Safety Act, Operating Engineers regulations, Boiler and Pressure Vessels Regulations and the CSA-B52-99 Mechanical Refrigeration Code on hand at your location.

1) The owner has three options on how to carry out the maintenance program which are: (a) by a qualified licensed refrigeration mechanic, (b) by a certified Operating Engineer or Refrigeration Operator (c) trained and competent individual(s) (the responsibility and onus is on owner to ensure and prove that this individual(s) have competency)

2) Once the owner has decided which option they wish to implement, the written maintenance program must clearly define who will be responsible for what repairs and maintenance items. I.e. The municipality or owner must clearly define in writing as to what daily, weekly, bi-annual and annual duties; repairs and maintenance will be performed by their refrigeration “B” operators and or competent facility operators: And clearly define in writing what duties; repairs and maintenance activities will be performed by their qualified refrigeration mechanic/ mechanical company.

Page 8: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

5

It is essential that any maintenance activity be performed at least to the maintenance and service recommendations of the manufacturer. Further, all work performed must be done by an accepted process.

The owner is responsible that all maintenance carried out on the refrigeration plant is

logged in the Log Book or in the case of the refrigeration contractor; all work orders are kept in the logbook.

Ensure that you have audible and visual alarms in place and in working order, that

are activated by the safety-guarded controls? Do these alarms reach the appropriate personnel on and off premises 24/7?

Fail-safe devices must be tested and serviced. Tag according to code Ensure that your gas detection unit is installed in the refrigeration room and properly

connected to the ventilation system and tested a minimum of once per year. (It is recommended that it be tested twice per year). Tag according to code

Ensure that all your external plant shut down devices are properly installed, labeled and tested at least once per year. Tag according to code

Ensure that your ventilation exhaust system meets code, is properly installed and tested on a regular basis.

Ensure that you have an approved written procedures manual for your operations. When replacing pressure and temperature gauge markings it is advisable to

purchase gauges which image in both imperial and metric readings. It is important that the person responsible for the plant operation can read the gauges to ensure safe operation.

It is necessary to replace or service and reseal all safety/relief valves at least once

every (5) five years.

Page 9: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

6

Refrigeration Plant Maintenance Program

Policy

To develop a quality preventive maintenance program based on manufacturer recommendations, to promote operator safety, to increase operating efficiency, to reduce energy consumption, to extend life expectancy of refrigeration plant and equipment, to provide public and ice user safety, to reduce liability, and to provide a means of accumulating equipment history.

Preamble

The qualified facility operator(s) and/or qualified service refrigeration mechanic will carry out the following daily, weekly, monthly and yearly (annually) inspections and preventive maintenance program duties.

The preventive maintenance program is developed according to manufacturer maintenance and service recommendations and is intended to:

Get more dependable service from the refrigeration equipment. Increase operating efficiency and a reduction in energy consumption. Improve facility operator’s awareness, knowledge and training on the

refrigeration system and equipment. Reduce risk and liability to our owners and staff. Elimination or reduction of major breakdowns and repairs. Reduction of overall maintenance costs. Provide increased safety to facility staff; ice participants, spectators and

general public. Efficient scheduling of maintenance operations. Reduce spare parts inventory required. Better control of labour and material costs. Extend life expectancy of refrigeration plant and equipment. Better means of identifying causes of breakdowns. Allows a process to accumulate the history records for each piece of

equipment. Provide due diligence.

Page 10: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

7

Ice Plant Start-up Procedure Checklist 1 Read previous logbook entries before starting plant. 2 Record compressor hours in log book 3 Record brine expansion tank level in log book 4 Confirm chemical treatment levels in the cooling water and brine 5 Record rink brine thermostat settings in log book 6 Confirm receiver refrigerant level 7 Make sure all electrical switches and disconnects are in “off” (open) position 8 Test refrigeration machinery room exhaust fan before starting plant 9 Ensure relief valves have not been tampered with 10 Ensure no personnel are working on any equipment before it is started 11 Close main switch on main panel 12 Close one valve on brine pump not being started 13 Start brine pump in “hand” position 14 Allow pump to run ½ hour, check brine system, header, and tubes for leaks 15 Record brine pressure, temperature, and level 16 Open water valve to condenser water circulation tank 17 When tank has filled to overflow pipe level, start pump in “hand” position 18 Check water sprays on condenser 19 Record pump pressure in log book 20 Shut off condenser pump, place switch in “auto” position 21 Start condenser fans in “hand” position – check that both operate 22 Shut off condenser fans, place switches in “auto” position 23 Check compressors oil level 24 Check compressors water valves are all open 25 Check compressors electrical switches are in “off” (open) position 26 Check compressors electrical disconnects are in “off” (open) position 27 Turn over compressors by hand using drive belts. Be careful not to pinch

