h-1 aggregates - picked up ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020 · $ 10.00 $ 9.40...
TRANSCRIPT
H-1
Aggregates - PICKED UP
BID TABULATION - Open May 12,2020 at 3:00 pm
MDOT
All States
Asphalt /
Mitchell
Materials,
LLC
All States
Asphalt / Trew
Stone, LLC
Delta Sand &
Gravel, Inc.
Eurovia
Atlantic Coast,
LLC
Hathaway
Construction
Hilltown Sand
& Gravel
Ondrick
Materials &
Recycling,
LLC
Porter
Transportation
Co., Inc.
Tonlino &
Sons, LLC
Zoar Stone &
Gravel
Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton
John S. Lane & Son
1 6" Minus max type "a" aka Bank Run Gravel 1.03.0 8.00$ No Bid 6.40$ No Bid 11.65$ W'fld 7.25$ No Bid No Bid 5.33$ 10.50$ 10.80$
2
3” Minus max type “b” aka Bank Run Gravel /Processed
Gravel for Subbase or Dense Graded Gravel) 1.03.1 10.00$ No Bid 8.60$ No Bid 11.65$ W'fld 7.35$ No Bid No Bid 6.66$ 10.50$ 10.00$
3 1 ½” Minus Screened Gravel –type “d” aka 2" minus screened 1.03.0 12.00$ No Bid 8.60$ 12.00$ No Bid 7.55$ 12.50$ No Bid 10.00$ No Bid 9.75$
4 3/4” Minus Screened Gravel- (aka 1” minus crushed gravel) 1.03.0 12.50$ No Bid 10.90$ 13.00$ No Bid 7.55$ No Bid No Bid 10.66$ No Bid 9.75$
5
3” Minus Crushed Gravel (aka Processed Gravel for Subbase
or Dense Graded Gravel) 1.03.1 12.00$ No Bid No Bid 14.00$ 11.65$ W'fld 7.65$ No Bid No Bid 7.33$ 10.50$ 10.00$
6
1 ½” Minus Crushed Gravel (aka Processed Gravel for
Subbase or Dense Graded Gravel) 1.03.1 12.00$ No Bid 10.90$ 14.00$ No Bid 7.35$ 12.50$ 10.20$ 10.00$ No Bid 9.75$
7 3/4” Minus Crushed Gravel 14.00$ No Bid 10.90$ 14.00$ No Bid 7.65$ 13.50$ No Bid 10.66$ No Bid 9.75$
8 1/2” Minus Crushed Gravel No Bid No Bid 10.15$ No Bid No Bid No Bid 15.95$ No Bid No Bid No Bid No Bid
9 Stone Screening/Stone Dust Natural/Brown Color 2.05.0 No Bid No Bid 7.40$ No Bid No Bid No Bid No Bid No Bid 5.33$ No Bid No Bid
10 Recycled Asphalt/Reclaimed Pavement/Hardpak 1.09.0 No Bid 18.25$ 12.25$ 8.00$ 10.25$ E'ton 7.80$ No Bid No Bid 10.00$ No Bid 10.50$
11 3/4” Minus Recycled Asphalt/Crushed/Driveway Millings No Bid 7.00$ 12.25$ 8.00$ No Bid 7.80$ No Bid No Bid No Bid No Bid 12.00$
12 1 ½” Washed Gravel Stone - Size #4 ASTM D448 No Bid No Bid 12.20$ 11.65$ No Bid 10.95$ 11.50$ No Bid No Bid No Bid No Bid
13 1 ½” Un-Washed Gravel Stone - Size #4 ASTM D448 No Bid No Bid 12.20$ 11.65$ No Bid 10.95$ 10.50$ No Bid 11.33$ No Bid 13.50$
14 3/4” Washed Gravel Stone - Size #6 ASTM D448 No Bid No Bid 11.00$ 11.65$ 13.30$ Pochassic 11.70$ 12.75$ No Bid No Bid No Bid No Bid
15 1/2” Washed Gravel Stone - Size #7 ASTM D448 No Bid No Bid 10.75$ 11.65$ No Bid 11.85$ No Bid No Bid No Bid No Bid No Bid
16 3/8” Washed Gravel Stone - Size #8 ASTM D448 No Bid No Bid 14.45$ 11.65$ No Bid 11.20$ 13.25$ No Bid No Bid No Bid No Bid
17 1 ½” Crushed Stone Traprock 2.01.1 13.50$ 15.00$ 21.65$ 15.50$ 13.70$ W'fld / Amherst No Bid 14.00$ No Bid No Bid 12.50$ 13.50$
18 3/4”Crushed Stone Traprock 2.01.4 13.50$ 15.00$ 21.65$ 15.50$ 14.00$ W'fld / Amherst No Bid 15.00$ No Bid No Bid 13.25$ No Bid
19 ½” Crushed Stone Traprock 2.01.5 14.00$ 16.00$ No Bid 16.50$ 13.95$ W'fld / Amherst No Bid No Bid No Bid No Bid No Bid No Bid
20 3/8” Crushed Stone Traprock 2.01.6 15.45$ 15.45$ 22.40$ 16.50$ 14.70$ W'fld / Amherst No Bid 16.00$ No Bid No Bid No Bid No Bid
21 1 ½” Dense Graded Crushed Stone Traprock for sub-base 2.01.7 11.50$ 15.75$ 22.40$ 14.00$ 12.40$ W'fld / Amherst No Bid No Bid No Bid No Bid 11.75$ 13.50$
22 3/4”Minus TRG Traprock Gravel No Bid 10.85$ 18.30$ 10.00$ 12.40$ W'fld / Amherst No Bid No Bid 11.50$ No Bid 12.25$ 14.50$
23 ½” Minus TRG Traprock gravel 11.50$ 8.00$ 17.25$ No Bid 10.50$ W'fld / Amherst No Bid No Bid No Bid No Bid 12.25$ No Bid
24 Rip Rap 6” max 2.02.0 15.00$ 15.75$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid 14.00$ 12.50$ 15.50$
25 Rockfill 2.02.1 14.00$ 15.75$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 14.50$ No Bid
26 Dumped Rip Rap 2.02.2 14.00$ 14.00$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 14.50$ No Bid
27 Stone for Pipe Ends 2.02.3 15.00$ 15.75$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 12.50$ No Bid
28 Modified Rockfill 2.02.4 15.00$ 17.00$ 27.80$ 17.50$ 15.45$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 12.50$ No Bid
29 Quarry Stone Dust Blue/Grey Color 2.05.0 No Bid 10.00$ 16.75$ 14.00$ 10.50$ W'fld / Amherst No Bid No Bid No Bid No Bid No Bid No Bid
30 Loam 1.05.0 No Bid No Bid 16.80$ 25.00$ 20.00$ Easthampton 16.70$ 22.00$ No Bid 12.66$ 22.00$ No Bid
20 Payne Road,
Winchester, NH
03470
901 River Road,
Deerfield, MA
01342
562 Amherst Rd,
Sunderland, MA
01375
216 Mt Hermon
Station Road,
Northfield, MA
01360
Westfield - 311
East M'tn Rd.
Amherst - 1550
West Rd (Route
116)
Easthampton -
Arthur Street
Pochassic Pit -
931 Pochassic Rd.
Westfield
129 North Road
Westhampton,
MA 01027
87 Worthington
Road
Huntington, MA
01050
240 Chicopee St.
Granby, MA
01033
61 Tully Road
Orange, MA
01364
2188 Algerie Rd.
East Otis, MA
01029
300 Zoar Road
Charlemont, MA
01389
X X X X X X X X X X X
X X X X X X X X X X X
X X X X X X X X X X X
X X X X X X X X X X X
X X X X X X X X X X X
CONTACT # 6033570881 413-665-7021 413-665-4051 413-498-2956 413-246-0814 413-527-2324 4136675789 4135922566 9785750567 4133298083 4133394205
REGION TOWNAll States
Asphalt /
Mitchell
Materials, LLC
All States
Asphalt / Trew
Stone, LLC
Delta Sand &
Gravel, Inc.
Eurovia
Atlantic
Coast, LLC
Hathaway
Construction
Hilltown Sand
& Gravel
Ondrick
Materials &
Recycling,
LLC
Porter
Transporta-
tion Co., Inc.
Tonlino &
Sons, LLC
Zoar Stone &
Gravel
Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton
1A Ashfield 896 Cape Street Ashfield, MA 8.00$ 6.75$ 6.00$ 9.00$ $ $ $ $ $ $ $1A Buckland 2 Sears Street Buckland, MA 7.50$ 6.75$ 6.00$ 6.50$ $ $ $ $ $ $ $1A Charlemont Factory Road Charlemont, MA 7.50$ 8.00$ 6.55$ 7.00$ $ $ $ $ $ $ 3.00$ 1A Colrain 51 Main Road Colrain, MA 6.50$ 8.00$ 6.00$ 5.50$ $ $ $ $ $ $ $1A Conway 40 Fournier Road Conway, MA 6.00$ 6.75$ 3.75$ 6.50$ 9.95$ From Amh $ $ $ $ $ $1A Cummington 20 Fairgrounds Road Cummington, MA 8.30$ 12.50$ 8.60$ 10.00$ $ 4.75$ 4.00$ $ $ $ $1A Goshen 8 Highland Road Goshen, MA 8.30$ 12.50$ 8.05$ 10.00$ 10.80$ From W'fld 4.00$ 4.75$ $ $ $ $1A Hawley 247 W. Hawley Road Hawley, MA 8.50$ 11.25$ 9.40$ 9.00$ $ $ $ $ $ $ 3.25$ 1A Heath 123 Branch Hill Road Heath, MA 8.30$ 11.25$ 8.45$ 7.50$ $ $ $ $ $ $ 3.25$ 1A Hinsdale 156 Maple Street Hindsale, MA 01235 13.00$ 13.50$ 10.30$ 11.25$ $ $ $ $ $ 5.85$ $1A Monroe 3C School Street Monroe, MA 10.00$ 11.25$ 11.25$ 9.00$ $ $ $ $ $ $ $1A Plainfield 184 East Main Street Plainfield, MA 9.00$ 10.00$ 8.45$ 10.00$ $ $ $ $ $ 10.85$ $1A Rowe 6 Sibley Road Rowe, MA 9.00$ 11.25$ 9.20$ 9.00$ $ $ $ $ $ $ 3.00$ 1A Savoy 720 Main Road Savoy, MA 10.00$ 10.00$ 11.25$ 10.00$ $ $ $ $ $ 10.45$ $1A Shelburne 24 Colrain Shelburne Road Shelburne, MA 5.00$ 6.75$ 5.25$ 6.50$ $ $ $ $ $ $ $1A Williamsburg 24R Main Street Williamsburg, MA 10.00$ 7.50$ 11.00$ 7.45$ From W'fld 3.30$ 4.50$ $ $ $ $
1B Blandford 114 Otis Stage Road Blandford, MA 12.50$ 9.40$ 13.00$ 9.10$ From W'fld $ 3.75$ $ $ 3.75$ $1B Chester 2 Town Road Chester, MA 12.50$ 9.40$ 13.00$ 5.95$ From W'fld $ 3.00$ $ $ 4.75$ $1B Chesterfield 164 Main Road Chesterfield, MA 11.25$ 7.50$ 14.00$ 9.95$ From Amh 3.50$ 4.00$ $ $ $ $1B Granville 69 Old Westfield Road Granville, MA 13.50$ 9.40$ 14.00$ 5.95$ From W'fld $ 4.50$ $ $ 5.25$ $1B Huntington 7 Mill Street Huntington, MA 10.00$ 9.40$ 14.00$ 7.45$ From W'fld $ 1.50$ $ $ 4.75$ $1B Middlefield 4 Bell Road Middlefield, MA 12.50$ 10.30$ 11.00$ 7.45$ From W'fld $ 4.00$ $ $ 3.75$ $1B Montgomery 160 Main Road Montgomery, MA 10.00$ 8.45$ 14.00$ 4.95$ From W'fld $ 2.00$ $ $ 7.25$ $1B Russell Frog Hollow Road Russell, MA 10.00$ 9.40$ 14.00$ 4.95$ From W'fld $ 3.50$ $ $ 4.25$ $1B Sandisfield 3 Silverbrook Road Sandisfield, MA 15.75$ 15.00$ 14.00$ $ $ 7.00$ $ $ 3.75$ $1B Tolland 162 Colebrook River Road Tolland, MA 13.50$ 11.25$ 14.00$ 7.45$ From W'fld $ 5.00$ $ $ 4.75$ $1B Worthington 64 Huntington Road Worthington, MA 12.00$ 10.00$ 9.40$ 14.00$ 7.95$ From W'fld $ 3.00$ $ $ 10.25$ $
2A Bernardston Nelson Road Bernardston, MA 4.50$ 5.50$ 4.70$ 4.00$ $ $ $ $ $ $ $2A Deerfield 9 Merrigan Way So. Deerfield, MA 4.50$ 2.45$ 6.00$ $ $ $ $ $ $ $2A Erving 16 Public Works Blvd. Erving, MA 5.00$ 6.75$ 4.70$ 6.00$ $ $ $ $ $ $ $2A Gill 196C Main Road Gill, MA 5.00$ 6.75$ 4.70$ 4.00$ $ $ $ $ $ $ $2A Greenfield 209 Wells Street Greenfield, MA 4.50$ 4.15$ 6.00$ $ $ $ $ $ $ $2A Leverett 95 Montague Road Leverett, MA 6.75$ 2.80$ 9.00$ $ $ $ $ $ $ $2A Leyden 16 West Leyden Road Leyden, MA 7.00$ 6.75$ 6.40$ 6.00$ $ $ $ $ $ $ $2A Montague 500 Avenue A Ext. Turners Falls, MA 6.75$ 3.75$ 7.00$ $ $ $ $ $ $ $2A New Salem 22 Wendell Road New Salem, MA 9.00$ 4.70$ 7.00$ $ $ $ $ 3.66$ $ $2A Northfield 41 Caldwell Road Northfield, MA 4.50$ 6.75$ 5.65$ 4.00$ $ $ $ $ $ $ $2A Orange 526 E. River Street Orange, MA 6.00$ 8.00$ 6.00$ 6.00$ $ $ $ $ 3.00$ $ $2A Shutesbury 59 Leverett Road Shutesbury, MA 9.00$ 4.15$ 9.00$ $ $ $ $ 4.00$ $ $2A Sunderland 111 River Road Sunderland, MA 5.50$ 2.25$ 9.00$ $ $ $ $ $ $2A Warwick 15 Garage Road Warwick, MA 5.00$ 10.00$ 7.50$ 6.00$ $ $ $ $ 3.66$ $ $2A Wendell Jackie Lane Wendell, MA 8.00$ 10.00$ 5.65$ 7.00$ $ $ $ $ 3.66$ $ $2A Whately 71 Christian Lane Whately, MA 5.50$ 2.80$ 6.00$ $ $ $ $ $ $ $
2B Belchertown 290 Jackson Street Belchertown, MA 9.00$ 4.90$ 14.00$ 5.95$ From Amh $ $ $ $ $ $2B Easthampton 30 Rear Northampton St. Easthampton, MA 10.00$ 6.40$ 11.00$ 4.95$ From W'fld 4.25$ 4.00$ $ $ $ $2B Granby 15 Crescent Street Granby, MA 10.00$ 5.65$ 11.00$ 3.15$ From Amh $ $ 2.85$ $ $ $2B Hadley 230 Middle Street Hadley, MA 6.75$ 3.40$ 11.00$ 3.65$ From Amh $ $ $ $ $ $2B Hatfield 10 Straits Road Hatfield, MA 6.75$ 2.80$ 11.00$ $ 6.00$ $ $ $ $ $2B Pelham 353 Amherst Road Pelham, MA 9.00$ 3.75$ 14.00$ $ $ $ $ $ $ $2B Southampton 8 Fomer Road Southampton, MA 11.25$ 5.65$ 11.00$ 4.95$ From W'fld 4.00$ 3.00$ $ $ $ $2B Westhampton 58 Hathaway Road Westhampton, MA 11.25$ 7.50$ 11.00$ 5.95$ From W'fld 1.70$ 3.00$ $ $ $ $
TOWN GARAGE LOCATION / DELIVERIES
John S. Lane & Son
FRANKLIN REGIONAL COLLECTIVE
BID # H2 COLD PATCH
Open May 12, 2020 @ 1pm
Cold Mix Manufacturing
Corp. Crafco, Inc. Innovative Surface Solutions Eurovia / Northeast Paving Ondrick Natural Earth
Seaboard Asphalt Products
Company Warner Brothers
FOR JULY 1, 2020 TO JUNE 30, 202165 Edison Avenue Mount
Vernon, NY 10550
6165 W. Detroit St. Chandler,
AZ 85226
454 River Rd, Glenmont, NY
12077
216 Mount Hermon Station Rd.,
Northfield, MA 01360
729 Fuller Rd., Chicopee, MA
01020
3601 Fairfield Road, Baltimore, MD
21226
325 Amherst Rd Sunderland, MA
01375
Picked Up Product Tel 718-463-1444 602-276-0406 800-387-5777x101 413-498-2956 413-594-8803 410-355-0330 Tel 413-665-4055
[email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]
A. HIGH PERFORMANCE COLD PATCH Picked Up Estimates In Tons Price Per Ton Price Per Ton Price Per Ton Price Per Ton Price Per Ton Price Per Ton
Total Estimated Tons 1,252 No Bid No Bid No Bid $115.00 $112.00 No Bid $118.00
PICK UP LOCATION N/A N/A N/A
216 Mount Hermon Rd., Northfield,
MA 01360 or 30 Willow Hill Road,
Lee, MA 01238 729 Fuller Rd. Chicopee, MA N/A 901 River Rd. East Deerfield,MA
Delivered Product
B. HIGH PERFORMANCE COLD PATCH Delivered Bags
Estimates In 50-
bag Pallets Price Per POUND Price Per POUND Price Per POUND Price Per POUND Price Per POUND Price Per POUND
Total Estimated Tons 2,350
Region 1A 750 0.188$ 0.200$ 0.156$ No Bid 0.160$ 0.132$ No Bid
Region 1B 700 0.188$ 0.200$ 0.156$ No Bid 0.160$ 0.132$ No Bid
Region 2A 900 0.188$ 0.200$ 0.156$ No Bid 0.160$ 0.132$ No Bid
Region 2B 0 0.188$ 0.200$ 0.156$ No Bid 0.155$ 0.132$ No Bid
50 POUND BAGS 50 POUND BAGS 50 POUND BAGS 50 POUND BAGS 60 POUND BAGS
PRODUCT DETAILS
Product Name Greenpatch Crafco HP Asphalt Cold Patch Propatch QPR - Quality Pavement Repair EZ Street Bond-X Green duraPATCH
Brochures with Bid Yes Yes Yes Yes Yes Yes Yes
Comments 50 lb bags; 56 bags/pallet 50 lb bags; 56 bags/pallet 50 lb bags; 56 bags/pallet N/A 50 lb bags; 56 bags/pallet 60 lb bags; 49 bags/pallet N/A
Tax Compliance Signed? X X X X X X X
Non-Collusion Signed? X X X X X X X
Bid Signature Form signed? X X X X X X X
FRANKLIN REGIONAL COLLECTIVE
H3 GEOTEXTILES
Open May 12, 2020 @ 1pm
BID TABULATION
FOR JULY 1, 2020 TO JUNE 30, 2021
RENEWALS FOR TWO ADDT'L
YEARS AVAILABLE TO MAKE EJ PRESCOTT UNDERGROUND SUPPLY
THREE YEAR CONTRACTS 28C STATE RD., PO BOX 192 NORTH HATFIELD, MA 01093 413-665-2499 82 STATE RD., PO BOX 164 WHATELY, MA 01093 413-397-3412
HEAVY DUTY WOVEN - 16 estimated NONWOVEN -3 estimated info on manufacturer/type WOVEN - 16 estimated NONWOVEN -3 estimated info on manufacturer/type
Size of Roll 12.5' x 360' 12.5' x 360' Mirafi 600x woven 12.5' x 360' 12.5' x 360' ADS GEOSYNTHETICS #601
Price Per Square yard $0.85 $0.75 Mirafi N series nonwoven $0.78 $0.83 500 sq yds/roll
Price Per Roll $425.00 $375.00 $390.00 $415.00
Delivery Charge Per Roll
Total Delivered Price Per Roll $425.00 $375.00 $390.00 $415.00
LIGHT DUTY
Size of Roll 12.5' x 432' 12.5' x 360' 12.5' x 432' 12.5' x 360' ADS GEOSYNTHETICS #401
Price Per Square yard $0.65 $0.75 $0.530 $0.58 500 sq yds/roll
Price Per Roll $390.00 $375.00 $318.00 $290.00
Delivery Charge Per Roll
Total Delivered Price Per Roll $390.00 $375.00 $318.00 $290.00
Location of Warehouse Location for Pick up: WHATELY, MA Location for Pick up: WHATELY, MA
Yes Yes
PARTICIPANTS ELIGIBLE: All with permission.
Estimates 22 rolls of WOVEN Heavy Duty and 3 NONWOVEN Heavy Duty and 10 rollls of WOVEN light duty and 3 rolls of NONWOVEN Light Duty
RENEWAL FOR YEARS TWO AND THREE, NO MORE THAN 2% MORE THAN THESE PROCESSES IF CATALOG PRICES HAVE INCREASED
Tax compliance, Non Collusion,
Signed Bid Forms?
FRANKLIN REGIONAL COLLECTIVE All States Asphalt
Innovative Municipal
US Inc
BID # H4 CALCIUM and MAG CHLORIDE
325 Amherst Road,
Sunderland, MA 01375
454 River Road,
Glenmont, NY 12077
Open May 12, 2020 @ 1pm RENEWALS FOR TWO ADDT'L Tel 413-665-7021 Tel 800-387-5777
Bid Tabulation YEARS AVAILABLE TO MAKE
THREE YEAR CONTRACTS Alan Chicoine Div. Mgr. Syed Ali
A. LIQUID CALC DELIVERED IN BULK Estimates Price Per Gallon Price Per Gallon
REGION 1A 16,000 $0.99 $1.00
REGION 2A 4,000 $0.99 $1.00
REGION 2B 3,000 $0.99 $1.00
REGION 1B NONE
total 23,000 $22,770.00 $23,000.00
Minimum Delivery? 1000 GALLONS 2000 GALLONS
Product Name
Liquidow Technical
Grade Calcium Chloride Promelt CAL 32
B. LIQUID MAGNESIUM DELIVERED IN BULK
REGION 1B Blandford 2x2500 5,000 $0.95
total 5,000 No Bid $4,750.00
Minimum Delivery? 1000 GALLONS 2000 GALLONS
Product Name Promelt MAG INH
C. CALCIUM CHLORIDE 50# BAGS DELIVERED Price Per 50# Price Per 50#
Estimates
REGION 1B 1 PALLET
REGION 2A 3 PALLETS
REGION 2B 2 PALLETS
total 6 pallets No Bid No Bid
Minimum Delivery Amount?
D. MAG CHLORIDE 50# BAGS DELIVERED Price Per 50# Price Per 50#
Estimates
REGION 1A 1 PALLET
TOTAL 1 PALLET No Bid No Bid
Minimum Delivery amount
Bid Signature Form Signed? X X
Tax Compliance Signed? X X
Non-Collusion Signed? X X
FRANKLIN REGIONAL COLLECTIVE
BID # H5 CULVERTS RENEWALS FOR TWO ADDT'L
Open May 12, 2020 @ 1pm YEARS AVAILABLE TO MAKE
Bid Tabulation THREE YEAR CONTRACTS
DELIVERED PRICES
EJ PRESCOTT INC. UNDERGROUND SUPPLY, INC.
28C STATE RD,. PO BOX 192 NORTH HATFIELD, MA 01093 82 STATE RD., PO BOX 164 WHATELY, MA 01093
Single Wall Plastic Culverts Single Wall Plastic Culverts
estimates by type EJP UNDERGROUND
Price per FOOT delivered Price per FOOT delivered solid perf split watertigh
Inside Dia Solid Perf Split Inside Dia Solid Perf Split
6" $1.35 $4.00 6" $1.21 $1.21 $3.51 500 6 -$ 675.00$ 24.00$ -$ -$ $605.00 $21.06 -$
10" 10" $3.97 $3.97 $6.56 -$ -$ -$ -$ -$ $0.00 $0.00 -$
12" 12" $5.67 $5.67 $7.13 -$ -$ -$ -$ -$ $0.00 $0.00 -$
15" 15" $7.40 $7.40 $11.85 -$ -$ -$ -$ -$ $0.00 $0.00 -$
18" $10.75 18" $11.00 $11.00 $20.21 600 6,450.00$ -$ -$ -$ 6,600.00$ $0.00 $0.00 -$
24" $16.00 24" $16.60 $16.00 200 3,200.00$ -$ -$ -$ 3,320.00$ $0.00 $0.00 -$
Bidder will deliver to the following Regions: Bidder will deliver to the following Regions: 9,650.00$ 675.00$ 24.00$ -$ 9,920.00$ 605.00$ 21.06$ -$
1A_X__ 1B_X__ 2A_X__ 2B_X__ 1A_X__ 1B_X__ 2A_X__ 2B_X__ 10,349.00$ 10,546.06$
Bid Form Total 10,349.00$ 10,546.06$
Double Wall Plastic Culverts Double Wall Plastic Culverts
EJ PRESCOTT INC.
