h-7b - city of madison
TRANSCRIPT
System Specs
Temp
Volume BTU Potential GPM
pH
160°F * 668.7 Gallons
2,158,348 BTU per hour
225 GPM 6.8 - 8.5
* 160°F Water Temp for Peak Load when outside temp is -10°F and below.
Zone Valves - Delta Fin SF-125 Actuator Flow ControlDetail
Item
Qty
Location
Type
Brand Valve Model Size CV Brand Model VAC Brand Model GPM Size
Detail
Sheet
ZF-1 2
Tropical - Lower Fin 3-Way
Belimo B330+ARB24-3-S 1
1
4
" 19.0 Belimo ARB24-3-S 24
Flow Design
YRH125-0110 11 1
1
4
" H6A
ZF-2 2
Tropical - Upper Fin 3-Way
Belimo B330+ARB24-3-S 1
1
4
" 19.0 Belimo ARB24-3-S 24
Flow Design
YRH125-0120 12 1
1
4
" H6A
ZF-3 2
Orchids - Upper Fin 3-Way
Belimo B330+ARB24-3-S 1
1
4
" 19.0 Belimo ARB24-3-S 24
Flow Design
YRH125-0100 10 1
1
4
" H6A
ZF-4 1
Orchids Cool - Upper Fin 3-Way
Belimo B330+ARB24-3-S 1
1
4
" 19.0 Belimo ARB24-3-S 24
Flow Design
YRH125-0130 13 1
1
4
" H6A
ZF-5 1 Production - Lower Fin
3-Way
Belimo B330+ARB24-3-S 1
1
4
" 19.0 Belimo ARB24-3-S 24
Flow Design
YRH125-0150 15 1
1
4
" H6A
ZF-6 1
Production - Upper Fin 3-Way
Belimo B330+ARB24-3-S 1
1
4
" 19.0 Belimo ARB24-3-S 24
Flow Design
YRH125-0160 16 1
1
4
" H6A
ZF-7 1 Production - Lower Fin
3-Way
Belimo B330+ARB24-3-S 1
1
4
" 19.0 Belimo ARB24-3-S 24
Flow Design
YRH125-0150 15 1
1
4
" H6A
ZF-8 1
Production - Upper Fin 3-Way
Belimo B330+ARB24-3-S 1
1
4
" 19.0 Belimo ARB24-3-S 24
Flow Design
YRH125-0160 16 1
1
4
" H6A
ZF-9 1 Corridor
3-Way
Belimo B330+ARB24-3-S 1
1
4
" 19.0 Belimo ARB24-3-S 24
Flow Design
YRH125-0140 14 1
1
4
" H6A
ZF-101
Snow Melt Loop - North 3-Way
Belimo B330+ARB24-3-S 1
1
4
" 19.0 Belimo ARB24-3-S 24
Flow Design
YRH125-0060 6 1
1
4
" H6A
ZF-111
Snow Melt Loop - Corridor 3-Way
Belimo B330+ARB24-3-S 1
1
4
" 19.0 Belimo ARB24-3-S 24
Flow Design
YRH125-0060 6 1
1
4
" H6A
ZF-121
Snow Melt Loop - South 3-Way
Belimo B330+ARB24-3-S 1
1
4
" 19.0 Belimo ARB24-3-S 24
Flow Design
YRH125-0060 6 1
1
4
" H6A
Mixing Group - PEX ManifoldControl Valve
Actuator
Pump
Flow ControlDetail
Item
Qty
Location
Type
Brand Model Size CV Brand Model VAC Band Model
Flange
GPM Ft Hd HP VAC Ø
Amps
Hz Brand Model GPM Size Detail Sheet
ZP-1 1
Tropical 3-Way Mixing
Belimo B239 1
1
4
" 68.0 Belimo ARB24-3-S 24 Grundfos UP 26-64F 1
1
4
" GF 12.0 11.6 1/12
120 1 0.74/0.43
60
Flow Design
YRH125-0120 12 1
1
4
" H6
ZP-2 1 Orchid Intermediate
3-Way Mixing
Belimo B239 1
1
4
" 68.0 Belimo ARB24-3-S 24 Grundfos UP 15-58F 1
1
4
" GF 9.0 12.6 1/25
120 1 0.75
60
Flow Design
YRH125-0090 9 1
1
4
" H6
ZP-3 1 Orchid Cool
3-Way Mixing
Belimo B239 1
1
4
" 68.0 Belimo ARB24-3-S 24 Grundfos UP 15-58F 1
1
4
" GF 3.0 13.6 1/25
120 1 0.75
60
Flow Design
YRH125-0003 3 1
1
4
" H6
ZP-4 1 Production
3-Way Mixing
Belimo B239 1
1
4
" 68.0 Belimo ARB24-3-S 24 Grundfos UP 26-64F 1
1
4
" GF 12.0 14.6 1/12
120 1 0.74/0.43
60
Flow Design
YRH125-0120 12 1
1
4
" H6
ZP-5 1 Production
3-Way Mixing
Belimo B239 1
1
4
" 68.0 Belimo ARB24-3-S 24 Grundfos UP 26-64F 1
1
4
" GF 12.0 15.6 1/12
120 1 0.74/0.43
60
Flow Design
YRH125-0120 12 1
1
4
" H6
JP
Heating System Notes (Unless Otherwise Specified)
1. Perimeter Fin Tube systems are designed for up to 230°F water. Refer to design for
operating Temperature. Do NOT exceed this temperature or system damage can occur.
2. Maintain a water treatment program appropriate for all the materials in the heating system.
In addition, the pH of the system water is to be maintained between 6.8 and 8.5.
3. All Steel Piping to be Schedule 40.
4. Vent high spots in piping mains to prevent air locks.
5. Piping runs to be supported as required.
6. Installation to follow all state and local codes where applicable.
7. Heat Source shall be by General Contractor. General Contractor shall provide and install
hot water supply and return line, with flanged connections and ball valves into each
greenhouse corridor as indicated on H Drawings, with constant flow at hot water supply
temperatures consistent with established ration of 1:1 from baseline of 160°F HWS at OAT
of below -10°F. Refer to below System Design Note.
8. All Line Voltage and Low Voltage Wiring, Conduit and Disconnect shall be Supplied and
Installed By Electrical Contractor.
9. Installing subcontractor will be required to measure, cut, and modify in the field for proper fit
per details.
10. Attachment to structure shall be supplied by installing subcontractor as required.
11. Installing subcontractor will be required to measure and cut all sections of the threaded rod,
Unistrut, and related hanging materials based on Field Conditions.
13. The Installing subcontractor will be required to measure and cut some sections of Expanded
Metal Covers based on Field Conditions.