hands- FOLLOW PROPER LOCK-OUT PROCEDURES

28 Ensure the valves to all pressure gauges and controls are open. 29 Check that discharge valves are open from compressor to condenser 30 Check that inlet and outlet valves at expansion valve(s) are open 31 Check that main suction valve and all oil return line valves are closed 32 MAKE SURE THAT COMPRESSOR DISCHARGE VALVES AND LINE

VALVES TO CONDENSER ARE OPEN

33 Confirm all valves are in their correct open or closed position before starting 34 Open suction valve on first compressor to be started 35 Close disconnect switch for that compressor 36 Open main suction valve ¼ - ½ turn 37 Place compressor electrical switch in “auto” position

Page 11: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

8

38 (Compressor may be on time delay start for up to 3 minutes). When compressor starts, maintain suction pressure at 25 p.s.i.g. (Open main suction valve slightly to increase; close slightly to decrease suction pressure)

39 Check compressor cooling water drain for flow at condenser tank 40 Record all plant readings (pressure, temperature, levels etc.) every ½ hour

for the first 4 hours, and every hour afterward until close-up at night

41 When first compressor has stabilized at normal operating temperatures, second compressor can be started up

42 When second compressor has stabilized at normal operating temperatures, third compressor can be started up

43 Continue operating main suction valve to maintain 25 p.s.i.g suction pressure; when suction valve is wide open, record compressor hours in log book.

44 If start up after an extended shut down period, confirm operation of guarded controls.

PROCEDURES: DAILY MAINTENANCE:

1. Inspect ice conditions and record findings.

2. Inspect each compressor and record findings in log book (a) Discharge Pressure (b) Discharge temperature (c) Suction Pressure (d) Suction Temperature (e) Oil Pressure (f) Oil Level (g) Glycol Temperature (h) Elapsed or Run Time hours (i) Belts (j) Hoses (k) Electrical Couplings and Connections (l) Guards and Covers (m) Oil added

(n) Rotate daily oil filter strainer if applicable.

3. Inspect all pumps and motors and record findings in log book (a) Brine Pump Pressure (b) Brine Temperature IN (c) Brine Temperature Out (d) Expansion Tank Level – Tank X

Page 12: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

9

(e) Expansion Tank Level – Tank Y (f) Water Pump Pressure (g) Water Pump Temperature (h) Under Floor Glycol Temperature (where applicable)

4. Inspect and record temperatures in log book (a) Refrigeration Room Temperature (b) Outside Air Temperature (c) Ice Surface Temperature (where applicable) (d) Ice Slab Temperature (where applicable) (e) Under Floor Heating Temperature (where applicable)

5. Inspect Condensers and record findings in logbook. (a) Motor (b) Fan (c) Belts (visual) (d) Pump

(e) Inspect receiver refrigeration level.

6. Inspect Chiller/High Pressure Receiver (a) Drain oil following proper oil draining procedures (b) Compare logged consumption with the amount drained out.

They should be equal) (c) Record in log book

7. Test and inspect exhaust fan to ensure it is operating and record findings in log book. 8. Ensure security of access doors.

9. It is recommended to check for pipe vibration

Page 13: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

10

WEEKLY:

1. Inspect and test both brine and water chemical treatment for condenser cooling water then record in logbook.

2. Inspect the Condenser Unit

(a) Condenser piping (b) Condenser belts (c) Condenser squirrel cages (d) Condenser eliminators (check over spray) (e) Condenser bearings (any noises)

(f) Condenser for ice and snow accumulation (g) spray nozzles and trouves

3. Inspect cleanliness of refrigeration room and ensure no flammable liquids are stored.

4. Inspect all piping in refrigeration room

5. Check lighting in refrigeration room

6. Inspect, text and record Air Quality findings in log book (a) Carbon Monoxide (ppm) (b) Nitrogen Dioxide (ppm) (c) Ammonia (ppm)

7. Inspect sump pump MONTHLY: Performed by Refrigeration Mechanic or qualified and competent personnel:

1. Inspect all compressors (Note: Ensure all electrical and valve lock outs in place) (a) sound of bearings (b) any over spray (c) belts (d) electrical connection (e) couplings for stretch (f) rotate crankshaft by hand on each compressor during shut

down period.