28C STATE RD,. PO BOX 192 NORTH HATFIELD, MA 01093
Price per FOOT delivered $0.00 Price per FOOT delivered estimates by type EJP UNDERGROUND
Inside Dia Solid Perf Split Watertight Inside Dia Solid Perf Split Watertight solid perf split watertight
6" 2.15$ 2.15$ 4.00$ 11.00$ 6" 2.10$ 2.10$ 3.51$ 11.18$ 100 3000 0 10 215.00$ 6,450.00$ -$ 110.00$ 210.00$ $6,300.00 $0.00 111.800$
10" 4.95$ 4.95$ 7.50$ 22.00$ 10" 4.84$ 4.84$ 6.56$ 22.50$ 104 951 80 1 514.80$ 4,707.45$ 600.00$ 22.00$ 503.36$ 4,602.84$ $524.80 22.50$
12" 6.00$ 6.00$ 8.00$ 60.00$ 12" 5.78$ 5.78$ 7.13$ 56.77$ 3616 3901 3 9 21,696.00$ 23,406.00$ 24.00$ 540.00$ 20,900.48$ 22,547.78$ $21.39 510.93$
15" 7.65$ 7.65$ 13.00$ 88.00$ 15" 7.44$ 7.44$ 11.85$ 85.86$ 4332 3001 25 31 33,139.80$ 22,957.65$ 325.00$ 2,728.00$ 32,230.08$ 22,327.44$ $296.25 2,661.66$
18" 11.25$ 11.25$ 22.00$ 152.00$ 18" 10.98$ 10.98$ 20.21$ 148.34$ 3459 321 49 35 38,913.75$ 3,611.25$ 1,078.00$ 5,320.00$ 37,979.82$ 3,524.58$ $990.29 5,191.90$
24" 17.50$ 17.50$ 30.00$ 225.00$ 24" 17.10$ 17.10$ 28.44$ 224.14$ 1253 0 22 25 21,927.50$ -$ 660.00$ 5,625.00$ 21,426.30$ -$ $625.68 5,603.50$
30" 25.50$ 25.50$ 70.00$ 492.00$ 30" 25.73$ 25.73$ 66.47$ 493.02$ 368 60 2 7 9,384.00$ 1,530.00$ 140.00$ 3,444.00$ 9,468.64$ 1,543.80$ $132.94 3,451.14$
36" 32.50$ 32.50$ 165.00$ 675.00$ 36" 33.04$ 33.04$ 94.00$ 675.42$ 420 60 1 2 13,650.00$ 1,950.00$ 165.00$ 1,350.00$ 13,876.80$ 1,982.40$ $94.00 1,350.84$
48" 53.00$ 53.00$ 48" 54.06$ 54.06$ 160.00$ 1,091.43$ 220 60 0 0 11,660.00$ 3,180.00$ -$ -$ 11,893.20$ 3,243.60$ $0.00 -$
151,100.85$ 67,792.35$ 2,992.00$ 19,139.00$ 148,488.68$ 66,072.44$ 2,685.35$ 18,904.27$
241,024.20$ 236,150.74$
Signed X X Bid Form Total 241,024.20$ 236,150.74$
Tax Comp X X
Non-Coll X X
Delivery terms:
82 STATE RD., PO BOX 164 WHATELY, MA 01093
UNDERGROUND SUPPLY, INC.
Delivery terms:
FRANKLIN REGIONAL COLLECTIVE
BID #H6 GUARD RAIL PRODUCTS 1010 Turnpike Rd
Open May 12, 2020 @ 1pm Canton, MA 02021
Tel 781-821-5900
Premier Fence
THREE YEAR CONTRACTS IF RENEWED REG
ION
1A
REG
ION
1B
REG
ION
2A
REG
ION
2B
John Feerick
PRODUCTS includes delivery UNIT Total Est Prices Extensions
12.5' Straight rail sections galvanized w/steel postsea 26 0 40 10 76 $102.00 $7,752.00
12'5" Curved rail sections galvanized w/steel postsea 12 0 8 5 25 $158.15 $3,953.75
Steel Terminal Ends ea 24 0 0 8 32 $75.00 $2,400.00
6"6" Steel Posts, H Section, galv ea 35 0 132 0 167 $73.00 $12,191.00
6'6" Wood Posts, pressure treated ea 0 0 0 0 0 $0.00
Splice bolts, 1 1/2" per 100 2 0 5 0 7 $65.00 $455.00
Post bolts 2" per 100 3 0 5 0 8 $100.00 $800.00
Post bolts 5" per 100 2 0 2 0 4 $155.00 $620.00
Post bolts 8" per 100 2 0 2 0 4 $185.00 $740.00
Post bolts 10 1/2" per 100 2 0 2 0 4 $240.00 $960.00
Round washers, galv per lb 10 0 100 0 110 $13.00 $1,430.00
Hex nuts, galv per 100 4 0 16 0 20 $60.00 $1,200.00
Offset spacers, galv ea 25 0 100 0 125 $15.00 $1,875.00
Offset spacers, Pressure treated ea 10 0 0 0 10 $17.00 $170.00
Total Value of this Bid $34,546.75
Percent discount, picked up n/a
Bid Signature Form Signed? x
Tax Compliance Signed? x
Non-Collusion Signed? x
FY21 Draft Bid Tabs H-2 through 23
FRANKLIN REGIONAL COLLECTIVE
BID #H7 PICKED UP HOT MIX ASPHALT
All States Asphalt,
Inc.
Eurovia/Northeast
Paving
Ondrick Materials &
Recycling, LLC Palmer Paving Corp All States Asphalt, Inc. Northeast Paving
Ondrick Materials &
Recycling, LLC Palmer Paving Corp
Open May 12, 2020 @ 1pm
325 Amherst Rd
Sunderland, MA 01375
216 Mt Hermon Station
Rd., Northfield, MA
01360
22 Industry Road
Chicopee, MA 01020
25 Blanchard St., Palmer,
MA 01069
325 Amherst Rd
Sunderland, MA 01375
216 Mt Hermon Station
Rd., Northfield, MA
01360
22 Industry Road
Chicopee, MA 01020
25 Blanchard St., Palmer,
MA 01069
Limited avail July 1 - Dec 15/Apr 1-June 30
Amount
Estimated
Tons 413-655-7021 Tel 413-498-2956 Tel 413-592-2566 Tel 413-283-8354 413-655-7021 Tel 413-498-2956 Tel 413-592-2566 Tel 413-283-8354
ALL PARTICIPANTS 14,380 64.00$ 62.00$ 68.00$ 62.00$ 920,320.00$ 891,560.00$ 977,840.00$ 891,560.00$
PLANT PICK UP LOCATION
Warner Bros.:
Sunderland &
Deerfield, MA and
Mitchell Materials:
Winchester, NH
216 Mt. Hermon Station
Rd., Northfield, MA; 311
East Mountain Road,
Westfield, MA; 30
Willow Hill Rd., Lee, MA;
17 New Ludlow Rd.,
Granby, MA.
58 Industry Road,
Chicopee, MA
23 Arthur St.,
Easthampton, MA;
1000 Page Blvd.,
Springfield, MA; 25
Blanchard St., Palmer,
MA; 43 Old Coldbrook
Dr., Barre, MA
Tax Compliance / Non Collusion X X X X
Addendum 1 Bid Form X X X X
FRANKLIN REGIONAL COLLECTIVE
BID # H8 SNOW PLOW AND GRADER BLADES RENEWALS FOR TWO ADDT'L
Open May 12, 2020 @ 1pm YEARS AVAILABLE TO MAKE
Bid Tabulation THREE YEAR CONTRACTS
DELIVERED PRICES
For information only/; bid rejected due to mim. order amount
Valk Maufacturing Co. Winter Equipment Co., Inc.
PO Box 428, 66 East Main St., New Kingstown, MA 17072 1900 Joseph Lloyd Parkway, Willoughby, OH 44060
Tel::717-766-0711 Email: [email protected] Tel:: 800-294-6837 Email: [email protected]
PLOW BLADES PLOW BLADES
Delivery terms: Delivery terms:
$5,500 minimum order per location
Price per FOOT delivered Price per FOOT delivered Price per FOOT delivered
Size est ft. Bid Price Extension Size est ft. Bid Price Extension
5/8 x 6 100 $10.84 $1,084.00 5/8 x 6 100 $9.04 $904.00
3/4 x 6 36 $13.01 $468.36 3/4 x 6 36 $10.91 $392.76
1 x 6 18 $18.36 $330.48 1 x 6 18 $14.55 $261.90
5/8 x 8 250 $14.45 $3,612.50 5/8 x 8 250 $12.10 $3,025.00
3/4 x 8 1392 $17.34 $24,137.28 3/4 x 8 1392 $14.51 $20,197.92
1 x 8 22 $24.48 $538.56 1 x 8 22 $19.73 $434.06
GRADER BLADES GRADER BLADES
Size est ft. Bid Price Extension Size est ft. Bid Price Extension
3/4 x 8 120 $16.48 $1,977.60 3/4 x 8 120 $14.10 $1,692.00
LOADER CUTTING EDGES LOADER CUTTING EDGES
Size est ft. Bid Price Extension Size est ft. Bid Price Extension
1 X 12 Carbon
Dbl Bevel 56 $67.32 $3,769.92
1 X 12 Carbon
Dbl Bevel 56 No Bid
Each EachRound
Countersunk
Holes 8 $2.00 $16.00
Round
Countersunk
Holes 8 No Bid
total bid $35,934.70 total bid $26,907.64
Bid signature? X X
Tax Compliance? X X
Non-Collusion? X X
Lead time 35 - 40 days ARO Lead time 3-4 weeks ARO
FRANKLIN REGIONAL COLLECTIVE
BID #H9A HIGHWAY LINE PAINTING
BID TABULATION
Open May 12, 2020 at 2:00pm
Markings Inc.
30 Riverside Dr
Pembroke, MA 02359
781-826-5171
BID PRICE PER FOOT
HIGHWAY LINE PAINTING REGION 1A REGION 1B REGION 2A REGION 2B TOTALS REG 1A REG 1B REG 2A REG 2B REG 1A $ REG 1B $ REG 2A $ REG 2B $ REG 1A REG 1B REG 2A REG 2B REG 1A $ REG 1B $ REG 2A $ REG 2B $
unit lf / sf
Waterborne Fast Dry White 4" lf 137,000 101,821 1,013,112 882,400 2,134,333 0.055$ 0.055$ 0.055$ 0.055$ 7,535.00$ 5,600.16$ 55,721.16$ 48,532.000$ 0.054$ 0.054$ 0.054$ 0.054$ $7,398.00 $5,498.33 $54,708.05 $47,649.60
Waterborne Fast Dry Yellow 4" lf 799,362 945,169 1,966,328 1,324,700 5,035,559 0.055$ 0.055$ 0.055$ 0.055$ 43,964.91$ 51,984.30$ 108,148.04$ 72,858.50$ 0.054$ 0.054$ 0.054$ 0.054$ $43,165.55 $51,039.13 $106,181.71 $71,533.80
Waterborne Fast Dry White 6" lf 0 50,000 14,300 0 64,300 0.082$ 0.082$ -$ 4,100.00$ 1,172.60$ -$ 0.075$ 0.075$ $0.00 $3,750.00 $1,072.50 $0.00
Waterborne Fast Dry Yellow 6" lf 0 180,000 0 0 180,000 0.082$ -$ 14,760.00$ -$ -$ 0.075$ $0.00 $13,500.00 $0.00 $0.00
Waterborne White Crosswalks 12" sf 0 2,100 25,730 2,600 30,430 0.680$ 0.680$ 0.680$ -$ 1,428.00$ 17,496.40$ 1,768.00$ 0.550$ 0.550$ 0.550$ $0.00 $1,155.00 $14,151.50 $1,430.00
White thermoplastic 4" lf 0 111,636 0 1,500 113,136 0.540$ 0.540$ -$ 60,283.44$ -$ 810.00$ 0.480$ 0.480$ $0.00 $53,585.28 $0.00 $720.00
Yellow Thermoplastic 4" lf 0 111,636 0 2,500 114,136 0.540$ 0.540$ -$ 60,283.44$ -$ 1,350.00$ 0.480$ 0.480$ $0.00 $53,585.28 $0.00 $1,200.00
White thermoplastic 6" lf 13,800 0 0 0 13,800 0.810$ 11,178.00$ -$ -$ -$ 0.720$ $9,936.00 $0.00 $0.00 $0.00
Yellow Thermoplastic 6" lf 13,800 0 0 0 13,800 0.810$ 11,178.00$ -$ -$ -$ 0.720$ $9,936.00 $0.00 $0.00 $0.00
TOTAL BID BY REGION Total for each region: 73,855.91$ 198,439.33$ 182,538.20$ 125,318.50$ Total for each region: 70,435.55$ 182,113.02$ 176,113.76$ 122,533.40$
Total all regions: 580,151.94$ Total all regions: 551,195.73$
Total Value This Bid 580,151.94 551,195.73
Minimum # of feet line painting must be no more than 2,000 1,000 1,000
MiN # of feet parking/crosswalks 500 500
Lead time required 1 week 2 weeks
Tax Compliance Signed? X X
Non-Collusion Signed? X X
Debarment Statement? X X
Osha Cert? X X
Prequal List? X X
Addenda? N/A N/A
Bid Bond? X X
* Note total rounded up one penny more than total stated on bid of $580,151.93.Comments
Hi-Way Safety Systems
9 Rockview Way
Rockland, MA 02370
781-982-9229
BID PRICE PER FOOT
FY21 Draft Bid Tabs H-2 through 23
FRANKLIN REGIONAL COLLECTIVE Hi-Way Safety Systems Roadsafe Traffic Systems
BID #H9B HIGHWAY LINE PAINTING 9 Rockview Way 55 Bodwell St
BID TABULATION Rockland, MA 02370 Avon, MA 02322
Open May 12, 2020 at 2:00pm 781-982-9229
UNIT PRICE EXTENSION
HIGHWAY LINE PAINTING Granby Rowe Warwick Whately TOTALS
Unit LF/SF
White Chlorinated Low VOC 4" LF 150,000 60,000 20,000 230,000 $0.055 $12,650.00
Yellow Chlorinated Low VOC 4" LF 150,000 19,000 60,000 70,000 299,000 $0.055 $16,445.00
Comments
Total Value This Bid $29,095.000
Lead time required 2 weeks
Minimum for line painting Must be no more than 2,000 2,000'
Minimum for crosswalks/pking
Tax Compliance Signed? X
Non-Collusion Signed? X
Debarment Signed? X
Osha Cert? X
Bid Bond N/A
Addenda? N/A
FRANKLIN REGIONAL COLLECTIVE
BID #H10 GUARDRAIL INSTALLED Guardrail Solutions, LLC Premier Fence, LLC
BID TABULATION 108A Front St 1010 Turnpike St.
Open May 12, 2020 at 2:00 pm Springfield, MA 01089 Canton, MA 02021
413-310-2428 781-821-5900
ITEM DESCRIPTION TOTALS Unit Price Extension Unit Price Extension
Standard Steel straight w/ steel post per ft. 11,750 $25.25 $296,687.50 $31.80 $373,650.00
Standard Steel curved w/ steel post per ft. 727 $28.00 $20,356.00 $35.00 $25,445.00
Standard Steel straight w/ wood post 200 $28.00 $5,600.00 $33.00 $6,600.00
Standard Steel curved w/ wood post 220 $29.00 $6,380.00 $38.00 $8,360.00
Standard Steel Terminal Ends each 123 $65.00 $7,995.00 $65.00 $7,995.00
# of reflectors, installed (each) 327 $7.00 $2,289.00 $6.50 $2,125.50
Replace wooden post w/ steel post 100 $115.00 $11,500.00 $140.00 $14,000.00
Replace wooden post w/ wooden post 59 $155.00 $9,145.00 $150.00 $8,850.00
# of existing feet to be removed 600 $4.00 $2,400.00 $5.00 $3,000.00
Cor-ten Straight w/ steel posts per foot 1,240 $27.50 $34,100.00 $34.00 $42,160.00
Cor-ten Curved w/ steel posts per foot 92 $29.00 $2,668.00 $42.00 $3,864.00
Cor-ten Standard Terminal Ends each 10 $75.00 $750.00 $100.00 $1,000.00
Total Value This Bid $399,870.50 $497,049.50
Bid Deposit x x
Tax Compliance Signed? x x
Non-collusion signed? x x
Debarment Signed? x x
Prequalified? x x
OSHA Cert x x
Bid Tabulation H-10
FRANKLIN REGIONAL COLLECTIVE
BID #H11 COMPREHENSIVE PAVEMENT PRESERVATION
BID TABULATION
Open May 12, 2020 at 2:00pm
SEALCOATING, INC. DBA INDUS FELIX MARINO
825 GRANITE STREET 32 CORWIN STREET
BRAINTREE, MA 02184 PEABODY, MA 01960
Art Baker [email protected] James Henebury [email protected]
781-428-3400 978-532-3838
CATEGORIES INELIGIBLE; for information only
H-11A-1 FIBER (PG)
Price Per Gallon Fiber 42,811 $10.12 $0.00
Day Rate for 1,000 gallons $8,050.00 $0.00
Day Rate above 1,000 gallons $4.25 $0.00
Total Bid Fiber $433,247.32 $0.00
H-11A-1 PCRM
Price Per Gallon 54,600 $12.29 $0.00
Day Rate for 800 gallons $8,375.00 $0.00
Day Rate above 800 gallons $4.87 $0.00
Total Bid PCRM $671,034.00 $0.00
H-11A - 2 HOT POURED MASTIC
Est Gallons Mastic 400
Price Per Gallon $27.25 $0.00
Day Rate for 200 gallons $8,635.00 $0.00
Day Rate above 200 gallons $10.50 $0.00
Total Bid Mastic $10,900.00 $0.00
H-11A - 3 COLD CRACK FILL
Est Gallons Crack Fill 500 No Bid
Day Rate w/ 2 person crew $0.00 $4,500.00
Date Rate per gallon $0.00 $15.95
Addtl pricing extre crew member $0.00 $950.00
Total Bid Crack Fill $0.00 $20,450.00
SEALCOATING, INC. DBA INDUS FELIX MARINO
825 GRANITE STREET 32 CORWIN STREET
BRAINTREE, MA 02184 PEABODY, MA 01960
Art Baker [email protected] James Henebury [email protected]
781-428-3400 978-532-3838
CATEGORIES INELIGIBLE; for information only
H-11-B-1 MICROSURFACING HIMA
Est SQ YDS Microsurf HIMA 91,797
Price Per SQ YD Micros HIMA $5.20 $0.00
Total Bid Microsurf HIMA $477,344.40 $0.00
H-11-B-2 MICROSURFACING Conventional
Est SQ YDS Microsurf HIMA 19,000
Price Per SQ YD Micros Conv $4.68 $0.00
Total Value of Microsurf Conv $88,920.00 $0.00
H-11-C-1 FOG SEAL- Polymer Modified Rejuvenating
Est SQ YDS PMR FOG SEAL 181,006
Price Per SQ YD PMR FOG SEAL $1.23 $0.00
Total Bid PMR FOG SEAL $222,637.38 $0.00
H-11-C-1 FOG SEAL- Penetrating
Est SQ YDS Pen FOG SEAL 94,600 No Bid
Price Per SQ YD Pen FOG SEAL $0.00 $0.96
Total Bid Penetrating FOG SEAL $0.00 $90,816.00
H-11-D - CAPE SEAL
Est SQ YDS CAPE SEAL 41,705
Price Per SQ YD CAPE SEAL $6.87 $0.00
Total Bid CAPE SEAL $286,513.35 $0.00
Debarment Signed? X X
Addendum 1? X
Bid bond enclosed? X X
Prequalified? X
Acknowledge Addenda? X X
OSHA X X
Tax Compliance/Non Collusion X X
grand total of bid by co. $2,190,596.45 $111,266.00
FRANKLIN REGIONAL COLLECTIVE
H-12 CALCIUM CHLORIDE APPLIED
BID TABULATION
Open May 12, 2020 at 2:00pm
TOWN
Est Volume Square
Yards Ph 413-665-7021
per sq. yd.