14. All Delta Fin material shall be supplied in 12'-0" lengths. Installing Contractor will be required
to measure, cut, de-fin, and groove some sections of the Delta Fin SF-125 Fin Pipe and Fin
Pipe Covers based on Field Conditions. Fin Covers supplied are a 8'-0" lengths.
15. All hanging hardware shall be Galvanized or aluminum
16. This is a corrosive environment and proper materials must be used.
17. Insulation to be provided for bare aluminum pipe riser with-in zones below the 7 ft. (Off
Finished Floor) level in each zone.
18. All piping shall be designed with expansion joints where required.
19. Installer will be required to assemble zone valve stations and piping connections using
appropriate Teflon tape and sealant to insure leak free assembly.
20. Installing Contractor shall verify all dimensions at the site making field measurements and
shop drawings necessary for fabrication of erection of HVAC and piping systems. Make
allowance for beams, pipes, and other obstructions in building construction. Check drawings
Showing work of other trades and consult with the owner's representative in the event of
potential interference. Shop drawings shall be minimum 1/4"=1'-0" scale, indicating fittings,
sizes, welds, and configurations and submitted in the latest version of autocad to the
engineer for review.
21. Fill, Leak Test and Pressure Test system after installation is complete but prior to installation
of insulation, to be completed by installing subcontractor.
22. Installing Subcontractor shall be responsible for start up and testing of systems.
23. Inslab heating shall be PEX6250X tubing with manifold box.
24. In-Slab hot water heating systems are designed for 130-140°F water. Do NOT exceed this
temperature or system damage can occur.
25. The Installer will be required to measure and cut some sections of PEX Delta Tube based
on Project design.
26. PEX 6250X rolls lengths are 500 or 1000 Feet.
27. All exposed piping (including bends) to be insulated.
28. All pipes to be labeled with Type and flow direction.
29. All Valves to be tagged, provide tagged list mounted under glass in each greenhouse, Fog
Room, and Boiler Room. Indicate Size type, water type and location.
GREENHOUSE HEATING SYSTEM DESIGN REQUIREMENTS - Delta Fin
Pipe
Inside Temperature: 58 °F (Average based on 65°,62°,52°,62°,42°,65° temps )
Outside Temperature: -15 °F
Temperature Difference: 73 °F (Average based on 80°,77°,67°,77°,57°,80°temps )
Hot Water Supply 160 °F
Hot Water Return 140 °F
Temperature Differential: 20 °F
Relief Valve Pressure: 30psi
Operating Pressure: 12psi
DESIGN FLOW RATE FOR EACH AREA AS FOLLOWS:
Delta Fin Heat Minimum Flow Req 177 GPM
GREENHOUSE HEATING SYSTEM DESIGN REQUIREMENTS - PEX TUBE
Inside Temperature: 58 °F (Average based on 65°,62°,52°,62°,42°,65° temps )
Outside Temperature: -15 °F
Temperature Difference: 73 °F (Average based on 80°,77°,67°,77°,57°,80°temps )
Hot Water Supply 130 °F
Hot Water Return 110 °F
Temperature Differential: 20 °F
Relief Valve Pressure: 30psi
Operating Pressure: 12psi
DESIGN FLOW RATE FOR EACH AREA AS FOLLOWS:
PEX Floor Heat Minimum Flow Req 51 GPM
Drawing Index
Sheet
Description
H1
Greenhouse Heating System Notes & Schedules
H2
Greenhouse Heating System Layout
H2A
Greenhouse Heating System PEX Manifold Box
H3
Greenhouse Heating System PEX Layout
H3A
Greenhouse Heating System PEX Details
H4
Greenhouse Heating Upper & Lower Fin Tube Layout
H4A
Greenhouse Snow Melt Fin Tube Layout
H4B Fin Tube Details
H4C Fin Tube Cover & Insulation Details
H5
Tropical Ghse. A Piping Elevation
H5A
Tropical Ghse. B Piping Elevation
H5B
Orchid Intermediate Ghse. A Piping Elevation
H5C
Orchid Intermediate Ghse. B Piping Elevation
H5D
Orchid Cool Ghse. Piping Elevation
H5E
Production Ghse. A Piping Elevation
H5F
Production Ghse. B Piping Elevation
H5G
Corridor Piping Elevation
H6
Mixing Valve Details
H6A Zone Control Valve Details
H7
Bench Top Heating Layout
H7A
Bench Top Heating Details
H7B
Bench Top Zone Control Valve Details
GREENHOUSE HEATING SYSTEM DESIGN NOTE
System to Accommodate 1:1 water temp. reset ratio to 60 °F outdoor / 90 °F HWS
EXHIBIT I
H1
GREENHOUSE
HEATING SYSTEM
NOTES & SCHEDULES
Zone Valves - Bench Top Heat
Actuator Flow ControlDetail
Item
Qty
Location
Type
Brand Valve Model Size CV Brand Model VAC Brand Model GPM Size
Detail
Sheet
ZB-1 1 Orchid Int.
3-Way Honeywell
VCZMR6100 1" 8.6
Honeywell
VC2714ZZ11 24
Flow Design
YR0100F 1 1" H7C
ZB-2 2 Production
3-Way Honeywell
VCZMR6100 1" 8.6
Honeywell
VC2714ZZ11 24
Flow Design
YR0100F 1 1" H7C
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison
, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
1-H
5F
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
Radiation - Delta SD Tube
1. Refer to Drawings H7 for Delta Tube Layout H7A &H7B for the details.
2. Bench-Top and In-Slab hot water heating systems are designed for 130-140°F water. Do NOT
exceed this temperature or system damage can occur.
3. The Installer will be required to measure and cut some sections of SD Delta Tube based on
Project design.
