System Specs Temp Volume BTU Potential GPM pH 160°F * 668.7 Gallons 2,158,348 BTU per hour 225 GPM 6.8 - 8.5 * 160°F Water Temp for Peak Load when outside temp is -10°F and below. Zone Valves - Delta Fin SF-125 Actuator Flow Control Detail Item Qty Location Type Brand Valve Model Size CV Brand Model VAC Brand Model GPM Size Detail Sheet ZF-1 2 Tropical - Lower Fin 3-Way Belimo B330+ARB24-3-S 1 1 4 " 19.0 Belimo ARB24-3-S 24 Flow Design YRH125-0110 11 1 1 4 " H6A ZF-2 2 Tropical - Upper Fin 3-Way Belimo B330+ARB24-3-S 1 1 4 " 19.0 Belimo ARB24-3-S 24 Flow Design YRH125-0120 12 1 1 4 " H6A ZF-3 2 Orchids - Upper Fin 3-Way Belimo B330+ARB24-3-S 1 1 4 " 19.0 Belimo ARB24-3-S 24 Flow Design YRH125-0100 10 1 1 4 " H6A ZF-4 1 Orchids Cool - Upper Fin 3-Way Belimo B330+ARB24-3-S 1 1 4 " 19.0 Belimo ARB24-3-S 24 Flow Design YRH125-0130 13 1 1 4 " H6A ZF-5 1 Production - Lower Fin 3-Way Belimo B330+ARB24-3-S 1 1 4 " 19.0 Belimo ARB24-3-S 24 Flow Design YRH125-0150 15 1 1 4 " H6A ZF-6 1 Production - Upper Fin 3-Way Belimo B330+ARB24-3-S 1 1 4 " 19.0 Belimo ARB24-3-S 24 Flow Design YRH125-0160 16 1 1 4 " H6A ZF-7 1 Production - Lower Fin 3-Way Belimo B330+ARB24-3-S 1 1 4 " 19.0 Belimo ARB24-3-S 24 Flow Design YRH125-0150 15 1 1 4 " H6A ZF-8 1 Production - Upper Fin 3-Way Belimo B330+ARB24-3-S 1 1 4 " 19.0 Belimo ARB24-3-S 24 Flow Design YRH125-0160 16 1 1 4 " H6A ZF-9 1 Corridor 3-Way Belimo B330+ARB24-3-S 1 1 4 " 19.0 Belimo ARB24-3-S 24 Flow Design YRH125-0140 14 1 1 4 " H6A ZF-10 1 Snow Melt Loop - North 3-Way Belimo B330+ARB24-3-S 1 1 4 " 19.0 Belimo ARB24-3-S 24 Flow Design YRH125-0060 6 1 1 4 " H6A ZF-11 1 Snow Melt Loop - Corridor 3-Way Belimo B330+ARB24-3-S 1 1 4 " 19.0 Belimo ARB24-3-S 24 Flow Design YRH125-0060 6 1 1 4 " H6A ZF-12 1 Snow Melt Loop - South 3-Way Belimo B330+ARB24-3-S 1 1 4 " 19.0 Belimo ARB24-3-S 24 Flow Design YRH125-0060 6 1 1 4 " H6A Mixing Group - PEX Manifold Control Valve Actuator Pump Flow Control Detail Item Qty Location Type Brand Model Size CV Brand Model VAC Band Model Flange GPM Ft Hd HP VAC Amps Hz Brand Model GPM Size Detail Sheet ZP-1 1 Tropical 3-Way Mixing Belimo B239 1 1 4 " 68.0 Belimo ARB24-3-S 24 Grundfos UP 26-64F 1 1 4 " GF 12.0 11.6 1/12 120 1 0.74/0.43 60 Flow Design YRH125-0120 12 1 1 4 " H6 ZP-2 1 Orchid Intermediate 3-Way Mixing Belimo B239 1 1 4 " 68.0 Belimo ARB24-3-S 24 Grundfos UP 15-58F 1 1 4 " GF 9.0 12.6 1/25 120 1 0.75 60 Flow Design YRH125-0090 9 1 1 4 " H6 ZP-3 1 Orchid Cool 3-Way Mixing Belimo B239 1 1 4 " 68.0 Belimo ARB24-3-S 24 Grundfos UP 15-58F 1 1 4 " GF 3.0 13.6 1/25 120 1 0.75 60 Flow Design YRH125-0003 3 1 1 4 " H6 ZP-4 1 Production 3-Way Mixing Belimo B239 1 1 4 " 68.0 Belimo ARB24-3-S 24 Grundfos UP 26-64F 1 1 4 " GF 12.0 14.6 1/12 120 1 0.74/0.43 60 Flow Design YRH125-0120 12 1 1 4 " H6 ZP-5 1 Production 3-Way Mixing Belimo B239 1 1 4 " 68.0 Belimo ARB24-3-S 24 Grundfos UP 26-64F 1 1 4 " GF 12.0 15.6 1/12 120 1 0.74/0.43 60 Flow Design YRH125-0120 12 1 1 4 " H6 JP Heating System Notes (Unless Otherwise Specified) 1. Perimeter Fin Tube systems are designed for up to 230°F water. Refer to design for operating Temperature. Do NOT exceed this temperature or system damage can occur. 2. Maintain a water treatment program appropriate for all the materials in the heating system. In addition, the pH of the system water is to be maintained between 6.8 and 8.5. 3. All Steel Piping to be Schedule 40. 4. Vent high spots in piping mains to prevent air locks. 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. 7. Heat Source shall be by General Contractor. General Contractor shall provide and install hot water supply and return line, with flanged connections and ball valves into each greenhouse corridor as indicated on H Drawings, with constant flow at hot water supply temperatures consistent with established ration of 1:1 from baseline of 160°F HWS at OAT of below -10°F. Refer to below System Design Note. 8. All Line Voltage and Low Voltage Wiring, Conduit and Disconnect shall be Supplied and Installed By Electrical Contractor. 9. Installing subcontractor will be required to measure, cut, and modify in the field for proper fit per details. 10. Attachment to structure shall be supplied by installing subcontractor as required. 11. Installing subcontractor will be required to measure and cut all sections of the threaded rod, Unistrut, and related hanging materials based on Field Conditions. 13. The Installing subcontractor will be required to measure and cut some sections of Expanded Metal Covers based on Field Conditions. 14. All Delta Fin material shall be supplied in 12'-0" lengths. Installing Contractor will be required to measure, cut, de-fin, and groove some sections of the Delta Fin SF-125 Fin Pipe and Fin Pipe Covers based on Field Conditions. Fin Covers supplied are a 8'-0" lengths. 15. All hanging hardware shall be Galvanized or aluminum 16. This is a corrosive environment and proper materials must be used. 17. Insulation to be provided for bare aluminum pipe riser with-in zones below the 7 ft. (Off Finished Floor) level in each zone. 18. All piping shall be designed with expansion joints where required. 19. Installer will be required to assemble zone valve stations and piping connections using appropriate Teflon tape and sealant to insure leak free assembly. 20. Installing Contractor shall verify all dimensions at the site making field measurements and shop drawings necessary for fabrication of erection of HVAC and piping systems. Make allowance for beams, pipes, and other obstructions in building construction. Check drawings Showing work of other trades and consult with the owner's representative in the event of potential interference. Shop drawings shall be minimum 1/4"=1'-0" scale, indicating fittings, sizes, welds, and configurations and submitted in the latest version of autocad to the engineer for review. 