2. Inspect all pumps (Note: Ensure all electrical and valve lock outs in place) (a) sound of bearings

Page 14: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

11

(b) any over spray (c) belts (d) electrical connection (e) couplings for stretch

(f) rotate brine/glycol pump by hand during shut down period

3. Inspect all motors (a) sound of bearings (b) belts (where applicable) (c) electrical connection (d) couplings for wear

4. Inspect Water Tank – inspect and clean strainer

5. Inspect Brine/Glycol Tanks

6. Inspect Ammonia Detector

7. Inspect and test audile system devices – auto dialer (where applicable)

8. Inspect visual alarm lights

BI-ANNUALLY:

1. Inspect and test all safety devices: (a) evaporator high level cut out

(b) oil failure (c) low pressure cut out (d) high pressure cut out (e) high oil temperature cut out (f) high discharge temperature cut out (g) high level switch on receiver (h) energy cut out switch (i) fire box cut out switch (j) vestibule cut out switch (k) temperature controls

2. Complete compressor oil changes complete with inspection of unit

Page 15: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

12

3. Complete condenser maintenance (a) Electrical lock out

(b) belts (c) clean and grease bearings (d) inspect pump (e) inspect spray nozzles

4. Inspect and test exhaust fan

5. Grease all motors

6. Inspect and remove drain plugs on motors and pump bearing hosing

7. Inspect and test all personal protective equipment and record findings in logbook, i.e.

SCBA, CGM, Face Shields, etc.

ANNUALLY:

1. Complete maintenance to compressor(s) (a) year 1 – top end inspection (b) year 2 – bottom end inspection

2. Complete detailed inspection of all equipment. 3. An inspection of all electrical control terminals and connections by a qualified

electrician.

4. Test ammonia (a) is system adequately charged?

5. Test brine (a) are levels correct? (b) are any leaks noticed? (c) is there air in the system? (d) is brine mixture correct or is mixture too weak?

6. Test glycol (a) are levels correct? (b) are any leaks noticed? (c) is there air in the system? (d) is glycol mixture correct or is mixture too weak?

Page 16: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

13

7. Inspect Headers (a) Inspect all connections and clamps (b) Inspect all piping and U connections (c) inspect for leaks (d) treat header pipes

(e) flush and clean header trench

8. Ensure fire safety equipment is inspected and updated as required. 9. Confirm with the local fire department that their site safety plan and plant information

record is on hand and current.

Every 5 Years 1. At some point between 1-5 years it is advisable to have the pressure gauges calibrated. 2. It is necessary to replace or service and reseal all safety/relief valves at least once every

(5) five years.

Page 17: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

14

TROUBLESHOOTING GUIDE When trouble develops in a refrigeration system, the cause is not always easy to pinpoint since the system contains many components and controls. To aid the operator or maintenance man in analyzing the trouble, some manufacturers provide a troubleshooting guide for their equipment. In the absence of a manufacturer’s troubleshooting guide, the following can be used in its place. This general guide applies to systems with reciprocating compressors. However, many of the items also apply to systems with centrifugal compressors. TROUBLE: Compressor fails to start

SYMPTOMS POSSIBLE CAUSE CORRECTIVE ACTION 1. No power Fuses or circuit breaker

open Check circuit for shorts or grounds. Replace fuses or close circuit breaker after fault is corrected.

2. Thermal overloads of motor

No power on motor terminal Check motor circuit and motor for grounds or starter open shorts. Correct fault. If overloads tripped due to compressor overloading, find reason. Reset thermal overloads.

3. Low voltage Circuit tester glows but at reduced brilliance

Check with voltmeter. Call power company.

4. Defective starter Test for burned-out holding coil or broken contacts

Repair or replace

5. Burned-out motor Full voltage at motor terminals but motor does not run

Repair or replace

6. Open control circuit No power on terminals of starter holding coil

Locate open operating or safety control and determine cause. Correct and reset control.