4. Standard roll lengths for Delta Tube are 500 or 1000 Feet.
Bench Top Heating System Design Requirments - Delta SD Tube
HOT WATER SUPPLY TEMP: 135°
HOT WATER RETURN TEMP: 115°
TEMPERATURE DIFFERENTIAL: 20°
RELIEF VALVE: 30 PSI
OPERATING PRESSURE 12-15 PSI STATIC
PRODUCTION ZONE BTU POTENTIAL 10,000 BTUH
ORCHID ZONE BTU POTENTIAL 10,000 BTUH
A B C D E F G J
1
2
3
4
5
6
H
Scale:
1
8
" = 1'-0"
System Piping Layout
N
SUPPLY AND RETURN LINES
FOR FIN TUBE HEATING SYSTEM
SHALL BE BROUGHT INTO THE
GREEN HOUSE CORRIDOR BY
MECHANICAL CONTRACTOR
WITH A FLANGED CONNECTION
AND A BALL VALVE
Tropical
Greenhouse
Orchid
Intermediate
Orchid
Cool
Production
Greenhouse
HWS & HWR
PIPING
DELTA TUBE PEX
MANIFOLD BOX
(TYP.) FOR DETAILS
SEE SHT. H2A
3-WAY CONTROL VALVE
w/ FLOW CONTROL
96'-0"
11'-5"35'-4"47'-3"
11
2'-0
"
50
'-6
"9
'-2
"5
0'-6
"
Corridor
25
'-3
"2
5'-3
"2
5'-3
"2
5'-3
"
ZP-5
ZP-3ZP-2
ZP-4
ZP-5
ZP-1
ZF-1
ZF-1
ZF-5
ZF-2
ZF-2
ZF-3
ZF-3
ZF-4
ZF-6
ZF-7
ZF-8
ZF-9
JP
EXHIBIT I
H2
GREENHOUSE
HEATING SYSTEM
LAYOUT
DELTA TUBE PEX
MANIFOLD BOX
(TYP.) FOR DETAILS
SEE SHT. H2A
26'-2"
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
1-H
5F
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
Scale: 1" = 1'-0"
System Piping to PEX Manifold Box
DELTA TUBE PEX
MANIFOLD BOX
1
1
4
" MANUAL
BALL VALVE
DELTA TUBE PEX
MANIFOLD BOX
HWS
HWR
1
1
4
" HWS
1
1
4" HWR
Level of
Finished Floor
HWR
HWS
AUTOMATIC AIR
VENT ON
3
8
" MINI
BALL VALVE
AUTOMATIC AIR
VENT ON
3
8
" MINI
BALL VALVE
Elevation
Section
UNI-STRUT
w/ PIPE CLAMPS
UNI-STRUT
w/ PIPE CLAMPS
1
1
4" HWR
Structure
Level of
Finished Floor
1
1
4" HWS
Heat
Source
10
'-0
" T
.B
.D
.
Structure
7'-5
"
JP
EXHIBIT I
H2A
GREENHOUSE
HEATING SYSTEM PEX
MANIFOLD BOX
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
1-H
5F
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
Heating System Notes (Unless Otherwise Specified)
1. All exposed piping (including bends) to be insulated.
2. All pipes to be labeled with Typ and flow direction.
3. All Valves to be tagged, provide tagged list mounted under glass in each greenhouse, Fog
Room, and Boiler Room. Indicate Size type, water type and location.
SF-125 DELTA FIN SHOW
FOR REFERENCE
A B C D E F G J
1
2
3
4
5
6
H
Note: Piping shown outside the
greenhouse for clarity only.
PEX Tubing Layout
N
Structure
(Typ)
Scale:
1
8
" = 1'-0"
Tropical
Greenhouse
Orchid
Intermediate
Production
Greenhouse
DELTA TUBE PEX
6 LOOPS/MANIFOLD
@ 12" TUBE SPC'G.
(TYP)
6 Loops
6 Loops
6 Loops
6 Loops
5 Loops
6 Loops
6 Loops
6 Loops
6 Loops
Corridor
ZP-3ZP-2
ZP-4
ZP-5
ZP-1
95'-10"
11'-5"35'-4"47'-4"
11
2'-1
0"
50
'-6
"
9'-2
"5
0'-6
"
25
'-4
"2
5'-2
"2
5'-4
"2
5'-2
"
JP
EXHIBIT I
H3
GREENHOUSE
HEATING SYSTEM
PEX LAYOUT
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
1-H
5F
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
TRENCH DRAIN & BASIN
(TYP)
Orchid
Cool
2'-8"
STEP RACK
Pre-Assembled
MANIFOLD BOX
w/ COVER
1
1
4
" COPPER MANIFOLD
Pre-Assembled w/ Required
Ball Valves & Hose Barbs
1
1
4
" ELBOW
BRASS
1'-6"
1
1
4
" ELBOW
BRASS
CONNECTION TO
HWS
1
1
4
" STREET ELBOW
BRASS
1'-6"
8
1 2
"
REBAR OR
6"x6" 10-GAUGE WIRE MESH
CONTROL JOINTS
To Be No Greater Than
3
4
"
When a 4" Floor is Poured
(SEE NOTE 2)
DELTA TUBE
PEX
CONCRETE
CONNECTION TO
HWR
1
1
4
" BRASS
BALL VALVE
1
1
4
" CONNECTION
TO HWS
1
1
4
" BRASS
BALL VALVE
1
1
4
" CONNECTION
TO HWR
1
1
4
" COPPER MANIFOLD
Pre-Assembled w/ Required
Ball Valves & Hose Barbs
1
1
4
" x 4" NIPPLE
BRASS
1
1
4
" ELBOW
BRASS
STEP RACK
Pre-Assembled
1
1
4
" x 6" NIPPLE
BRASS
1
1
4
" ELBOW
BRASS
1
1
4
" STREET ELBOW
BRASS
MANIFOLD BOX
w/ COVER
1
1
4
" COPPER MANIFOLD
Pre-Assembled w/ Required
Ball Valves & Hose Barbs
1
1
4
" BRASS
BALL VALVE
1
1
4
" CONNECTION
TO HWR
1
1
4
" x 6" NIPPLE
BRASS
1
1
4
" STEEL NIPPLE
1
1
4
" ADAPTOR
BRASS FTP x PVC SLIP
1
1
4
" SCHEDULE 80
PVC PIPE
1
1
4
" x 6" NIPPLE
BRASS
1
1
4
" BRASS
BALL VALVE
1
1
4
" STEEL NIPPLE
1
1
4
" GROOVED
COUPLING
1
1
4
" STEEL PIPE
1
1
4
" x 6" NIPPLE
BRASS
1
1
4
" BRASS
BALL VALVE
2'-8"
1'-6"
ALUMINUM
DIAMOND PLATE
COVER
8
1 2
" M
in
STEP RACK
Preassembled
1
1
4
" ELBOW
BRASS
1
1
4
" STREET ELBOW
BRASS
MANIFOLD BOX w/
COVER
(Installed in slab)
CONCRETECONCRETE
(SEE NOTE 2)
WIRE
TIE
DELTA TUBE
PEX
REBAR OR
WIRE MESH
G
Wire Tie Placement
Scale:
3
4
" = 1'-0"
B
Manifold Box - Side Elevation
Scale: 1
1
2
" = 1'-0"
E
Slab - Cross Section
Scale: 1
1
2
" = 1'-0"
F
Manifold Box - Top View
Scale: 1
1
2
" = 1'-0"
C
Manifold Box - Front Elevation
Scale: 1
1
2
" = 1'-0"
Notes (Unless Otherwise Specified)
1 Floor Heat Water System is designed for 130°F - DO NOT
EXCEED THIS TEMPERATURE. Failure to comply will result in
System Damage
2 For slab details refer to S-Series Drawings and sheet G002 FL-1
3 All tubing loops to be one piece - DO NOT SPLICE TUBING IN
CONCRETE FLOOR.