Gill 17,600 $0.38 $6,688.00
Hatfield 8,600 $0.38 $3,268.00
Hawley 10,000 $0.38 $3,800.00
Rowe 9,000 $0.38 $3,420.00
Sandisfield 25,098 $0.38 $9,537.24
Shutesbury 20,000 $0.38 $7,600.00
Sunderland 4,000 $0.38 $1,520.00
Westhampton 48,000 $0.38 $18,240.00
Total 142,298
$54,073.24
Minimum Application Amt 4,000 sq yd confirmed via email 5-14-20
Tax Compliance Signed? x
Non-Collusion Signed? x
Debarment Signed? x
Prequalification? x
OSHA x
Bid bond x
All States Asphalt
PO Box 91, Sunderland, MA
FY21 Draft Bid Tabs H-2 through 23
FRANKLIN REGIONAL COLLECTIVE
H13 STONE SEAL DUE TO FRCOG ERROR, ALL BIDS REJECTED - TO BE REBID
Open May 12, 2020 at 2:00pm
BID TABULATION
MaDOT Period Prices Apply MARCH 2020 $552.50/TON
All States Asphalt Inc. 325 Amherst Road,
P O Box 91, Sunderland, MA 01375
All States
Total Value
By Towns
Comer Contracting, Inc. 15 Holmes Rd
Newington, CT 06111-1709
Comer
Total Value
By Towns
Alan L. Chicoine Martin Comer
Division Manager President
TOWN Est Volume Square Yards
Tel 413-665-7021
Bid Price Per Square Yard
Old Work DoubleChip New Work Old Work DoubleChip New Work Old Work DoubleChip New Work
Chesterfield 25000 $ 6.25 $ 156,250.00 $ 6.10 $ 152,500.00
Gill 19000 2.48$ $ 47,120.00 2.10$ $ 39,900.00
Montague 14000 2.48$ $ 34,720.00 2.24$ $ 31,360.00
Southampton 75101 6000 2.42$ 4.60$ $ 209,344.42 1.89$ 4.20$ $ 167,140.89
Total 108,101 6,000 25,000 $447,434.42 $390,900.89
0
bid bond X X
OSHA X X
Debar X X
signed bid form/corp resolution X X
Prequald X
Tax compl Non Collus X X
Tel 860-677-0603
Bid Price Per Square Yard
FY21 Draft Bid Tabs H-2 through 23
FRANKLIN REGIONAL COLLECTIVE
RUBBERIZED CHIP SEAL H14
Open May 12, 2020 at 2:00pm
BID TABULATION Alan L. Chicoine Tel 413-665-7021
Period Prices MaDOT Apply: MARCH 2020 $552.50/TON Division Manager
10% Rubber Product-One Coat total bid by town PER SQ YD
Ashfield 69000 $240,120.00 $3.48
Buckland 58411 $203,270.28 $3.48
Chesterfield 20000 $69,600.00 $3.48
Conway 63420 $220,701.60 $3.48
Shelburne 18500 $64,380.00 $3.48
Sunderland 18000 $62,640.00 $3.48
Williamsburg 11,517 $41,230.86 $3.58
Total 258,848 $901,942.74
20% Rubber Product-One Coat total bid by town PER SQ YD
Belchertown 85,962.00 $408,319.50 $4.75
Charlemont 15,253.00 $72,451.75 $4.75
Conway 24,000.00 $114,000.00 $4.75
Deerfield 63,286.00 $300,608.50 $4.75
Gill 19,000.00 $90,250.00 $4.75
Granby 15,685.00 $74,503.75 $4.75
Granville 96,175.00 $456,831.25 $4.75
Hadley 21,947.00 $104,248.25 $4.75
Hatfield 15,900.00 $75,525.00 $4.75
Montague 14,000.00 $66,500.00 $4.75
Northfield 10,000.00 $47,500.00 $4.75
Pelham 6,500.00 $32,175.00 $4.95
Savoy 49,600.00 $235,600.00 $4.75
Southampton 24,075.00 $114,356.25 $4.75
Sunderland 18,000.00 $85,500.00 $4.75
Total 479,383.00 $2,278,369.25
$3,180,311.99
$3,180,311.99
Pre-Qual? x
Tax Compliance Signed? x
Non-Collusion Signed? x
Debarment Signed? x
OSHA x
Acknowledged Add 1 and Add 2? x
Bid deposit? x
All States Asphalt Inc. 325 Amherst Road, P O
Box 91, Sunderland, MA 01375
FY21 Draft Bid Tabs H-2 through 23
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Ashfield 1A TOTAL ROADWAYS 5,636 2,540
WARNER Unit Price Bid 69.00$ 4.75$ Total Bid
Extended Bid 388,884.00$ 12,065.00$ 400,949.00$
NORTHEAST Unit Price Bid 72.65$ 5.50$ Total Bid
Extended Bid 409,455.40$ 13,970.00$ 423,425.40$
PALMER Unit Price Bid 69.30$ 4.50$ Total Bid
Extended Bid 390,574.80$ 11,430.00$ 402,004.80$
Charlemont 1A TOTAL ROADWAYS 2120
TOTAL DRIVEWAYS/PARKING LOTS 200
WARNER Unit Price Bid Roadways 70.50$
Unit Price Bid Driveways 125.00$ Total Bid
Extended Bid 174,460.00$ 174,460.00$
NORTHEAST Unit Price Bid Roadways 72.00$
Unit Price Bid Driveways 130.00$ Total Bid
Extended Bid 178,640.00$ 178,640.00$
PALMER Unit Price Bid Roadways 68.70$
Unit Price Bid Driveways 98.00$ Total Bid
Extended Bid 165,244.00$ 165,244.00$
Colrain 1A TOTAL ROADWAYS 10,801 4,695 105
WARNER Unit Price Bid 67.25$ 4.75$ 300 Total Bid
Extended Bid 726,367.25$ 22,301.25$ 31500 780,168.50$
NORTHEAST Unit Price Bid 69.00$ 4.15$ 350 Total Bid
Extended Bid 745,269.00$ 19,484.25$ 36750 801,503.25$
PALMER Unit Price Bid 67.70$ 4.35$ 250 Total Bid
Extended Bid 731,227.70$ 20,423.25$ 26250 777,900.95$
1
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Conway 1A TOTAL ROADWAYS 2,080 25
TOTAL DRIVEWAYS/PARKING LOTS 185 25 42
WARNER Unit Price Bid Roadways 66.00$ 150.00$ 10.00$
Unit Price Bid Driveways 150.00$ 150.00$ 10.00$ Total Bid
Extended Bid 165,030.00$ 7,500.00$ 420.00$ 172,950.00$
NORTHEAST Unit Price Bid Roadways 67.50$ 155.00$
Unit Price Bid Driveways 135.00$ 155.00$ 17.00$ Total Bid
Extended Bid 165,375.00$ 7,750.00$ 714.00$ 173,839.00$
PALMER Unit Price Bid Roadways 63.95$ 150.00$ 13.00$
Unit Price Bid Driveways 110.00$ 150.00$ 13.00$ Total Bid
Extended Bid 153,366.00$ 7,500.00$ 546.00$ 161,412.00$
Cummington 1A TOTAL ROADWAYS 2,300 1350
WARNER Unit Price Bid 72.00$ 4.75$ Total Bid
Extended Bid 165,600.00$ 6,412.50$ 172,012.50$
NORTHEAST Unit Price Bid 74.00$ 4.75$ Total Bid
Extended Bid 170,200.00$ 6,412.50$ 176,612.50$
PALMER Unit Price Bid 66.90$ 3.85$ Total Bid
Extended Bid 153,870.00$ 5,197.50$ 159,067.50$
Goshen 1A TOTAL ROADWAYS 1,790 1,050
WARNER Unit Price Bid 69.00$ 4.75$ Total Bid
Extended Bid 123,510.00$ 4,987.50$ 128,497.50$
NORTHEAST Unit Price Bid 71.25$ 4.00$ Total Bid
Extended Bid 127,537.50$ 4,200.00$ 131,737.50$
PALMER Unit Price Bid 69.40$ 4.25$ Total Bid
Extended Bid 124,226.00$ 4,462.50$ 128,688.50$
2
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Hawley 1A TOTAL ROADWAYS 11,281
WARNER Unit Price Bid 65.00$ Total Bid
Extended Bid 733,265.00$ 733,265.00$
NORTHEAST Unit Price Bid 68.25$ Total Bid
Extended Bid 769,928.25$ 769,928.25$
PALMER Unit Price Bid 67.20$ Total Bid
Extended Bid 758,083.20$ 758,083.20$
Heath 1A TOTAL ROADWAYS 2,500 12 1,056
WARNER Unit Price Bid 70.00$ 150.00$ 4.75$ Total Bid
Extended Bid 175,000.00$ 1,800.00$ 5,016.00$ 181,816.00$
NORTHEAST Unit Price Bid 73.00$ 155.00$ 5.40$ Total Bid
Extended Bid 182,500.00$ 1,860.00$ 5,702.40$ 190,062.40$
PALMER Unit Price Bid 67.65$ 175.00$ 4.50$ Total Bid
Extended Bid 169,125.00$ 2,100.00$ 4,752.00$ 175,977.00$
Monroe 1A TOTAL ROADWAYS 3,050 483
WARNER Unit Price Bid 69.00$ 4.75$ Total Bid
Extended Bid 210,450.00$ 2,294.25$ 212,744.25$
NORTHEAST Unit Price Bid 73.50$ 5.50$ Total Bid
Extended Bid 224,175.00$ 2,656.50$ 226,831.50$
PALMER Unit Price Bid 69.25$ 4.75$ Total Bid
Extended Bid 211,212.50$ 2,294.25$ 213,506.75$
Plainfield 1A TOTAL ROADWAYS 2,600
WARNER Unit Price Bid 67.30$ Total Bid
Extended Bid 174,980.00$ 174,980.00$
NORTHEAST Unit Price Bid 67.25$ Total Bid
Extended Bid 174,850.00$ 174,850.00$
PALMER Unit Price Bid 62.30$ Total Bid
Extended Bid 161,980.00$ 161,980.00$
3
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Rowe 1A TOTAL ROADWAYS 2,000 1,500 1
WARNER Unit Price Bid 71.00$ 4.75$ 500 Total Bid
Extended Bid 142,000.00$ 7,125.00$ 500 149,625.00$
NORTHEAST Unit Price Bid 70.00$ 3.60$ 350 Total Bid
Extended Bid 140,000.00$ 5,400.00$ 350 145,750.00$
PALMER Unit Price Bid 69.70$ 3.90$ NO BID Total Bid
Extended Bid 139,400.00$ 5,850.00$ INELIGIBLE BID 145,250.00$
Savoy 1A TOTAL ROADWAYS 880
WARNER Unit Price Bid 75.00$ Total Bid
Extended Bid 66,000.00$ 66,000.00$
NORTHEAST Unit Price Bid 76.00$ Total Bid
Extended Bid 66,880.00$ 66,880.00$
PALMER Unit Price Bid 69.96$ Total Bid
Extended Bid 61,564.80$ 61,564.80$
Shelburne 1A TOTAL ROADWAYS 4,410 2,010
WARNER Unit Price Bid 66.25$ 4.75$ Total Bid
Extended Bid 292,162.50$ 9,547.50$ 301,710.00$
NORTHEAST Unit Price Bid 68.65$ 5.50$ Total Bid
Extended Bid 302,746.50$ 11,055.00$ 313,801.50$
PALMER Unit Price Bid 68.10$ 4.45$ Total Bid
Extended Bid 300,321.00$ 8,944.50$ 309,265.50$
Williamsburg 1A TOTAL ROADWAYS 230 105 3
WARNER Unit Price Bid 72.00$ 5.00$ 300.00$ Total Bid
Extended Bid 16,560.00$ 525.00$ 900.00$ 17,985.00$
NORTHEAST Unit Price Bid 135.00$ 8.50$ 350.00$ Total Bid
Extended Bid 31,050.00$ 892.50$ 1,050.00$ 32,992.50$
PALMER Unit Price Bid 90.70$ 12.00$ 350.00$ Total Bid
Extended Bid 20,861.00$ 1,260.00$ 1,050.00$ 23,171.00$
4
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
TOTAL BID REGION 1A WARNER 3,667,162.75$
TOTAL BID REGION 1A NORTHEAST 3,806,853.80$
TOTAL BID REGION 1A PALMER 3,643,116.00$
Chester 1B TOTAL ROADWAYS 3,500
WARNER Unit Price Bid 75.00$ Total Bid
Extended Bid 262,500.00$ 262,500.00$
NORTHEAST Unit Price Bid 67.25$ Total Bid
Extended Bid 235,375.00$ 235,375.00$
PALMER Unit Price Bid 63.70$ Total Bid
Extended Bid 222,950.00$ 222,950.00$
Chesterfield 1B TOTAL ROADWAYS 4,200 300 100 10
WARNER Unit Price Bid 67.65$ 100.00$ 125.00$ 300.00$ Total Bid
Extended Bid 284,130.00$ 30,000.00$ 12,500.00$ 3,000.00$ 329,630.00$
NORTHEAST Unit Price Bid 67.85$ 155.00$ 155.00$ 350.00$ Total Bid
Extended Bid 284,970.00$ 46,500.00$ 15,500.00$ 3,500.00$ 350,470.00$
PALMER Unit Price Bid 62.00$ 130.00$ 150.00$ 325.00$ Total Bid
Extended Bid 260,400.00$ 39,000.00$ 15,000.00$ 3,250.00$ 317,650.00$
Granville 1B TOTAL ROADWAYS 10,620
WARNER Unit Price Bid 77.00$ Total Bid
Extended Bid 817,740.00$ 817,740.00$
NORTHEAST Unit Price Bid 63.75$ Total Bid
Extended Bid 677,025.00$ 677,025.00$
PALMER Unit Price Bid 60.40$ Total Bid
Extended Bid 641,448.00$ 641,448.00$
5
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Huntington 1B TOTAL ROADWAYS 1,950 870
WARNER Unit Price Bid 75.00$ 4.75$ Total Bid
Extended Bid 146,250.00$ 4,132.50$ 150,382.50$
NORTHEAST Unit Price Bid 82.50$ 5.75$ Total Bid
Extended Bid 160,875.00$ 5,002.50$ 165,877.50$
PALMER Unit Price Bid 67.67$ 4.75$ Total Bid
Extended Bid 131,956.50$ 4,132.50$ 136,089.00$
Middlefield 1B TOTAL ROADWAYS 8,500 7,557
TOTAL DRIVEWAYS/PARKING LOTS 660 186 19
WARNER Unit Price Bid Roadways 71.00$ 3.00$ 325
Unit Price Bid Driveways 90.00$ 10.00$ 325.00$ Total Bid
Extended Bid 662,900.00$ 24,531.00$ 6,175.00$ 693,606.00$
NORTHEAST Unit Price Bid Roadways 69.25$ 3.50$ 350
Unit Price Bid Driveways 99.00$ 3.50$ Total Bid
Extended Bid 653,965.00$ 27,100.50$ 6,650.00$ 687,715.50$
PALMER Unit Price Bid Roadways 66.70$ 3.50$ 325
Unit Price Bid Driveways 82.65$ 8.25$ 325.00$ Total Bid
Extended Bid 621,499.00$ 27,984.00$ 6,175.00$ 655,658.00$
Montgomery 1B TOTAL ROADWAYS 2,841 820
WARNER Unit Price Bid 75.00$ 4.75$ Total Bid
Extended Bid 213,075.00$ 3,895.00$ 216,970.00$
NORTHEAST Unit Price Bid 70.00$ 4.25$ Total Bid
Extended Bid 198,870.00$ 3,485.00$ 202,355.00$
PALMER Unit Price Bid 67.70$ 3.65$ Total Bid
Extended Bid 192,335.70$ 2,993.00$ 195,328.70$
6
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Sandisfield 1B TOTAL ROADWAYS 3,824 20
WARNER Unit Price Bid 74.75$ 150.00$ Total Bid
Extended Bid 285,844.00$ 3,000.00$ 288,844.00$
NORTHEAST Unit Price Bid 69.75$ 155.00$ Total Bid
Extended Bid 266,724.00$ 3,100.00$ 269,824.00$
PALMER Unit Price Bid 71.70$ 165.00$ Total Bid
Extended Bid 274,180.80$ 3,300.00$ 277,480.80$
Tolland 1B TOTAL DRIVWAYS/PARKING LOTS 1,070
WARNER Unit Price Bid 115.00$ Total Bid
Extended Bid 123,050.00$ 123,050.00$
NORTHEAST Unit Price Bid 105.00$ Total Bid
Extended Bid 112,350.00$ 112,350.00$
PALMER Unit Price Bid 78.87$ Total Bid
Extended Bid 84,390.90$ 84,390.90$
Worthington 1B TOTAL ROADWAYS 2,665 220 713 20 3
WARNER Unit Price Bid 69.70$ 125.00$ 4.75$ 200.00$ 400.00$ Total Bid
Extended Bid 185,750.50$ 27,500.00$ 3,386.75$ 4,000.00$ 1,200.00$ 221,837.25$
NORTHEAST Unit Price Bid 69.00$ 155.00$ 4.50$ 155.00$ 350.00$ Total Bid
Extended Bid 183,885.00$ 34,100.00$ 3,208.50$ 3,100.00$ 1,050.00$ 225,343.50$
PALMER Unit Price Bid 64.90$ 150.00$ 3.85$ 180.00$ 350.00$ Total Bid
Extended Bid 172,958.50$ 33,000.00$ 2,745.05$ 3,600.00$ 1,050.00$ 213,353.55$
TOTAL BID REGION 1B WARNER 3,104,559.75$
TOTAL BID REGION 1B NORTHEAST 2,926,335.50$
TOTAL BID REGION 1B PALMER 2,744,348.95$
7
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Deerfield 2A TOTAL ROADWAYS 1,722 502 24
WARNER Unit Price Bid 71.80$ 4.75$ 325.00$ Total Bid
Extended Bid 123,639.60$ 2,384.50$ 7,800.00$ 133,824.10$
NORTHEAST Unit Price Bid 78.85$ 6.00$ 350.00$ Total Bid
Extended Bid 135,779.70$ 3,012.00$ 8,400.00$ 147,191.70$
PALMER Unit Price Bid 110.00$ 8.00$ 600.00$ Total Bid
Extended Bid 189,420.00$ 4,016.00$ 14,400.00$ 207,836.00$
Gill 2A TOTAL ROADWAYS 2,136 1,716
TOTAL DRIVEWAY/PARKING LOTS 258 2 81
WARNER Unit Price Bid Roadways 70.00$ 150.00$ 4.75$
Unit Price Bid Driveways 110.00$ 150.00$ 10.00$ Total Bid
Extended Bid 177,900.00$ 300.00$ 8,961.00$ 187,161.00$
NORTHEAST Unit Price Bid Roadways 66.25$ 3.75$
Unit Price Bid Driveways 115.00$ 155.00$ 3.75$ Total Bid
Extended Bid 171,180.00$ 310.00$ 6,738.75$ 178,228.75$
PALMER Unit Price Bid Roadways 74.50$ 185.00$ 4.50$
Unit Price Bid Driveways 110.00$ 185.00$ 12.00$ Total Bid
Extended Bid 187,512.00$ 370.00$ 8,694.00$ 196,576.00$
Leverett 2A TOTAL ROADWAYS 2,200 1,325 3
WARNER Unit Price Bid 67.00$ 4.75$ 400.00$ Total Bid
Extended Bid 147,400.00$ 6,293.75$ 1,200.00$ 154,893.75$
NORTHEAST Unit Price Bid 73.50$ 4.75$ 350.00$ Total Bid
Extended Bid 161,700.00$ 6,293.75$ 1,050.00$ 169,043.75$
PALMER Unit Price Bid 72.00$ 5.00$ 500.00$ Total Bid
Extended Bid 158,400.00$ 6,625.00$ 1,500.00$ 166,525.00$
8
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Leyden 2A TOTAL ROADWAYS 1,582 500
WARNER Unit Price Bid 68.00$ 4.75$ Total Bid
Extended Bid 107,576.00$ 2,375.00$ 109,951.00$
NORTHEAST Unit Price Bid 66.65$ 5.50$ Total Bid
Extended Bid 105,440.30$ 2,750.00$ 108,190.30$
PALMER Unit Price Bid 71.50$ 6.00$ Total Bid
Extended Bid 113,113.00$ 3,000.00$ 116,113.00$
Co. Name Unit Price Bid Total Bid
Extended Bid -$ -$ -$
Montague 2A TOTAL ROADWAYS 1,500 500
WARNER Unit Price Bid 68.00$ 4.75$ Total Bid
Extended Bid 102,000.00$ 2,375.00$ 104,375.00$
NORTHEAST Unit Price Bid 68.90$ 5.50$ Total Bid
Extended Bid 103,350.00$ 2,750.00$ 106,100.00$
PALMER Unit Price Bid 74.50$ 6.00$ Total Bid
Extended Bid 111,750.00$ 3,000.00$ 114,750.00$
New Salem 2A TOTAL ROADWAYS 1,990 875
WARNER Unit Price Bid 70.50$ 4.75$ Total Bid
Extended Bid 140,295.00$ 4,156.25$ 144,451.25$
NORTHEAST Unit Price Bid 78.00$ 4.75$ Total Bid
Extended Bid 155,220.00$ 4,156.25$ 159,376.25$
PALMER Unit Price Bid 73.00$ 5.50$ Total Bid
Extended Bid 145,270.00$ 4,812.50$ 150,082.50$
Northfield 2A TOTAL ROADWAYS 8,480 50 1,400 12
WARNER Unit Price Bid 70.00$ 150.00$ 4.75$ 200.00$ Total Bid
Extended Bid 593,600.00$ 7,500.00$ 6,650.00$ 2,400.00$ 610,150.00$
NORTHEAST Unit Price Bid 63.65$ 155.00$ 6.00$ 155.00$ Total Bid
Extended Bid 539,752.00$ 7,750.00$ 8,400.00$ 1,860.00$ 557,762.00$
PALMER Unit Price Bid 68.90$ 180.00$ 4.50$ 195.00$ Total Bid
Extended Bid 584,272.00$ 9,000.00$ 6,300.00$ 2,340.00$ 601,912.00$
9
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Orange 2A TOTAL ROADWAYS 1,875 450 75 40
WARNER Unit Price Bid 72.00$ 4.75$ 150.00$ 325.00$ Total Bid
Extended Bid 135,000.00$ 2,137.50$ 11,250.00$ 13,000.00$ 161,387.50$
NORTHEAST Unit Price Bid 68.95$ 6.00$ 155.00$ 350.00$ Total Bid
Extended Bid 129,281.25$ 2,700.00$ 11,625.00$ 14,000.00$ 157,606.25$
PALMER Unit Price Bid 67.25$ 6.25$ 155.00$ 260.00$ Total Bid
Extended Bid 126,093.75$ 2,812.50$ 11,625.00$ 10,400.00$ 150,931.25$
Shutesbury 2A TOTAL ROADWAYS 3,910 1,305
WARNER Unit Price Bid 68.00$ 4.75$ Total Bid
Extended Bid 265,880.00$ 6,198.75$ 272,078.75$
NORTHEAST Unit Price Bid 70.00$ 4.75$ Total Bid
Extended Bid 273,700.00$ 6,198.75$ 279,898.75$
PALMER Unit Price Bid 69.90$ 5.75$ Total Bid
Extended Bid 273,309.00$ 7,503.75$ 280,812.75$
Sunderland 2A TOTAL ROADWAYS 1,711 30 800 100 20
WARNER Unit Price Bid 72.00$ 150.00$ 4.75$ 125.00$ 300.00$ Total Bid
Extended Bid 123,192.00$ 4,500.00$ 3,800.00$ 12,500.00$ 6,000.00$ 149,992.00$
NORTHEAST Unit Price Bid 80.00$ 155.00$ 5.00$ 155.00$ 350.00$ Total Bid
Extended Bid 136,880.00$ 4,650.00$ 4,000.00$ 15,500.00$ 7,000.00$ 168,030.00$
PALMER Unit Price Bid 85.00$ 250.00$ 6.00$ 175.00$ 575.00$ Total Bid
Extended Bid 145,435.00$ 7,500.00$ 4,800.00$ 17,500.00$ 11,500.00$ 186,735.00$
Warwick 2A TOTAL ROADWAYS 3,500 2,500
WARNER Unit Price Bid 69.00$ 3.00$ Total Bid
Extended Bid 241,500.00$ 7,500.00$ 249,000.00$
NORTHEAST Unit Price Bid 65.45$ 3.75$ Total Bid
Extended Bid 229,075.00$ 9,375.00$ 238,450.00$
PALMER Unit Price Bid 70.00$ 4.25$ Total Bid
Extended Bid 245,000.00$ 10,625.00$ 255,625.00$
10
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Wendell 2A TOTAL ROADWAYS 5,500 1,500 9
WARNER Unit Price Bid 69.00$ 4.75$ 325.00$ Total Bid
Extended Bid 379,500.00$ 7,125.00$ 2,925.00$ 389,550.00$
NORTHEAST Unit Price Bid 66.95$ 6.00$ 350.00$ Total Bid
Extended Bid 368,225.00$ 9,000.00$ 3,150.00$ 380,375.00$
PALMER Unit Price Bid 66.60$ 4.25$ 325.00$ Total Bid
Extended Bid 366,300.00$ 6,375.00$ 2,925.00$ 375,600.00$
Whately 2A TOTAL ROADWAYS 1,100 70 60
WARNER Unit Price Bid 68.00$ 10.00$ 125.00$ Total Bid
Extended Bid 74,800.00$ 700.00$ 7,500.00$ 83,000.00$
NORTHEAST Unit Price Bid 74.45$ 15.00$ 155.00$ Total Bid
Extended Bid 81,895.00$ 1,050.00$ 9,300.00$ 92,245.00$
PALMER Unit Price Bid 78.85$ 30.00$ 185.00$ Total Bid
Extended Bid 86,735.00$ 2,100.00$ 11,100.00$ 99,935.00$
TOTAL BID REGION 2A WARNER 2,749,814.35$
TOTAL BID REGION 2A NORTHEAST 2,742,497.75$
TOTAL BID REGION 2A PALMER 2,903,433.50$
11
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Belchertown 2B TOTAL ROADWAYS 12,019 6,796 290.5 93
WARNER Unit Price Bid 66.00$ 4.75$ 125.00$ 300.00$ Total Bid
Extended Bid 793,254.00$ 32,281.00$ 36,312.50$ 27,900.00$ 889,747.50$
NORTHEAST Unit Price Bid 71.85$ 4.15$ 155.00$ 350.00$ Total Bid
Extended Bid 863,565.15$ 28,203.40$ 45,027.50$ 32,550.00$ 969,346.05$
PALMER Unit Price Bid 64.20$ 3.25$ 130.00$ 230.00$ Total Bid
Extended Bid 771,619.80$ 22,087.00$ 37,765.00$ 21,390.00$ 852,861.80$
Easthampton 2B TOTAL ROADWAYS 8,700 245 3,950 43 168
WARNER Unit Price Bid 75.00$ 150.00$ 4.00$ 200.00$ 350.00$ Total Bid
Extended Bid 652,500.00$ 36,750.00$ 15,800.00$ 8,600.00$ 58,800.00$ 772,450.00$
NORTHEAST Unit Price Bid 71.00$ 155.00$ 4.15$ 155.00$ 350.00$ Total Bid
Extended Bid 617,700.00$ 37,975.00$ 16,392.50$ 6,665.00$ 58,800.00$ 737,532.50$
PALMER Unit Price Bid 63.30$ 135.00$ 4.05$ 135.00$ 230.00$ Total Bid
Extended Bid 550,710.00$ 33,075.00$ 15,997.50$ 5,805.00$ 38,640.00$ 644,227.50$
Granby 2B TOTAL ROADWAYS 8,922 650 75
WARNER Unit Price Bid 77.00$ 4.75$ 150.00$ Total Bid
Extended Bid 686,994.00$ 3,087.50$ 11,250.00$ 701,331.50$
NORTHEAST Unit Price Bid 65.45$ 4.75$ 155.00$ Total Bid
Extended Bid 583,944.90$ 3,087.50$ 11,625.00$ 598,657.40$
PALMER Unit Price Bid 60.90$ 4.25$ 145.00$ Total Bid
Extended Bid 543,349.80$ 2,762.50$ 10,875.00$ 556,987.30$
Hadley 2B TOTAL ROADWAYS 1,249 642
WARNER Unit Price Bid 72.00$ 4.00$ Total Bid
Extended Bid 89,928.00$ 2,568.00$ 92,496.00$
NORTHEAST Unit Price Bid 82.00$ 5.75$ Total Bid
Extended Bid 102,418.00$ 3,691.50$ 106,109.50$
PALMER Unit Price Bid 73.99$ 5.50$ Total Bid
Extended Bid 92,413.51$ 3,531.00$ 95,944.51$
12
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Hatfield 2B TOTAL ROADWAYS 250 50 250 10 2
WARNER Unit Price Bid 75.00$ 125.00$ 4.00$ 150.00$ 400.00$ Total Bid
Extended Bid 18,750.00$ 6,250.00$ 1,000.00$ 1,500.00$ 800.00$ 28,300.00$
NORTHEAST Unit Price Bid 135.00$ 155.00$ 5.00$ 155.00$ 350.00$ Total Bid
Extended Bid 33,750.00$ 7,750.00$ 1,250.00$ 1,550.00$ 700.00$ 45,000.00$
PALMER Unit Price Bid 89.00$ 175.00$ 6.00$ 310.00$ 325.00$ Total Bid
Extended Bid 22,250.00$ 8,750.00$ 1,500.00$ 3,100.00$ 650.00$ 36,250.00$
Pelham 2B TOTAL ROADWAYS 2,050 710
WARNER Unit Price Bid 67.00$ 4.00$ Total Bid
Extended Bid 137,350.00$ 2,840.00$ 140,190.00$
NORTHEAST Unit Price Bid 76.00$ 6.50$ Total Bid
Extended Bid 155,800.00$ 4,615.00$ 160,415.00$
PALMER Unit Price Bid 73.00$ 5.25$ Total Bid
Extended Bid 149,650.00$ 3,727.50$ 153,377.50$
Southampton 2B TOTAL ROADWAYS 4,944 20 2,842 42
WARNER Unit Price Bid 68.00$ 150.00$ 4.00$ 300.00$ Total Bid
Extended Bid 336,192.00$ 3,000.00$ 11,368.00$ 12,600.00$ 363,160.00$
NORTHEAST Unit Price Bid 66.00$ 155.00$ 4.15$ 350.00$ Total Bid
Extended Bid 326,304.00$ 3,100.00$ 11,794.30$ 14,700.00$ 355,898.30$
PALMER Unit Price Bid 63.25$ 150.00$ 3.85$ 250.00$ Total Bid
Extended Bid 312,708.00$ 3,000.00$ 10,941.70$ 10,500.00$ 337,149.70$
13
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Westhampton 2B TOTAL ROADWAYS 2,659 1,244
2B TOTAL DRIVEWAY/PARKING LOTS 220
WARNER Unit Price Bid Roadways 68.00$ 4.75$
Unit Price Bid Driveways 120.00$ Total Bid
Extended Bid 207,212.00$ 5,909.00$ 213,121.00$
NORTHEAST Unit Price Bid Roadways 66.95$ 4.25$
Unit Price Bid Driveways 88.00$ Total Bid
Extended Bid 197,380.05$ 5,287.00$ 202,667.05$
PALMER Unit Price Bid Roadways 65.30$ 4.40$
Unit Price Bid Driveways 95.00$ 6.00$ Total Bid
Extended Bid 194,532.70$ 5,473.60$ 200,006.30$
TOTAL BID REGION 2B WARNER 3,200,796.00$
TOTAL BID REGION 2B NORTHEAST 3,175,625.80$
TOTAL BID REGION 2B PALMER 2,876,804.61$
WARNER 12,722,332.85$
NORTHEAST 12,651,312.85$
PALMER 12,167,703.06$
GRAND TOTAL BID (for bid bond)
GRAND TOTAL BID (for bid bond)
GRAND TOTAL BID (for bid bond)
14
FRANKLIN REGIONAL COLLECTIVE
BID #H16 LIQUID ASPHALT
BID TABULATION
Open May 12, 2020 at 2:00pm
MaDOT Period Prices Apply
All States Asphalt Inc.