7. Broken or sheared coupling

Motor runs, compressor does not

Repair or replace. Check alignment

8. Seized compressor Motor hums but does not start. Starter will trip on overload

Repair compressor

9. Motor hums but does not start. Starter will trip on overload.

Single phase condition Find cause such as blown fuse and take corrective action

Page 18: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

15

TROUBLE: Compressor “short-cycles”

SYMPTOMS POSSIBLE CAUSE CORRECTIVE ACTION 1. Intermittent contact in

electrical circuit Compressor operates normally but starts and stops frequently

Repair or replace faulty control

2. Low pressure controller differential set too close

Compressor operates normally but starts and stops frequently

Reset differential

3. Leaky liquid line solenoid valve

Valve may hiss when closed. Also temperature change in refrigerant line through valve.

Repair or replace

4. Dirty or iced evaporator Reduced air flow due to: a) Dirty air filters b) Broken fan belt c) Improperly adjust fan

belt tension

Clean or defrost evaporator. Check filters and fan drive.

5. Insufficient condensing Excessively high discharge pressure. Compressor cuts off on high pressure cut-out

Check operation of condenser fan, water supply.

6.Overcharge of refrigerant High discharge pressure Remove excess refrigerant

7.Non-condensable gases High discharge pressure Purge system 8. Lack of refrigerant Normal operation but

frequent starting and stopping on low pressure cut-out

Check for leaks, repair and recharge

9. Water valve inoperative or restrictive

High discharge pressure Clean or repair water valve.

10. Restricted liquid line strainer or solenoid stop valve

Suction pressure too low, frosting at strainer

Clean strainer or valve

11. Faulty motor Motor starts and stops rapidly

Repair or replace motor

Page 19: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

16

TROUBLE: Suction pressure too high

SYMPTOMS POSSIBLE CAUSE CORRECTIVE ACTION 1. Excessive evaporator

load. Compressor runs continuously

Reduce load. Check for excessive fresh air or infiltration, poor insulation.

2. Expansion valve overfeeding.

Suction line abnormally cold. Liquid flooding to compressor.

Regulate superheat. Check remote bulb attachment to suction line.

3. Expansion valve stuck open.

Suction line abnormally cold. Liquid flooding to compressor.

Repair or replace valve.

4. Expansion valve too large.

Abnormally cold suction line. Liquid flooding to compressor.

Check valve rating, replace if necessary.

5. Broken suction valves in compressor.

Noisy compressor, reduced capacity.

Repair or replace valves.

TROUBLE: Suction pressure too low

SYMPTOMS POSSIBLE CAUSE CORRECTIVE ACTION 1. Lack of refrigerant. Bubbles in sight glass. Check for leaks then

charge system. 2. Evaporator dirty or iced

up. Compressor short-cycles. Clean or defrost.

3. Clogged liquid line filter-drier.

Temperature change in liquid line before and after filter-drier.

Replace cartridge.

4. Expansion valve sensing element has lost charge.

No flow of refrigerant through valve.

Replace sensing element.

5. Obstructed expansion valve.

Loss of capacity Clean valve.

6. Contacts on controller stuck in closed position.

Conditioned space too cold. Repair or replace control.

7. Compressor capacity control range set too low.

Compressor short-cycles. Reset control range.

Page 20: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

17

TROUBLE: Discharge pressure too low

SYMPTOMS POSSIBLE CAUSE CORRECTIVE ACTION 1. Too much condenser water.

Water temperature at outlet to low.

Adjust water-regulating valve.

2. Lack of refrigerant. Bubble in sight glass. Check for leaks. Add refrigerant.

3. Broken or leaky compressor discharge valves.

Suction pressure rises faster than 35 kPa (5 lbs) per minute after compressor shuts down.

Repair or replace valves.

4. Leaky relief bypass valve.

Low discharge pressure and high suction pressure.

Inspect valve, replace if necessary.

TROUBLE: Discharge pressure too high

SYMPTOMS POSSIBLE CAUSE CORRECTIVE ACTION 1. Insufficient supply to

condenser or water too warm.

Water temperature at outlet too high

Increase water supply, adjust water regulating valve, and check spray nozzles.

2. Fouled tubes in shell-an-tube condenser.

Water temperature at outlet too low.

Clean tubes.

3. Air passages through air-cooled condenser dirty.

Temperature difference between air in and out too large, low air volume.

Clean condenser.

4. Improper operation of evaporative condenser.

Low air or spray water volume. Scaled coil surface.

Correct air or water flow. Clean coil surface.

5. Non-condensables in system.

Very hot condenser. Purge system.

6. Overcharge of refrigerant.

Very hot condenser. Remove excess.