4 Install tubing on 12 Inch center with a minimum radius of 6 Inch on
all loops.
5 Install all tubing 6" to 12" from all outside walls and floor drains.
6 Tie tubing to rebar or 6"x6" 10-gauge wire mesh every 2.0 Feet
7 PRESSURE TEST TUBING WITH 40 PSI AIR PRIOR AND
DURING CONCRETE POUR BY INSTALLING
SUBCONTRACTOR
8 Installation to follow all state and local codes where applicable.
9 This Drawing to be used in Conjunction with Delta T Installation &
Operating Instructions for PEX Tube by installing subcontractor.
DELTA TUBE PEX
@ 12" TUBE SPACING
WIRE TIE
(TYP)
2'-0" Wire Tie
Spacing
(TYP)
A
Manifold Box - Connection Detail
Scale: 1
1
2
" = 1'-0"
Coupled
Steel
PVC
Schedule 80
1'-0
"1
'-0
"
F
Manifold Box Cover - Top View
Scale: 1
1
2
" = 1'-0"
JP
EXHIBIT I
H3A
GREENHOUSE
HEATING SYSTEM
PEX DETAILS
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
3A
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
A B C D E F G J
1
2
3
4
5
6
HA B C D E F G J
1
2
3
4
5
6
H
N
Scale:
1
8
" = 1'-0"
DELTA FIN SF-125
(TYP)
DELTA FIN SF-125
HANGER BRACKET
ASSEMBLY
DELTA FIN SF-125
EXPANDED
ALUMINUM COVER
(TYP)
DELTA FIN SF-125
COVER BRACKET
ASSEMBLY (TYP)
DELTA FIN SF-125
CAST-ALUMINUM COUPLING
B
SF-1
Delta Fin SF-125 Detail
Scale:
1
2
" = 1'-0"
SF-1
B
Tropical
Greenhouse
Orchid
Intermediate
Orchid
Cool
Production
Greenhouse
ZF-1
ZF-1
ZF-7
ZF-5
Lower Fin Tube Layout
Corridor
95'-10"
11'-5"35'-4"47'-4"
11
2'-1
0"
50
'-6
"
9'-2
"5
0'-6
"
25
'-4
"2
5'-2
"2
5'-4
"2
5'-2
"
1
1
4
" BARE ALUMINUM
CONNECTOR AT DOWNSPOUT
1
1
4
" BARE ALUMINUM PIPE
CONNECTOR @
DOWNSPOUT (TYP)
DOWNSPOUT (TYP)
JP
INSULATED 1
1
4
" BARE
ALUMINUM RISER
INSULATED 1
1
4
" BARE
ALUMINUM RISER
INSULATED 1
1
4
" BARE
ALUMINUM RISER
INSULATED
1
1
4
" BARE RISER
INSULATED 1
1
4
" BARE
ALUMINUM DOOR
RISER
INSULATED 1
1
4
" BARE
ALUMINUM DOOR
RISER
1
1
4
" BARE ALUMINUM
CONNECTOR AT DOWNSPOUT
DELTA FIN SF-125/48 LOWER
PERIMETER SINGLE TIER
RUN w/ COVER (TYP)
INSULATED 1
1
4
" BARE
ALUMINUM RISER
INSULATED 1
1
4
" BARE
ALUMINUM RISER
INSULATED 1
1
4
" BARE
ALUMINUM RISER
INSULATED 1
1
4
" BARE
ALUMINUM RISER
EXHIBIT I
H4
GREENHOUSE
HEATING UPPER &
LOWER FIN TUBE
LAYOUT
Upper Fin Tube Layout
Scale:
1
8
" = 1'-0"
Tropical
Greenhouse
Orchid
Intermediate
Orchid
Cool
Production
Greenhouse
Corridor
1
1
4
" BARE ALUMINUM PIPE
CONNECTOR @
DOWNSPOUT (TYP)
DOWNSPOUT (TYP)
DELTA FIN SF-125/48 UPPER
PERIMETER SINGLE TIER
RUN (TYP)
DELTA FIN SF-125/48 UPPER
PERIMETER SINGLE TIER
RUN (TYP)
ZF-2
ZF-2
ZF-8
ZF-6
ZF-3
ZF-3
ZF-4
ZF-9
95'-10"
11'-5"35'-4"47'-4"
11
2'-1
0"
50
'-6
"
9'-2
"5
0'-6
"
25
'-4
"2
5'-2
"2
5'-4
"2
5'-2
"
3-WAY VALVE
STATION (TYP)
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
1-H
5F
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
NO LOWER PERIMETER
DELTA FIN PIPE IN ORCHID
ROOM
NO LOWER PERIMETER
DELTA FIN PIPE IN ORCHID
ROOM
A B C D E F G J
1
2
3
4
5
6
H
Snow Melt Fin Tube Layout
N
Scale:
1
8
" = 1'-0"
Tropical
Greenhouse
Orchid
Intermediate
Orchid
Cool
Production
Greenhouse
Corridor
DELTA FIN SF-125/24
SNOW MELT LOOP
ZF-11
ZF-10
95'-10"
11'-5"35'-4"48'-0"
11
2'-1
0"
50
'-6
"
9'-2
"5
0'-6
"
25
'-4
"2
5'-2
"2
5'-4
"2
5'-2
"
ZONE VALVE
JP
EXHIBIT I
H4A
GREENHOUSE
SNOW MELT FIN
TUBE LAYOUT
ZONE VALVE
ZONE VALVE
DELTA FIN SF-125/24
SNOW MELT LOOP
DELTA FIN SF-125/24
SNOW MELT LOOP
ZF-12
1.25" BARE
ALUMINUM
PIPE (TYP)
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
1-H
5F
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
FLEXIBLE ALUMINUM
COUPLINGCOUPLING
GASKET
FLEXIBLE
ALUMINUM
COUPLING
ALUMINUM
90° ELBOW
1
2
" Tap
DRAIN VALVE
w/ CAP &
DRAIN
FLEXIBLE ALUMINUM
COUPLING
DELTA FIN
SF-125
12'
BALL VALVE
1
8
"
AUTOMATIC
AIR VENT
FLEXIBLE
ALUMINUM
COUPLING
ALUMINUM
90° ELBOW
1
8
" Tap
3
1
4
"
3
1
4
"
3
1
4
"
Delta Fin SF-125
24 Fins/Ft
3
1
4
"
SNOW
MELT
RUNS
IN-ZONE
RUNS
3
1 4
"
3
1
4
"
3
1
4
"
3
1
4
"
Delta Fin SF-125
48 Fins/Ft
FLEXIBLE ALUMINUM
COUPLING
12
"
Level of Finished Floor
DELTA FIN SF-125
w/ ALUMINUM COVER
HANGER BRACKET
ASSEMBLY
HANGER BRACKET
ASSEMBLY
COVER BRACKET
ASSEMBLY
ALUMINUM COVER
DELTA FIN SF-125
EAVE
DELTA FIN
SF-125