325 Amherst Rd. PO Box 91
Sunderland, MA 01375
Tel 413-665-7021
Fax 413-665-9027
MC Cutback Asphalt Applied-in-place Price Per gal. Total by Town
Hawley 3,520 $3.65 $12,848.00
Westhampton 8,806 $3.65 $32,141.90
$44,989.90
Tax Compliance Signed? x
Non-Collusion Signed? x
Debarment Cert Signed? x
OSHA Cert? x
Pre-Qual? x
MARCH 2020 $552.50/TON
FY21 Draft Bid Tabs H-2 through 23
TOWN Region
Total Estimated
Square Yards
Reclaim
Pavement
Quantity in SY
ALL STATES
Cost / SY
GARRITY Cost
/ SY
MURRAY Cost
/ SY
PALMER Cost /
SY
RAFFERTY
Cost / SY
Reclaim
Pavement
w/fine grading
& vibratory
compacition
Quantity in SY
ALL STATES
Cost / SY
GARRITY Cost
/ SY
MURRAY
Cost / SY
PALMER Cost
/ SY
RAFFERTY
Cost / SY
Structures
Lowered
Qty in EA
ALL STATES
Cost / Each
GARRITY Cost
/ Each
MURRAY Cost
/ Each
PALMER Cost
/ Each
RAFFERTY
Cost / Each
Addition of
Calcium at 1 gal
per SY unless
otherwise noted
Quantity in SY
ALL STATES
Cost / ga
GARRITY Cost /
ga
MURRAY Cost
/ ga
PALMER Cost
/ ga
RAFFERTY
Cost / ga
Injection of
Emulsion *
Quantity in SY
ALL STATES
Cost / SY
GARRITY Cost
/ SY
MURRAY Cost
/ SY
PALMER Cost /
SY
RAFFERTY
Cost / SY
ALL STATES ASPHALT-
Sunderland, MA Total Bid
GARRITY ASPHALT
RECLAIMING Bloomfield,
CT Total Bid
MURRAY PAVING and
RECLAMATION
Holliston, MA Total Bid
PALMER PAVING CORP
Palmer, MA Total Bid
RAFFERTY FINE
GRADING Enfield,
CT Total Bid
Charlemont 1A 27000.00 27000.00 0.69 0.85 0.63 0.70 0.84 18,630.00$ 22,950.00$ 17,010.00$ 18,900.00$ 22,680.00$
Conway 1A 15000.00 15000.00 1.24 2.60 1.57 1.65 1.52 15000.00 1.00 1.40 1.00 2.45 1.34 33,600.00$ 60,000.00$ 38,550.00$ 61,500.00$ 42,900.00$
Hawley 1A 28160.00 28160.00 2.60 3.00 NoBid 1.50 2.22 28160.00 3.25 4.00 NoBid 4.20 4.00 164,736.00$ 197,120.00$ NO BID 160,512.00$ 175,155.20$
Monroe 1A 21103.00 21103.00 1.24 2.60 1.95 1.60 1.32 13532.00 1.00 1.40 1.00 2.55 1.44 39,699.72$ 73,812.60$ 54,682.85$ 68,271.40$ 47,342.04$
Savoy 1A 8000.00 8000.00 1.70 2.60 2.11 1.85 1.74 8000.00 1.00 1.40 1.00 2.65 1.54 21,600.00$ 32,000.00$ 24,880.00$ 36,000.00$ 26,240.00$
Shelburne 1A 9900.00 9900.00 1.42 3.00 1.69 1.71 1.74 14,058.00$ 29,700.00$ 16,731.00$ 16,929.00$ 17,226.00$
TOTAL BID REGION 1A 292,323.72$ 415,582.60$ 151,853.85$ 362,112.40$ 331,543.24$
Chesterfield 1B 11000.00 11000.00 1.26 2.60 1.69 1.75 1.64 11000.00 1.04 1.40 1.00 2.62 1.54 25,300.00$ 44,000.00$ 29,590.00$ 48,070.00$ 34,980.00$
Granville 1B 63350.00 63350.00 2.60 3.00 NoBid 1.70 2.22 63350.00 3.25 4.00 NoBid 4.25 4.00 370,597.50$ 443,450.00$ NO BID 376,932.50$ 394,037.00$
Montgomery 1B 12790.00 12790.00 1.34 2.60 1.69 1.70 1.54 12790.00 1.04 1.40 1.00 2.60 1.54 30,440.20$ 51,160.00$ 34,405.10$ 54,997.00$ 39,393.20$
Sandisfield 1B 22225.00 22225.00 1.16 2.60 1.89 1.65 1.18 22225.00 1.04 1.40 1.00 2.75 1.14 48,895.00$ 88,900.00$ 64,230.25$ 97,790.00$ 51,562.00$
Worthington 1B 12000.00 12000.00 2.60 3.50 NoBid 1.65 4.50 12000.00 3.25 4.00 NoBid 4.70 6.00 70,200.00$ 90,000.00$ NO BID 76,200.00$ 126,000.00$
TOTAL BID REGION 1B 545,432.70$ 717,510.00$ 128,225.35$ 653,989.50$ 645,972.20$
Northfield 2A 19398.00 19398.00 0.74 0.85 0.68 0.80 0.88 14,354.52$ 16,488.30$ 13,190.64$ 15,518.40$ 17,070.24$
Orange 2A 7100.00 7100.00 2.15 2.60 1.69 3.60 1.54 40.00 150.00 500.00 200.00 750.00 650.00 7100.00 1.00 1.40 1.00 3.75 1.54 28,365.00$ 48,400.00$ 27,099.00$ 82,185.00$ 47,868.00$
TOTAL BID REGION 2A 42,719.52$ 64,888.30$ 40,289.64$ 97,703.40$ 64,938.24$
Belchertown 2B 25100.00 25100.00 1.16 2.60 1.69 2.80 1.24 28.00 150.00 500.00 200.00 750.00 650.00 25100.00 1.00 1.40 1.00 4.10 1.14 58,416.00$ 114,400.00$ 73,119.00$ 194,190.00$ 77,938.00$
Easthampton 2B 9600.00 9600.00 1.49 2.60 1.69 3.00 1.94 24.00 150.00 500.00 200.00 775.00 650.00 9600.00 1.04 1.40 1.00 3.75 1.54 27,888.00$ 50,400.00$ 30,624.00$ 83,400.00$ 49,008.00$
Granby 2B 34708.00 34708.00 0.72 0.85 0.63 0.75 0.84 24,989.76$ 29,501.80$ 21,866.04$ 26,031.00$ 29,154.72$
Hadley 2B 10533.00 10533.00 0.84 0.85 0.63 0.80 0.98 8,847.72$ 8,953.05$ 6,635.79$ 8,426.40$ 10,322.34$
TOTAL BID REGION 2B 120,141.48$ 203,254.85$ 132,244.83$ 312,047.40$ 166,423.06$
GRAND TOTAL ALL REGIONS 1,000,617.42$ 1,401,235.75$ 452,613.67$ 1,425,852.70$ 1,208,876.74$
* For Reclamation with Injection of Emulsion: Additional, if needed and approved by Town – Liquid Asphalt Adjustment after Mix Design $_______/Gall $3.25/GAL $4.00/GA N/A $4.65/GALLON $12.00/GA
TAX COMPLIANCE? X X X X X
NON COLLUSION? X X X X X
PREQUALIFIED? X X X X X
ACKNOWLEDGE ADD.? X X X X X
DBARMENT? X X X X X
OSHA? X X X X X
BID DEPOSIT? X X X X X
H-17 RECLAMATION BID / FY21 - ADDENDUM 1
FRANKLIN REGIONAL COLLECTIVE
H-19 Hot In Place Recycling
BID TABULATION
Open May 12, 2020 at 2:00pm
MaDOT Period Prices Apply $552.50 per ton base price
2258 Rte 22, Brewster, NY 10509
TOWN
Est Volume Square
Yards 845-278-9645 total
per sq. yd.
GRANBY 38174 $ 5.16 $ 196,977.84
Pre-Qual? x
Tax Compliance Signed? x
Non-Collusion Signed? x
Debarment Signed? x
OSHA x
Bid deposit? x
Highway Rehabilitation Corp
FY21 Draft Bid Tabs H-2 through 23
FRANKLIN REGIONAL COLLECTIVE
BID TABULATION
Open May 12, 2020 at 2:00pm
COLD
PLANING/MILLING-
H20A Standard Milling
Rafferty Fine
Grading
Total SY Structures
Total
Structures
Contractor
Removes
Millings?
Town Retains
Millings?
Town/Road PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for
SQ YD STRUCTURE Town SQ YD STRUCTURE Town SQ YD STRUCTURE Town SQ YD STRUCTURETown
Belchertown
25900 61
A- Town
Retains 1.94$ 250.00$ 65,496.00$ 1.73$ 10.00$ 45,417.00$ 2.65$ 75.00$ 73,210.00$ 1.90$ 25.00$ 50,735.00$
Gill -$ -$ -$ -$
19500 0
A- Town
Retains 2.44$ 47,580.00$ 1.57$ 30,615.00$ 1.70$ 33,150.00$ 1.92$ 25.00$ 37,440.00$
Easthampton -$ -$ -$ -$
28900 144
A- Town
Retains 2.44$ 250.00$ 106,516.00$ 1.80$ 10.00$ 53,460.00$ 2.25$ 75.00$ 75,825.00$ NO BID -$
Granby -$ -$ -$ -$
18939
C- Contractor
Removes
A- Town
Retains 2.44$ 46,211.16$ 1.75$ 33,143.25$ 1.85$ 35,037.15$ NO BID -$
Hadley -$ -$ -$ -$
9533 49
A-Town
Retains 3.54$ 250.00$ 45,996.82$ 1.98$ 10.00$ 19,365.34$ 1.95$ 75.00$ 22,264.35$ NO BID -$
Huntington -$ -$ -$ -$
3900
A-Town
Retains 12.00$ 46,800.00$ 3.75$ 14,625.00$ 4.00$ 15,600.00$ NO BID -$
Leverett -$ -$ -$ -$
8448 1
A-Town
Retains 6.54$ 250.00$ 55,499.92$ 2.24$ 10.00$ 18,933.52$ 2.20$ 75.00$ 18,660.60$ 1.85$ 25.00$ 15,653.80$
Montague -$ -$ -$ -$
31,000 32
Split
millings
between Town
& Contractor 2.44$ 250.00$ 83,640.00$ 1.49$ 10.00$ 46,510.00$ 1.85$ 75.00$ 59,750.00$ 1.79$ 25.00$ 56,290.00$
Montgomery -$ -$ -$ -$
11736 0
A-Town
Retains 6.54$ 76,753.44$ 1.82$ 21,359.52$ 1.85$ 21,711.60$ NO BID -$
Sunderland -$ -$ -$ -$
13493 25
A-Town
Retains 3.54$ 250.00$ 54,015.22$ 1.76$ 10.00$ 23,997.68$ 1.95$ 75.00$ 28,186.35$ 1.75$ 25.00$ 24,237.75$
Whately -$ -$ -$ -$
1350 14 25.00$ 250.00$ 37,250.00$ 11.00$ 10.00$ 14,990.00$ 10.30$ 75.00$ 14,955.00$ 9.00$ 25.00$ 12,500.00$
TOTAL 172699 326 665,758.56$ 322,416.31$ 398,350.05$ 196,856.55$
COLD PLANING/MILLING BID H20
PO Box 91, Sunderland, MA 01375
Eurovia Atlantic Coast/Northeast Paving All States Asphalt Inc.Garrity Asphalt Reclaiming
57 S Rd., Enfield, CT 06082 22 Peters Rd., Bloomfield, CT 06002 311 East Mtn Road, Westfield, MA 01085
FY21 Draft Bid Tabs H-2 through 23
COLD
PLANING/MILLING-
H20B Micro Milling Total SY Structures
Total
Structures
Contractor
Removes
Millings?
Town Retains
Millings?
Rafferty
Fine Grading
Town/Road
PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for
Chesterfield SQ YD STRUCTURETown SQ YD STRUCTURE Town SQ YD STRUCTURETown SQ YD STRUCTURETown
20000 10 10
TOWN
RETAINS 2.84$ 250.00$ 59,300.00$ NO BID 1.85$ 75.00$ 37,750.00$ NO BID
Conway -$ NO BID -$ NO BID
8115 3 3
TOWN
RETAINS 3.94$ 250.00$ 32,723.10$ NO BID 2.15$ 75.00$ 17,672.25$ NO BID
Deerfield -$ NO BID -$ NO BID
11700
TOWN
RETAINS 3.84$ 44,928.00$ NO BID 2.95$ 34,515.00$ NO BID
Gill -$ NO BID -$ NO BID
19500
TOWN
RETAINS 2.84$ 55,380.00$ NO BID 1.70$ 33,150.00$ NO BID
Middlefield -$ NO BID -$ NO BID
75568 19
TOWN
RETAINS 2.74$ 250.00$ 211,806.32$ NO BID 1.70$ 75.00$ 129,890.60$ NO BID
Northfield -$ NO BID -$ NO BID
20228 3 2.94$ 250.00$ 60,220.32$ NO BID 1.70$ 75.00$ 34,612.60$ NO BID
-$ NO BID -$ NO BID
Sunderland -$ NO BID -$ NO BID
13493 25
TOWN
RETAINS 3.38$ 250.00$ 51,856.34$ NO BID 1.95$ 75.00$ 28,186.35$ NO BID
NO BID -$ NO BID
TOTAL 168,604 60 516,214.08$ NO BID -$
315,776.80$
Pre-Qual? X X X X
Addendum 1? X X X X
Tax Compliance Signed? X X X X
Non-Collusion Signed? X X X X
Debarment Signed? X X X X
OSHA X X X X
Bid bond X X X X
57 S Rd., Enfield, CT 06082 22 Peters Rd., Bloomfield, CT 06002 311 East Mtn Road, Westfield, MA 01085 PO Box 91, Sunderland, MA 01375
Garrity Asphalt Reclaiming Eurovia Atlantic Coast/Northeast Paving All States Asphalt Inc.
FY21 Draft Bid Tabs H-2 through 23
FRANKLIN REGIONAL COLLECTIVE
H-21 Cold In Place Recycling
BID TABULATION
Open May 12, 2020 at 2:00pm
MaDOT Period Prices Apply
825 Granite St., Braintree,
MA 02184
TOWN
Est Volume Square
Yards Ph 781-428-3400 total
per sq. yd.
Colrain 34,222 $ 5.30 $ 181,376.60
Deerfield 60,000 $ 4.87 $ 292,200.00
Gill 19,066 $ 6.25 $ 119,162.50
TOTAL $ 592,739.10
Additional items, if needed Aggregate 35.00$ ton
Portland Cement 210.00$ ton
Liquid Asphalt Adjustment 3.43$ gallon
Pre-Qual? x
Addendum 1? x
Tax Compliance Signed? x
Non-Collusion Signed? x
Debarment Signed? x
OSHA x
Bid deposit? x
Sealcoating, Inc. dba Indus
FY21 Draft Bid Tabs H-2 through 23
Bucket Truck Operator Laborer (Tree Removal) 60' Aerial Lift 65' Aerial Lift 75' Alpine Unit
Log loader & Operator -
(Prentice 120 C log
loader on a
Log-hauler truck with at
least a
50 cubic yard capacity)
or equal
Blandford 80 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Chester 200 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Chesterfield 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Conway 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Deerfield 150 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Easthampton 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Gill 80 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Granby 120 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Granville 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Hadley 120 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Middlefield 12 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Sunderland 24 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Westhampton 8 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Williamsburg 16 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Worthington 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Bid Form X Tax Compliance/Non-Collusion X OSHA Statement X
Bid Signature X Debarment Form X 5% Bid Bond X
BID TABULATION
H-22 TREE WORK FY2021
Tree Removal
Vendors may bid per hour for all towns, a single town, or any group of towns.
Bidder Name: Northern Tree Service, Inc. 1290 Park St., PO Box 790, Palmer, MA 01069
Franklin Regional Collective Open May 12, 2020 at 2pm
1 of 3
Climber / Trimmer
operator
( A )
60' Aerial Lift Bucket
truck w/dump chipper
box
( B )
Total Per Hour Bucket
Truck and Operator
( A + B )
Hydraulic Disc chipper
w/capacity for 12" limb
( C )
Ground person
( D )
Total Bucket Truck,
Trimmer, Chipper and
Ground Person Per Hour
(A + B + C + D)
Blandford 120 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Chesterfield 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Deerfield 150 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Easthampton 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Goshen 80 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Granby 20 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Hadley 120 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Heath 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Middlefield 8 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Sunderland 24 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Tolland 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Worthington 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Tree Trimming
BID TABULATION
H-22 TREE WORK FY2021
Vendors may bid per hour for all towns, a single town, or any group of towns.
Bidder Name: Northern Tree Service, Inc. 1290 Park St., PO Box 790, Palmer, MA 01069
2 of 3
Chipper Crew:
Foreman/operator
Dump truck With 10 cu
yd chip box
Laborer/Chainsaw
operator
Hydraulic Disc Chipper
w/capacity for 12” limb
Log loader & Operator
(Prentice 120 C log
loader on a Log-
hauler/debris hauling
truck w min. 50 cubic
yard capacity) or equal.
Truck must be equipped
with solid sides to allow
loading of brush and
debris.
Horizontal Grinder CBI
1000H.P. or equal
Deerfield 150 hours Cost Per HourNormal Shift 85.00$ 40.00$ 85.00$ 25.00$ 180.00$ 850.00$
Emergency/
Overtime120.00$ 40.00$ 120.00$ 25.00$ 235.00$ 1,200.00$
Granby 30 hours Cost Per HourNormal Shift 85.00$ 40.00$ 85.00$ 25.00$ 180.00$ 850.00$
Emergency/
Overtime120.00$ 40.00$ 120.00$ 25.00$ 235.00$ 1,200.00$
Westhampton 8 hours Cost Per HourNormal Shift 85.00$ 40.00$ 85.00$ 25.00$ 180.00$ 850.00$
Emergency/
Overtime120.00$ 40.00$ 120.00$ 25.00$ 235.00$ 1,200.00$
Stump Grinder (12” to
48” grinding capacity)
Granby 20 hours Cost Per HourNormal Shift 175.00$
Emergency/
Overtime225.00$
Granville 32 hours Cost Per HourNormal Shift 175.00$
Emergency/
Overtime225.00$
Worthington 40 hours Cost Per HourNormal Shift 175.00$
Emergency/
Overtime225.00$
BID TABULATION
H-22 TREE WORK FY2021
Vendors may bid per hour for all towns, a single town, or any group of towns.
Stump Grinding
Debris Removal
Bidder Name: Northern Tree Service, Inc. 1290 Park St., PO Box 790, Palmer, MA 01069
3 of 3
FRANKLIN REGIONAL COLLECTIVE
BID # H23 Catch Basin Cleaning
Open May 12, 2020 @ 1pm
Bid Tabulation
Company J.R. Sweeping Service Wind River Environmental Eastern Pipe Service LLC
28 Moylan Lane, Agawam, MA 01001 46 Lizotte Dr, Marlborough, MA 01752 2 Thibeault Drive, Bow, NH 03304
Contact Person James Ricco, Owner/Mgr Steve Ciras Richard Berthiaume
Tel/Fax or Email Tel 413-786-2168 Fax 413-789-3738 Tel 978-875-3290 Tel 603-424-4600
Machine Descriptions 1: 2006 Vac-Con Model V312IAH/1000 8 cy, 12,000 CFM DOESN'T MEET SPEC
1: 2012 Kenworth Vactor 2100, 12 cy, 1200 gallon, 4460 CFM
1: 2015 Vactor Model 2115-EQ8886 15 cy, 3800 CFM 1500 gallon
2001 Vactor 2100 8 cy, DOESN'T MEET SPEC
2: 2012 Freightliner Vactor 2100 Plus, 12 cy capacity, 1200 gallon, 4460 CFM
2: 2013 Vactor Model 2115 Plus-EQ6287 15 cy, 4460 CFM, 1500 gallon
3: 2015 Freightliner VacCon 5450 CFM, 10 yd capacity 1500 gall DOESN’T MEET
SPEC
3: 2012 Freightliner Vactor Model 2115 Plus - EQ 5914 15 cy, 3800 CFM, 1500 gall
Bid per hr REGION 1A Cleaning/Jetting $225.00 $269.00 $219.00
Bid per hr REGION 1B Cleaning/Jetting $210.00 $269.00 $219.00
Lateral Cleaning $210.00 $269.00 $219.00
Bid per hr REGION 2A Cleaning/Jetting $225.00 $269.00 $219.00
Lateral Cleaning $225.00 $269.00 $219.00
Bid per hr REGION 2B Cleaning/Jetting $200.00 $269.00 $219.00
Lateral Cleaning $200.00 $269.00 $219.00
Total Hrs x Bid Price = $358,345 Total Hrs x Bid Price $459,183.00 Total Hrs x Bid Price = $373,833
Emergency Response Time? 24 HOURS
3-4 HOURS 48 HOURS
References if not worked for FRCOG COLLECTIVEtax compliance, non collusion, signature,
TOWN ESTIMATES
REGION 1A CLEAN/JE 164 HRS APPROXIMATELY Required Docs JR SWEEP WIND RIV EASTERN
REGION 1A LATERAL 0 HRS APPROXIMATELY Bid Form X
Addendum X
REGION 1B CLEAN/JE 236 HRS APPROXIMATELY Tax Comp XREGION 1B LATERAL 36 HRS APPROXIMATELY Non Collus X
OSHA XREGION 2A CLEAN/JE 403 HRS APPROXIMATELY Debarment XREGION 2A LATERAL 2 HRS APPROXIMATELY Corp Auth X
REGION 2B CLEAN/JE 728 HRS APPROXIMATELYREGION 2B LATERAL 138 HRS APPROXIMATELY
1707
FY21 Draft Bid Tabs H-2 through 23
H-1
Aggregates - PICKED UP
BID TABULATION - Open May 12,2020 at 3:00 pm
MDOT
All States
Asphalt /
Mitchell
Materials,
LLC
All States
Asphalt / Trew
Stone, LLC
Delta Sand &
Gravel, Inc.