Page 21: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

18

TROUBLE: System short of capacity

SYMPTOMS POSSIBLE CAUSE CORRECTIVE ACTION 1. Flash gas in liquid line. Expansion valve hisses. Add refrigerant. 2. Clogged strainer or stop

valve. Temperature difference in liquid line before and after strainer or valve.

Clean or replace.

3. Ice or dirt on evaporator. Reduced airflow. Defrost coil or clean. 4 Expansion valve stuck or

obstructed. Short-cycling or continuous operation.

Repair or replace valve.

5. Excess pressure drop in evaporator.

Superheat too high. Rest thermostatic expansion valve.

6. Improper superheat adjustment.

Short-cycling or continuous operation.

Adjust thermostatic expansion valve.

7. Expansion valve improperly sized.

Short-cycling or continuous operation.

Replace with correct valve.

TROUBLE: Compressor or system noisy

SYMPTOMS POSSIBLE CAUSE CORRECTIVE ACTION 1. Coupling loose or

misaligned. Coupling bolts loose, vibration.

Tighten coupling; check alignment.

2. Lack of oil. Compressor cuts out on oil failure control.

Add oil.

3. Dry or scored seal. Squeaky seal during operation.

Check oil level; replace seal.

4. Internal parts loose or broken.

Compressor knocks. Overhaul compressor.

5. Liquid floods back to compressor.

Compressor knocks, abnormal cold suction line.

Check rating and adjustment of expansion valve. Replace valve if defective.

6. Compressor or motor loose on base.

Compressor or motor jumps on base.

Tighten hold-down bolts.

7. Improper piping support. Piping vibrates. Relocate, add, or readjust hangers and supports.

8. Water regulating valve is dirty, water pressure too high.

Water valve chatters or hammers.

Clean valve; reduce supply pressure.

Page 22: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

19

TROUBLE: Compressor runs continuously

SYMPTOMS POSSIBLE CAUSE CORRECTIVE ACTION

1. Excessive load. High temperature of substance to be cooled.

Check for excessive warm air infiltration, or for inadequate insulation of space to be cooled.

2. Thermostat set too low or defective.

Low temperature of substance to be cooled.

Reset or repair thermostat.

3. Welded contacts or stuck electrical control in motor starting circuit.

Low temperature of substance to be cooled.

Repair or replace faulty control.

3. Lack of refrigerant. Bubbles in sigh glass. Repair leak and charge system.

4.Overcharge of refrigerant. High discharge pressure. Remove excess. 5.Leaky valves in

compressor. Compressor noisy or operating at abnormally low discharge pressure or abnormally high suction pressure.

Overhaul compressor.

6. Solenoid valve stuck open.

Low temperature of substance to be cooled.

Repair valve.

Page 23: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

20

PLANT MAINTENANCE INSPECTION REPORT

PERSONNEL PRESENT DURING INSPECTION:

Facility staff Signature Refrigeration Company Signature Refrigeration Mechanic Signature Inspection Date

Page 24: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

21

JOB FUNCTION MID SEASON

SHUT DOWN

START UP

1. Compressors Top Side Inspection Remove heads and inspect. X X Remove crankcase covers and inspect. X X Inspect suction valves and seats. X X Inspect discharge valves and seats. X X Replace suction and discharge springs. X X Inspect rings and cylinder walls for wear. X X Inspect wrist pin bearing for wear. X X Inspect connecting rod bearing for wear. X X Inspect shaft seal for oil leakage. X X Remove and inspect oil cooler. X X Lubricate compressor motors. Remove diamond covers and inspect. X X Replace required gaskets and seals. X X 2. Compressor Oil Change. Remove and dispose of spent oil. X Remove side cover. X Wash out crankcase. X Remove and wash Cuno oil filter. X Wash oil filter casing. X Remove and clean oil suction strainer. X Clean and inspect sight glass. X Replace oil to manufacturers specs. X Replace required gaskets. X Start compressor and adjust oil pressure. X Inspect and test oil pressure gauge. X