12" M
IN
HANGER BRACKET
ASSEMBLY
SF-125 SS
WIRE HANGER
DELTA FIN
SF-125
ALL-THREAD
ROD
GREENHOUSE
STRUCTURE
BEAM
CLAMP
ROD SWIVEL
ATTACHMENT
DELTAFIN
SF-125
ALL-THREAD
ROD
BEAM
CLAMP
ROD SWIVEL
ATTACHMENT
DELTA FIN
SF-125 WIRE HANGER
BOLT
ALUMINUM
COUPLING
GREENHOUSE
STRUCTURE
J
Delta Fin SF-125 - Sizes
Scale: 2
1
2
" = 1'-0"
H
Delta Fin SF-125 - Lower Run
Scale: 2
1
2
" = 1'-0"
F
Delta Fin SF-125 - Air Vent
Scale: 2
1
2
" = 1'-0"
G
Delta Fin SF-125 - Drain Valve
Scale: 2
1
2
" = 1'-0"
A
Delta Fin SF-125 - Coupling
Scale: 2
1
2
" = 1'-0"
B
Delta Fin SF-125 - Fin Pipe
Scale: 2
1
2
" = 1'-0"
C
SF-D
Delta Fin SF-125 - Coupling
Scale: 2
1
2
" = 1'-0"
D
Delta Fin SF-125 - Upper Run
Scale: 2
1
2
" = 1'-0"
I
Delta Fin SF-125 - Cover
Scale: 2
1
2
" = 1'-0"
E
Delta Fin SF-125 - Hanger Bracket w/ Side View
Scale: 2
1
2
" = 1'-0"
Notes (Unless Otherwise Specified)
1. The Installer will be Required to Cut and Groove Some
Sections of the Delta Fin SF-125 Fin Pipe Based on Field
Conditions.
2. The Installing subcontractor is Required to Verify Delta Fin
type on the SF Layout Sheets prior to installation.
JP
EXHIBIT I
H4B
FIN TUBE DETAILS
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
4B
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
EXPANDED ALUMINUM
COVER NOTCHED
FOR RISER
SCREW
COVER
TOP BRACKET
ALUMINUM
END CAP
EXPANDED
ALUMINUM
COVER
12
"
Level of Finished Floor
DELTA FIN SF-125
w/ ALUMINUM COVER
HANGER BRACKET
ASSEMBLY
COVER TOP
BRACKET
EXPANDED ALUMINUM
COVER
COVER BOTTOM
BRACKET
DELTA FIN
SF-125
FIN SLIDE
BRACKET
FIN WALL
BRACKET
1
1
2
" FIBERGLASS
INSULATION
BUTT INSULATION
DOWN TO COUPLER
ALUMINUM
INSULATION COVER
INSTALL ALUMINUM INSULATION COVER
OVER INSULATION & COUPLING
AND SLIDE DOWN TO FIN PIPE COVER
1
1
4
" BARE ALUMINUM
RISER
1
1
4
" ALUMINUM
COUPLER
NOTCH COVER AND
SLIDE UNDER COUPLING
CORNER COVER
PLATE
EXPANDED ALUMINUM
COVER
COVER BOTTOM
BRACKET
SCREW
DELTA FIN
SF-125
ALUMINUM INNER FIN
COVER BRACKET
(INSTALLED)
ALUMINUM COUPLER
ALUMINUM
ELBOW
D
Delta Fin SF-125 Lower Run End Cap Detail
Scale: 2
1
2
" = 1'-0"
B
Delta Fin SF-125 Lower Run Cover Detail
Scale: 2
1
2
" = 1'-0"
C
Delta Fin SF-125 Lower Run Bracket Detail
Scale: 2
1
2
" = 1'-0"
F
Delta Fin SF-125 Lower Run - Insulated Riser
Scale: 2
1
2
" = 1'-0"
E
Delta Fin SF-125 Lower Run - Bare Riser
Scale: 2
1
2
" = 1'-0"
G
Delta Fin SF-125 Lower Run - Insulated Riser w/Cover
Scale: 2
1
2
" = 1'-0"
A
Delta Fin SF-125 Lower Run Cover Corner Detail
Scale: 2
1
2
" = 1'-0"
Note:
· The Installer Will be Required to Cut and
Groove Some Sections of the Delta Fin
SF-125 Fin Pipe Based on Field Conditions.
JP
EXHIBIT I
H4C
FIN TUBE COVER &
INSULATION DETAILS
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
4C
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
E
X
I
T
E
X
I
T
N
Scale:
3
8
" = 1'-0"
DELTA FIN SF-125/48 LOWER
PERIMETER SINGLE TIER
RUN w/ COVER (TYP)
Piping Elevation
DELTA FIN SF-125/48 LOWER
PERIMETER SINGLE TIER
RUN w/ COVER (TYP)
BARE ALUMINUM RISER
w/ 1
1
2
" ALUMINUM-CLAD
FIBERGLASS
INSULATION (TYP)
Clear Door & Exit Signage As Req.
CONNECTIONS
TO ZONE VALVE
(TYP)
DRAIN VALVE
(TYP)
AIR VENT
(TYP)
DRAIN VALVE
(TYP)
ZF-2
ZF-1
Tropical
Greenhouse - A
JP
EXHIBIT I
H5
TROPICAL GHSE. A
PIPING ELEVATION
Key Plan
SEE FIN TUBE LAYOUT
PLANS ON SHEETS
H4 & H4A
DELTA FIN SF-125/48 UPPER
PERIMETER SINGLE TIER
RUN (TYP)
DELTA FIN SF-125/24 SNOW MELT
SINGLE TIER LOOP RUN (TYP)
BARE ALUMINUM SNOW
MELT LATERAL LOOP PIPE
FOR PEX MANIFOLD BOX
AND RELATED PIPING, SEE
SHEETS H-2 & H2A
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
1-H
5F
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
ZF-10
BARE ALUMINUM RISER
w/ 1
1
2
" ALUMINUM-CLAD
FIBERGLASS
INSULATION (TYP)
DELTA FIN SF-125/24 SNOW MELT
SINGLE TIER CONTINUE INTO
ORCHID GREENHOUSE (TYP)
2'-0
"
EXIT SIGNAGE ABOVE ALL
DOORS (BY OTHERS)
N
Scale:
3
8
" = 1'-0"
DELTA FIN SF-125/48 LOWER
PERIMETER SINGLE TIER
RUN w/ COVER (TYP)
Tropical
Greenhouse - B
ZF-2
ZF-1
Piping Elevation
BARE ALUMINUM RISER
w/ 1
1
2
" ALUMINUM-CLAD
FIBERGLASS
INSULATION (TYP)
Clear Door& Exit Signage As Req.