Eurovia
Atlantic Coast,
LLC
Hathaway
Construction
Hilltown Sand
& Gravel
Ondrick
Materials &
Recycling,
LLC
Porter
Transportation
Co., Inc.
Tonlino &
Sons, LLC
Zoar Stone &
Gravel
Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton
John S. Lane & Son
1 6" Minus max type "a" aka Bank Run Gravel 1.03.0 8.00$ No Bid 6.40$ No Bid 11.65$ W'fld 7.25$ No Bid No Bid 5.33$ 10.50$ 10.80$
2
3” Minus max type “b” aka Bank Run Gravel /Processed
Gravel for Subbase or Dense Graded Gravel) 1.03.1 10.00$ No Bid 8.60$ No Bid 11.65$ W'fld 7.35$ No Bid No Bid 6.66$ 10.50$ 10.00$
3 1 ½” Minus Screened Gravel –type “d” aka 2" minus screened 1.03.0 12.00$ No Bid 8.60$ 12.00$ No Bid 7.55$ 12.50$ No Bid 10.00$ No Bid 9.75$
4 3/4” Minus Screened Gravel- (aka 1” minus crushed gravel) 1.03.0 12.50$ No Bid 10.90$ 13.00$ No Bid 7.55$ No Bid No Bid 10.66$ No Bid 9.75$
5
3” Minus Crushed Gravel (aka Processed Gravel for Subbase
or Dense Graded Gravel) 1.03.1 12.00$ No Bid No Bid 14.00$ 11.65$ W'fld 7.65$ No Bid No Bid 7.33$ 10.50$ 10.00$
6
1 ½” Minus Crushed Gravel (aka Processed Gravel for
Subbase or Dense Graded Gravel) 1.03.1 12.00$ No Bid 10.90$ 14.00$ No Bid 7.35$ 12.50$ 10.20$ 10.00$ No Bid 9.75$
7 3/4” Minus Crushed Gravel 14.00$ No Bid 10.90$ 14.00$ No Bid 7.65$ 13.50$ No Bid 10.66$ No Bid 9.75$
8 1/2” Minus Crushed Gravel No Bid No Bid 10.15$ No Bid No Bid No Bid 15.95$ No Bid No Bid No Bid No Bid
9 Stone Screening/Stone Dust Natural/Brown Color 2.05.0 No Bid No Bid 7.40$ No Bid No Bid No Bid No Bid No Bid 5.33$ No Bid No Bid
10 Recycled Asphalt/Reclaimed Pavement/Hardpak 1.09.0 No Bid 18.25$ 12.25$ 8.00$ 10.25$ E'ton 7.80$ No Bid No Bid 10.00$ No Bid 10.50$
11 3/4” Minus Recycled Asphalt/Crushed/Driveway Millings No Bid 7.00$ 12.25$ 8.00$ No Bid 7.80$ No Bid No Bid No Bid No Bid 12.00$
12 1 ½” Washed Gravel Stone - Size #4 ASTM D448 No Bid No Bid 12.20$ 11.65$ No Bid 10.95$ 11.50$ No Bid No Bid No Bid No Bid
13 1 ½” Un-Washed Gravel Stone - Size #4 ASTM D448 No Bid No Bid 12.20$ 11.65$ No Bid 10.95$ 10.50$ No Bid 11.33$ No Bid 13.50$
14 3/4” Washed Gravel Stone - Size #6 ASTM D448 No Bid No Bid 11.00$ 11.65$ 13.30$ Pochassic 11.70$ 12.75$ No Bid No Bid No Bid No Bid
15 1/2” Washed Gravel Stone - Size #7 ASTM D448 No Bid No Bid 10.75$ 11.65$ No Bid 11.85$ No Bid No Bid No Bid No Bid No Bid
16 3/8” Washed Gravel Stone - Size #8 ASTM D448 No Bid No Bid 14.45$ 11.65$ No Bid 11.20$ 13.25$ No Bid No Bid No Bid No Bid
17 1 ½” Crushed Stone Traprock 2.01.1 13.50$ 15.00$ 21.65$ 15.50$ 13.70$ W'fld / Amherst No Bid 14.00$ No Bid No Bid 12.50$ 13.50$
18 3/4”Crushed Stone Traprock 2.01.4 13.50$ 15.00$ 21.65$ 15.50$ 14.00$ W'fld / Amherst No Bid 15.00$ No Bid No Bid 13.25$ No Bid
19 ½” Crushed Stone Traprock 2.01.5 14.00$ 16.00$ No Bid 16.50$ 13.95$ W'fld / Amherst No Bid No Bid No Bid No Bid No Bid No Bid
20 3/8” Crushed Stone Traprock 2.01.6 15.45$ 15.45$ 22.40$ 16.50$ 14.70$ W'fld / Amherst No Bid 16.00$ No Bid No Bid No Bid No Bid
21 1 ½” Dense Graded Crushed Stone Traprock for sub-base 2.01.7 11.50$ 15.75$ 22.40$ 14.00$ 12.40$ W'fld / Amherst No Bid No Bid No Bid No Bid 11.75$ 13.50$
22 3/4”Minus TRG Traprock Gravel No Bid 10.85$ 18.30$ 10.00$ 12.40$ W'fld / Amherst No Bid No Bid 11.50$ No Bid 12.25$ 14.50$
23 ½” Minus TRG Traprock gravel 11.50$ 8.00$ 17.25$ No Bid 10.50$ W'fld / Amherst No Bid No Bid No Bid No Bid 12.25$ No Bid
24 Rip Rap 6” max 2.02.0 15.00$ 15.75$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid 14.00$ 12.50$ 15.50$
25 Rockfill 2.02.1 14.00$ 15.75$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 14.50$ No Bid
26 Dumped Rip Rap 2.02.2 14.00$ 14.00$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 14.50$ No Bid
27 Stone for Pipe Ends 2.02.3 15.00$ 15.75$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 12.50$ No Bid
28 Modified Rockfill 2.02.4 15.00$ 17.00$ 27.80$ 17.50$ 15.45$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 12.50$ No Bid
29 Quarry Stone Dust Blue/Grey Color 2.05.0 No Bid 10.00$ 16.75$ 14.00$ 10.50$ W'fld / Amherst No Bid No Bid No Bid No Bid No Bid No Bid
30 Loam 1.05.0 No Bid No Bid 16.80$ 25.00$ 20.00$ Easthampton 16.70$ 22.00$ No Bid 12.66$ 22.00$ No Bid
20 Payne Road,
Winchester, NH
03470
901 River Road,
Deerfield, MA
01342
562 Amherst Rd,
Sunderland, MA
01375
216 Mt Hermon
Station Road,
Northfield, MA
01360
Westfield - 311
East M'tn Rd.
Amherst - 1550
West Rd (Route
116)
Easthampton -
Arthur Street
Pochassic Pit -
931 Pochassic Rd.
Westfield
129 North Road
Westhampton,
MA 01027
87 Worthington
Road
Huntington, MA
01050
240 Chicopee St.
Granby, MA
01033
61 Tully Road
Orange, MA
01364
2188 Algerie Rd.
East Otis, MA
01029
300 Zoar Road
Charlemont, MA
01389
X X X X X X X X X X X
X X X X X X X X X X X
X X X X X X X X X X X
X X X X X X X X X X X
X X X X X X X X X X X
REGION TOWNAll States
Asphalt /
Mitchell
Materials, LLC
All States
Asphalt / Trew
Stone, LLC
Delta Sand &
Gravel, Inc.
Eurovia
Atlantic
Coast, LLC
Hathaway
Construction
Hilltown Sand
& Gravel
Ondrick
Materials &
Recycling,
LLC
Porter
Transporta-
tion Co., Inc.
Tonlino &
Sons, LLC
Zoar Stone &
Gravel
Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton
1A Ashfield 896 Cape Street Ashfield, MA 8.00$ 6.75$ 6.00$ 9.00$ $ $ $ $ $ $ $1A Buckland 2 Sears Street Buckland, MA 7.50$ 6.75$ 6.00$ 6.50$ $ $ $ $ $ $ $1A Charlemont Factory Road Charlemont, MA 7.50$ 8.00$ 6.55$ 7.00$ $ $ $ $ $ $ 3.00$ 1A Colrain 51 Main Road Colrain, MA 6.50$ 8.00$ 6.00$ 5.50$ $ $ $ $ $ $ $1A Conway 40 Fournier Road Conway, MA 6.00$ 6.75$ 3.75$ 6.50$ 9.95$ From Amh $ $ $ $ $ $1A Cummington 20 Fairgrounds Road Cummington, MA 8.30$ 12.50$ 8.60$ 10.00$ $ 4.75$ 4.00$ $ $ $ $1A Goshen 8 Highland Road Goshen, MA 8.30$ 12.50$ 8.05$ 10.00$ 10.80$ From W'fld 4.00$ 4.75$ $ $ $ $1A Hawley 247 W. Hawley Road Hawley, MA 8.50$ 11.25$ 9.40$ 9.00$ $ $ $ $ $ $ 3.25$ 1A Heath 123 Branch Hill Road Heath, MA 8.30$ 11.25$ 8.45$ 7.50$ $ $ $ $ $ $ 3.25$ 1A Hinsdale 156 Maple Street Hindsale, MA 01235 13.00$ 13.50$ 10.30$ 11.25$ $ $ $ $ $ 5.85$ $1A Monroe 3C School Street Monroe, MA 10.00$ 11.25$ 11.25$ 9.00$ $ $ $ $ $ $ $1A Plainfield 184 East Main Street Plainfield, MA 9.00$ 10.00$ 8.45$ 10.00$ $ $ $ $ $ 10.85$ $1A Rowe 6 Sibley Road Rowe, MA 9.00$ 11.25$ 9.20$ 9.00$ $ $ $ $ $ $ 3.00$ 1A Savoy 720 Main Road Savoy, MA 10.00$ 10.00$ 11.25$ 10.00$ $ $ $ $ $ 10.45$ $1A Shelburne 24 Colrain Shelburne Road Shelburne, MA 5.00$ 6.75$ 5.25$ 6.50$ $ $ $ $ $ $ $1A Williamsburg 24R Main Street Williamsburg, MA 10.00$ 7.50$ 11.00$ 7.45$ From W'fld 3.30$ 4.50$ $ $ $ $
1B Blandford 114 Otis Stage Road Blandford, MA 12.50$ 9.40$ 13.00$ 9.10$ From W'fld $ 3.75$ $ $ 3.75$ $1B Chester 2 Town Road Chester, MA 12.50$ 9.40$ 13.00$ 5.95$ From W'fld $ 3.00$ $ $ 4.75$ $1B Chesterfield 164 Main Road Chesterfield, MA 11.25$ 7.50$ 14.00$ 9.95$ From Amh 3.50$ 4.00$ $ $ $ $1B Granville 69 Old Westfield Road Granville, MA 13.50$ 9.40$ 14.00$ 5.95$ From W'fld $ 4.50$ $ $ 5.25$ $1B Huntington 7 Mill Street Huntington, MA 10.00$ 9.40$ 14.00$ 7.45$ From W'fld $ 1.50$ $ $ 4.75$ $1B Middlefield 4 Bell Road Middlefield, MA 12.50$ 10.30$ 11.00$ 7.45$ From W'fld $ 4.00$ $ $ 3.75$ $1B Montgomery 160 Main Road Montgomery, MA 10.00$ 8.45$ 14.00$ 4.95$ From W'fld $ 2.00$ $ $ 7.25$ $1B Russell Frog Hollow Road Russell, MA 10.00$ 9.40$ 14.00$ 4.95$ From W'fld $ 3.50$ $ $ 4.25$ $1B Sandisfield 3 Silverbrook Road Sandisfield, MA 15.75$ 15.00$ 14.00$ $ $ 7.00$ $ $ 3.75$ $1B Tolland 162 Colebrook River Road Tolland, MA 13.50$ 11.25$ 14.00$ 7.45$ From W'fld $ 5.00$ $ $ 4.75$ $1B Worthington 64 Huntington Road Worthington, MA 12.00$ 10.00$ 9.40$ 14.00$ 7.95$ From W'fld $ 3.00$ $ $ 10.25$ $
2A Bernardston Nelson Road Bernardston, MA 4.50$ 5.50$ 4.70$ 4.00$ $ $ $ $ $ $ $2A Deerfield 9 Merrigan Way So. Deerfield, MA 4.50$ 2.45$ 6.00$ $ $ $ $ $ $ $2A Erving 16 Public Works Blvd. Erving, MA 5.00$ 6.75$ 4.70$ 6.00$ $ $ $ $ $ $ $2A Gill 196C Main Road Gill, MA 5.00$ 6.75$ 4.70$ 4.00$ $ $ $ $ $ $ $2A Greenfield 209 Wells Street Greenfield, MA 4.50$ 4.15$ 6.00$ $ $ $ $ $ $ $2A Leverett 95 Montague Road Leverett, MA 6.75$ 2.80$ 9.00$ $ $ $ $ $ $ $2A Leyden 16 West Leyden Road Leyden, MA 7.00$ 6.75$ 6.40$ 6.00$ $ $ $ $ $ $ $2A Montague 500 Avenue A Ext. Turners Falls, MA 6.75$ 3.75$ 7.00$ $ $ $ $ $ $ $2A New Salem 22 Wendell Road New Salem, MA 9.00$ 4.70$ 7.00$ $ $ $ $ 3.66$ $ $2A Northfield 41 Caldwell Road Northfield, MA 4.50$ 6.75$ 5.65$ 4.00$ $ $ $ $ $ $ $2A Orange 526 E. River Street Orange, MA 6.00$ 8.00$ 6.00$ 6.00$ $ $ $ $ 3.00$ $ $2A Shutesbury 59 Leverett Road Shutesbury, MA 9.00$ 4.15$ 9.00$ $ $ $ $ 4.00$ $ $2A Sunderland 111 River Road Sunderland, MA 5.50$ 2.25$ 9.00$ $ $ $ $ $ $2A Warwick 15 Garage Road Warwick, MA 5.00$ 10.00$ 7.50$ 6.00$ $ $ $ $ 3.66$ $ $2A Wendell Jackie Lane Wendell, MA 8.00$ 10.00$ 5.65$ 7.00$ $ $ $ $ 3.66$ $ $2A Whately 71 Christian Lane Whately, MA 5.50$ 2.80$ 6.00$ $ $ $ $ $ $ $
2B Belchertown 290 Jackson Street Belchertown, MA 9.00$ 4.90$ 14.00$ 5.95$ From Amh $ $ $ $ $ $2B Easthampton 30 Rear Northampton St. Easthampton, MA 10.00$ 6.40$ 11.00$ 4.95$ From W'fld 4.25$ 4.00$ $ $ $ $2B Granby 15 Crescent Street Granby, MA 10.00$ 5.65$ 11.00$ 3.15$ From Amh $ $ 2.85$ $ $ $2B Hadley 230 Middle Street Hadley, MA 6.75$ 3.40$ 11.00$ 3.65$ From Amh $ $ $ $ $ $2B Hatfield 10 Straits Road Hatfield, MA 6.75$ 2.80$ 11.00$ $ 6.00$ $ $ $ $ $2B Pelham 353 Amherst Road Pelham, MA 9.00$ 3.75$ 14.00$ $ $ $ $ $ $ $2B Southampton 8 Fomer Road Southampton, MA 11.25$ 5.65$ 11.00$ 4.95$ From W'fld 4.00$ 3.00$ $ $ $ $2B Westhampton 58 Hathaway Road Westhampton, MA 11.25$ 7.50$ 11.00$ 5.95$ From W'fld 1.70$ 3.00$ $ $ $ $
TOWN GARAGE LOCATION / DELIVERIES
John S. Lane & Son
FRANKLIN REGIONAL COLLECTIVE
BID # H2 COLD PATCH
Open May 12, 2020 @ 1pm
Cold Mix Manufacturing
Corp. Crafco, Inc. Innovative Surface Solutions Eurovia / Northeast Paving Ondrick Natural Earth
Seaboard Asphalt Products
Company Warner Brothers
FOR JULY 1, 2020 TO JUNE 30, 202165 Edison Avenue Mount
Vernon, NY 10550
6165 W. Detroit St. Chandler,
AZ 85226
454 River Rd, Glenmont, NY
12077
216 Mount Hermon Station Rd.,
Northfield, MA 01360
729 Fuller Rd., Chicopee, MA
01020
3601 Fairfield Road, Baltimore, MD
21226
325 Amherst Rd Sunderland, MA
01375
Picked Up Product Tel 718-463-1444 602-276-0406 800-387-5777x101 413-498-2956 413-594-8803 410-355-0330 Tel 413-665-4055
[email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]
A. HIGH PERFORMANCE COLD PATCH Picked Up Estimates In Tons Price Per Ton Price Per Ton Price Per Ton Price Per Ton Price Per Ton Price Per Ton
Total Estimated Tons 1,252 No Bid No Bid No Bid $115.00 $112.00 No Bid $118.00
PICK UP LOCATION N/A N/A N/A
216 Mount Hermon Rd., Northfield,
MA 01360 or 30 Willow Hill Road,
Lee, MA 01238 729 Fuller Rd. Chicopee, MA N/A 901 River Rd. East Deerfield,MA
Delivered Product
B. HIGH PERFORMANCE COLD PATCH Delivered Bags
Estimates In 50-
bag Pallets Price Per POUND Price Per POUND Price Per POUND Price Per POUND Price Per POUND Price Per POUND
Total Estimated Tons 2,350
Region 1A 750 0.188$ 0.200$ 0.156$ No Bid 0.160$ 0.132$ No Bid
Region 1B 700 0.188$ 0.200$ 0.156$ No Bid 0.160$ 0.132$ No Bid
Region 2A 900 0.188$ 0.200$ 0.156$ No Bid 0.160$ 0.132$ No Bid
Region 2B 0 0.188$ 0.200$ 0.156$ No Bid 0.155$ 0.132$ No Bid
50 POUND BAGS 50 POUND BAGS 50 POUND BAGS 50 POUND BAGS 60 POUND BAGS
PRODUCT DETAILS
Product Name Greenpatch Crafco HP Asphalt Cold Patch Propatch QPR - Quality Pavement Repair EZ Street Bond-X Green duraPATCH
Brochures with Bid Yes Yes Yes Yes Yes Yes Yes
Comments 50 lb bags; 56 bags/pallet 50 lb bags; 56 bags/pallet 50 lb bags; 56 bags/pallet N/A 50 lb bags; 56 bags/pallet 60 lb bags; 49 bags/pallet N/A
Tax Compliance Signed? X X X X X X X
Non-Collusion Signed? X X X X X X X
Bid Signature Form signed? X X X X X X X
FRANKLIN REGIONAL COLLECTIVE
H3 GEOTEXTILES
Open May 12, 2020 @ 1pm
BID TABULATION
FOR JULY 1, 2020 TO JUNE 30, 2021
RENEWALS FOR TWO ADDT'L
YEARS AVAILABLE TO MAKE EJ PRESCOTT UNDERGROUND SUPPLY
THREE YEAR CONTRACTS 28C STATE RD., PO BOX 192 NORTH HATFIELD, MA 01093 413-665-2499 82 STATE RD., PO BOX 164 WHATELY, MA 01093 413-397-3412
HEAVY DUTY WOVEN - 16 estimated NONWOVEN -3 estimated info on manufacturer/type WOVEN - 16 estimated NONWOVEN -3 estimated info on manufacturer/type
Size of Roll 12.5' x 360' 12.5' x 360' Mirafi 600x woven 12.5' x 360' 12.5' x 360' ADS GEOSYNTHETICS #601
Price Per Square yard $0.85 $0.75 Mirafi N series nonwoven $0.78 $0.83 500 sq yds/roll
Price Per Roll $425.00 $375.00 $390.00 $415.00
Delivery Charge Per Roll
Total Delivered Price Per Roll $425.00 $375.00 $390.00 $415.00
LIGHT DUTY
Size of Roll 12.5' x 432' 12.5' x 360' 12.5' x 432' 12.5' x 360' ADS GEOSYNTHETICS #401
Price Per Square yard $0.65 $0.75 $0.530 $0.58 500 sq yds/roll
Price Per Roll $390.00 $375.00 $318.00 $290.00
Delivery Charge Per Roll
Total Delivered Price Per Roll $390.00 $375.00 $318.00 $290.00
Location of Warehouse Location for Pick up: WHATELY, MA Location for Pick up: WHATELY, MA
Yes Yes
PARTICIPANTS ELIGIBLE: All with permission.
Estimates 22 rolls of WOVEN Heavy Duty and 3 NONWOVEN Heavy Duty and 10 rollls of WOVEN light duty and 3 rolls of NONWOVEN Light Duty
RENEWAL FOR YEARS TWO AND THREE, NO MORE THAN 2% MORE THAN THESE PROCESSES IF CATALOG PRICES HAVE INCREASED
Tax compliance, Non Collusion,
Signed Bid Forms?
FRANKLIN REGIONAL COLLECTIVE All States Asphalt
Innovative Municipal
US Inc
BID # H4 CALCIUM and MAG CHLORIDE
325 Amherst Road,
Sunderland, MA 01375
454 River Road,
Glenmont, NY 12077
Open May 12, 2020 @ 1pm RENEWALS FOR TWO ADDT'L Tel 413-665-7021 Tel 800-387-5777
Bid Tabulation YEARS AVAILABLE TO MAKE
THREE YEAR CONTRACTS Alan Chicoine Div. Mgr. Syed Ali
A. LIQUID CALC DELIVERED IN BULK Estimates Price Per Gallon Price Per Gallon
REGION 1A 16,000 $0.99 $1.00
REGION 2A 4,000 $0.99 $1.00
REGION 2B 3,000 $0.99 $1.00
REGION 1B NONE
total 23,000 $22,770.00 $23,000.00
Minimum Delivery? 1000 GALLONS 2000 GALLONS
Product Name
Liquidow Technical
Grade Calcium Chloride Promelt CAL 32
B. LIQUID MAGNESIUM DELIVERED IN BULK
REGION 1B Blandford 2x2500 5,000 $0.95
total 5,000 No Bid $4,750.00
Minimum Delivery? 1000 GALLONS 2000 GALLONS
Product Name Promelt MAG INH
C. CALCIUM CHLORIDE 50# BAGS DELIVERED Price Per 50# Price Per 50#
Estimates
REGION 1B 1 PALLET
REGION 2A 3 PALLETS
REGION 2B 2 PALLETS
total 6 pallets No Bid No Bid
Minimum Delivery Amount?
D. MAG CHLORIDE 50# BAGS DELIVERED Price Per 50# Price Per 50#
Estimates
REGION 1A 1 PALLET
TOTAL 1 PALLET No Bid No Bid
Minimum Delivery amount
Bid Signature Form Signed? X X
Tax Compliance Signed? X X
Non-Collusion Signed? X X
FRANKLIN REGIONAL COLLECTIVE
BID # H5 CULVERTS RENEWALS FOR TWO ADDT'L
Open May 12, 2020 @ 1pm YEARS AVAILABLE TO MAKE
Bid Tabulation THREE YEAR CONTRACTS
DELIVERED PRICES
EJ PRESCOTT INC. UNDERGROUND SUPPLY, INC.
28C STATE RD,. PO BOX 192 NORTH HATFIELD, MA 01093 82 STATE RD., PO BOX 164 WHATELY, MA 01093
Single Wall Plastic Culverts Single Wall Plastic Culverts
estimates by type EJP UNDERGROUND
Price per FOOT delivered Price per FOOT delivered solid perf split watertigh
Inside Dia Solid Perf Split Inside Dia Solid Perf Split
6" $1.35 $4.00 6" $1.21 $1.21 $3.51 500 6 -$ 675.00$ 24.00$ -$ -$ $605.00 $21.06 -$
10" 10" $3.97 $3.97 $6.56 -$ -$ -$ -$ -$ $0.00 $0.00 -$
12" 12" $5.67 $5.67 $7.13 -$ -$ -$ -$ -$ $0.00 $0.00 -$
15" 15" $7.40 $7.40 $11.85 -$ -$ -$ -$ -$ $0.00 $0.00 -$
18" $10.75 18" $11.00 $11.00 $20.21 600 6,450.00$ -$ -$ -$ 6,600.00$ $0.00 $0.00 -$
24" $16.00 24" $16.60 $16.00 200 3,200.00$ -$ -$ -$ 3,320.00$ $0.00 $0.00 -$
Bidder will deliver to the following Regions: Bidder will deliver to the following Regions: 9,650.00$ 675.00$ 24.00$ -$ 9,920.00$ 605.00$ 21.06$ -$
1A_X__ 1B_X__ 2A_X__ 2B_X__ 1A_X__ 1B_X__ 2A_X__ 2B_X__ 10,349.00$ 10,546.06$
Bid Form Total 10,349.00$ 10,546.06$
Double Wall Plastic Culverts Double Wall Plastic Culverts
EJ PRESCOTT INC.
28C STATE RD,. PO BOX 192 NORTH HATFIELD, MA 01093
Price per FOOT delivered $0.00 Price per FOOT delivered estimates by type EJP UNDERGROUND
Inside Dia Solid Perf Split Watertight Inside Dia Solid Perf Split Watertight solid perf split watertight
6" 2.15$ 2.15$ 4.00$ 11.00$ 6" 2.10$ 2.10$ 3.51$ 11.18$ 100 3000 0 10 215.00$ 6,450.00$ -$ 110.00$ 210.00$ $6,300.00 $0.00 111.800$
10" 4.95$ 4.95$ 7.50$ 22.00$ 10" 4.84$ 4.84$ 6.56$ 22.50$ 104 951 80 1 514.80$ 4,707.45$ 600.00$ 22.00$ 503.36$ 4,602.84$ $524.80 22.50$
12" 6.00$ 6.00$ 8.00$ 60.00$ 12" 5.78$ 5.78$ 7.13$ 56.77$ 3616 3901 3 9 21,696.00$ 23,406.00$ 24.00$ 540.00$ 20,900.48$ 22,547.78$ $21.39 510.93$
15" 7.65$ 7.65$ 13.00$ 88.00$ 15" 7.44$ 7.44$ 11.85$ 85.86$ 4332 3001 25 31 33,139.80$ 22,957.65$ 325.00$ 2,728.00$ 32,230.08$ 22,327.44$ $296.25 2,661.66$
18" 11.25$ 11.25$ 22.00$ 152.00$ 18" 10.98$ 10.98$ 20.21$ 148.34$ 3459 321 49 35 38,913.75$ 3,611.25$ 1,078.00$ 5,320.00$ 37,979.82$ 3,524.58$ $990.29 5,191.90$
24" 17.50$ 17.50$ 30.00$ 225.00$ 24" 17.10$ 17.10$ 28.44$ 224.14$ 1253 0 22 25 21,927.50$ -$ 660.00$ 5,625.00$ 21,426.30$ -$ $625.68 5,603.50$
30" 25.50$ 25.50$ 70.00$ 492.00$ 30" 25.73$ 25.73$ 66.47$ 493.02$ 368 60 2 7 9,384.00$ 1,530.00$ 140.00$ 3,444.00$ 9,468.64$ 1,543.80$ $132.94 3,451.14$
36" 32.50$ 32.50$ 165.00$ 675.00$ 36" 33.04$ 33.04$ 94.00$ 675.42$ 420 60 1 2 13,650.00$ 1,950.00$ 165.00$ 1,350.00$ 13,876.80$ 1,982.40$ $94.00 1,350.84$
48" 53.00$ 53.00$ 48" 54.06$ 54.06$ 160.00$ 1,091.43$ 220 60 0 0 11,660.00$ 3,180.00$ -$ -$ 11,893.20$ 3,243.60$ $0.00 -$
151,100.85$ 67,792.35$ 2,992.00$ 19,139.00$ 148,488.68$ 66,072.44$ 2,685.35$ 18,904.27$
241,024.20$ 236,150.74$
Signed X X Bid Form Total 241,024.20$ 236,150.74$
Tax Comp X X
Non-Coll X X
Delivery terms:
82 STATE RD., PO BOX 164 WHATELY, MA 01093
UNDERGROUND SUPPLY, INC.
Delivery terms:
FRANKLIN REGIONAL COLLECTIVE
BID #H6 GUARD RAIL PRODUCTS 1010 Turnpike Rd
Open May 12, 2020 @ 1pm Canton, MA 02021
Tel 781-821-5900
Premier Fence
THREE YEAR CONTRACTS IF RENEWED REG
ION
1A
REG
ION
1B
REG
ION
2A
REG
ION
2B
John Feerick
PRODUCTS includes delivery UNIT Total Est Prices Extensions
12.5' Straight rail sections galvanized w/steel postsea 26 0 40 10 76 $102.00 $7,752.00
12'5" Curved rail sections galvanized w/steel postsea 12 0 8 5 25 $158.15 $3,953.75
Steel Terminal Ends ea 24 0 0 8 32 $75.00 $2,400.00
6"6" Steel Posts, H Section, galv ea 35 0 132 0 167 $73.00 $12,191.00
6'6" Wood Posts, pressure treated ea 0 0 0 0 0 $0.00
Splice bolts, 1 1/2" per 100 2 0 5 0 7 $65.00 $455.00
Post bolts 2" per 100 3 0 5 0 8 $100.00 $800.00
Post bolts 5" per 100 2 0 2 0 4 $155.00 $620.00
Post bolts 8" per 100 2 0 2 0 4 $185.00 $740.00
Post bolts 10 1/2" per 100 2 0 2 0 4 $240.00 $960.00
Round washers, galv per lb 10 0 100 0 110 $13.00 $1,430.00
Hex nuts, galv per 100 4 0 16 0 20 $60.00 $1,200.00
Offset spacers, galv ea 25 0 100 0 125 $15.00 $1,875.00
Offset spacers, Pressure treated ea 10 0 0 0 10 $17.00 $170.00
Total Value of this Bid $34,546.75
Percent discount, picked up n/a
Bid Signature Form Signed? x
Tax Compliance Signed? x
Non-Collusion Signed? x
FY21 Draft Bid Tabs H-2 through 23
FRANKLIN REGIONAL COLLECTIVE
BID #H7 PICKED UP HOT MIX ASPHALT
All States Asphalt,
Inc.
Eurovia/Northeast
Paving
Ondrick Materials &
Recycling, LLC Palmer Paving Corp All States Asphalt, Inc. Northeast Paving
Ondrick Materials &
Recycling, LLC Palmer Paving Corp
Open May 12, 2020 @ 1pm
325 Amherst Rd
Sunderland, MA 01375
216 Mt Hermon Station
Rd., Northfield, MA
01360
22 Industry Road
Chicopee, MA 01020
25 Blanchard St., Palmer,
MA 01069
325 Amherst Rd
Sunderland, MA 01375
216 Mt Hermon Station
Rd., Northfield, MA
01360
22 Industry Road
Chicopee, MA 01020
25 Blanchard St., Palmer,
MA 01069
Limited avail July 1 - Dec 15/Apr 1-June 30
Amount
Estimated
Tons 413-655-7021 Tel 413-498-2956 Tel 413-592-2566 Tel 413-283-8354 413-655-7021 Tel 413-498-2956 Tel 413-592-2566 Tel 413-283-8354
ALL PARTICIPANTS 14,380 64.00$ 62.00$ 68.00$ 62.00$ 920,320.00$ 891,560.00$ 977,840.00$ 891,560.00$
PLANT PICK UP LOCATION
Warner Bros.:
Sunderland &
Deerfield, MA and
Mitchell Materials:
Winchester, NH
216 Mt. Hermon Station
Rd., Northfield, MA; 311
East Mountain Road,
Westfield, MA; 30
Willow Hill Rd., Lee, MA;
17 New Ludlow Rd.,
Granby, MA.
58 Industry Road,
Chicopee, MA
23 Arthur St.,
Easthampton, MA;
1000 Page Blvd.,
Springfield, MA; 25
Blanchard St., Palmer,
MA; 43 Old Coldbrook
Dr., Barre, MA
Tax Compliance / Non Collusion X X X X
Addendum 1 Bid Form X X X X
FRANKLIN REGIONAL COLLECTIVE
BID # H8 SNOW PLOW AND GRADER BLADES RENEWALS FOR TWO ADDT'L
Open May 12, 2020 @ 1pm YEARS AVAILABLE TO MAKE
Bid Tabulation THREE YEAR CONTRACTS
DELIVERED PRICES
For information only/; bid rejected due to mim. order amount
Valk Maufacturing Co. Winter Equipment Co., Inc.
PO Box 428, 66 East Main St., New Kingstown, MA 17072 1900 Joseph Lloyd Parkway, Willoughby, OH 44060
Tel::717-766-0711 Email: [email protected] Tel:: 800-294-6837 Email: [email protected]
PLOW BLADES PLOW BLADES
Delivery terms: Delivery terms:
$5,500 minimum order per location
Price per FOOT delivered Price per FOOT delivered Price per FOOT delivered
Size est ft. Bid Price Extension Size est ft. Bid Price Extension
5/8 x 6 100 $10.84 $1,084.00 5/8 x 6 100 $9.04 $904.00
3/4 x 6 36 $13.01 $468.36 3/4 x 6 36 $10.91 $392.76
1 x 6 18 $18.36 $330.48 1 x 6 18 $14.55 $261.90
5/8 x 8 250 $14.45 $3,612.50 5/8 x 8 250 $12.10 $3,025.00
3/4 x 8 1392 $17.34 $24,137.28 3/4 x 8 1392 $14.51 $20,197.92
1 x 8 22 $24.48 $538.56 1 x 8 22 $19.73 $434.06
GRADER BLADES GRADER BLADES
Size est ft. Bid Price Extension Size est ft. Bid Price Extension
3/4 x 8 120 $16.48 $1,977.60 3/4 x 8 120 $14.10 $1,692.00
LOADER CUTTING EDGES LOADER CUTTING EDGES
Size est ft. Bid Price Extension Size est ft. Bid Price Extension
1 X 12 Carbon
Dbl Bevel 56 $67.32 $3,769.92
1 X 12 Carbon
Dbl Bevel 56 No Bid
Each EachRound
Countersunk
Holes 8 $2.00 $16.00
Round
Countersunk
Holes 8 No Bid
total bid $35,934.70 total bid $26,907.64
Bid signature? X X
Tax Compliance? X X
Non-Collusion? X X
Lead time 35 - 40 days ARO Lead time 3-4 weeks ARO
FRANKLIN REGIONAL COLLECTIVE
BID #H9A HIGHWAY LINE PAINTING
BID TABULATION
Open May 12, 2020 at 2:00pm
Markings Inc.
30 Riverside Dr
Pembroke, MA 02359
781-826-5171
BID PRICE PER FOOT
HIGHWAY LINE PAINTING REGION 1A REGION 1B REGION 2A REGION 2B TOTALS REG 1A REG 1B REG 2A REG 2B REG 1A $ REG 1B $ REG 2A $ REG 2B $ REG 1A REG 1B REG 2A REG 2B REG 1A $ REG 1B $ REG 2A $ REG 2B $
unit lf / sf
Waterborne Fast Dry White 4" lf 137,000 101,821 1,013,112 882,400 2,134,333 0.055$ 0.055$ 0.055$ 0.055$ 7,535.00$ 5,600.16$ 55,721.16$ 48,532.000$ 0.054$ 0.054$ 0.054$ 0.054$ $7,398.00 $5,498.33 $54,708.05 $47,649.60
Waterborne Fast Dry Yellow 4" lf 799,362 945,169 1,966,328 1,324,700 5,035,559 0.055$ 0.055$ 0.055$ 0.055$ 43,964.91$ 51,984.30$ 108,148.04$ 72,858.50$ 0.054$ 0.054$ 0.054$ 0.054$ $43,165.55 $51,039.13 $106,181.71 $71,533.80
Waterborne Fast Dry White 6" lf 0 50,000 14,300 0 64,300 0.082$ 0.082$ -$ 4,100.00$ 1,172.60$ -$ 0.075$ 0.075$ $0.00 $3,750.00 $1,072.50 $0.00
Waterborne Fast Dry Yellow 6" lf 0 180,000 0 0 180,000 0.082$ -$ 14,760.00$ -$ -$ 0.075$ $0.00 $13,500.00 $0.00 $0.00
Waterborne White Crosswalks 12" sf 0 2,100 25,730 2,600 30,430 0.680$ 0.680$ 0.680$ -$ 1,428.00$ 17,496.40$ 1,768.00$ 0.550$ 0.550$ 0.550$ $0.00 $1,155.00 $14,151.50 $1,430.00
White thermoplastic 4" lf 0 111,636 0 1,500 113,136 0.540$ 0.540$ -$ 60,283.44$ -$ 810.00$ 0.480$ 0.480$ $0.00 $53,585.28 $0.00 $720.00
Yellow Thermoplastic 4" lf 0 111,636 0 2,500 114,136 0.540$ 0.540$ -$ 60,283.44$ -$ 1,350.00$ 0.480$ 0.480$ $0.00 $53,585.28 $0.00 $1,200.00
White thermoplastic 6" lf 13,800 0 0 0 13,800 0.810$ 11,178.00$ -$ -$ -$ 0.720$ $9,936.00 $0.00 $0.00 $0.00
Yellow Thermoplastic 6" lf 13,800 0 0 0 13,800 0.810$ 11,178.00$ -$ -$ -$ 0.720$ $9,936.00 $0.00 $0.00 $0.00
TOTAL BID BY REGION Total for each region: 73,855.91$ 198,439.33$ 182,538.20$ 125,318.50$ Total for each region: 70,435.55$ 182,113.02$ 176,113.76$ 122,533.40$
Total all regions: 580,151.94$ Total all regions: 551,195.73$
Total Value This Bid 580,151.94 551,195.73
Minimum # of feet line painting must be no more than 2,000 1,000 1,000
MiN # of feet parking/crosswalks 500 500
Lead time required 1 week 2 weeks
Tax Compliance Signed? X X
Non-Collusion Signed? X X
Debarment Statement? X X
Osha Cert? X X
Prequal List? X X
Addenda? N/A N/A
Bid Bond? X X
* Note total rounded up one penny more than total stated on bid of $580,151.93.Comments
Hi-Way Safety Systems
9 Rockview Way
Rockland, MA 02370
781-982-9229
BID PRICE PER FOOT
FY21 Draft Bid Tabs H-2 through 23
FRANKLIN REGIONAL COLLECTIVE Hi-Way Safety Systems Roadsafe Traffic Systems
BID #H9B HIGHWAY LINE PAINTING 9 Rockview Way 55 Bodwell St
BID TABULATION Rockland, MA 02370 Avon, MA 02322
Open May 12, 2020 at 2:00pm 781-982-9229
UNIT PRICE EXTENSION
HIGHWAY LINE PAINTING Granby Rowe Warwick Whately TOTALS
Unit LF/SF
White Chlorinated Low VOC 4" LF 150,000 60,000 20,000 230,000 $0.055 $12,650.00
Yellow Chlorinated Low VOC 4" LF 150,000 19,000 60,000 70,000 299,000 $0.055 $16,445.00
Comments
Total Value This Bid $29,095.000
Lead time required 2 weeks
Minimum for line painting Must be no more than 2,000 2,000'
Minimum for crosswalks/pking
Tax Compliance Signed? X
Non-Collusion Signed? X
Debarment Signed? X
Osha Cert? X
Bid Bond N/A
Addenda? N/A
FRANKLIN REGIONAL COLLECTIVE
BID #H10 GUARDRAIL INSTALLED Guardrail Solutions, LLC
BID TABULATION 108A Front Street
Open May 12, 2020 at 2:00pm West Springfield, MA 01089
413-310-2428
ITEM DESCRIPTION TOTALS Unit Price Extension
Standard Steel straight w/ steel post per ft. 11,750 $25.25 $296,687.50
Standard Steel curved w/ steel post per ft. 727 $28.00 $20,356.00
Standard Steel straight w/ wood post 200 $28.00 $5,600.00
Standard Steel curved w/ wood post 220 $29.00 $6,380.00
Standard Steel Terminal Ends each 123 $65.00 $7,995.00
# of reflectors, installed (each) 327 $7.00 $2,289.00
Replace wooden post w/ steel post 100 $115.00 $11,500.00
Replace wooden post w/ wooden post 59 $155.00 $9,145.00
# of existing feet to be removed 600 $4.00 $2,400.00
Cor-ten Straight w/ steel posts per foot 1,240 $27.50 $34,100.00
Cor-ten Curved w/ steel posts per foot 92 $29.00 $2,668.00
Cor-ten Standard Terminal Ends each 10 $75.00 $750.00
Total Value This Bid $399,870.50
Bid Deposit X
Tax Compliance Signed? X
Non-collusion signed? X
Debarment Signed? X
Prequalified? X
OSHA Cert X
FRANKLIN REGIONAL COLLECTIVE
BID #H11 COMPREHENSIVE PAVEMENT PRESERVATION
BID TABULATION
Open May 12, 2020 at 2:00pm
SEALCOATING, INC. DBA INDUS FELIX MARINO
825 GRANITE STREET 32 CORWIN STREET
BRAINTREE, MA 02184 PEABODY, MA 01960
Art Baker [email protected] James Henebury [email protected]
781-428-3400 978-532-3838
CATEGORIES INELIGIBLE; for information only
H-11A-1 FIBER (PG)
Price Per Gallon Fiber 42,811 $10.12 $0.00
Day Rate for 1,000 gallons $8,050.00 $0.00
Day Rate above 1,000 gallons $4.25 $0.00
Total Bid Fiber $433,247.32 $0.00
H-11A-1 PCRM
Price Per Gallon 54,600 $12.29 $0.00
Day Rate for 800 gallons $8,375.00 $0.00
Day Rate above 800 gallons $4.87 $0.00
Total Bid PCRM $671,034.00 $0.00
H-11A - 2 HOT POURED MASTIC
Est Gallons Mastic 400
Price Per Gallon $27.25 $0.00
Day Rate for 200 gallons $8,635.00 $0.00
Day Rate above 200 gallons $10.50 $0.00
Total Bid Mastic $10,900.00 $0.00
H-11A - 3 COLD CRACK FILL
Est Gallons Crack Fill 500 No Bid
Day Rate w/ 2 person crew $0.00 $4,500.00
Date Rate per gallon $0.00 $15.95
Addtl pricing extre crew member $0.00 $950.00
Total Bid Crack Fill $0.00 $20,450.00
SEALCOATING, INC. DBA INDUS FELIX MARINO
825 GRANITE STREET 32 CORWIN STREET
BRAINTREE, MA 02184 PEABODY, MA 01960
Art Baker [email protected] James Henebury [email protected]
781-428-3400 978-532-3838
CATEGORIES INELIGIBLE; for information only
H-11-B-1 MICROSURFACING HIMA
Est SQ YDS Microsurf HIMA 91,797
Price Per SQ YD Micros HIMA $5.20 $0.00
Total Bid Microsurf HIMA $477,344.40 $0.00
H-11-B-2 MICROSURFACING Conventional
Est SQ YDS Microsurf HIMA 19,000
Price Per SQ YD Micros Conv $4.68 $0.00
Total Value of Microsurf Conv $88,920.00 $0.00
H-11-C-1 FOG SEAL- Polymer Modified Rejuvenating
Est SQ YDS PMR FOG SEAL 181,006
Price Per SQ YD PMR FOG SEAL $1.23 $0.00
Total Bid PMR FOG SEAL $222,637.38 $0.00
H-11-C-1 FOG SEAL- Penetrating
Est SQ YDS Pen FOG SEAL 94,600 No Bid
Price Per SQ YD Pen FOG SEAL $0.00 $0.96
Total Bid Penetrating FOG SEAL $0.00 $90,816.00
H-11-D - CAPE SEAL
Est SQ YDS CAPE SEAL 41,705
Price Per SQ YD CAPE SEAL $6.87 $0.00
Total Bid CAPE SEAL $286,513.35 $0.00
Debarment Signed? X X
Addendum 1? X
Bid bond enclosed? X X
Prequalified? X
Acknowledge Addenda? X X
OSHA X X
Tax Compliance/Non Collusion X X
grand total of bid by co. $2,190,596.45 $111,266.00
FRANKLIN REGIONAL COLLECTIVE
H-12 CALCIUM CHLORIDE APPLIED
BID TABULATION
Open May 12, 2020 at 2:00pm
TOWN
Est Volume Square
Yards Ph 413-665-7021
per sq. yd.