Page 25: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

22

JOB FUNCTION MID

SEASON START UP

SHUT DOWN

3. Compressor # 1 Record oil pump pressure. Inspect unloading mechanism. Lubricate and test low-pressure switch. Lubricate and test high-pressure switch. Lubricate and test oil failure switch. Lubricate and test water failure switch. Inspect belts and drive. Inspect compressor-cooling system. 4. Compressor # 2 Record oil pump pressure. Inspect unloading mechanism. Lubricate and test low-pressure switch. Lubricate and test high-pressure switch. Lubricate and test oil failure switch. Lubricate and test water failure switch. Inspect belts and drive. Inspect compressor-cooling system. 5. Evaporative Condenser Remove eliminators and inspect. X X Remove access covers and inspect. X X Inspect water distribution system. Inspect belts and drive. X Inspect and lubricate shaft bearings. X Inspect and clean fans and housings. X Inspect and lubricate motors. X Purge condenser of non-condensable. X X Record water pressure. Inspect and observe pump operation. Inspect sump water supply and float valve. Rescale cooling system and inspect coil. X X Drain and clean tank if required. X X Inspect and clean spray nozzles. X X X

Page 26: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

23

JOB FUNCTION MID

SEASON START

UP SHUT DOWN

6. Brine System Inspect chiller for brine leaks. Inspect chiller for insulation deterioration. Check ammonia levels and sight glasses. Check chiller for corrosion. Inspect and operate high-level float switch. X Inspect all valves to ensure good condition. Inspect Brine pump coupling. Inspect seal bearing housing. Inspect motor. Lubricate pump and motor. X Inspect, clean, and lubricate brine stat X Take brine sample and provide test results. X X Test specific gravity of brine solution. X X Provide report on brine chemical analysis. X X Inspect brine level in expansion tank. 7. Electrical panel and controls Inspect and test overload switches. X Verify fuse sizing and function. X Inspect and secure terminal screws. X Test timers and cycled operation. X Inspect and test firebox electrical switch. X Inspect and test emergency stop switch. X Inspect and test exhaust fan. X 8. Motor Amperages and Voltages (30) Horsepower Motor L1 Amperage X L2 Amperage X L3 Amperage X L1-L2 Voltage X L1-L3 Voltage X L2-L3 Voltage X (60) Horsepower Motor L1 Amperage X

Page 27: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

24

L2 Amperage X L3 Amperage X L1-L2 Voltage X L1-L3 Voltage X L2-L3 Voltage X Brine Pump Motor L1 Amperage X L2 Amperage X L3 Amperage X L1-L2 Voltage X L1-L3 Voltage X L2-L3 Voltage X Condenser Fan Motor L1 Amperage X L2 Amperage X L3 Amperage X L1-L2 Voltage X L1-L3 Voltage X L2-L3 Voltage X Condenser Pump Motor L1 Amperage X L2 Amperage X L3 Amperage X L1-L2 Voltage X L1-L3 Voltage X L2-L3 Voltage X

Page 28: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

25

JOB FUNCTION MID

SEASON SHUT DOWN

START UP

8. Motor Amperages and Voltages L1 Amperage X L2 Amperage X L3 Amperage X L1-L2 Voltage X L1-L3 Voltage X L2-L3 Voltage X Main 200 Amp Panel L1 Amperage X L2 Amperage X L3 Amperage X L1-L2 Voltage X L1-L3 Voltage X L2-L3 Voltage X 9. Shut Down Inspection Procedure Isolate charge. X X Shut compressors downs. X X Shut condenser down. X X Shut brine pump down. X X Tag all isolated valves with proper markers. X X Isolate and lockout electrical panels and

supply. X X

10. Additional Inspections Inspect and report on any oil leaks. Inspect and report on any pipe vibration. Inspect safety guards and equipment. Inspect fire line and fire valve. Inspect relief valves and relief line to outside. Inspect firebox. Inspect and operate indicator lights. Inspect for hazards and cleanliness. Calibrate suction and discharge gauges. X X

Page 29: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

26

Comment on system condition and recommendations for Capital Improvements: Compressor # 1

Compressor # 2

Condenser

Chiller/Heat Plate

Brine/Glycol System

Page 30: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

27

Electrical

Headers

Other

_____

Page 31: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested Guidelines for Refrigeration Plant Maintenance

28

GENERAL COMMENTS

_____

__________________

__________

Page 32: GUIDELINES REFRIGERATION P MAINTENANCE - ORFAorfa.com/resources/documents/librarydocs/guides_bp/refrigeration... · Suggested Guidelines for Refrigeration Plant Maintenance 2 INTRODUCTION

Suggested G

uidelines for Refrigeration Plant M

aintenance 29

Refrigeration M

aintenance and Repair R

ecord

D

ATE

WO

RK

D

ESCR

IPTION

R

EFRIG

ERA

TION

M

ECH

AN

IC

FAC

ILITY O

PERA

TOR

EQ

UIPM

ENT

WO

RK

ED O

N