CONNECTIONS
TO ZONE VALVE
(TYP)
DRAIN VALVE
(TYP)
AIR VENT
(TYP)
DRAIN VALVE
(TYP)
JP
EXHIBIT I
H5A
TROPICAL GHSE. B
PIPING ELEVATION
SEE FIN TUBE PLANS
ON SHEETS
H4 & H4A
FOR PEX MANIFOLD BOX
AND RELATED PIPING, SEE
SHEETS H-2 & H2A
DELTA FIN SF-125/48 UPPER
PERIMETER SINGLE TIER
RUN (TYP)
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
1-H
5F
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
ZP-1
Key Plan
N
Scale:
3
8
" = 1'-0"
DELTA FIN SF-125/48 UPPER
PERIMETER SINGLE TIER
RUN (TYP)
Orchid
Intermediate-A
Piping Elevation
ZF-3
JP
EXHIBIT I
H5B
ORCHID INT. GHSE. A
PIPING ELEVATION
Key Plan
FOR FIN TUBE LAYOUT
PLANS SEE SHEETS H4 &
H4A
DELTA FIN SF-125/24 SNOW MELT
SINGLE TIER LOOP RUN (TYP)
FOR PEX MANIFOLD BOX
AND RELATED PIPING, SEE
SHEETS H-2 & H2A
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
1-H
5F
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
DELTA FIN SF-125/24 SNOW MELT
CONTINUOUS FROM TROPICAL
N
Scale:
1
8
" = 1'-0"
DELTA FIN SF-125/48 UPPER
PERIMETER SINGLE TIER
RUN (TYP)
Orchid Intermediate
Greenhouse - B
Piping Elevation
ZF-3
JP
FOR FIN TUBE LAYOUT
PLANS SEE SHEETS
4 & 4A
EXHIBIT I
H5C
ORCHID INT. GHSE. B
PIPING ELEVATION
FOR PEX MANIFOLD BOX
AND RELATED PIPING, SEE
SHEETS H-2 & H2A
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
1-H
5F
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
ZP-2
Key Plan
N
Scale:
3
8
" = 1'-0"
DELTA FIN SF-125/48 UPPER
PERIMETER SINGLE TIER
RUN (TYP)
Orchid
Cool
Piping Elevation
ZF-4
CONNECTIONS
TO ZONE VALVE
(TYP)
JP
EXHIBIT I
H5D
ORCHIDS COOL GHSE.
PIPING ELEVATION
FOR FIN TUBE LAYOUT
PLANS SEE SHEETS
H4 & H4A
DELTA FIN SF-125/24 SNOW MELT
SINGLE TIER LOOP RUN (TYP)
DELTA FIN SF-125/24 SNOW MELT
SINGLE TIER LOOP RUN (TYP)
FOR PEX MANIFOLD BOX AND
RELATED PIPING, SEE SHEETS
H-2 & H2A
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
1-H
5F
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
ZF-3
Key Plan
Scale:
1
4
" = 1'-0"
Piping - Elevation
DELTA FIN SF-125/48 LOWER
PERIMETER SINGLE TIER
RUN w/ COVER (TYP)
Production
Greenhouse-A
Z-5
Z-6
BARE ALUMINUM RISER
w/ 1
1
2
" ALUMINUM-CLAD
FIBERGLASS
INSULATION (TYP)
Clear Door & Exit Signage As Req.
CONNECTIONS
TO ZONE VALVE
(TYP)
DRAIN VALVE
(TYP)
AIR VENT
(TYP)
JP
BARE ALUMINUM RISER
w/ 1
1
2
" ALUMINUM-CLAD
FIBERGLASS
INSULATION (TYP)
EXHIBIT I
H5E
PRODUCTION GHSE. A
PIPING ELEVATION
DELTA FIN SF-125/48 UPPER
PERIMETER SINGLE TIER
RUN (TYP)
FOR PEX MANIFOLD
BOX AND RELATED
PIPING, SEE
SHEETS H-2 & H2A
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
1-H
5F
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
ZP-4
Key Plan
Scale:
1
8
" = 1'-0"
DELTA FIN SF-125
CAST-ALUMINUM COUPLING
Production
G'hse. - B
Z-8
Z-7
Piping Elevation
DELTA FIN SF-125/48 LOWER
PERIMETER SINGLE TIER
RUN w/ COVER (TYP)
BARE ALUMINUM RISER
w/ 1
1
2
" ALUMINUM-CLAD
FIBERGLASS
INSULATION (TYP)
Clear Door& Exit Signage As Req.
CONNECTIONS
TO ZONE VALVE
(TYP)
DRAIN VALVE
(TYP)
AIR VENT
(TYP)
AIR VENT
(TYP)
BARE ALUMINUM RISER
w/ 1
1
2
" ALUMINUM-CLAD
FIBERGLASS
INSULATION (TYP)
DRAIN
VALVE
(TYP)
JP
Key Plan
FOR FIN TUBE LAYOUT
PLANS SEE SHEETS
H4 & H4A
EXHIBIT I
H5F
PRODUCTION GHSE. B
PIPING ELEVATION
FOR PEX MANIFOLD
BOX AND RELATED
PIPING, SEE
SHEETS H-2 & H2A
DELTA FIN SF-125/48 UPPER
PERIMETER SINGLE TIER
RUN (TYP)
DELTA FIN SF-125/24
SNOW MELT SINGLE
TIER LOOP (TYP)
BARE ALUMINUM
SNOW MELT LATERAL
LOOP PIPE
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
1-H
5F
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
ZP-5
Z-10
Scale:
1
4
" = 1'-0"
Corridor
Z-9
Piping Elevation
CONNECTIONS
TO ZONE VALVE
(TYP)
JP
Key Plan
FOR FIN TUBE LAYOUT
PLAN SEE SHEETS
H4A
EXHIBIT I
H5G
CORRIDOR PIPING
ELEVATION
BARE ALUMINUM
SNOW MELT LATERAL
LOOP PIPE
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
1-H
5F
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
DELTA FIN SF-125/48 UPPER
PERIMETER SINGLE TIER
RUN (TYP)
HOT WATER SUPPLY AND
RETURN LINES (BY OTHERS)
HOT WATER SUPPLY AND
RETURN LINES TO
PRODUCTION GREENHOUSE
(BY OTHERS)
HOT WATER SUPPLY AND RETURN
LINES TO ORCHID COOL
GREENHOUSE (BY OTHERS)
HOT WATER SUPPLY AND RETURN
LINES TO ORCHID INTERMEDIATE
GREENHOUSE (BY OTHERS)
HOT WATER SUPPLY AND
RETURN LINES TO TROPICAL
GREENHOUSE (BY OTHERS)
AB A
B
Honeywell
2
6
0
2
4
0
22
0
2
0
0
1
8
0
1
6
0
1
4
0
1
2
0
1
0
0
8
0
6
0
40
2
0
0
°F
2
6
0
2
4
0
22
0
2
0
0
1
8
0
1
6
0
1
4
0
1
2
0
1
0
0
8
0
6
0
40
2
0
0
°F
CLOSE
OPEN
24 V COMMON
32
1
BE
LIM
O
S3
S2
S1
S3
S2
S2
S3
S1
S1
Y1
Y2
AR
B2
4-3
-S
White
Red
CLOSE
OPEN
24 V COMMON
White
Red
Black
DEPRESS BUTTON
TO OPERATE VALVE
MANUALLY
Valve in Open
Position
Valve in By-Pass
Position
Black
32
1
BE
LIM
O
S3
S2
S1
S3
S2
S2
S3
S1
S1
Y1
Y2
AR
B2
4-3
-S
B
AB A
B
AB A
B
AB A
B
AB A
3-Way Valve Actuator
HWS
HWR
Heat
Source
Equipment Schedule
Item
Description
Part No.