21. Fill, Leak Test and Pressure Test system after installation is complete but prior to installation of insulation, to be completed by installing subcontractor. 22. Installing Subcontractor shall be responsible for start up and testing of systems. 23. Inslab heating shall be PEX6250X tubing with manifold box. 24. In-Slab hot water heating systems are designed for 130-140°F water. Do NOT exceed this temperature or system damage can occur. 25. The Installer will be required to measure and cut some sections of PEX Delta Tube based on Project design. 26. PEX 6250X rolls lengths are 500 or 1000 Feet. 27. All exposed piping (including bends) to be insulated. 28. All pipes to be labeled with Type and flow direction. 29. All Valves to be tagged, provide tagged list mounted under glass in each greenhouse, Fog Room, and Boiler Room. Indicate Size type, water type and location. GREENHOUSE HEATING SYSTEM DESIGN REQUIREMENTS - Delta Fin Pipe Inside Temperature: 58 °F (Average based on 65°,62°,52°,62°,42°,65° temps ) Outside Temperature: -15 °F Temperature Difference: 73 °F (Average based on 80°,77°,67°,77°,57°,80°temps ) Hot Water Supply 160 °F Hot Water Return 140 °F Temperature Differential: 20 °F Relief Valve Pressure: 30psi Operating Pressure: 12psi DESIGN FLOW RATE FOR EACH AREA AS FOLLOWS: Delta Fin Heat Minimum Flow Req 177 GPM GREENHOUSE HEATING SYSTEM DESIGN REQUIREMENTS - PEX TUBE Inside Temperature: 58 °F (Average based on 65°,62°,52°,62°,42°,65° temps ) Outside Temperature: -15 °F Temperature Difference: 73 °F (Average based on 80°,77°,67°,77°,57°,80°temps ) Hot Water Supply 130 °F Hot Water Return 110 °F Temperature Differential: 20 °F Relief Valve Pressure: 30psi Operating Pressure: 12psi DESIGN FLOW RATE FOR EACH AREA AS FOLLOWS: PEX Floor Heat Minimum Flow Req 51 GPM Drawing Index Sheet Description H1 Greenhouse Heating System Notes & Schedules H2 Greenhouse Heating System Layout H2A Greenhouse Heating System PEX Manifold Box H3 Greenhouse Heating System PEX Layout H3A Greenhouse Heating System PEX Details H4 Greenhouse Heating Upper & Lower Fin Tube Layout H4A Greenhouse Snow Melt Fin Tube Layout H4B Fin Tube Details H4C Fin Tube Cover & Insulation Details H5 Tropical Ghse. A Piping Elevation H5A Tropical Ghse. B Piping Elevation H5B Orchid Intermediate Ghse. A Piping Elevation H5C Orchid Intermediate Ghse. B Piping Elevation H5D Orchid Cool Ghse. Piping Elevation H5E Production Ghse. A Piping Elevation H5F Production Ghse. B Piping Elevation H5G Corridor Piping Elevation H6 Mixing Valve Details H6A Zone Control Valve Details H7 Bench Top Heating Layout H7A Bench Top Heating Details H7B Bench Top Zone Control Valve Details GREENHOUSE HEATING SYSTEM DESIGN NOTE System to Accommodate 1:1 water temp. reset ratio to 60 °F outdoor / 90 °F HWS EXHIBIT I H1 GREENHOUSE HEATING SYSTEM NOTES & SCHEDULES Zone Valves - Bench Top Heat Actuator Flow Control Detail Item Qty Location Type Brand Valve Model Size CV Brand Model VAC Brand Model GPM Size Detail Sheet ZB-1 1 Orchid Int. 3-Way Honeywell VCZMR6100 1" 8.6 Honeywell VC2714ZZ11 24 Flow Design YR0100F 1 1" H7C ZB-2 2 Production 3-Way Honeywell VCZMR6100 1" 8.6 Honeywell VC2714ZZ11 24 Flow Design YR0100F 1 1" H7C DRAWN BY: CHECKED BY: PROJECT NO. PROJECT PHASE Drawing 2016 Copyright Meyer, Scherer & Rocastle, Ltd. Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd. ISSUE I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the Laws of the State of Wisconsin. ARCHITECT SEAL Signature: Print Names: Date: License No: DATE MARK DESCRIPTION Jack Poling A-8984 BID DOCUMENTS 2017016 Civil Engineer Vierbicher Associates, Inc. 999 Fourier Drive, Suite 201 Madison, WI 53717 608.826.0532 tel Landscape Architect Ken Saiki Design, Inc. 303 South Paterson Street, Suite 1 Madison, WI 53703 608.251.3600 tel Structural Engineer, Technology and A/V IMEG Corp. 1800 Deming Way, Suite 200 Middleton, WI 53562 608.223.9600 tel MEP Engineer MEP Associates, LLC 860 Blue Gentian Road, Suite 175 Eagan, MN 55121 651.379.9120 tel Olbrich Botanical Gardens Expansion Phase 1 BPW Project # 8162 3330 Atwood Avenue Madison, WI 53704 Fire Protection Engineer and Code Consultant Summit Fire Consulting 575 Minnehaha Ave West St. Paul, MN 55103 651.251.1880 tel Greenhouse Design Rough Brothers, Inc. 5513 Vine Street Cincinnati, OH 45217 513.242.0310 tel FILE NAME: E:\DELTA T\170830-3355 OLBRICH BOTANICAL GARDENS\EMAIL FROM SR 3-27-18\172035-H1-H5F - DELTA T.DWG SAVE DATE: 05-25-18 09.29.2017 SCHEMATIC DESIGN SUBMISSION 05.04.2018 90% CD SUBMISSION 04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION 01.10.2018 DESIGN DEVELOPMENT SUBMISSION 01.17.2018 UDC SUBMISSION 03.30.2018 70% CD PRICING ISSUE 12.08.2017 DD PRICING SET JUNE 4, 2018 06.01.2018 BID ISSUE 06.04.2018 PERMIT ISSUE Radiation - Delta SD Tube 1. Refer to Drawings H7 for Delta Tube Layout H7A &H7B for the details. 2. Bench-Top and In-Slab hot water heating systems are designed for 130-140°F water. Do NOT exceed this temperature or system damage can occur. 3. The Installer will be required to measure and cut some sections of SD Delta Tube based on Project design. 4. Standard roll lengths for Delta Tube are 500 or 1000 Feet. Bench Top Heating System Design Requirments - Delta SD Tube HOT WATER SUPPLY TEMP: 135° HOT WATER RETURN TEMP: 115° TEMPERATURE DIFFERENTIAL: 20° RELIEF VALVE: 30 PSI OPERATING PRESSURE 12-15 PSI STATIC PRODUCTION ZONE BTU POTENTIAL 10,000 BTUH ORCHID ZONE BTU POTENTIAL 10,000 BTUH