Gill 17,600 $0.38 $6,688.00
Hatfield 8,600 $0.38 $3,268.00
Hawley 10,000 $0.38 $3,800.00
Rowe 9,000 $0.38 $3,420.00
Sandisfield 25,098 $0.38 $9,537.24
Shutesbury 20,000 $0.38 $7,600.00
Sunderland 4,000 $0.38 $1,520.00
Westhampton 48,000 $0.38 $18,240.00
Total 142,298
$54,073.24
Minimum Application Amt 4,000 sq yd confirmed via email 5-14-20
Tax Compliance Signed? x
Non-Collusion Signed? x
Debarment Signed? x
Prequalification? x
OSHA x
Bid bond x
All States Asphalt
PO Box 91, Sunderland, MA
FY21 Draft Bid Tabs H-2 through 23
FRANKLIN REGIONAL COLLECTIVE
H13 STONE SEAL DUE TO FRCOG ERROR, ALL BIDS REJECTED - TO BE REBID
Open May 12, 2020 at 2:00pm
BID TABULATION
MaDOT Period Prices Apply MARCH 2020 $552.50/TON
All States Asphalt Inc. 325 Amherst Road,
P O Box 91, Sunderland, MA 01375
All States
Total Value
By Towns
Comer Contracting, Inc. 15 Holmes Rd
Newington, CT 06111-1709
Comer
Total Value
By Towns
Alan L. Chicoine Martin Comer
Division Manager President
TOWN Est Volume Square Yards
Tel 413-665-7021
Bid Price Per Square Yard
Old Work DoubleChip New Work Old Work DoubleChip New Work Old Work DoubleChip New Work
Chesterfield 25000 $ 6.25 $ 156,250.00 $ 6.10 $ 152,500.00
Gill 19000 2.48$ $ 47,120.00 2.10$ $ 39,900.00
Montague 14000 2.48$ $ 34,720.00 2.24$ $ 31,360.00
Southampton 75101 6000 2.42$ 4.60$ $ 209,344.42 1.89$ 4.20$ $ 167,140.89
Total 108,101 6,000 25,000 $447,434.42 $390,900.89
0
bid bond X X
OSHA X X
Debar X X
signed bid form/corp resolution X X
Prequald X
Tax compl Non Collus X X
Tel 860-677-0603
Bid Price Per Square Yard
FY21 Draft Bid Tabs H-2 through 23
FRANKLIN REGIONAL COLLECTIVE
RUBBERIZED CHIP SEAL H14
Open May 12, 2020 at 2:00pm
BID TABULATION Alan L. Chicoine Tel 413-665-7021
Period Prices MaDOT Apply: MARCH 2020 $552.50/TON Division Manager
10% Rubber Product-One Coat total bid by town PER SQ YD
Ashfield 69000 $240,120.00 $3.48
Buckland 58411 $203,270.28 $3.48
Chesterfield 20000 $69,600.00 $3.48
Conway 63420 $220,701.60 $3.48
Shelburne 18500 $64,380.00 $3.48
Sunderland 18000 $62,640.00 $3.48
Williamsburg 11,517 $41,230.86 $3.58
Total 258,848 $901,942.74
20% Rubber Product-One Coat total bid by town PER SQ YD
Belchertown 85,962.00 $408,319.50 $4.75
Charlemont 15,253.00 $72,451.75 $4.75
Conway 24,000.00 $114,000.00 $4.75
Deerfield 63,286.00 $300,608.50 $4.75
Gill 19,000.00 $90,250.00 $4.75
Granby 15,685.00 $74,503.75 $4.75
Granville 96,175.00 $456,831.25 $4.75
Hadley 21,947.00 $104,248.25 $4.75
Hatfield 15,900.00 $75,525.00 $4.75
Montague 14,000.00 $66,500.00 $4.75
Northfield 10,000.00 $47,500.00 $4.75
Pelham 6,500.00 $32,175.00 $4.95
Savoy 49,600.00 $235,600.00 $4.75
Southampton 24,075.00 $114,356.25 $4.75
Sunderland 18,000.00 $85,500.00 $4.75
Total 479,383.00 $2,278,369.25
$3,180,311.99
$3,180,311.99
Pre-Qual? x
Tax Compliance Signed? x
Non-Collusion Signed? x
Debarment Signed? x
OSHA x
Acknowledged Add 1 and Add 2? x
Bid deposit? x
All States Asphalt Inc. 325 Amherst Road, P O
Box 91, Sunderland, MA 01375
FY21 Draft Bid Tabs H-2 through 23
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Ashfield 1A TOTAL ROADWAYS 5,636 2,540
WARNER Unit Price Bid 69.00$ 4.75$ Total Bid
Extended Bid 388,884.00$ 12,065.00$ 400,949.00$
NORTHEAST Unit Price Bid 72.65$ 5.50$ Total Bid
Extended Bid 409,455.40$ 13,970.00$ 423,425.40$
PALMER Unit Price Bid 69.30$ 4.50$ Total Bid
Extended Bid 390,574.80$ 11,430.00$ 402,004.80$
Charlemont 1A TOTAL ROADWAYS 2120
TOTAL DRIVEWAYS/PARKING LOTS 200
WARNER Unit Price Bid Roadways 70.50$
Unit Price Bid Driveways 125.00$ Total Bid
Extended Bid 174,460.00$ 174,460.00$
NORTHEAST Unit Price Bid Roadways 72.00$
Unit Price Bid Driveways 130.00$ Total Bid
Extended Bid 178,640.00$ 178,640.00$
PALMER Unit Price Bid Roadways 68.70$
Unit Price Bid Driveways 98.00$ Total Bid
Extended Bid 165,244.00$ 165,244.00$
Colrain 1A TOTAL ROADWAYS 10,801 4,695 105
WARNER Unit Price Bid 67.25$ 4.75$ 300 Total Bid
Extended Bid 726,367.25$ 22,301.25$ 31500 780,168.50$
NORTHEAST Unit Price Bid 69.00$ 4.15$ 350 Total Bid
Extended Bid 745,269.00$ 19,484.25$ 36750 801,503.25$
PALMER Unit Price Bid 67.70$ 4.35$ 250 Total Bid
Extended Bid 731,227.70$ 20,423.25$ 26250 777,900.95$
1
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Conway 1A TOTAL ROADWAYS 2,080 25
TOTAL DRIVEWAYS/PARKING LOTS 185 25 42
WARNER Unit Price Bid Roadways 66.00$ 150.00$ 10.00$
Unit Price Bid Driveways 150.00$ 150.00$ 10.00$ Total Bid
Extended Bid 165,030.00$ 7,500.00$ 420.00$ 172,950.00$
NORTHEAST Unit Price Bid Roadways 67.50$ 155.00$
Unit Price Bid Driveways 135.00$ 155.00$ 17.00$ Total Bid
Extended Bid 165,375.00$ 7,750.00$ 714.00$ 173,839.00$
PALMER Unit Price Bid Roadways 63.95$ 150.00$ 13.00$
Unit Price Bid Driveways 110.00$ 150.00$ 13.00$ Total Bid
Extended Bid 153,366.00$ 7,500.00$ 546.00$ 161,412.00$
Cummington 1A TOTAL ROADWAYS 2,300 1350
WARNER Unit Price Bid 72.00$ 4.75$ Total Bid
Extended Bid 165,600.00$ 6,412.50$ 172,012.50$
NORTHEAST Unit Price Bid 74.00$ 4.75$ Total Bid
Extended Bid 170,200.00$ 6,412.50$ 176,612.50$
PALMER Unit Price Bid 66.90$ 3.85$ Total Bid
Extended Bid 153,870.00$ 5,197.50$ 159,067.50$
Goshen 1A TOTAL ROADWAYS 1,790 1,050
WARNER Unit Price Bid 69.00$ 4.75$ Total Bid
Extended Bid 123,510.00$ 4,987.50$ 128,497.50$
NORTHEAST Unit Price Bid 71.25$ 4.00$ Total Bid
Extended Bid 127,537.50$ 4,200.00$ 131,737.50$
PALMER Unit Price Bid 69.40$ 4.25$ Total Bid
Extended Bid 124,226.00$ 4,462.50$ 128,688.50$
2
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Hawley 1A TOTAL ROADWAYS 11,281
WARNER Unit Price Bid 65.00$ Total Bid
Extended Bid 733,265.00$ 733,265.00$
NORTHEAST Unit Price Bid 68.25$ Total Bid
Extended Bid 769,928.25$ 769,928.25$
PALMER Unit Price Bid 67.20$ Total Bid
Extended Bid 758,083.20$ 758,083.20$
Heath 1A TOTAL ROADWAYS 2,500 12 1,056
WARNER Unit Price Bid 70.00$ 150.00$ 4.75$ Total Bid
Extended Bid 175,000.00$ 1,800.00$ 5,016.00$ 181,816.00$
NORTHEAST Unit Price Bid 73.00$ 155.00$ 5.40$ Total Bid
Extended Bid 182,500.00$ 1,860.00$ 5,702.40$ 190,062.40$
PALMER Unit Price Bid 67.65$ 175.00$ 4.50$ Total Bid
Extended Bid 169,125.00$ 2,100.00$ 4,752.00$ 175,977.00$
Monroe 1A TOTAL ROADWAYS 3,050 483
WARNER Unit Price Bid 69.00$ 4.75$ Total Bid
Extended Bid 210,450.00$ 2,294.25$ 212,744.25$
NORTHEAST Unit Price Bid 73.50$ 5.50$ Total Bid
Extended Bid 224,175.00$ 2,656.50$ 226,831.50$
PALMER Unit Price Bid 69.25$ 4.75$ Total Bid
Extended Bid 211,212.50$ 2,294.25$ 213,506.75$
Plainfield 1A TOTAL ROADWAYS 2,600
WARNER Unit Price Bid 67.30$ Total Bid
Extended Bid 174,980.00$ 174,980.00$
NORTHEAST Unit Price Bid 67.25$ Total Bid
Extended Bid 174,850.00$ 174,850.00$
PALMER Unit Price Bid 62.30$ Total Bid
Extended Bid 161,980.00$ 161,980.00$
3
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Rowe 1A TOTAL ROADWAYS 2,000 1,500 1
WARNER Unit Price Bid 71.00$ 4.75$ 500 Total Bid
Extended Bid 142,000.00$ 7,125.00$ 500 149,625.00$
NORTHEAST Unit Price Bid 70.00$ 3.60$ 350 Total Bid
Extended Bid 140,000.00$ 5,400.00$ 350 145,750.00$
PALMER Unit Price Bid 69.70$ 3.90$ NO BID Total Bid
Extended Bid 139,400.00$ 5,850.00$ INELIGIBLE BID 145,250.00$
Savoy 1A TOTAL ROADWAYS 880
WARNER Unit Price Bid 75.00$ Total Bid
Extended Bid 66,000.00$ 66,000.00$
NORTHEAST Unit Price Bid 76.00$ Total Bid
Extended Bid 66,880.00$ 66,880.00$
PALMER Unit Price Bid 69.96$ Total Bid
Extended Bid 61,564.80$ 61,564.80$
Shelburne 1A TOTAL ROADWAYS 4,410 2,010
WARNER Unit Price Bid 66.25$ 4.75$ Total Bid
Extended Bid 292,162.50$ 9,547.50$ 301,710.00$
NORTHEAST Unit Price Bid 68.65$ 5.50$ Total Bid
Extended Bid 302,746.50$ 11,055.00$ 313,801.50$
PALMER Unit Price Bid 68.10$ 4.45$ Total Bid
Extended Bid 300,321.00$ 8,944.50$ 309,265.50$
Williamsburg 1A TOTAL ROADWAYS 230 105 3
WARNER Unit Price Bid 72.00$ 5.00$ 300.00$ Total Bid
Extended Bid 16,560.00$ 525.00$ 900.00$ 17,985.00$
NORTHEAST Unit Price Bid 135.00$ 8.50$ 350.00$ Total Bid
Extended Bid 31,050.00$ 892.50$ 1,050.00$ 32,992.50$
PALMER Unit Price Bid 90.70$ 12.00$ 350.00$ Total Bid
Extended Bid 20,861.00$ 1,260.00$ 1,050.00$ 23,171.00$
4
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
TOTAL BID REGION 1A WARNER 3,667,162.75$
TOTAL BID REGION 1A NORTHEAST 3,806,853.80$
TOTAL BID REGION 1A PALMER 3,643,116.00$
Chester 1B TOTAL ROADWAYS 3,500
WARNER Unit Price Bid 75.00$ Total Bid
Extended Bid 262,500.00$ 262,500.00$
NORTHEAST Unit Price Bid 67.25$ Total Bid
Extended Bid 235,375.00$ 235,375.00$
PALMER Unit Price Bid 63.70$ Total Bid
Extended Bid 222,950.00$ 222,950.00$
Chesterfield 1B TOTAL ROADWAYS 4,200 300 100 10
WARNER Unit Price Bid 67.65$ 100.00$ 125.00$ 300.00$ Total Bid
Extended Bid 284,130.00$ 30,000.00$ 12,500.00$ 3,000.00$ 329,630.00$
NORTHEAST Unit Price Bid 67.85$ 155.00$ 155.00$ 350.00$ Total Bid
Extended Bid 284,970.00$ 46,500.00$ 15,500.00$ 3,500.00$ 350,470.00$
PALMER Unit Price Bid 62.00$ 130.00$ 150.00$ 325.00$ Total Bid
Extended Bid 260,400.00$ 39,000.00$ 15,000.00$ 3,250.00$ 317,650.00$
Granville 1B TOTAL ROADWAYS 10,620
WARNER Unit Price Bid 77.00$ Total Bid
Extended Bid 817,740.00$ 817,740.00$
NORTHEAST Unit Price Bid 63.75$ Total Bid
Extended Bid 677,025.00$ 677,025.00$
PALMER Unit Price Bid 60.40$ Total Bid
Extended Bid 641,448.00$ 641,448.00$
5
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Huntington 1B TOTAL ROADWAYS 1,950 870
WARNER Unit Price Bid 75.00$ 4.75$ Total Bid
Extended Bid 146,250.00$ 4,132.50$ 150,382.50$
NORTHEAST Unit Price Bid 82.50$ 5.75$ Total Bid
Extended Bid 160,875.00$ 5,002.50$ 165,877.50$
PALMER Unit Price Bid 67.67$ 4.75$ Total Bid
Extended Bid 131,956.50$ 4,132.50$ 136,089.00$
Middlefield 1B TOTAL ROADWAYS 8,500 7,557
TOTAL DRIVEWAYS/PARKING LOTS 660 186 19
WARNER Unit Price Bid Roadways 71.00$ 3.00$ 325
Unit Price Bid Driveways 90.00$ 10.00$ 325.00$ Total Bid
Extended Bid 662,900.00$ 24,531.00$ 6,175.00$ 693,606.00$
NORTHEAST Unit Price Bid Roadways 69.25$ 3.50$ 350
Unit Price Bid Driveways 99.00$ 3.50$ Total Bid
Extended Bid 653,965.00$ 27,100.50$ 6,650.00$ 687,715.50$
PALMER Unit Price Bid Roadways 66.70$ 3.50$ 325
Unit Price Bid Driveways 82.65$ 8.25$ 325.00$ Total Bid
Extended Bid 621,499.00$ 27,984.00$ 6,175.00$ 655,658.00$
Montgomery 1B TOTAL ROADWAYS 2,841 820
WARNER Unit Price Bid 75.00$ 4.75$ Total Bid
Extended Bid 213,075.00$ 3,895.00$ 216,970.00$
NORTHEAST Unit Price Bid 70.00$ 4.25$ Total Bid
Extended Bid 198,870.00$ 3,485.00$ 202,355.00$
PALMER Unit Price Bid 67.70$ 3.65$ Total Bid
Extended Bid 192,335.70$ 2,993.00$ 195,328.70$
6
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Sandisfield 1B TOTAL ROADWAYS 3,824 20
WARNER Unit Price Bid 74.75$ 150.00$ Total Bid
Extended Bid 285,844.00$ 3,000.00$ 288,844.00$
NORTHEAST Unit Price Bid 69.75$ 155.00$ Total Bid
Extended Bid 266,724.00$ 3,100.00$ 269,824.00$
PALMER Unit Price Bid 71.70$ 165.00$ Total Bid
Extended Bid 274,180.80$ 3,300.00$ 277,480.80$
Tolland 1B TOTAL DRIVWAYS/PARKING LOTS 1,070
WARNER Unit Price Bid 115.00$ Total Bid
Extended Bid 123,050.00$ 123,050.00$
NORTHEAST Unit Price Bid 105.00$ Total Bid
Extended Bid 112,350.00$ 112,350.00$
PALMER Unit Price Bid 78.87$ Total Bid
Extended Bid 84,390.90$ 84,390.90$
Worthington 1B TOTAL ROADWAYS 2,665 220 713 20 3
WARNER Unit Price Bid 69.70$ 125.00$ 4.75$ 200.00$ 400.00$ Total Bid
Extended Bid 185,750.50$ 27,500.00$ 3,386.75$ 4,000.00$ 1,200.00$ 221,837.25$
NORTHEAST Unit Price Bid 69.00$ 155.00$ 4.50$ 155.00$ 350.00$ Total Bid
Extended Bid 183,885.00$ 34,100.00$ 3,208.50$ 3,100.00$ 1,050.00$ 225,343.50$
PALMER Unit Price Bid 64.90$ 150.00$ 3.85$ 180.00$ 350.00$ Total Bid
Extended Bid 172,958.50$ 33,000.00$ 2,745.05$ 3,600.00$ 1,050.00$ 213,353.55$
TOTAL BID REGION 1B WARNER 3,104,559.75$
TOTAL BID REGION 1B NORTHEAST 2,926,335.50$
TOTAL BID REGION 1B PALMER 2,744,348.95$
7
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Deerfield 2A TOTAL ROADWAYS 1,722 502 24
WARNER Unit Price Bid 71.80$ 4.75$ 325.00$ Total Bid
Extended Bid 123,639.60$ 2,384.50$ 7,800.00$ 133,824.10$
NORTHEAST Unit Price Bid 78.85$ 6.00$ 350.00$ Total Bid
Extended Bid 135,779.70$ 3,012.00$ 8,400.00$ 147,191.70$
PALMER Unit Price Bid 110.00$ 8.00$ 600.00$ Total Bid
Extended Bid 189,420.00$ 4,016.00$ 14,400.00$ 207,836.00$
Gill 2A TOTAL ROADWAYS 2,136 1,716
TOTAL DRIVEWAY/PARKING LOTS 258 2 81
WARNER Unit Price Bid Roadways 70.00$ 150.00$ 4.75$
Unit Price Bid Driveways 110.00$ 150.00$ 10.00$ Total Bid
Extended Bid 177,900.00$ 300.00$ 8,961.00$ 187,161.00$
NORTHEAST Unit Price Bid Roadways 66.25$ 3.75$
Unit Price Bid Driveways 115.00$ 155.00$ 3.75$ Total Bid
Extended Bid 171,180.00$ 310.00$ 6,738.75$ 178,228.75$
PALMER Unit Price Bid Roadways 74.50$ 185.00$ 4.50$
Unit Price Bid Driveways 110.00$ 185.00$ 12.00$ Total Bid
Extended Bid 187,512.00$ 370.00$ 8,694.00$ 196,576.00$
Leverett 2A TOTAL ROADWAYS 2,200 1,325 3
WARNER Unit Price Bid 67.00$ 4.75$ 400.00$ Total Bid
Extended Bid 147,400.00$ 6,293.75$ 1,200.00$ 154,893.75$
NORTHEAST Unit Price Bid 73.50$ 4.75$ 350.00$ Total Bid
Extended Bid 161,700.00$ 6,293.75$ 1,050.00$ 169,043.75$
PALMER Unit Price Bid 72.00$ 5.00$ 500.00$ Total Bid
Extended Bid 158,400.00$ 6,625.00$ 1,500.00$ 166,525.00$
8
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Leyden 2A TOTAL ROADWAYS 1,582 500
WARNER Unit Price Bid 68.00$ 4.75$ Total Bid
Extended Bid 107,576.00$ 2,375.00$ 109,951.00$
NORTHEAST Unit Price Bid 66.65$ 5.50$ Total Bid
Extended Bid 105,440.30$ 2,750.00$ 108,190.30$
PALMER Unit Price Bid 71.50$ 6.00$ Total Bid
Extended Bid 113,113.00$ 3,000.00$ 116,113.00$
Co. Name Unit Price Bid Total Bid
Extended Bid -$ -$ -$
Montague 2A TOTAL ROADWAYS 1,500 500
WARNER Unit Price Bid 68.00$ 4.75$ Total Bid
Extended Bid 102,000.00$ 2,375.00$ 104,375.00$
NORTHEAST Unit Price Bid 68.90$ 5.50$ Total Bid
Extended Bid 103,350.00$ 2,750.00$ 106,100.00$
PALMER Unit Price Bid 74.50$ 6.00$ Total Bid
Extended Bid 111,750.00$ 3,000.00$ 114,750.00$
New Salem 2A TOTAL ROADWAYS 1,990 875
WARNER Unit Price Bid 70.50$ 4.75$ Total Bid
Extended Bid 140,295.00$ 4,156.25$ 144,451.25$
NORTHEAST Unit Price Bid 78.00$ 4.75$ Total Bid
Extended Bid 155,220.00$ 4,156.25$ 159,376.25$
PALMER Unit Price Bid 73.00$ 5.50$ Total Bid
Extended Bid 145,270.00$ 4,812.50$ 150,082.50$
Northfield 2A TOTAL ROADWAYS 8,480 50 1,400 12
WARNER Unit Price Bid 70.00$ 150.00$ 4.75$ 200.00$ Total Bid
Extended Bid 593,600.00$ 7,500.00$ 6,650.00$ 2,400.00$ 610,150.00$
NORTHEAST Unit Price Bid 63.65$ 155.00$ 6.00$ 155.00$ Total Bid
Extended Bid 539,752.00$ 7,750.00$ 8,400.00$ 1,860.00$ 557,762.00$
PALMER Unit Price Bid 68.90$ 180.00$ 4.50$ 195.00$ Total Bid
Extended Bid 584,272.00$ 9,000.00$ 6,300.00$ 2,340.00$ 601,912.00$
9
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Orange 2A TOTAL ROADWAYS 1,875 450 75 40
WARNER Unit Price Bid 72.00$ 4.75$ 150.00$ 325.00$ Total Bid
Extended Bid 135,000.00$ 2,137.50$ 11,250.00$ 13,000.00$ 161,387.50$
NORTHEAST Unit Price Bid 68.95$ 6.00$ 155.00$ 350.00$ Total Bid
Extended Bid 129,281.25$ 2,700.00$ 11,625.00$ 14,000.00$ 157,606.25$
PALMER Unit Price Bid 67.25$ 6.25$ 155.00$ 260.00$ Total Bid
Extended Bid 126,093.75$ 2,812.50$ 11,625.00$ 10,400.00$ 150,931.25$
Shutesbury 2A TOTAL ROADWAYS 3,910 1,305
WARNER Unit Price Bid 68.00$ 4.75$ Total Bid
Extended Bid 265,880.00$ 6,198.75$ 272,078.75$
NORTHEAST Unit Price Bid 70.00$ 4.75$ Total Bid
Extended Bid 273,700.00$ 6,198.75$ 279,898.75$
PALMER Unit Price Bid 69.90$ 5.75$ Total Bid
Extended Bid 273,309.00$ 7,503.75$ 280,812.75$
Sunderland 2A TOTAL ROADWAYS 1,711 30 800 100 20
WARNER Unit Price Bid 72.00$ 150.00$ 4.75$ 125.00$ 300.00$ Total Bid
Extended Bid 123,192.00$ 4,500.00$ 3,800.00$ 12,500.00$ 6,000.00$ 149,992.00$
NORTHEAST Unit Price Bid 80.00$ 155.00$ 5.00$ 155.00$ 350.00$ Total Bid
Extended Bid 136,880.00$ 4,650.00$ 4,000.00$ 15,500.00$ 7,000.00$ 168,030.00$
PALMER Unit Price Bid 85.00$ 250.00$ 6.00$ 175.00$ 575.00$ Total Bid
Extended Bid 145,435.00$ 7,500.00$ 4,800.00$ 17,500.00$ 11,500.00$ 186,735.00$
Warwick 2A TOTAL ROADWAYS 3,500 2,500
WARNER Unit Price Bid 69.00$ 3.00$ Total Bid
Extended Bid 241,500.00$ 7,500.00$ 249,000.00$
NORTHEAST Unit Price Bid 65.45$ 3.75$ Total Bid
Extended Bid 229,075.00$ 9,375.00$ 238,450.00$
PALMER Unit Price Bid 70.00$ 4.25$ Total Bid
Extended Bid 245,000.00$ 10,625.00$ 255,625.00$
10
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Wendell 2A TOTAL ROADWAYS 5,500 1,500 9
WARNER Unit Price Bid 69.00$ 4.75$ 325.00$ Total Bid
Extended Bid 379,500.00$ 7,125.00$ 2,925.00$ 389,550.00$
NORTHEAST Unit Price Bid 66.95$ 6.00$ 350.00$ Total Bid
Extended Bid 368,225.00$ 9,000.00$ 3,150.00$ 380,375.00$
PALMER Unit Price Bid 66.60$ 4.25$ 325.00$ Total Bid
Extended Bid 366,300.00$ 6,375.00$ 2,925.00$ 375,600.00$
Whately 2A TOTAL ROADWAYS 1,100 70 60
WARNER Unit Price Bid 68.00$ 10.00$ 125.00$ Total Bid
Extended Bid 74,800.00$ 700.00$ 7,500.00$ 83,000.00$
NORTHEAST Unit Price Bid 74.45$ 15.00$ 155.00$ Total Bid
Extended Bid 81,895.00$ 1,050.00$ 9,300.00$ 92,245.00$
PALMER Unit Price Bid 78.85$ 30.00$ 185.00$ Total Bid
Extended Bid 86,735.00$ 2,100.00$ 11,100.00$ 99,935.00$
TOTAL BID REGION 2A WARNER 2,749,814.35$
TOTAL BID REGION 2A NORTHEAST 2,742,497.75$
TOTAL BID REGION 2A PALMER 2,903,433.50$
11
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Belchertown 2B TOTAL ROADWAYS 12,019 6,796 290.5 93
WARNER Unit Price Bid 66.00$ 4.75$ 125.00$ 300.00$ Total Bid
Extended Bid 793,254.00$ 32,281.00$ 36,312.50$ 27,900.00$ 889,747.50$
NORTHEAST Unit Price Bid 71.85$ 4.15$ 155.00$ 350.00$ Total Bid
Extended Bid 863,565.15$ 28,203.40$ 45,027.50$ 32,550.00$ 969,346.05$
PALMER Unit Price Bid 64.20$ 3.25$ 130.00$ 230.00$ Total Bid
Extended Bid 771,619.80$ 22,087.00$ 37,765.00$ 21,390.00$ 852,861.80$
Easthampton 2B TOTAL ROADWAYS 8,700 245 3,950 43 168
WARNER Unit Price Bid 75.00$ 150.00$ 4.00$ 200.00$ 350.00$ Total Bid
Extended Bid 652,500.00$ 36,750.00$ 15,800.00$ 8,600.00$ 58,800.00$ 772,450.00$
NORTHEAST Unit Price Bid 71.00$ 155.00$ 4.15$ 155.00$ 350.00$ Total Bid
Extended Bid 617,700.00$ 37,975.00$ 16,392.50$ 6,665.00$ 58,800.00$ 737,532.50$
PALMER Unit Price Bid 63.30$ 135.00$ 4.05$ 135.00$ 230.00$ Total Bid
Extended Bid 550,710.00$ 33,075.00$ 15,997.50$ 5,805.00$ 38,640.00$ 644,227.50$
Granby 2B TOTAL ROADWAYS 8,922 650 75
WARNER Unit Price Bid 77.00$ 4.75$ 150.00$ Total Bid
Extended Bid 686,994.00$ 3,087.50$ 11,250.00$ 701,331.50$
NORTHEAST Unit Price Bid 65.45$ 4.75$ 155.00$ Total Bid
Extended Bid 583,944.90$ 3,087.50$ 11,625.00$ 598,657.40$
PALMER Unit Price Bid 60.90$ 4.25$ 145.00$ Total Bid
Extended Bid 543,349.80$ 2,762.50$ 10,875.00$ 556,987.30$
Hadley 2B TOTAL ROADWAYS 1,249 642
WARNER Unit Price Bid 72.00$ 4.00$ Total Bid
Extended Bid 89,928.00$ 2,568.00$ 92,496.00$
NORTHEAST Unit Price Bid 82.00$ 5.75$ Total Bid
Extended Bid 102,418.00$ 3,691.50$ 106,109.50$
PALMER Unit Price Bid 73.99$ 5.50$ Total Bid
Extended Bid 92,413.51$ 3,531.00$ 95,944.51$
12
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Hatfield 2B TOTAL ROADWAYS 250 50 250 10 2
WARNER Unit Price Bid 75.00$ 125.00$ 4.00$ 150.00$ 400.00$ Total Bid
Extended Bid 18,750.00$ 6,250.00$ 1,000.00$ 1,500.00$ 800.00$ 28,300.00$
NORTHEAST Unit Price Bid 135.00$ 155.00$ 5.00$ 155.00$ 350.00$ Total Bid
Extended Bid 33,750.00$ 7,750.00$ 1,250.00$ 1,550.00$ 700.00$ 45,000.00$
PALMER Unit Price Bid 89.00$ 175.00$ 6.00$ 310.00$ 325.00$ Total Bid
Extended Bid 22,250.00$ 8,750.00$ 1,500.00$ 3,100.00$ 650.00$ 36,250.00$
Pelham 2B TOTAL ROADWAYS 2,050 710
WARNER Unit Price Bid 67.00$ 4.00$ Total Bid
Extended Bid 137,350.00$ 2,840.00$ 140,190.00$
NORTHEAST Unit Price Bid 76.00$ 6.50$ Total Bid
Extended Bid 155,800.00$ 4,615.00$ 160,415.00$
PALMER Unit Price Bid 73.00$ 5.25$ Total Bid
Extended Bid 149,650.00$ 3,727.50$ 153,377.50$
Southampton 2B TOTAL ROADWAYS 4,944 20 2,842 42
WARNER Unit Price Bid 68.00$ 150.00$ 4.00$ 300.00$ Total Bid
Extended Bid 336,192.00$ 3,000.00$ 11,368.00$ 12,600.00$ 363,160.00$
NORTHEAST Unit Price Bid 66.00$ 155.00$ 4.15$ 350.00$ Total Bid
Extended Bid 326,304.00$ 3,100.00$ 11,794.30$ 14,700.00$ 355,898.30$
PALMER Unit Price Bid 63.25$ 150.00$ 3.85$ 250.00$ Total Bid
Extended Bid 312,708.00$ 3,000.00$ 10,941.70$ 10,500.00$ 337,149.70$
13
H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION
Town
Regi
onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons
Number of raised
castings
Westhampton 2B TOTAL ROADWAYS 2,659 1,244
2B TOTAL DRIVEWAY/PARKING LOTS 220
WARNER Unit Price Bid Roadways 68.00$ 4.75$
Unit Price Bid Driveways 120.00$ Total Bid
Extended Bid 207,212.00$ 5,909.00$ 213,121.00$
NORTHEAST Unit Price Bid Roadways 66.95$ 4.25$
Unit Price Bid Driveways 88.00$ Total Bid
Extended Bid 197,380.05$ 5,287.00$ 202,667.05$
PALMER Unit Price Bid Roadways 65.30$ 4.40$
Unit Price Bid Driveways 95.00$ 6.00$ Total Bid
Extended Bid 194,532.70$ 5,473.60$ 200,006.30$
TOTAL BID REGION 2B WARNER 3,200,796.00$
TOTAL BID REGION 2B NORTHEAST 3,175,625.80$
TOTAL BID REGION 2B PALMER 2,876,804.61$
WARNER 12,722,332.85$
NORTHEAST 12,651,312.85$
PALMER 12,167,703.06$
GRAND TOTAL BID (for bid bond)
GRAND TOTAL BID (for bid bond)
GRAND TOTAL BID (for bid bond)
14
FRANKLIN REGIONAL COLLECTIVE
BID #H16 LIQUID ASPHALT
BID TABULATION
Open May 12, 2020 at 2:00pm
MaDOT Period Prices Apply
All States Asphalt Inc.