Qty
1VALVE, 3-WAY 1.25"
PER DESIGN 1
2 PRIMARY PUMP 1.25" PER DESIGN 1
3 THERMOMETER DET25 2
4 HIGH LIMIT AQUASTAT DEAQ 1
5 CONTROL SENSOR BY OTHERS 1
See Detail B for
Actuator Operation
A
H6
3-Way Mixing Group
Scale: 3" = 1'-0"
B
H6
Control Valve Actuator
Scale: 8" = 1'-0"
4
Piping Schedule (Provided w/ Optional Piping Package)
Item
Description
Part No.
Qty
PPIPE, STL GROOVED 1.25"
DSP12510-252R AR
T TEE GROOVED 1.25" DST125 1
Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 7
A ADAPTER GROOVEDxMTP 1.25" ST DSA125-04ST 6
C COUPLING GROOVED RIGID 1.25" DSCR125 7
BV BALL VALVE FPT 1.25" DSV125 2
CV CHECK VALVE MPT 1.25" DSCV125T 1
FL CAST IRON 125# NPT FLANGE 1.25" DEFC12 2
N NIPPLE GALV 1.25"x2.00" DSNG125020 2
S1 CHANNEL GALVANIZED 1.6250x40" DSMU-040 2
S2 STRUT CLAMP PLATED 1.25" DSMC125 4
HB HOSE BIB MPTX HOSE 0.50" DSHB050 1
SW SENSOR WELL - 2
C
BV
TP
S2
Tr
3
Tr
HB
S1
FL
2
1
CV
N A
Tr
5
Tr
HWS
HWR
Heated
Zones
C
Optional Drain Valve w/ Cap - Detail
Scale: 2
1
2
" = 1'-0"
H6
DV
Drain Valve w/ Cap (Optional)
Item
Description
Part No.
Qty
DV DRAIN VALVE 0.50" W/ CAP DSV050HTDC 1
JP
EXHIBIT I
H6
MIXING VALVE
DETAILS
Tr
SW
Tr
SW
Note: Temp Sensors
Provided by
Wadsworth Controls
and installed by
electrical Contractor.
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
6 - D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
5
5
Location May Vary
Shown for Reference
ABA
B
2
6
0
2
4
0
22
0
2
0
0
1
8
0
1
6
0
1
4
0
1
2
0
1
0
0
8
0
6
0
40
2
0
0
°F
2
6
0
2
4
0
22
0
2
0
0
1
8
0
1
6
0
1
4
0
1
2
0
1
0
0
8
0
6
0
40
2
0
0
°F
32
1
BE
LIM
O
S3
S2
S1
S3
S2
S2
S3
S1
S1
Y1
Y2
LR
B2
4-3
-S
CLOSE
OPEN
24 V COMMON
32
1
BE
LIM
O
S3
S2
S1
S3
S2
S2
S3
S1
S1
Y1
Y2
LR
B2
4-3
-S
White
Red
Black
3-Way Valve Actuator
Valve in Open
Position
Valve in By-Pass
Position
B
ABA
DEPRESS BUTTON
TO OPERATE VALVE
MANUALLY
B
ABA
CLOSE
OPEN
24 V COMMON
White
Red
Black
HWS
HWR
Heat
Source
Equipment Schedule
Item
Description
Part No.
Qty
1VALVE, 3-WAY, 24V, 1-1/4" BELIMO
DEVS3125 1
2FLOW REGULATOR, 1-1/4" AUTOFLOW
YRH125-2300 1
3 THERMOMETER DET25 2
Piping Schedule (Provided w/ Optional Piping Package)
Item
Description
Part No.
Qty
P PIPE STEEL GROOVED 1.25" DSP12510-252R AR
T TEE GROOVED 1.25" DST125 1
Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 3
A ADAPTER GROOVEDxMPT 1.25" DSA125-04ST 6
C COUPLING GROOVED 1.25" DSCR125 7
BV BALL VALVE FPT 1.25" DSV125 4
N NIPPLE GALV. 1.25"x2.00" DSNG125020 3
HB HOSE BIB MPTxHOSE 0.50" DSHB050 1
See Detail B for
Actuator Operation
HB
A
H6A
3-Way Zone Control Valve - Piping Detail
Scale: 4" = 1'-0"
B
H6A
Control Valve - Actuator Detail
Scale: 8" = 1'-0"
P
Tr
A
BV
AN
2
T
C
BV
HWS
HWR
Heated
Zones
1
Piping Schedule (Provided w/ Optional Drain Valve)
Item
Description
Part No.
Qty
DV DRAIN VALVE 0.50" W/ CAP DSV050HTDC 1
B
Optional Drain Valve w/ Cap - Detail
Scale: 4" = 1'-0"H6A
DV
JP
EXHIBIT I
H6A
ZONE CONTROL
VALVE DETAILS
3
Tr
3
Tr
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
6A
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
A
L-1
Delta Tube SD - Benchtop Heat
Scale:
3
16
" = 1'
DELTA TUBE SD
15 LOOPS PER MANIFOLD
@ WITH 2" TUBE SPACING (TYP)
DELTA TUBE SD
SPACER (TYP)
ZONE HWS & HWR
DELTA TUBE SD
18 LOOPS PER MANIFOLD
@ 2" TUBE SPACING (TYP)
FLEXIBLE HIGH TEMPERATURE
HOSE CONNECTORS (TYP)
To Allow Bench Movement
M/P CONTRACTOR TO SUPPLY DEDICATED
PIPING TO THE ACTUAL VALVE STATION.