Upload: others

Post on 26-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

System Specs

Temp

Volume BTU Potential GPM

pH

160°F * 668.7 Gallons

2,158,348 BTU per hour

225 GPM 6.8 - 8.5

* 160°F Water Temp for Peak Load when outside temp is -10°F and below.

Zone Valves - Delta Fin SF-125 Actuator Flow ControlDetail

Item

Qty

Location

Type

Brand Valve Model Size CV Brand Model VAC Brand Model GPM Size

Detail

Sheet

ZF-1 2

Tropical - Lower Fin 3-Way

Belimo B330+ARB24-3-S 1

1

4

" 19.0 Belimo ARB24-3-S 24

Flow Design

YRH125-0110 11 1

1

4

" H6A

ZF-2 2

Tropical - Upper Fin 3-Way

Belimo B330+ARB24-3-S 1

1

4

" 19.0 Belimo ARB24-3-S 24

Flow Design

YRH125-0120 12 1

1

4

" H6A

ZF-3 2

Orchids - Upper Fin 3-Way

Belimo B330+ARB24-3-S 1

1

4

" 19.0 Belimo ARB24-3-S 24

Flow Design

YRH125-0100 10 1

1

4

" H6A

ZF-4 1

Orchids Cool - Upper Fin 3-Way

Belimo B330+ARB24-3-S 1

1

4

" 19.0 Belimo ARB24-3-S 24

Flow Design

YRH125-0130 13 1

1

4

" H6A

ZF-5 1 Production - Lower Fin

3-Way

Belimo B330+ARB24-3-S 1

1

4

" 19.0 Belimo ARB24-3-S 24

Flow Design

YRH125-0150 15 1

1

4

" H6A

ZF-6 1

Production - Upper Fin 3-Way

Belimo B330+ARB24-3-S 1

1

4

" 19.0 Belimo ARB24-3-S 24

Flow Design

YRH125-0160 16 1

1

4

" H6A

ZF-7 1 Production - Lower Fin

3-Way

Belimo B330+ARB24-3-S 1

1

4

" 19.0 Belimo ARB24-3-S 24

Flow Design

YRH125-0150 15 1

1

4

" H6A

ZF-8 1

Production - Upper Fin 3-Way

Belimo B330+ARB24-3-S 1

1

4

" 19.0 Belimo ARB24-3-S 24

Flow Design

YRH125-0160 16 1

1

4

" H6A

ZF-9 1 Corridor

3-Way

Belimo B330+ARB24-3-S 1

1

4

" 19.0 Belimo ARB24-3-S 24

Flow Design

YRH125-0140 14 1

1

4

" H6A

ZF-101

Snow Melt Loop - North 3-Way

Belimo B330+ARB24-3-S 1

1

4

" 19.0 Belimo ARB24-3-S 24

Flow Design

YRH125-0060 6 1

1

4

" H6A

ZF-111

Snow Melt Loop - Corridor 3-Way

Belimo B330+ARB24-3-S 1

1

4

" 19.0 Belimo ARB24-3-S 24

Flow Design

YRH125-0060 6 1

1

4

" H6A

ZF-121

Snow Melt Loop - South 3-Way

Belimo B330+ARB24-3-S 1

1

4

" 19.0 Belimo ARB24-3-S 24

Flow Design

YRH125-0060 6 1

1

4

" H6A

Mixing Group - PEX ManifoldControl Valve

Actuator

Pump

Flow ControlDetail

Item

Qty

Location

Type

Brand Model Size CV Brand Model VAC Band Model

Flange

GPM Ft Hd HP VAC Ø

Amps

Hz Brand Model GPM Size Detail Sheet

ZP-1 1

Tropical 3-Way Mixing

Belimo B239 1

1

4

" 68.0 Belimo ARB24-3-S 24 Grundfos UP 26-64F 1

1

4

" GF 12.0 11.6 1/12

120 1 0.74/0.43

60

Flow Design

YRH125-0120 12 1

1

4

" H6

ZP-2 1 Orchid Intermediate

3-Way Mixing

Belimo B239 1

1

4

" 68.0 Belimo ARB24-3-S 24 Grundfos UP 15-58F 1

1

4

" GF 9.0 12.6 1/25

120 1 0.75

60

Flow Design

YRH125-0090 9 1

1

4

" H6

ZP-3 1 Orchid Cool

3-Way Mixing

Belimo B239 1

1

4

" 68.0 Belimo ARB24-3-S 24 Grundfos UP 15-58F 1

1

4

" GF 3.0 13.6 1/25

120 1 0.75

60

Flow Design

YRH125-0003 3 1

1

4

" H6

ZP-4 1 Production

3-Way Mixing

Belimo B239 1

1

4

" 68.0 Belimo ARB24-3-S 24 Grundfos UP 26-64F 1

1

4

" GF 12.0 14.6 1/12

120 1 0.74/0.43

60

Flow Design

YRH125-0120 12 1

1

4

" H6

ZP-5 1 Production

3-Way Mixing

Belimo B239 1

1

4

" 68.0 Belimo ARB24-3-S 24 Grundfos UP 26-64F 1

1

4

" GF 12.0 15.6 1/12

120 1 0.74/0.43

60

Flow Design

YRH125-0120 12 1

1

4

" H6

JP

Heating System Notes (Unless Otherwise Specified)

1. Perimeter Fin Tube systems are designed for up to 230°F water. Refer to design for

operating Temperature. Do NOT exceed this temperature or system damage can occur.

2. Maintain a water treatment program appropriate for all the materials in the heating system.

In addition, the pH of the system water is to be maintained between 6.8 and 8.5.

3. All Steel Piping to be Schedule 40.

4. Vent high spots in piping mains to prevent air locks.

5. Piping runs to be supported as required.

6. Installation to follow all state and local codes where applicable.

7. Heat Source shall be by General Contractor. General Contractor shall provide and install

hot water supply and return line, with flanged connections and ball valves into each

greenhouse corridor as indicated on H Drawings, with constant flow at hot water supply

temperatures consistent with established ration of 1:1 from baseline of 160°F HWS at OAT

of below -10°F. Refer to below System Design Note.

8. All Line Voltage and Low Voltage Wiring, Conduit and Disconnect shall be Supplied and

Installed By Electrical Contractor.

9. Installing subcontractor will be required to measure, cut, and modify in the field for proper fit

per details.

10. Attachment to structure shall be supplied by installing subcontractor as required.

11. Installing subcontractor will be required to measure and cut all sections of the threaded rod,

Unistrut, and related hanging materials based on Field Conditions.

13. The Installing subcontractor will be required to measure and cut some sections of Expanded

Metal Covers based on Field Conditions.

14. All Delta Fin material shall be supplied in 12'-0" lengths. Installing Contractor will be required

to measure, cut, de-fin, and groove some sections of the Delta Fin SF-125 Fin Pipe and Fin

Pipe Covers based on Field Conditions. Fin Covers supplied are a 8'-0" lengths.

15. All hanging hardware shall be Galvanized or aluminum

16. This is a corrosive environment and proper materials must be used.

17. Insulation to be provided for bare aluminum pipe riser with-in zones below the 7 ft. (Off

Finished Floor) level in each zone.

18. All piping shall be designed with expansion joints where required.

19. Installer will be required to assemble zone valve stations and piping connections using

appropriate Teflon tape and sealant to insure leak free assembly.

20. Installing Contractor shall verify all dimensions at the site making field measurements and

shop drawings necessary for fabrication of erection of HVAC and piping systems. Make

allowance for beams, pipes, and other obstructions in building construction. Check drawings

Showing work of other trades and consult with the owner's representative in the event of

potential interference. Shop drawings shall be minimum 1/4"=1'-0" scale, indicating fittings,

sizes, welds, and configurations and submitted in the latest version of autocad to the

engineer for review.

21. Fill, Leak Test and Pressure Test system after installation is complete but prior to installation

of insulation, to be completed by installing subcontractor.

22. Installing Subcontractor shall be responsible for start up and testing of systems.

23. Inslab heating shall be PEX6250X tubing with manifold box.

24. In-Slab hot water heating systems are designed for 130-140°F water. Do NOT exceed this

temperature or system damage can occur.

25. The Installer will be required to measure and cut some sections of PEX Delta Tube based

on Project design.

26. PEX 6250X rolls lengths are 500 or 1000 Feet.

27. All exposed piping (including bends) to be insulated.

28. All pipes to be labeled with Type and flow direction.

29. All Valves to be tagged, provide tagged list mounted under glass in each greenhouse, Fog

Room, and Boiler Room. Indicate Size type, water type and location.

GREENHOUSE HEATING SYSTEM DESIGN REQUIREMENTS - Delta Fin

Pipe

Inside Temperature: 58 °F (Average based on 65°,62°,52°,62°,42°,65° temps )

Outside Temperature: -15 °F

Temperature Difference: 73 °F (Average based on 80°,77°,67°,77°,57°,80°temps )

Hot Water Supply 160 °F

Hot Water Return 140 °F

Temperature Differential: 20 °F

Relief Valve Pressure: 30psi

Operating Pressure: 12psi

DESIGN FLOW RATE FOR EACH AREA AS FOLLOWS:

Delta Fin Heat Minimum Flow Req 177 GPM

GREENHOUSE HEATING SYSTEM DESIGN REQUIREMENTS - PEX TUBE

Inside Temperature: 58 °F (Average based on 65°,62°,52°,62°,42°,65° temps )

Outside Temperature: -15 °F

Temperature Difference: 73 °F (Average based on 80°,77°,67°,77°,57°,80°temps )

Hot Water Supply 130 °F

Hot Water Return 110 °F

Temperature Differential: 20 °F

Relief Valve Pressure: 30psi

Operating Pressure: 12psi

DESIGN FLOW RATE FOR EACH AREA AS FOLLOWS:

PEX Floor Heat Minimum Flow Req 51 GPM

Drawing Index

Sheet

Description

H1

Greenhouse Heating System Notes & Schedules

H2

Greenhouse Heating System Layout

H2A

Greenhouse Heating System PEX Manifold Box

H3

Greenhouse Heating System PEX Layout

H3A

Greenhouse Heating System PEX Details

H4

Greenhouse Heating Upper & Lower Fin Tube Layout

H4A

Greenhouse Snow Melt Fin Tube Layout

H4B Fin Tube Details

H4C Fin Tube Cover & Insulation Details

H5

Tropical Ghse. A Piping Elevation

H5A

Tropical Ghse. B Piping Elevation

H5B

Orchid Intermediate Ghse. A Piping Elevation

H5C

Orchid Intermediate Ghse. B Piping Elevation

H5D

Orchid Cool Ghse. Piping Elevation

H5E

Production Ghse. A Piping Elevation

H5F

Production Ghse. B Piping Elevation

H5G

Corridor Piping Elevation

H6

Mixing Valve Details

H6A Zone Control Valve Details

H7

Bench Top Heating Layout

H7A

Bench Top Heating Details

H7B

Bench Top Zone Control Valve Details

GREENHOUSE HEATING SYSTEM DESIGN NOTE

System to Accommodate 1:1 water temp. reset ratio to 60 °F outdoor / 90 °F HWS

EXHIBIT I

H1

GREENHOUSE

HEATING SYSTEM

NOTES & SCHEDULES

Zone Valves - Bench Top Heat

Actuator Flow ControlDetail

Item

Qty

Location

Type

Brand Valve Model Size CV Brand Model VAC Brand Model GPM Size

Detail

Sheet

ZB-1 1 Orchid Int.

