guinea bissau - world bankspappssecext.worldbank.org/sites/indc/pdf_library/gw.pdf · Ò a gÞ5 d...

30
Guinea Bissau

Upload: others

Post on 26-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

Guinea Bissau

Page 2: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

Acknowledgments

The (I)NDC Content Briefs were produced by the Climate Policy

Team of the World Bank Climate Change Group. The team was led

by Sebastian Wienges and Ana Bucher under the supervision of

Stephen Alan Hammer. Detail analysis of country (I)NDC was

provided by Tom Witt, Jiawei Song, Karan Chouksey (mitigation

components), Yin Qiu, Yunziyi Lang, and Prajwal Baral (adaptation

components). The team is grateful for all comments and

suggestions received from regional and sector specialists

regarding the presentation and synthesis of relevant information.

© 2016 International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433, U.S.A. Internet: www.worldbank.org

Climate Policy Team | World Bank Group

Page 3: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

Introduction      In response to a growing interest in understanding (Intended) Nationally DeterminedContributions ((I)NDCs) and with regard to the ultimate goal of supporting countries'implementation of their national climate targets, the World Bank Climate Policy Team (WB­CPT) has

reviewed all developing countries (I)NDCs' submitted to the UNFCCC. The (I)NDC Content Brief

aims to provide a summary analysis of existing and instead country mitigation and adaptation

policies and plans, commitments and targets, implementation strategies and sector priorities,

associated costs and conditionalities, and stated gaps and needs, among other issues. 

      The (I)NDC content briefs are created solely on the basis of information from submitted(I)NDCs and makes no inferences about robustness, quality, or viability of intended policiesor actions. 

The (I)NDCs review will help implementing organizations like the World Bank Group (WBG) identify

and familiarize with a range of country priorities in terms of sectoral engagement, and needs in

terms of capacity building, technology transfer, and financing. Based on this comprehensive

mapping exercise, the WBG will develop a useful, easy­to­use, and interactive database and briefs

of all (I)NDCs to inform a wide range of WBG initiatives and client engagement processes, including

the development of Systematic Country Diagnostics (SCDs) and Country Partnership Frameworks

(CPFs), and at a later stage respond to the more specific requests from all WBG Global Practices

(GPs), regions, and country units for the identification of potential development opportunities,

analytical studies and technical assistance to support countries' implementation of planned policies

and actions. In­depth summaries of (I)NDCs by sectors and regions will be prepared at a later stage. 

      In regards to Adaptation, although no global adaptation mechanism is established, the ParisAgreement parties are required to engage in adaptation planning and implementation of actions

which include preparation of adaptation plans. The Adaptation section of a large number of

submitted (I)NDCs, aims to increase development planning and scale the ability of countries to

adapt to the adverse impacts of climate change and foster climate resilience and low greenhouse

gas emissions development, in a manner that does not threaten sustainable development. In

addition to requested finance, the implementation of country commitments is largely tied to

significant amounts of external assistance to support development and execution of adaptation

plans. Although subsequent (I)NDCs are not explicitly required to have an adaptation component,

the process will ensure increased resilience is recognized under the UNFCCC and climate finance

mobilization is enhanced with an aim to achieve a balance between adaptation and mitigation flows.

Climate Policy Team | World Bank Group

Page 4: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

Table of Contents

I Overall Planning and Preparation Process 

II  Mitigation

  Economy­wide Targets

  Economy­wide Policies

  Mitigation Actions and Policies

III  Adaptation

  Adaptation Targets

  Adaptation Context

  Adaptation Actions and Policies

Acronyms

BAU Business as Usual NAMA Nationally Appropriate MitigationActions

CIF­PPCR Climate Investment Funds ­ PilotProgram for Climate Resilience

NAP National Adaptation Plan

DRM Disaster Risk Management NAPA National Adaptation Programmesof Action

INDC Intended Nationally DeterminedContributions

REDD+ Reducing emissions fromdeforestation and forestdegradation and the role ofconservation, sustainablemanagement of forests andenhancement of forest carbonstocks in developing countries

LEDS Low Emission DevelopmentStrategy

LULUCF Land Use and Land Use Changeand Forestry

|

|

|

Climate Policy Team | World Bank Group

Page 5: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

Overall Planning and

Preparation Process

How reliable is the prioritization of the (I)NDC? How serious is thegovernment about implementing policies and actions to achieve the (I)NDCtargets?