DELTA T TO PROVIDE THE CONTROL VALVE
AND ALL THE PIPING FROM THE POINT
OF THE HWS & HWR LINES
ZONE HWS, HWRR & HWR
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
H
-7.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
JDK
H7
BENCHTOP HEATING
LAYOUT
ZB-1
ZB-2
FLEXIBLE HIGH TEMPERATURE
HOSE CONNECTORS (TYP)
To Allow Bench Movement
DELTA TUBE SD
SPACER (TYP)
3-WAY CONTROL VALVE
W/ FLOW CONTROL (TYP)
DELTA TUBE SD
MANIFOLD (TYP)
3-WAY CONTROL VALVE
W/ FLOW CONTROL (TYP)
ZB-2
1'
to First Spacer
from Manifold
6' Max
Between Spacers
1" HWS 1" HWR
Delta Tube SD
Manifold
2"
2"
DELTA TUBE SD
SPACER (TYP)
DELTA TUBE SD
(TYP)
Delta Tube SD
Manifold
B
Delta Tube SD - Detail
Scale: 6" = 1'-0"
A
Delta Tube SD - Detail
Scale: 3" = 1'-0"
DELTA TUBE SD
CABLE TIE (TYP)
DELTA TUBE SD ELBOW
Pre-Installed on Manifold (TYP)
DELTA TUBE SD
(TYP)
C
Delta Tube SD Spacer - Detail
Scale: 6" = 1'-0"
DELTA TUBE SD ELBOW
Pre-Installed on Manifold (TYP)
DELTA TUBE SD
MANIFOLD
Delta TUBE SD
SPACER (TYP)
Delta TUBE SD
(TYP)
Greenhouse
Bench
Greenhouse
Post
1" SLIP x
3
4
" Barb
FITTING (TYP)
D
Delta Tube SD - Connection Detail
Scale: 2" = 1'-0"
DELTA TUBE SD
CABLE TIE (TYP)
HIGH TEMPERATURE
HOSE CONNECTION (TYP)
Install w/ Service Loop
TEE
Sized per Design
(TYP)
MANUAL BALL VALVE
(TYP)
SS HOSE
CLAMP (TYP)
1" PVC SCHED 80
PIPE (TYP)
BUSHING
As Required
(TYP)
Note:
· All Pipe, Fittings, Hangers, Valves and
Hoses Connecting to the Delta Tube SD
Manifolds are to be Provided By Others
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison
, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
H
-7A
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
JP
H7A
BENCHTOP HEATING
DETAILS
A B
AB
A
H7B
3-Way Zone Control Valve - Piping Detail
Scale: 4" = 1'-0"
JP
EXHIBIT I
H7B
BENCH TOP
ZONE CONTROL
VALVE DETAILS
DRAWN BY: CHECKED BY:
PROJECT NO.
PROJECT PHASE
Dra
win
g 2
01
6 C
op
yrig
ht M
eye
r, S
ch
ere
r &
R
oca
stle
, L
td
.
Drawing 2016 Copyright Meyer, Scherer & Rockcastle, Ltd.
ISSUE
I hereby certify that this plan, specification or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Architect under the Laws of the State of Wisconsin.
ARCHITECT SEAL
Signature:
Print Names:
Date:
License No:
DATEMARK DESCRIPTION
Jack Poling
A-8984
BID DOCUMENTS
2017016
Civil Engineer
Vierbicher Associates, Inc.
999 Fourier Drive, Suite 201
Madison, WI 53717
608.826.0532 tel
Landscape Architect
Ken Saiki Design, Inc.
303 South Paterson Street, Suite 1
Madison, WI 53703
608.251.3600 tel
Structural Engineer, Technology and A/V
IMEG Corp.
1800 Deming Way, Suite 200
Middleton, WI 53562
608.223.9600 tel
MEP Engineer
MEP Associates, LLC
860 Blue Gentian Road, Suite 175
Eagan, MN 55121
651.379.9120 tel
Olb
rich
B
ota
nica
l G
ard
en
s
Exp
an
sio
n P
ha
se
1
BP
W P
roject # 8162
3330 A
tw
ood A
venue
Madison
, W
I 53704
Fire Protection Engineer and Code Consultant
Summit Fire Consulting
575 Minnehaha Ave West
St. Paul, MN 55103
651.251.1880 tel
Greenhouse Design
Rough Brothers, Inc.
5513 Vine Street
Cincinnati, OH 45217
513.242.0310 tel
FILE
N
AM
E: E
:\D
ELT
A T
\170830-3355 O
LB
RIC
H B
OT
AN
IC
AL G
AR
DE
NS
\E
MA
IL F
RO
M S
R 3-27-18\172035-H
6A
- D
ELT
A T
.D
WG
SA
VE
D
AT
E: 05-25-18
09.29.2017 SCHEMATIC DESIGN SUBMISSION
05.04.2018 90% CD SUBMISSION
04.06.2018 PARKING LOT AND SITE PLAN SUBMISSION
01.10.2018 DESIGN DEVELOPMENT SUBMISSION
01.17.2018 UDC SUBMISSION
03.30.2018 70% CD PRICING ISSUE
12.08.2017 DD PRICING SET
JUNE 4, 2018
06.01.2018 BID ISSUE
06.04.2018 PERMIT ISSUE
Piping Schedule (Provided w/ Optional Piping Package)
Item
Description
Part No
Qty
E1 ELBOW GALV. FPT 1.00" DSEG100 1
T TEE GALV. FPT 1.00" DST100 2
BV BALL VALVE FPT1.00" DSV100 4
B BUSHING PVC SCH 80 1.00"x0.50" DPB100050F 1
N1NIPPLE, GALVE. 1.00"x2.00"
DSNG100020 6
N2NIPPLE, BRASS 1.00"x6.00"
DSNG100060 3
DV DRAIN VALVE 0.50" w/ CAP AND CHAIN DSV050HTDC 1
Equipment Schedule
Item
Description
Part No
Qty
1VALVE, 3-WAY, 24V, 1.00" HONEYWELL
DEV3100 1
2FLOW REGULATOR, 1.00" AUTOFLOW
DEFRL100-0100 1
HWR
HWS
HWS
HWR
Heat
Source
Heated
Zone
T
DV
B
BV
P
E
T
E
1
N1
2
BV
P
N2
N2
N2