3-Way Honeywell

VCZMR6100 1" 8.6

Honeywell

VC2714ZZ11 24

Flow Design

YR0100F 1 1" H7C

ZB-2 2 Production

3-Way Honeywell

VCZMR6100 1" 8.6

Honeywell

VC2714ZZ11 24

Flow Design

YR0100F 1 1" H7C

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison

, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

1-H

5F

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

Radiation - Delta SD Tube

1. Refer to Drawings H7 for Delta Tube Layout H7A &H7B for the details.

2. Bench-Top and In-Slab hot water heating systems are designed for 130-140°F water. Do NOT

exceed this temperature or system damage can occur.

3. The Installer will be required to measure and cut some sections of SD Delta Tube based on

Project design.

4. Standard roll lengths for Delta Tube are 500 or 1000 Feet.

Bench Top Heating System Design Requirments - Delta SD Tube

HOT WATER SUPPLY TEMP: 135°

HOT WATER RETURN TEMP: 115°

TEMPERATURE DIFFERENTIAL: 20°

RELIEF VALVE: 30 PSI

OPERATING PRESSURE 12-15 PSI STATIC

PRODUCTION ZONE BTU POTENTIAL 10,000 BTUH

ORCHID ZONE BTU POTENTIAL 10,000 BTUH

A B C D E F G J

1

2

3

4

5

6

H

Scale:

1

8

" = 1'-0"

System Piping Layout

N

SUPPLY AND RETURN LINES

FOR FIN TUBE HEATING SYSTEM

SHALL BE BROUGHT INTO THE

GREEN HOUSE CORRIDOR BY

MECHANICAL CONTRACTOR

WITH A FLANGED CONNECTION

AND A BALL VALVE

Tropical

Greenhouse

Orchid

Intermediate

Orchid

Cool

Production

Greenhouse

HWS & HWR

PIPING

DELTA TUBE PEX

MANIFOLD BOX

(TYP.) FOR DETAILS

SEE SHT. H2A

3-WAY CONTROL VALVE

w/ FLOW CONTROL

96'-0"

11'-5"35'-4"47'-3"

11

2'-0

"

50

'-6

"9

'-2

"5

0'-6

"

Corridor

25

'-3

"2

5'-3

"2

5'-3

"2

5'-3

"

ZP-5

ZP-3ZP-2

ZP-4

ZP-5

ZP-1

ZF-1

ZF-1

ZF-5

ZF-2

ZF-2

ZF-3

ZF-3

ZF-4

ZF-6

ZF-7

ZF-8

ZF-9

JP

EXHIBIT I

H2

GREENHOUSE

HEATING SYSTEM

LAYOUT

DELTA TUBE PEX

MANIFOLD BOX

(TYP.) FOR DETAILS

SEE SHT. H2A

26'-2"

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

1-H

5F

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS

Scale: 1" = 1'-0"

System Piping to PEX Manifold Box

DELTA TUBE PEX

MANIFOLD BOX

1

1

4

" MANUAL

BALL VALVE

DELTA TUBE PEX

MANIFOLD BOX

HWS

HWR

1

1

4

" HWS

1

1

4" HWR

Level of

Finished Floor

HWR

HWS

AUTOMATIC AIR

VENT ON

3

8

" MINI

BALL VALVE

AUTOMATIC AIR

VENT ON

3

8

" MINI

BALL VALVE

Elevation

Section

UNI-STRUT

w/ PIPE CLAMPS

UNI-STRUT

w/ PIPE CLAMPS

1

1

4" HWR

Structure

Level of

Finished Floor

1

1

4" HWS

Heat

Source

10

'-0

" T

.B

.D

.

Structure

7'-5

"

JP

EXHIBIT I

H2A

GREENHOUSE

HEATING SYSTEM PEX

MANIFOLD BOX

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

1-H

5F

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

Heating System Notes (Unless Otherwise Specified)

1. All exposed piping (including bends) to be insulated.

2. All pipes to be labeled with Typ and flow direction.

3. All Valves to be tagged, provide tagged list mounted under glass in each greenhouse, Fog

Room, and Boiler Room. Indicate Size type, water type and location.

SF-125 DELTA FIN SHOW

FOR REFERENCE

A B C D E F G J

1

2

3

4

5

6

H

Note: Piping shown outside the

greenhouse for clarity only.

PEX Tubing Layout

N

Structure

(Typ)

Scale:

1

8

" = 1'-0"

Tropical

Greenhouse

Orchid

Intermediate

Production

Greenhouse

DELTA TUBE PEX

6 LOOPS/MANIFOLD

@ 12" TUBE SPC'G.

(TYP)

6 Loops

6 Loops

6 Loops

6 Loops

5 Loops

6 Loops

6 Loops

6 Loops

6 Loops

Corridor

ZP-3ZP-2

ZP-4

ZP-5

ZP-1

95'-10"

11'-5"35'-4"47'-4"

11

2'-1

0"

50

'-6

"

9'-2

"5

0'-6

"

25

'-4

"2

5'-2

"2

5'-4

"2

5'-2

"

JP

EXHIBIT I

H3

GREENHOUSE

HEATING SYSTEM

PEX LAYOUT

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

1-H

5F

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

TRENCH DRAIN & BASIN

(TYP)

Orchid

Cool

AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS

2'-8"

STEP RACK

Pre-Assembled

MANIFOLD BOX

w/ COVER

1

1

4

" COPPER MANIFOLD

Pre-Assembled w/ Required

Ball Valves & Hose Barbs

1

1

4

" ELBOW

BRASS

1'-6"

1

1

4

" ELBOW

BRASS

CONNECTION TO

HWS

1

1

4

" STREET ELBOW

BRASS

1'-6"

8

1 2

"

REBAR OR

6"x6" 10-GAUGE WIRE MESH

CONTROL JOINTS

To Be No Greater Than

3

4

"

When a 4" Floor is Poured

(SEE NOTE 2)

DELTA TUBE

PEX

CONCRETE

CONNECTION TO

HWR

1

1

4

" BRASS

BALL VALVE

1

1

4

" CONNECTION

TO HWS

1

1

4

" BRASS

BALL VALVE

1

1

4

" CONNECTION

TO HWR

1

1

4

" COPPER MANIFOLD

Pre-Assembled w/ Required

Ball Valves & Hose Barbs

1

1

4

" x 4" NIPPLE

BRASS

1

1

4

" ELBOW

BRASS

STEP RACK

Pre-Assembled

1

1

4

" x 6" NIPPLE

BRASS

1

1

4

" ELBOW

BRASS

1

1

4

" STREET ELBOW

BRASS

MANIFOLD BOX

w/ COVER

1

1

4

" COPPER MANIFOLD

Pre-Assembled w/ Required

Ball Valves & Hose Barbs

1

1

4

" BRASS

BALL VALVE

1

1

4

" CONNECTION

TO HWR

1

1

4

" x 6" NIPPLE

BRASS

1

1

4

" STEEL NIPPLE

1

1

4

" ADAPTOR

BRASS FTP x PVC SLIP

1

1

4

" SCHEDULE 80

PVC PIPE

1

1

4

" x 6" NIPPLE

BRASS

1

1

4

" BRASS

BALL VALVE

1

1

4

" STEEL NIPPLE

1

1

4

" GROOVED

COUPLING

1

1

4

" STEEL PIPE

1

1

4

" x 6" NIPPLE

BRASS

1

1

4

" BRASS

BALL VALVE

2'-8"

1'-6"

ALUMINUM

DIAMOND PLATE

COVER

8

1 2

" M

in

STEP RACK

Preassembled

1

1

4

" ELBOW

BRASS

1

1

4

" STREET ELBOW

BRASS

MANIFOLD BOX w/

COVER

(Installed in slab)

CONCRETECONCRETE

(SEE NOTE 2)

WIRE

TIE

DELTA TUBE

PEX

REBAR OR

WIRE MESH

G

Wire Tie Placement

Scale:

3

4

" = 1'-0"

B

Manifold Box - Side Elevation

Scale: 1

1

2

" = 1'-0"

E

Slab - Cross Section

Scale: 1

1

2

" = 1'-0"

F

Manifold Box - Top View

Scale: 1

1

2

" = 1'-0"

C

Manifold Box - Front Elevation

Scale: 1

1

2

" = 1'-0"

Notes (Unless Otherwise Specified)

1 Floor Heat Water System is designed for 130°F - DO NOT

EXCEED THIS TEMPERATURE. Failure to comply will result in

System Damage

2 For slab details refer to S-Series Drawings and sheet G002 FL-1

3 All tubing loops to be one piece - DO NOT SPLICE TUBING IN

CONCRETE FLOOR.

4 Install tubing on 12 Inch center with a minimum radius of 6 Inch on

all loops.

5 Install all tubing 6" to 12" from all outside walls and floor drains.

6 Tie tubing to rebar or 6"x6" 10-gauge wire mesh every 2.0 Feet

7 PRESSURE TEST TUBING WITH 40 PSI AIR PRIOR AND

DURING CONCRETE POUR BY INSTALLING

SUBCONTRACTOR

8 Installation to follow all state and local codes where applicable.

9 This Drawing to be used in Conjunction with Delta T Installation &

Operating Instructions for PEX Tube by installing subcontractor.

DELTA TUBE PEX

@ 12" TUBE SPACING

WIRE TIE

(TYP)

2'-0" Wire Tie

Spacing

(TYP)

A

Manifold Box - Connection Detail

Scale: 1

1

2

" = 1'-0"

Coupled

Steel

PVC

Schedule 80

1'-0

"1

'-0

"

F

Manifold Box Cover - Top View

Scale: 1

1

2

" = 1'-0"

JP

EXHIBIT I

H3A

GREENHOUSE

HEATING SYSTEM

PEX DETAILS

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

3A

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

A B C D E F G J

1

2

3

4

5

6

HA B C D E F G J

1

2

3

4

5

6

H

N

Scale:

1

8

" = 1'-0"

DELTA FIN SF-125

(TYP)

DELTA FIN SF-125

HANGER BRACKET

ASSEMBLY

DELTA FIN SF-125

EXPANDED

ALUMINUM COVER

(TYP)

DELTA FIN SF-125

COVER BRACKET

ASSEMBLY (TYP)

DELTA FIN SF-125

CAST-ALUMINUM COUPLING

B

SF-1

Delta Fin SF-125 Detail

Scale:

1

2

" = 1'-0"

SF-1

B

Tropical

Greenhouse

Orchid

Intermediate

Orchid

Cool

Production

Greenhouse

ZF-1

ZF-1

ZF-7

ZF-5

Lower Fin Tube Layout

Corridor

95'-10"

11'-5"35'-4"47'-4"

11

2'-1

0"

50

'-6

"

9'-2

"5

0'-6

"

25

'-4

"2

5'-2

"2

5'-4

"2

5'-2

"

1

1

4

" BARE ALUMINUM

CONNECTOR AT DOWNSPOUT

1

1

4

" BARE ALUMINUM PIPE

CONNECTOR @

DOWNSPOUT (TYP)

DOWNSPOUT (TYP)

JP

INSULATED 1

1

4

" BARE

ALUMINUM RISER

INSULATED 1

1

4

" BARE

ALUMINUM RISER

INSULATED 1

1

4

" BARE

ALUMINUM RISER

INSULATED

1

1

4

" BARE RISER

INSULATED 1

1

4

" BARE

ALUMINUM DOOR

RISER

INSULATED 1

1

4

" BARE

ALUMINUM DOOR

RISER

1

1

4

" BARE ALUMINUM

CONNECTOR AT DOWNSPOUT

DELTA FIN SF-125/48 LOWER

PERIMETER SINGLE TIER

RUN w/ COVER (TYP)

INSULATED 1

1

4

" BARE

ALUMINUM RISER

INSULATED 1

1

4

" BARE

ALUMINUM RISER

INSULATED 1

1

4

" BARE

ALUMINUM RISER

INSULATED 1

1

4

" BARE

ALUMINUM RISER

EXHIBIT I

H4

GREENHOUSE

HEATING UPPER &

LOWER FIN TUBE

LAYOUT

Upper Fin Tube Layout

Scale:

1

8

" = 1'-0"

Tropical

Greenhouse

Orchid

Intermediate

Orchid

Cool

Production

Greenhouse

Corridor

1

1

4

" BARE ALUMINUM PIPE

CONNECTOR @

DOWNSPOUT (TYP)

DOWNSPOUT (TYP)

DELTA FIN SF-125/48 UPPER

PERIMETER SINGLE TIER

RUN (TYP)

DELTA FIN SF-125/48 UPPER

PERIMETER SINGLE TIER

RUN (TYP)

ZF-2

ZF-2

ZF-8

ZF-6

ZF-3

ZF-3

ZF-4

ZF-9

95'-10"

11'-5"35'-4"47'-4"

11

2'-1

0"

50

'-6

"

9'-2

"5

0'-6

"

25

'-4

"2

5'-2

"2

5'-4

"2

5'-2

"

3-WAY VALVE

STATION (TYP)

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

1-H

5F

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

NO LOWER PERIMETER

DELTA FIN PIPE IN ORCHID

ROOM

NO LOWER PERIMETER

DELTA FIN PIPE IN ORCHID

ROOM

AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS

A B C D E F G J

1

2

3

4

5

6

H

Snow Melt Fin Tube Layout

N

Scale:

1

8

" = 1'-0"

Tropical

Greenhouse

Orchid

Intermediate

Orchid

Cool

Production

Greenhouse

Corridor

DELTA FIN SF-125/24

SNOW MELT LOOP

ZF-11

ZF-10

95'-10"

11'-5"35'-4"48'-0"

11

2'-1

0"

50

'-6

"

9'-2

"5

0'-6

"

25

'-4

"2

5'-2

"2

5'-4

"2

5'-2

"

ZONE VALVE

JP

EXHIBIT I

H4A

GREENHOUSE

SNOW MELT FIN

TUBE LAYOUT

ZONE VALVE

ZONE VALVE

DELTA FIN SF-125/24

SNOW MELT LOOP

DELTA FIN SF-125/24

SNOW MELT LOOP

ZF-12

1.25" BARE

ALUMINUM

PIPE (TYP)

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

1-H

5F

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS

FLEXIBLE ALUMINUM

COUPLINGCOUPLING

GASKET

FLEXIBLE

ALUMINUM

COUPLING

ALUMINUM

90° ELBOW

1

2

" Tap

DRAIN VALVE

w/ CAP &

DRAIN

FLEXIBLE ALUMINUM

COUPLING

DELTA FIN

SF-125

12'

BALL VALVE

1

8

"

AUTOMATIC

AIR VENT

FLEXIBLE

ALUMINUM

COUPLING

ALUMINUM

90° ELBOW

1

8

" Tap

3

1

4

"

3

1

4

"

3

1

4

"

Delta Fin SF-125

24 Fins/Ft

3

1

4

"

SNOW

MELT

RUNS

IN-ZONE

RUNS

3

1 4

"

3

1

4

"

3

1

4

"

3

1

4

"

Delta Fin SF-125

48 Fins/Ft

FLEXIBLE ALUMINUM

COUPLING

12

"

Level of Finished Floor

DELTA FIN SF-125

w/ ALUMINUM COVER

HANGER BRACKET

ASSEMBLY

HANGER BRACKET

ASSEMBLY

COVER BRACKET

ASSEMBLY

ALUMINUM COVER

DELTA FIN SF-125

EAVE

DELTA FIN

SF-125

12" M

IN

HANGER BRACKET

ASSEMBLY

SF-125 SS

WIRE HANGER

DELTA FIN

SF-125

ALL-THREAD

ROD

GREENHOUSE

STRUCTURE

BEAM

CLAMP

ROD SWIVEL

ATTACHMENT

DELTAFIN

SF-125

ALL-THREAD

ROD

BEAM

CLAMP

ROD SWIVEL

ATTACHMENT

DELTA FIN

SF-125 WIRE HANGER

BOLT

ALUMINUM

COUPLING

GREENHOUSE

STRUCTURE

J

Delta Fin SF-125 - Sizes

Scale: 2

1

2

" = 1'-0"

H

Delta Fin SF-125 - Lower Run

Scale: 2

1

2

" = 1'-0"

F

Delta Fin SF-125 - Air Vent

Scale: 2

1

2

" = 1'-0"

G

Delta Fin SF-125 - Drain Valve

Scale: 2

1

2

" = 1'-0"

A

Delta Fin SF-125 - Coupling

Scale: 2

1

2

" = 1'-0"

B

Delta Fin SF-125 - Fin Pipe

Scale: 2

1

2

" = 1'-0"

C

SF-D

Delta Fin SF-125 - Coupling

Scale: 2

1

2

" = 1'-0"

D

Delta Fin SF-125 - Upper Run

Scale: 2

1

2

" = 1'-0"

I

Delta Fin SF-125 - Cover

Scale: 2

1

2

" = 1'-0"

E

Delta Fin SF-125 - Hanger Bracket w/ Side View

Scale: 2

1

2

" = 1'-0"

Notes (Unless Otherwise Specified)

1. The Installer will be Required to Cut and Groove Some

Sections of the Delta Fin SF-125 Fin Pipe Based on Field

Conditions.