Political decision of adoption of INDC at:Head of state level

Interministerial level

Parliament

Ministry Level

Technical development of INDC through a participatory processStakeholder involvement

Multisector commision

Have development benefits been assessed and considered in the planningprocess?

Are there climate policies and actions already in place/under development?

LEDS

NAMAS

NAPA YES

Climate Policy Team | World Bank Group

$N/A

(in Billion USD)

TOTAL COST OF

IMPLEMENTATION (mitigation and adaptation)

Page 6: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

Existing policies:PRSP I National Action Plan to Combat Drought and Desertification (NAP/CDD)

National Second Communication on Climate Change (NSC)

National Adaptation Programmes of Action for Climate Change (NAPA) (2006)

Has the INDC development been supported by a development partner?Technical support

Financial support GEF THROUGH UNEP

Implementation Plans and Needs

Specific requests for international provision of means of implementation:

Technology Transfer YES

Financial support YES

Capacity Building YES

Does the INDC intend the private sector to be involved in theimplementation of the NDC?

Are carbon pricing/international market mechanisms intended?

Are there any barriers identified?HUMAN CAPACITIES AND SKILLS, FINANCES

Link list:• Guinea Bissau INDC Factsheet (projected per capita emissions): http://www.climate­energy­college.net/files/site1/factsheets/Guinea­Bissau_INDCFactsheet_UoM­PRIMAP_GWPAR4.pdf 

Climate Policy Team | World Bank Group

Page 7: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

Mitigation

ECONOMY-WIDE TARGETS

Coverage of Gases: CO , CH , NOx

Other Targets:

POLICIES:

Develop and establish a legal framework through a national strategy for long-term low-carbondevelopment

Establish and schedule a new forestry policy

Ban the felling and export of timber over the next five years

2 4

Climate Policy Team | World Bank Group

Page 8: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

$200 million by 2020 | $500 million between2020 and 2030

n/a

n/a

n/a

n/a

Develop and establish a legal frameworkthrough a national strategy for long-term low-

carbon development

$200 million by 2020 | $500 million between2020 and 2030

n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESECONOMY-WIDE

Policies: INDC page link

Develop and establish a legal framework through a national strategy forlong-term low-carbon development

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 9: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESLULUCF/FORESTRY

Policies: INDC page link

Establish and schedule a new forestry policy

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Plans:

LULUCF/Forestry: General   P. 5

Sustainable Forest Management

Reforestation   P. 10

REDD+   P. 5

Conservation   P. 10

Climate Policy Team | World Bank Group

Page 10: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

CONSERVATIONTargets: INDC page link

26% of protected area; Reduce illegal and indiscriminate felling of trees by2030

P. 5

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Policies: INDC page link

Ban the felling and export of timber over the next five years P. 5

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Plans: INDC page link

Forest conservation P. 10

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 11: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESENERGY

Targets: INDC page link

80% of universal access to electricity by 2030 P. 6

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Plans:

Renewable Energy: Solar   P. 11

Renewable Energy: Wind   P. 11

Renewable Energy: Hydro   P. 11

Energy Efficiency

Energy: General

Renewable Energy   P. 11

Climate Policy Team | World Bank Group

Page 12: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

ENERGY

EFFICIENCYTargets: INDC page link

Reduce energy losses up to 10% by 2030 P. 6

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 13: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

RENEWABLE

ENERGYTargets: INDC page link

80% in national energy mix by 2030 P. 6

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Plans: INDC page link

Electric power generation systems from renewable energies; incorporatelargest possible potential of renewable energies in the energy mix

P. 11

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 14: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

N/A

USD 0.042 Billion

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

Adaptation

ADAPTATION TARGETS

ADAPTATION CONTEXT

Existing National Development/Resilience Policies and Plans

National Communications NATIONAL SECOND COMMUNICATION (NSC)