325 Amherst Rd. PO Box 91
Sunderland, MA 01375
Tel 413-665-7021
Fax 413-665-9027
MC Cutback Asphalt Applied-in-place Price Per gal. Total by Town
Hawley 3,520 $3.65 $12,848.00
Westhampton 8,806 $3.65 $32,141.90
$44,989.90
Tax Compliance Signed? x
Non-Collusion Signed? x
Debarment Cert Signed? x
OSHA Cert? x
Pre-Qual? x
MARCH 2020 $552.50/TON
FY21 Draft Bid Tabs H-2 through 23
TOWN Region
Total Estimated
Square Yards
Reclaim
Pavement
Quantity in SY
ALL STATES
Cost / SY
GARRITY Cost
/ SY
MURRAY Cost
/ SY
PALMER Cost /
SY
RAFFERTY
Cost / SY
Reclaim
Pavement
w/fine grading
& vibratory
compacition
Quantity in SY
ALL STATES
Cost / SY
GARRITY Cost
/ SY
MURRAY
Cost / SY
PALMER Cost
/ SY
RAFFERTY
Cost / SY
Structures
Lowered
Qty in EA
ALL STATES
Cost / Each
GARRITY Cost
/ Each
MURRAY Cost
/ Each
PALMER Cost
/ Each
RAFFERTY
Cost / Each
Addition of
Calcium at 1 gal
per SY unless
otherwise noted
Quantity in SY
ALL STATES
Cost / ga
GARRITY Cost /
ga
MURRAY Cost
/ ga
PALMER Cost
/ ga
RAFFERTY
Cost / ga
Injection of
Emulsion *
Quantity in SY
ALL STATES
Cost / SY
GARRITY Cost
/ SY
MURRAY Cost
/ SY
PALMER Cost /
SY
RAFFERTY
Cost / SY
ALL STATES ASPHALT-
Sunderland, MA Total Bid
GARRITY ASPHALT
RECLAIMING Bloomfield,
CT Total Bid
MURRAY PAVING and
RECLAMATION
Holliston, MA Total Bid
PALMER PAVING CORP
Palmer, MA Total Bid
RAFFERTY FINE
GRADING Enfield,
CT Total Bid
Charlemont 1A 27000.00 27000.00 0.69 0.85 0.63 0.70 0.84 18,630.00$ 22,950.00$ 17,010.00$ 18,900.00$ 22,680.00$
Conway 1A 15000.00 15000.00 1.24 2.60 1.57 1.65 1.52 15000.00 1.00 1.40 1.00 2.45 1.34 33,600.00$ 60,000.00$ 38,550.00$ 61,500.00$ 42,900.00$
Hawley 1A 28160.00 28160.00 2.60 3.00 NoBid 1.50 2.22 28160.00 3.25 4.00 NoBid 4.20 4.00 164,736.00$ 197,120.00$ NO BID 160,512.00$ 175,155.20$
Monroe 1A 21103.00 21103.00 1.24 2.60 1.95 1.60 1.32 13532.00 1.00 1.40 1.00 2.55 1.44 39,699.72$ 73,812.60$ 54,682.85$ 68,271.40$ 47,342.04$
Savoy 1A 8000.00 8000.00 1.70 2.60 2.11 1.85 1.74 8000.00 1.00 1.40 1.00 2.65 1.54 21,600.00$ 32,000.00$ 24,880.00$ 36,000.00$ 26,240.00$
Shelburne 1A 9900.00 9900.00 1.42 3.00 1.69 1.71 1.74 14,058.00$ 29,700.00$ 16,731.00$ 16,929.00$ 17,226.00$
TOTAL BID REGION 1A 292,323.72$ 415,582.60$ 151,853.85$ 362,112.40$ 331,543.24$
Chesterfield 1B 11000.00 11000.00 1.26 2.60 1.69 1.75 1.64 11000.00 1.04 1.40 1.00 2.62 1.54 25,300.00$ 44,000.00$ 29,590.00$ 48,070.00$ 34,980.00$
Granville 1B 63350.00 63350.00 2.60 3.00 NoBid 1.70 2.22 63350.00 3.25 4.00 NoBid 4.25 4.00 370,597.50$ 443,450.00$ NO BID 376,932.50$ 394,037.00$
Montgomery 1B 12790.00 12790.00 1.34 2.60 1.69 1.70 1.54 12790.00 1.04 1.40 1.00 2.60 1.54 30,440.20$ 51,160.00$ 34,405.10$ 54,997.00$ 39,393.20$
Sandisfield 1B 22225.00 22225.00 1.16 2.60 1.89 1.65 1.18 22225.00 1.04 1.40 1.00 2.75 1.14 48,895.00$ 88,900.00$ 64,230.25$ 97,790.00$ 51,562.00$
Worthington 1B 12000.00 12000.00 2.60 3.50 NoBid 1.65 4.50 12000.00 3.25 4.00 NoBid 4.70 6.00 70,200.00$ 90,000.00$ NO BID 76,200.00$ 126,000.00$
TOTAL BID REGION 1B 545,432.70$ 717,510.00$ 128,225.35$ 653,989.50$ 645,972.20$
Northfield 2A 19398.00 19398.00 0.74 0.85 0.68 0.80 0.88 14,354.52$ 16,488.30$ 13,190.64$ 15,518.40$ 17,070.24$
Orange 2A 7100.00 7100.00 2.15 2.60 1.69 3.60 1.54 40.00 150.00 500.00 200.00 750.00 650.00 7100.00 1.00 1.40 1.00 3.75 1.54 28,365.00$ 48,400.00$ 27,099.00$ 82,185.00$ 47,868.00$
TOTAL BID REGION 2A 42,719.52$ 64,888.30$ 40,289.64$ 97,703.40$ 64,938.24$
Belchertown 2B 25100.00 25100.00 1.16 2.60 1.69 2.80 1.24 28.00 150.00 500.00 200.00 750.00 650.00 25100.00 1.00 1.40 1.00 4.10 1.14 58,416.00$ 114,400.00$ 73,119.00$ 194,190.00$ 77,938.00$
Easthampton 2B 9600.00 9600.00 1.49 2.60 1.69 3.00 1.94 24.00 150.00 500.00 200.00 775.00 650.00 9600.00 1.04 1.40 1.00 3.75 1.54 27,888.00$ 50,400.00$ 30,624.00$ 83,400.00$ 49,008.00$
Granby 2B 34708.00 34708.00 0.72 0.85 0.63 0.75 0.84 24,989.76$ 29,501.80$ 21,866.04$ 26,031.00$ 29,154.72$
Hadley 2B 10533.00 10533.00 0.84 0.85 0.63 0.80 0.98 8,847.72$ 8,953.05$ 6,635.79$ 8,426.40$ 10,322.34$
TOTAL BID REGION 2B 120,141.48$ 203,254.85$ 132,244.83$ 312,047.40$ 166,423.06$
GRAND TOTAL ALL REGIONS 1,000,617.42$ 1,401,235.75$ 452,613.67$ 1,425,852.70$ 1,208,876.74$
* For Reclamation with Injection of Emulsion: Additional, if needed and approved by Town – Liquid Asphalt Adjustment after Mix Design $_______/Gall $3.25/GAL $4.00/GA N/A $4.65/GALLON $12.00/GA
TAX COMPLIANCE? X X X X X
NON COLLUSION? X X X X X
PREQUALIFIED? X X X X X
ACKNOWLEDGE ADD.? X X X X X
DBARMENT? X X X X X
OSHA? X X X X X
BID DEPOSIT? X X X X X
H-17 RECLAMATION BID / FY21 - ADDENDUM 1
FRANKLIN REGIONAL COLLECTIVE
H-19 Hot In Place Recycling
BID TABULATION
Open May 12, 2020 at 2:00pm
MaDOT Period Prices Apply $552.50 per ton base price
2258 Rte 22, Brewster, NY 10509
TOWN
Est Volume Square
Yards 845-278-9645 total
per sq. yd.
GRANBY 38174 $ 5.16 $ 196,977.84
Pre-Qual? x
Tax Compliance Signed? x
Non-Collusion Signed? x
Debarment Signed? x
OSHA x
Bid deposit? x
Highway Rehabilitation Corp
FY21 Draft Bid Tabs H-2 through 23
FRANKLIN REGIONAL COLLECTIVE
BID TABULATION
Open May 12, 2020 at 2:00pm
COLD
PLANING/MILLING-
H20A Standard Milling
Rafferty Fine
Grading
Total SY Structures
Total
Structures
Contractor
Removes
Millings?
Town Retains
Millings?
Town/Road PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for
SQ YD STRUCTURE Town SQ YD STRUCTURE Town SQ YD STRUCTURE Town SQ YD STRUCTURETown
Belchertown
25900 61
A- Town
Retains 1.94$ 250.00$ 65,496.00$ 1.73$ 10.00$ 45,417.00$ 2.65$ 75.00$ 73,210.00$ 1.90$ 25.00$ 50,735.00$
Gill -$ -$ -$ -$
19500 0
A- Town
Retains 2.44$ 47,580.00$ 1.57$ 30,615.00$ 1.70$ 33,150.00$ 1.92$ 25.00$ 37,440.00$
Easthampton -$ -$ -$ -$
28900 144
A- Town
Retains 2.44$ 250.00$ 106,516.00$ 1.80$ 10.00$ 53,460.00$ 2.25$ 75.00$ 75,825.00$ NO BID -$
Granby -$ -$ -$ -$
18939
C- Contractor
Removes
A- Town
Retains 2.44$ 46,211.16$ 1.75$ 33,143.25$ 1.85$ 35,037.15$ NO BID -$
Hadley -$ -$ -$ -$
9533 49
A-Town
Retains 3.54$ 250.00$ 45,996.82$ 1.98$ 10.00$ 19,365.34$ 1.95$ 75.00$ 22,264.35$ NO BID -$
Huntington -$ -$ -$ -$
3900
A-Town
Retains 12.00$ 46,800.00$ 3.75$ 14,625.00$ 4.00$ 15,600.00$ NO BID -$
Leverett -$ -$ -$ -$
8448 1
A-Town
Retains 6.54$ 250.00$ 55,499.92$ 2.24$ 10.00$ 18,933.52$ 2.20$ 75.00$ 18,660.60$ 1.85$ 25.00$ 15,653.80$
Montague -$ -$ -$ -$
31,000 32
Split
millings
between Town
& Contractor 2.44$ 250.00$ 83,640.00$ 1.49$ 10.00$ 46,510.00$ 1.85$ 75.00$ 59,750.00$ 1.79$ 25.00$ 56,290.00$
Montgomery -$ -$ -$ -$
11736 0
A-Town
Retains 6.54$ 76,753.44$ 1.82$ 21,359.52$ 1.85$ 21,711.60$ NO BID -$
Sunderland -$ -$ -$ -$
13493 25
A-Town
Retains 3.54$ 250.00$ 54,015.22$ 1.76$ 10.00$ 23,997.68$ 1.95$ 75.00$ 28,186.35$ 1.75$ 25.00$ 24,237.75$
Whately -$ -$ -$ -$
1350 14 25.00$ 250.00$ 37,250.00$ 11.00$ 10.00$ 14,990.00$ 10.30$ 75.00$ 14,955.00$ 9.00$ 25.00$ 12,500.00$
TOTAL 172699 326 665,758.56$ 322,416.31$ 398,350.05$ 196,856.55$
COLD PLANING/MILLING BID H20
PO Box 91, Sunderland, MA 01375
Eurovia Atlantic Coast/Northeast Paving All States Asphalt Inc.Garrity Asphalt Reclaiming
57 S Rd., Enfield, CT 06082 22 Peters Rd., Bloomfield, CT 06002 311 East Mtn Road, Westfield, MA 01085
FY21 Draft Bid Tabs H-2 through 23
COLD
PLANING/MILLING-
H20B Micro Milling Total SY Structures
Total
Structures
Contractor
Removes
Millings?
Town Retains
Millings?
Rafferty
Fine Grading
Town/Road
PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for
Chesterfield SQ YD STRUCTURETown SQ YD STRUCTURE Town SQ YD STRUCTURETown SQ YD STRUCTURETown
20000 10 10
TOWN
RETAINS 2.84$ 250.00$ 59,300.00$ NO BID 1.85$ 75.00$ 37,750.00$ NO BID
Conway -$ NO BID -$ NO BID
8115 3 3
TOWN
RETAINS 3.94$ 250.00$ 32,723.10$ NO BID 2.15$ 75.00$ 17,672.25$ NO BID
Deerfield -$ NO BID -$ NO BID
11700
TOWN
RETAINS 3.84$ 44,928.00$ NO BID 2.95$ 34,515.00$ NO BID
Gill -$ NO BID -$ NO BID
19500
TOWN
RETAINS 2.84$ 55,380.00$ NO BID 1.70$ 33,150.00$ NO BID
Middlefield -$ NO BID -$ NO BID
75568 19
TOWN
RETAINS 2.74$ 250.00$ 211,806.32$ NO BID 1.70$ 75.00$ 129,890.60$ NO BID
Northfield -$ NO BID -$ NO BID
20228 3 2.94$ 250.00$ 60,220.32$ NO BID 1.70$ 75.00$ 34,612.60$ NO BID
-$ NO BID -$ NO BID
Sunderland -$ NO BID -$ NO BID
13493 25
TOWN
RETAINS 3.38$ 250.00$ 51,856.34$ NO BID 1.95$ 75.00$ 28,186.35$ NO BID
NO BID -$ NO BID
TOTAL 168,604 60 516,214.08$ NO BID -$
315,776.80$
Pre-Qual? X X X X
Addendum 1? X X X X
Tax Compliance Signed? X X X X
Non-Collusion Signed? X X X X
Debarment Signed? X X X X
OSHA X X X X
Bid bond X X X X
57 S Rd., Enfield, CT 06082 22 Peters Rd., Bloomfield, CT 06002 311 East Mtn Road, Westfield, MA 01085 PO Box 91, Sunderland, MA 01375
Garrity Asphalt Reclaiming Eurovia Atlantic Coast/Northeast Paving All States Asphalt Inc.
FY21 Draft Bid Tabs H-2 through 23
FRANKLIN REGIONAL COLLECTIVE
H-21 Cold In Place Recycling
BID TABULATION
Open May 12, 2020 at 2:00pm
MaDOT Period Prices Apply
825 Granite St., Braintree,
MA 02184
TOWN
Est Volume Square
Yards Ph 781-428-3400 total
per sq. yd.
Colrain 34,222 $ 5.30 $ 181,376.60
Deerfield 60,000 $ 4.87 $ 292,200.00
Gill 19,066 $ 6.25 $ 119,162.50
TOTAL $ 592,739.10
Additional items, if needed Aggregate 35.00$ ton
Portland Cement 210.00$ ton
Liquid Asphalt Adjustment 3.43$ gallon
Pre-Qual? x
Addendum 1? x
Tax Compliance Signed? x
Non-Collusion Signed? x
Debarment Signed? x
OSHA x
Bid deposit? x
Sealcoating, Inc. dba Indus
FY21 Draft Bid Tabs H-2 through 23
Bucket Truck Operator Laborer (Tree Removal) 60' Aerial Lift 65' Aerial Lift 75' Alpine Unit
Log loader & Operator -
(Prentice 120 C log
loader on a
Log-hauler truck with at
least a
50 cubic yard capacity)
or equal
Blandford 80 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Chester 200 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Chesterfield 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Conway 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Deerfield 150 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Easthampton 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Gill 80 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Granby 120 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Granville 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Hadley 120 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Middlefield 12 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Sunderland 24 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Westhampton 8 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Williamsburg 16 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Worthington 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$
Emergency/
Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$
Bid Form X Tax Compliance/Non-Collusion X OSHA Statement X
Bid Signature X Debarment Form X 5% Bid Bond X
BID TABULATION
H-22 TREE WORK FY2021
Tree Removal
Vendors may bid per hour for all towns, a single town, or any group of towns.
Bidder Name: Northern Tree Service, Inc. 1290 Park St., PO Box 790, Palmer, MA 01069
Franklin Regional Collective Open May 12, 2020 at 2pm
1 of 3
Climber / Trimmer
operator
( A )
60' Aerial Lift Bucket
truck w/dump chipper
box
( B )
Total Per Hour Bucket
Truck and Operator
( A + B )
Hydraulic Disc chipper
w/capacity for 12" limb
( C )
Ground person
( D )
Total Bucket Truck,
Trimmer, Chipper and
Ground Person Per Hour
(A + B + C + D)
Blandford 120 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Chesterfield 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Deerfield 150 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Easthampton 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Goshen 80 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Granby 20 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Hadley 120 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Heath 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Middlefield 8 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Sunderland 24 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Tolland 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Worthington 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$
Emergency/
Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$
Tree Trimming
BID TABULATION
H-22 TREE WORK FY2021
Vendors may bid per hour for all towns, a single town, or any group of towns.
Bidder Name: Northern Tree Service, Inc. 1290 Park St., PO Box 790, Palmer, MA 01069
2 of 3
Chipper Crew:
Foreman/operator
Dump truck With 10 cu
yd chip box
Laborer/Chainsaw
operator
Hydraulic Disc Chipper
w/capacity for 12” limb
Log loader & Operator
(Prentice 120 C log
loader on a Log-
hauler/debris hauling
truck w min. 50 cubic
yard capacity) or equal.
Truck must be equipped
with solid sides to allow
loading of brush and
debris.
Horizontal Grinder CBI
1000H.P. or equal
Deerfield 150 hours Cost Per HourNormal Shift 85.00$ 40.00$ 85.00$ 25.00$ 180.00$ 850.00$
Emergency/
Overtime120.00$ 40.00$ 120.00$ 25.00$ 235.00$ 1,200.00$
Granby 30 hours Cost Per HourNormal Shift 85.00$ 40.00$ 85.00$ 25.00$ 180.00$ 850.00$
Emergency/
Overtime120.00$ 40.00$ 120.00$ 25.00$ 235.00$ 1,200.00$
Westhampton 8 hours Cost Per HourNormal Shift 85.00$ 40.00$ 85.00$ 25.00$ 180.00$ 850.00$
Emergency/
Overtime120.00$ 40.00$ 120.00$ 25.00$ 235.00$ 1,200.00$
Stump Grinder (12” to
48” grinding capacity)
Granby 20 hours Cost Per HourNormal Shift 175.00$
Emergency/
Overtime225.00$
Granville 32 hours Cost Per HourNormal Shift 175.00$
Emergency/
Overtime225.00$
Worthington 40 hours Cost Per HourNormal Shift 175.00$
Emergency/
Overtime225.00$
BID TABULATION
H-22 TREE WORK FY2021
Vendors may bid per hour for all towns, a single town, or any group of towns.
Stump Grinding
Debris Removal
Bidder Name: Northern Tree Service, Inc. 1290 Park St., PO Box 790, Palmer, MA 01069
3 of 3
FRANKLIN REGIONAL COLLECTIVE
BID # H23 Catch Basin Cleaning
Open May 12, 2020 @ 1pm
Bid Tabulation
Company J.R. Sweeping Service Wind River Environmental Eastern Pipe Service LLC
28 Moylan Lane, Agawam, MA 01001 46 Lizotte Dr, Marlborough, MA 01752 2 Thibeault Drive, Bow, NH 03304
Contact Person James Ricco, Owner/Mgr Steve Ciras Richard Berthiaume
Tel/Fax or Email Tel 413-786-2168 Fax 413-789-3738 Tel 978-875-3290 Tel 603-424-4600
Machine Descriptions 1: 2006 Vac-Con Model V312IAH/1000 8 cy, 12,000 CFM DOESN'T MEET SPEC
1: 2012 Kenworth Vactor 2100, 12 cy, 1200 gallon, 4460 CFM
1: 2015 Vactor Model 2115-EQ8886 15 cy, 3800 CFM 1500 gallon
2001 Vactor 2100 8 cy, DOESN'T MEET SPEC
2: 2012 Freightliner Vactor 2100 Plus, 12 cy capacity, 1200 gallon, 4460 CFM
2: 2013 Vactor Model 2115 Plus-EQ6287 15 cy, 4460 CFM, 1500 gallon
3: 2015 Freightliner VacCon 5450 CFM, 10 yd capacity 1500 gall DOESN’T MEET
SPEC
3: 2012 Freightliner Vactor Model 2115 Plus - EQ 5914 15 cy, 3800 CFM, 1500 gall
Bid per hr REGION 1A Cleaning/Jetting $225.00 $269.00 $219.00
Bid per hr REGION 1B Cleaning/Jetting $210.00 $269.00 $219.00
Lateral Cleaning $210.00 $269.00 $219.00
Bid per hr REGION 2A Cleaning/Jetting $225.00 $269.00 $219.00
Lateral Cleaning $225.00 $269.00 $219.00
Bid per hr REGION 2B Cleaning/Jetting $200.00 $269.00 $219.00
Lateral Cleaning $200.00 $269.00 $219.00
Total Hrs x Bid Price = $358,345 Total Hrs x Bid Price $459,183.00 Total Hrs x Bid Price = $373,833
Emergency Response Time? 24 HOURS
3-4 HOURS 48 HOURS
References if not worked for FRCOG COLLECTIVEtax compliance, non collusion, signature,
TOWN ESTIMATES
REGION 1A CLEAN/JE 164 HRS APPROXIMATELY Required Docs JR SWEEP WIND RIV EASTERN
REGION 1A LATERAL 0 HRS APPROXIMATELY Bid Form X
Addendum X
REGION 1B CLEAN/JE 236 HRS APPROXIMATELY Tax Comp XREGION 1B LATERAL 36 HRS APPROXIMATELY Non Collus X
OSHA XREGION 2A CLEAN/JE 403 HRS APPROXIMATELY Debarment XREGION 2A LATERAL 2 HRS APPROXIMATELY Corp Auth X
REGION 2B CLEAN/JE 728 HRS APPROXIMATELYREGION 2B LATERAL 138 HRS APPROXIMATELY
1707
FY21 Draft Bid Tabs H-2 through 23