2. The Installing subcontractor is Required to Verify Delta Fin

type on the SF Layout Sheets prior to installation.

JP

EXHIBIT I

H4B

FIN TUBE DETAILS

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

4B

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

EXPANDED ALUMINUM

COVER NOTCHED

FOR RISER

SCREW

COVER

TOP BRACKET

ALUMINUM

END CAP

EXPANDED

ALUMINUM

COVER

12

"

Level of Finished Floor

DELTA FIN SF-125

w/ ALUMINUM COVER

HANGER BRACKET

ASSEMBLY

COVER TOP

BRACKET

EXPANDED ALUMINUM

COVER

COVER BOTTOM

BRACKET

DELTA FIN

SF-125

FIN SLIDE

BRACKET

FIN WALL

BRACKET

1

1

2

" FIBERGLASS

INSULATION

BUTT INSULATION

DOWN TO COUPLER

ALUMINUM

INSULATION COVER

INSTALL ALUMINUM INSULATION COVER

OVER INSULATION & COUPLING

AND SLIDE DOWN TO FIN PIPE COVER

1

1

4

" BARE ALUMINUM

RISER

1

1

4

" ALUMINUM

COUPLER

NOTCH COVER AND

SLIDE UNDER COUPLING

CORNER COVER

PLATE

EXPANDED ALUMINUM

COVER

COVER BOTTOM

BRACKET

SCREW

DELTA FIN

SF-125

ALUMINUM INNER FIN

COVER BRACKET

(INSTALLED)

ALUMINUM COUPLER

ALUMINUM

ELBOW

D

Delta Fin SF-125 Lower Run End Cap Detail

Scale: 2

1

2

" = 1'-0"

B

Delta Fin SF-125 Lower Run Cover Detail

Scale: 2

1

2

" = 1'-0"

C

Delta Fin SF-125 Lower Run Bracket Detail

Scale: 2

1

2

" = 1'-0"

F

Delta Fin SF-125 Lower Run - Insulated Riser

Scale: 2

1

2

" = 1'-0"

E

Delta Fin SF-125 Lower Run - Bare Riser

Scale: 2

1

2

" = 1'-0"

G

Delta Fin SF-125 Lower Run - Insulated Riser w/Cover

Scale: 2

1

2

" = 1'-0"

A

Delta Fin SF-125 Lower Run Cover Corner Detail

Scale: 2

1

2

" = 1'-0"

Note:

· The Installer Will be Required to Cut and

Groove Some Sections of the Delta Fin

SF-125 Fin Pipe Based on Field Conditions.

JP

EXHIBIT I

H4C

FIN TUBE COVER &

INSULATION DETAILS

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

4C

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

E

X

I

T

E

X

I

T

N

Scale:

3

8

" = 1'-0"

DELTA FIN SF-125/48 LOWER

PERIMETER SINGLE TIER

RUN w/ COVER (TYP)

Piping Elevation

DELTA FIN SF-125/48 LOWER

PERIMETER SINGLE TIER

RUN w/ COVER (TYP)

BARE ALUMINUM RISER

w/ 1

1

2

" ALUMINUM-CLAD

FIBERGLASS

INSULATION (TYP)

Clear Door & Exit Signage As Req.

CONNECTIONS

TO ZONE VALVE

(TYP)

DRAIN VALVE

(TYP)

AIR VENT

(TYP)

DRAIN VALVE

(TYP)

ZF-2

ZF-1

Tropical

Greenhouse - A

JP

EXHIBIT I

H5

TROPICAL GHSE. A

PIPING ELEVATION

Key Plan

SEE FIN TUBE LAYOUT

PLANS ON SHEETS

H4 & H4A

DELTA FIN SF-125/48 UPPER

PERIMETER SINGLE TIER

RUN (TYP)

DELTA FIN SF-125/24 SNOW MELT

SINGLE TIER LOOP RUN (TYP)

BARE ALUMINUM SNOW

MELT LATERAL LOOP PIPE

FOR PEX MANIFOLD BOX

AND RELATED PIPING, SEE

SHEETS H-2 & H2A

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

1-H

5F

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

ZF-10

BARE ALUMINUM RISER

w/ 1

1

2

" ALUMINUM-CLAD

FIBERGLASS

INSULATION (TYP)

DELTA FIN SF-125/24 SNOW MELT

SINGLE TIER CONTINUE INTO

ORCHID GREENHOUSE (TYP)

2'-0

"

EXIT SIGNAGE ABOVE ALL

DOORS (BY OTHERS)

AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS

N

Scale:

3

8

" = 1'-0"

DELTA FIN SF-125/48 LOWER

PERIMETER SINGLE TIER

RUN w/ COVER (TYP)

Tropical

Greenhouse - B

ZF-2

ZF-1

Piping Elevation

BARE ALUMINUM RISER

w/ 1

1

2

" ALUMINUM-CLAD

FIBERGLASS

INSULATION (TYP)

Clear Door& Exit Signage As Req.

CONNECTIONS

TO ZONE VALVE

(TYP)

DRAIN VALVE

(TYP)

AIR VENT

(TYP)

DRAIN VALVE

(TYP)

JP

EXHIBIT I

H5A

TROPICAL GHSE. B

PIPING ELEVATION

SEE FIN TUBE PLANS

ON SHEETS

H4 & H4A

FOR PEX MANIFOLD BOX

AND RELATED PIPING, SEE

SHEETS H-2 & H2A

DELTA FIN SF-125/48 UPPER

PERIMETER SINGLE TIER

RUN (TYP)

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

1-H

5F

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

ZP-1

Key Plan

AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS

N

Scale:

3

8

" = 1'-0"

DELTA FIN SF-125/48 UPPER

PERIMETER SINGLE TIER

RUN (TYP)

Orchid

Intermediate-A

Piping Elevation

ZF-3

JP

EXHIBIT I

H5B

ORCHID INT. GHSE. A

PIPING ELEVATION

Key Plan

FOR FIN TUBE LAYOUT

PLANS SEE SHEETS H4 &

H4A

DELTA FIN SF-125/24 SNOW MELT

SINGLE TIER LOOP RUN (TYP)

FOR PEX MANIFOLD BOX

AND RELATED PIPING, SEE

SHEETS H-2 & H2A

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

1-H

5F

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

DELTA FIN SF-125/24 SNOW MELT

CONTINUOUS FROM TROPICAL

AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS

N

Scale:

1

8

" = 1'-0"

DELTA FIN SF-125/48 UPPER

PERIMETER SINGLE TIER

RUN (TYP)

Orchid Intermediate

Greenhouse - B

Piping Elevation

ZF-3

JP

FOR FIN TUBE LAYOUT

PLANS SEE SHEETS

4 & 4A

EXHIBIT I

H5C

ORCHID INT. GHSE. B

PIPING ELEVATION

FOR PEX MANIFOLD BOX

AND RELATED PIPING, SEE

SHEETS H-2 & H2A

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

1-H

5F

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

ZP-2

Key Plan

AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS

N

Scale:

3

8

" = 1'-0"

DELTA FIN SF-125/48 UPPER

PERIMETER SINGLE TIER

RUN (TYP)

Orchid

Cool

Piping Elevation

ZF-4

CONNECTIONS

TO ZONE VALVE

(TYP)

JP

EXHIBIT I

H5D

ORCHIDS COOL GHSE.

PIPING ELEVATION

FOR FIN TUBE LAYOUT

PLANS SEE SHEETS

H4 & H4A

DELTA FIN SF-125/24 SNOW MELT

SINGLE TIER LOOP RUN (TYP)

DELTA FIN SF-125/24 SNOW MELT

SINGLE TIER LOOP RUN (TYP)

FOR PEX MANIFOLD BOX AND

RELATED PIPING, SEE SHEETS

H-2 & H2A

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

1-H

5F

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

ZF-3

Key Plan

AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS

Scale:

1

4

" = 1'-0"

Piping - Elevation

DELTA FIN SF-125/48 LOWER

PERIMETER SINGLE TIER

RUN w/ COVER (TYP)

Production

Greenhouse-A

Z-5

Z-6

BARE ALUMINUM RISER

w/ 1

1

2

" ALUMINUM-CLAD

FIBERGLASS

INSULATION (TYP)

Clear Door & Exit Signage As Req.

CONNECTIONS

TO ZONE VALVE

(TYP)

DRAIN VALVE

(TYP)

AIR VENT

(TYP)

JP

BARE ALUMINUM RISER

w/ 1

1

2

" ALUMINUM-CLAD

FIBERGLASS

INSULATION (TYP)

EXHIBIT I

H5E

PRODUCTION GHSE. A

PIPING ELEVATION

DELTA FIN SF-125/48 UPPER

PERIMETER SINGLE TIER

RUN (TYP)

FOR PEX MANIFOLD

BOX AND RELATED

PIPING, SEE

SHEETS H-2 & H2A

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

1-H

5F

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

ZP-4

Key Plan

AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS

Scale:

1

8

" = 1'-0"

DELTA FIN SF-125

CAST-ALUMINUM COUPLING

Production

G'hse. - B

Z-8

Z-7

Piping Elevation

DELTA FIN SF-125/48 LOWER

PERIMETER SINGLE TIER

RUN w/ COVER (TYP)

BARE ALUMINUM RISER

w/ 1

1

2

" ALUMINUM-CLAD

FIBERGLASS

INSULATION (TYP)

Clear Door& Exit Signage As Req.

CONNECTIONS

TO ZONE VALVE

(TYP)

DRAIN VALVE

(TYP)

AIR VENT

(TYP)

AIR VENT

(TYP)

BARE ALUMINUM RISER

w/ 1

1

2

" ALUMINUM-CLAD

FIBERGLASS

INSULATION (TYP)

DRAIN

VALVE

(TYP)

JP

Key Plan

FOR FIN TUBE LAYOUT

PLANS SEE SHEETS

H4 & H4A

EXHIBIT I

H5F

PRODUCTION GHSE. B

PIPING ELEVATION

FOR PEX MANIFOLD

BOX AND RELATED

PIPING, SEE

SHEETS H-2 & H2A

DELTA FIN SF-125/48 UPPER

PERIMETER SINGLE TIER

RUN (TYP)

DELTA FIN SF-125/24

SNOW MELT SINGLE

TIER LOOP (TYP)

BARE ALUMINUM

SNOW MELT LATERAL

LOOP PIPE

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

1-H

5F

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

ZP-5

Z-10

AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS

Scale:

1

4

" = 1'-0"

Corridor

Z-9

Piping Elevation

CONNECTIONS

TO ZONE VALVE

(TYP)

JP

Key Plan

FOR FIN TUBE LAYOUT

PLAN SEE SHEETS

H4A

EXHIBIT I

H5G

CORRIDOR PIPING

ELEVATION

BARE ALUMINUM

SNOW MELT LATERAL

LOOP PIPE

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

1-H

5F

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

DELTA FIN SF-125/48 UPPER

PERIMETER SINGLE TIER

RUN (TYP)

HOT WATER SUPPLY AND

RETURN LINES (BY OTHERS)

HOT WATER SUPPLY AND

RETURN LINES TO

PRODUCTION GREENHOUSE

(BY OTHERS)

HOT WATER SUPPLY AND RETURN

LINES TO ORCHID COOL

GREENHOUSE (BY OTHERS)

HOT WATER SUPPLY AND RETURN

LINES TO ORCHID INTERMEDIATE

GREENHOUSE (BY OTHERS)

HOT WATER SUPPLY AND

RETURN LINES TO TROPICAL

GREENHOUSE (BY OTHERS)

AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS

AB A

B

Honeywell

2

6

0

2

4

0

22

0

2

0

0

1

8

0

1

6

0

1

4

0

1

2

0

1

0

0

8

0

6

0

40

2

0

0

°F

2

6

0

2

4

0

22

0

2

0

0

1

8

0

1

6

0

1

4

0

1

2

0

1

0

0

8

0

6

0

40

2

0

0

°F

CLOSE

OPEN

24 V COMMON

32

1

BE

LIM

O

S3

S2

S1

S3

S2

S2

S3

S1

S1

Y1

Y2

AR

B2

4-3

-S

White

Red

CLOSE

OPEN

24 V COMMON

White

Red

Black

DEPRESS BUTTON

TO OPERATE VALVE

MANUALLY

Valve in Open

Position

Valve in By-Pass

Position

Black

32

1

BE

LIM

O

S3

S2

S1

S3

S2

S2

S3

S1

S1

Y1

Y2

AR

B2

4-3

-S

B

AB A

B

AB A

B

AB A

B

AB A

3-Way Valve Actuator

HWS

HWR

Heat

Source

Equipment Schedule

Item

Description

Part No.

Qty

1VALVE, 3-WAY 1.25"

PER DESIGN 1

2 PRIMARY PUMP 1.25" PER DESIGN 1

3 THERMOMETER DET25 2

4 HIGH LIMIT AQUASTAT DEAQ 1

5 CONTROL SENSOR BY OTHERS 1

See Detail B for

Actuator Operation

A

H6

3-Way Mixing Group

Scale: 3" = 1'-0"

B

H6

Control Valve Actuator

Scale: 8" = 1'-0"

4

Piping Schedule (Provided w/ Optional Piping Package)

Item

Description

Part No.

Qty

PPIPE, STL GROOVED 1.25"

DSP12510-252R AR

T TEE GROOVED 1.25" DST125 1

Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 7

A ADAPTER GROOVEDxMTP 1.25" ST DSA125-04ST 6

C COUPLING GROOVED RIGID 1.25" DSCR125 7

BV BALL VALVE FPT 1.25" DSV125 2

CV CHECK VALVE MPT 1.25" DSCV125T 1

FL CAST IRON 125# NPT FLANGE 1.25" DEFC12 2

N NIPPLE GALV 1.25"x2.00" DSNG125020 2

S1 CHANNEL GALVANIZED 1.6250x40" DSMU-040 2

S2 STRUT CLAMP PLATED 1.25" DSMC125 4

HB HOSE BIB MPTX HOSE 0.50" DSHB050 1

SW SENSOR WELL - 2

C

BV

TP

S2

Tr

3

Tr

HB

S1

FL

2

1

CV

N A

Tr

5

Tr

HWS

HWR

Heated

Zones

C

Optional Drain Valve w/ Cap - Detail

Scale: 2

1

2

" = 1'-0"

H6

DV

Drain Valve w/ Cap (Optional)

Item

Description

Part No.

Qty

DV DRAIN VALVE 0.50" W/ CAP DSV050HTDC 1

JP

EXHIBIT I

H6

MIXING VALVE

DETAILS

Tr

SW

Tr

SW

Note: Temp Sensors

Provided by

Wadsworth Controls

and installed by

electrical Contractor.

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

6 - D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

5

5

Location May Vary

Shown for Reference

ABA

B

2

6

0

2

4

0

22

0

2

0

0

1

8

0

1

6

0

1

4

0

1

2

0

1

0

0

8

0

6

0

40

2

0

0

°F

2

6

0

2

4

0

22

0

2

0

0

1

8

0

1

6

0

1

4

0

1

2

0

1

0

0

8

0

6

0

40

2

0

0

°F

32

1

BE

LIM

O

S3

S2

S1

S3

S2

S2

S3

S1

S1

Y1

Y2

LR

B2

4-3

-S

CLOSE

OPEN

24 V COMMON

32

1

BE

LIM

O

S3

S2

S1

S3

S2

S2

S3

S1

S1

Y1

Y2

LR

B2

4-3

-S

White

Red

Black

3-Way Valve Actuator

Valve in Open

Position

Valve in By-Pass

Position

B

ABA

DEPRESS BUTTON

TO OPERATE VALVE

MANUALLY

B

ABA

CLOSE

OPEN

24 V COMMON

White

Red

Black

HWS

HWR

Heat

Source

Equipment Schedule

Item

Description

Part No.

Qty

1VALVE, 3-WAY, 24V, 1-1/4" BELIMO

DEVS3125 1

2FLOW REGULATOR, 1-1/4" AUTOFLOW

YRH125-2300 1

3 THERMOMETER DET25 2

Piping Schedule (Provided w/ Optional Piping Package)

Item

Description

Part No.

Qty

P PIPE STEEL GROOVED 1.25" DSP12510-252R AR

T TEE GROOVED 1.25" DST125 1

Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 3

A ADAPTER GROOVEDxMPT 1.25" DSA125-04ST 6

C COUPLING GROOVED 1.25" DSCR125 7

BV BALL VALVE FPT 1.25" DSV125 4

N NIPPLE GALV. 1.25"x2.00" DSNG125020 3

HB HOSE BIB MPTxHOSE 0.50" DSHB050 1

See Detail B for

Actuator Operation

HB

A

H6A

3-Way Zone Control Valve - Piping Detail

Scale: 4" = 1'-0"

B

H6A

Control Valve - Actuator Detail

Scale: 8" = 1'-0"

P

Tr

A

BV

AN

2

T

C

BV

HWS

HWR

Heated

Zones

1

Piping Schedule (Provided w/ Optional Drain Valve)

Item

Description

Part No.

Qty

DV DRAIN VALVE 0.50" W/ CAP DSV050HTDC 1

B

Optional Drain Valve w/ Cap - Detail

Scale: 4" = 1'-0"H6A

DV

JP

EXHIBIT I

H6A

ZONE CONTROL

VALVE DETAILS

3

Tr

3

Tr

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

6A

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

A

L-1

Delta Tube SD - Benchtop Heat

Scale:

3

16

" = 1'

DELTA TUBE SD

15 LOOPS PER MANIFOLD

@ WITH 2" TUBE SPACING (TYP)

DELTA TUBE SD

SPACER (TYP)

ZONE HWS & HWR

DELTA TUBE SD

18 LOOPS PER MANIFOLD

@ 2" TUBE SPACING (TYP)

FLEXIBLE HIGH TEMPERATURE

HOSE CONNECTORS (TYP)

To Allow Bench Movement

M/P CONTRACTOR TO SUPPLY DEDICATED

PIPING TO THE ACTUAL VALVE STATION.

DELTA T TO PROVIDE THE CONTROL VALVE

AND ALL THE PIPING FROM THE POINT

OF THE HWS & HWR LINES

ZONE HWS, HWRR & HWR

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

H

-7.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

JDK

H7

BENCHTOP HEATING

LAYOUT

ZB-1

ZB-2

FLEXIBLE HIGH TEMPERATURE

HOSE CONNECTORS (TYP)

To Allow Bench Movement

DELTA TUBE SD

SPACER (TYP)

3-WAY CONTROL VALVE

W/ FLOW CONTROL (TYP)

DELTA TUBE SD

MANIFOLD (TYP)

3-WAY CONTROL VALVE

W/ FLOW CONTROL (TYP)

ZB-2

1'

to First Spacer

from Manifold

6' Max

Between Spacers

1" HWS 1" HWR

Delta Tube SD

Manifold

2"

2"

DELTA TUBE SD

SPACER (TYP)

DELTA TUBE SD

(TYP)

Delta Tube SD

Manifold

B

Delta Tube SD - Detail

Scale: 6" = 1'-0"

A

Delta Tube SD - Detail

Scale: 3" = 1'-0"

DELTA TUBE SD

CABLE TIE (TYP)

DELTA TUBE SD ELBOW

Pre-Installed on Manifold (TYP)

DELTA TUBE SD

(TYP)

C

Delta Tube SD Spacer - Detail

Scale: 6" = 1'-0"

DELTA TUBE SD ELBOW

Pre-Installed on Manifold (TYP)

DELTA TUBE SD

MANIFOLD

Delta TUBE SD

SPACER (TYP)

Delta TUBE SD

(TYP)

Greenhouse

Bench

Greenhouse

Post

1" SLIP x

3

4

" Barb

FITTING (TYP)

D

Delta Tube SD - Connection Detail

Scale: 2" = 1'-0"

DELTA TUBE SD

CABLE TIE (TYP)

HIGH TEMPERATURE

HOSE CONNECTION (TYP)

Install w/ Service Loop

TEE

Sized per Design

(TYP)

MANUAL BALL VALVE

(TYP)

SS HOSE

CLAMP (TYP)

1" PVC SCHED 80

PIPE (TYP)

BUSHING

As Required

(TYP)

Note:

· All Pipe, Fittings, Hangers, Valves and

Hoses Connecting to the Delta Tube SD

Manifolds are to be Provided By Others

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison

, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

H

-7A

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

JP

H7A

BENCHTOP HEATING

DETAILS

A B

AB

A

H7B

3-Way Zone Control Valve - Piping Detail

Scale: 4" = 1'-0"

JP

EXHIBIT I

H7B

BENCH TOP

ZONE CONTROL

VALVE DETAILS

DRAWN BY: CHECKED BY:

PROJECT NO.

PROJECT PHASE

Dra

win

g 2

01

6 C

op

yrig

ht M

eye

r, S

ch

ere

r &

R

oca

stle

, L

td

.

Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.

ISSUE

I hereby certify that this plan, specification or report was prepared

by me or under my direct supervision and that I am a duly

Licensed Architect under the Laws of the State of Wisconsin.

ARCHITECT SEAL

Signature:

Print Names:

Date:

License No:

DATEMARK DESCRIPTION

Jack Poling

A-8984

BID DOCUMENTS

2017016

Civil Engineer

Vierbicher Associates, Inc.

999 Fourier Drive, Suite 201

Madison, WI 53717

608.826.0532 tel

Landscape Architect

Ken Saiki Design, Inc.

303 South Paterson Street, Suite 1

Madison, WI 53703

608.251.3600 tel

Structural Engineer, Technology and A/V

IMEG Corp.

1800 Deming Way, Suite 200

Middleton, WI 53562

608.223.9600 tel

MEP Engineer

MEP Associates, LLC

860 Blue Gentian Road, Suite 175

Eagan, MN 55121

651.379.9120 tel

Olb

rich

B

ota

nica

l G

ard

en

s

Exp

an

sio

n P

ha

se

1

BP

W P

roject # 8162

3330 A

tw

ood A

venue

Madison

, W

I 53704

Fire Protection Engineer and Code Consultant

Summit Fire Consulting

575 Minnehaha Ave West

St. Paul, MN 55103

651.251.1880 tel

Greenhouse Design

Rough Brothers, Inc.

5513 Vine Street

Cincinnati, OH 45217

513.242.0310 tel

FILE

N

AM

E: E

:\D

ELT

A T

\170830-3355 O

LB

RIC

H B

OT

AN

IC

AL G

AR

DE

NS

\E

MA

IL F

RO

M S

R 3-27-18\172035-H

6A

- D

ELT

A T

.D

WG

SA

VE

D

AT

E: 05-25-18

09.29.2017 SCHEMATIC DESIGN SUBMISSION

05.04.2018 90% CD SUBMISSION

04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION

01.10.2018 DESIGN DEVELOPMENT SUBMISSION

01.17.2018 UDC SUBMISSION

03.30.2018 70% CD PRICING ISSUE

12.08.2017 DD PRICING SET

JUNE 4, 2018

06.01.2018 BID ISSUE

06.04.2018 PERMIT ISSUE

Piping Schedule (Provided w/ Optional Piping Package)

Item

Description

Part No

Qty

E1 ELBOW GALV. FPT 1.00" DSEG100 1

T TEE GALV. FPT 1.00" DST100 2

BV BALL VALVE FPT1.00" DSV100 4

B BUSHING PVC SCH 80 1.00"x0.50" DPB100050F 1

N1NIPPLE, GALVE. 1.00"x2.00"

DSNG100020 6

N2NIPPLE, BRASS 1.00"x6.00"

DSNG100060 3

DV DRAIN VALVE 0.50" w/ CAP AND CHAIN DSV050HTDC 1

Equipment Schedule

Item

Description

Part No

Qty

1VALVE, 3-WAY, 24V, 1.00" HONEYWELL

DEV3100 1

2FLOW REGULATOR, 1.00" AUTOFLOW

DEFRL100-0100 1

HWR

HWS

HWS

HWR

Heat

Source

Heated

Zone

T

DV

B

BV

P

E

T

E

1

N1

2

BV

P

N2

N2

N2