NAPs YES

NAPAS YES

CIF-PPCRs

Sectoral StrategiesNATIONAL ACTION PLAN TOCOMBAT DROUGHT ANDDESERTIFICATION (NAP/CDD)

Cross-cutting PRSP I

Conditionality:

Unconditional part of adaptation implementation

Conditional part of adaptation implementation

Conditional upon international provision of meansof implementation

YES

TARGET YEAR

2025|2030

0.04(in Billion USD)

COST OFIMPLEMENTATION

Climate Policy Team | World Bank Group

Page 15: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

LULUCF/FORESTRY

SUSTAINABLE

FOREST

MANAGEMENT

Target: INDC page link

P. 4

Increase the percentage of protected areas from 15% to 26%

Actions:

CONDITIONAL ACTIONS: INDC page link

Conduct a nationwide forest inventoryDevelop an agro-ecological zone and forest managementDevelop a national reforestation and sustainable management of forestand agro forestry ecosystems programme by 2025Promote forestry/plantation of species resistant to drought and lowrainfall by 2030

P. 4

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 16: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

SUSTAINABLE

LAND

MANAGEMENT

Actions:

CONDITIONAL ACTIONS: INDC page link

Protect soil from water and wind erosion

P. 5

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 17: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

COASTAL ZONE

SEA-LEVEL RISE

PROTECTION

Actions:

CONDITIONAL ACTIONS: INDC page link

Protect coastal zone from rising sea levels

P. 5

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 18: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

COASTAL

MANAGEMENTActions:

CONDITIONAL ACTIONS: INDC page link

Develop an Integrated Management Programme for the Coastal Zone by2025

P. 6

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 19: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

ENERGY

RENEWABLE

ENERGY

Target: INDC page link

80% renewable energy in the national energy mix by 2030

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 20: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

ENERGY

EFFICIENCYTarget: INDC page link

Reduce energy losses up to 10% in the 2030 time span

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 21: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

ENERGY ACCESSTarget: INDC page link

80% of universal access to electricity by 2030

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 22: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

WATER

WATER

CONSERVATION

AND REUSE

Actions:

CONDITIONAL ACTIONS: INDC page link

Capture and storage of rainwater (water retention basins and mini-dams)for water management in the dry season

P. 6

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 23: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

AGRICULTURE

CROPS

Actions:

CONDITIONAL ACTIONS: INDC page link

Introduce short- cycle and drought resistant seeds

P. 6

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 24: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

FOOD SECURITYActions:

CONDITIONAL ACTIONS: INDC page link

Hydro-agricultural PlanningConstruction of grain banks and seeds

P. 6

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 25: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

CLIMATE SMART

AGRICULTUREActions:

CONDITIONAL ACTIONS: INDC page link

Introduction of farming techniques resilient to the effects of climate change

P. 6

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 26: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

LIVESTOCKActions:

CONDITIONAL ACTIONS: INDC page link

Introduction of rapid growth fodder plant for animal feeding

P. 6

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 27: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

CROSS-CUTTING AREA

CLIMATE RISK

MANAGEMENT

Actions:

CONDITIONAL ACTIONS: INDC page link

Preparation of contingency plans for the management of climate risks andnatural disasters

P. 6

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 28: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

national database (hydrological, hydrogeological, forest surveys)surveillance and monitoring units of long-

term climate parameterseffective systems of weather andhydrological forecastsnational centre specializing in research onclimate changematerial resources for collection, filing,

analysis and communication (gis, remotesensing, etc.) at national level

Capacity Building:

education, training and research on climatechange in particular with regard to thevulnerability and adaptation dimensionsspecialized staff in the field of climatechange

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

CLIMATE SERVICESTotal Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 29: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Guinea Bissau | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

URBAN

SUSTAINABLE

URBAN PLANNING

Actions:

CONDITIONAL ACTIONS: INDC page link

Improve infrastructure (roads, bridges, houses, etc)

P. 6

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 30: Guinea Bissau - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/GW.pdf · Ò A gÞ5 D ÞÞ7R (ëÊÞ AAÊRÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH