h. matistracking upgrade review – dec. 7, 20061 ssd update howard matis
TRANSCRIPT
H. Matis Tracking Upgrade Review – Dec. 7, 2006 1
SSD UpdateSSD Update
Howard Matis
H. Matis Tracking Upgrade Review – Dec. 7, 2006 2
OutlineOutline
What is the SSD? Why we need it? Some tracking results Current Status How to upgrade? Manpower needed to run the detector at
its potential
What is the SSD? Why we need it? Some tracking results Current Status How to upgrade? Manpower needed to run the detector at
its potential
H. Matis Tracking Upgrade Review – Dec. 7, 2006 3
The SSD is a Beautiful DetectorThe SSD is a Beautiful Detector
The SSD is thin 1% radiation length - double sided Si
The SSD lies at an ideal radius 23 cm - midway between IP and IFC
The SSD has excellent resolution The SSD is too large to be replaced The money is better spent elsewhere
The SSD is thin 1% radiation length - double sided Si
The SSD lies at an ideal radius 23 cm - midway between IP and IFC
The SSD has excellent resolution The SSD is too large to be replaced The money is better spent elsewhere
H. Matis Tracking Upgrade Review – Dec. 7, 2006 4
~ 60 cm
95 95 m m 4.2 cm strips 4.2 cm strips 300 300 m thickm thick Double sidedDouble sided Crossed at 35 mradCrossed at 35 mrad
20 ladders20 ladders 67 cm long67 cm long Air cooledAir cooled
< 1.2< 1.2
95 95 m m 4.2 cm strips 4.2 cm strips 300 300 m thickm thick Double sidedDouble sided Crossed at 35 mradCrossed at 35 mrad
20 ladders20 ladders 67 cm long67 cm long Air cooledAir cooled
< 1.2< 1.2
Two Layers of TrackingTwo Layers of TrackingTwo Layers of TrackingTwo Layers of Tracking
H. Matis Tracking Upgrade Review – Dec. 7, 2006 5
Inside the IFC
~ 1 m
xyxy = 30 µm = 30 µm
zz = 700 µm = 700 µm
TPC pointing TPC pointing resolution at resolution at the SSD is ~ 1 the SSD is ~ 1 mmmm
SSD pointing SSD pointing at the IST is ~ at the IST is ~ 300 300 mm
xyxy = 30 µm = 30 µm
zz = 700 µm = 700 µm
TPC pointing TPC pointing resolution at resolution at the SSD is ~ 1 the SSD is ~ 1 mmmm
SSD pointing SSD pointing at the IST is ~ at the IST is ~ 300 300 mm
SSD Facilitates Tracking from the TPC to ISTSSD Facilitates Tracking from the TPC to ISTSSD Facilitates Tracking from the TPC to ISTSSD Facilitates Tracking from the TPC to IST
H. Matis Tracking Upgrade Review – Dec. 7, 2006 6
SSD has been used in STAR analysisSSD has been used in STAR analysis Needed for SVT tracking SSD is essential for SVT analysis
Needed for SVT tracking SSD is essential for SVT analysis
H. Matis Tracking Upgrade Review – Dec. 7, 2006 7
Improves the Impact Parameter MeasurementImproves the Impact Parameter Measurement
analysis by Jonathan Bouchet
cm cm
cm cm
H. Matis Tracking Upgrade Review – Dec. 7, 2006 8
• Resolution here includes vertex and hit resolutions. Real values 20% smaller. • Huge difference in pointing between SVT and everything else• At infinite momentum limit is ~150 µm in XY and 80 µm in Z (~vertex resolution) • At 1 GeV/c, it is 220 µm in xy and 150 µm in z• z is our good (not shifting) coordinate!• MISSION ACCOMPLISHED
TPC
TPC
+SSD
+SSD
+SVT 1,2,3+SVT 1,2,3
Data - Cu + Cu 62 GeV – Impact ParameterData - Cu + Cu 62 GeV – Impact ParameterData - Cu + Cu 62 GeV – Impact ParameterData - Cu + Cu 62 GeV – Impact Parameter
1/p 1/p
H. Matis Tracking Upgrade Review – Dec. 7, 2006 9
Situation for Upcoming RunSituation for Upcoming Run Ran detector on Tuesday System ran and stable Obtained pedestals and noise 70% of the detector good for
physics - NOW Should be able to recover rest to
95% L2 aborts acceptable for rate <30
Hz SSD not useful for p-p running
Jerome Baudot will visit BNL and instruct new people early next year Need beam and full detector
Manpower?
Ran detector on Tuesday System ran and stable Obtained pedestals and noise 70% of the detector good for
physics - NOW Should be able to recover rest to
95% L2 aborts acceptable for rate <30
Hz SSD not useful for p-p running
Jerome Baudot will visit BNL and instruct new people early next year Need beam and full detector
Manpower?
H. Matis Tracking Upgrade Review – Dec. 7, 2006 10
Pedestal NoiseLadders 1 - 10
H. Matis Tracking Upgrade Review – Dec. 7, 2006 11
Pedestal NoiseLadders 11 - 20
H. Matis Tracking Upgrade Review – Dec. 7, 2006 12
Maintenance Needed Next Summer ShutdownMaintenance Needed Next Summer Shutdown Solve the problem with one of the LV power supply boards
(ladder 5) Check all cooling pipes. Understand HV trips (cooling problem?)
Solved if SVT removed
One ladder side (7P) is silent Fix ADC Board Might need to replace ladder
Check optical fibers Need specialized equipment. At BNL?
Fix L2 abort problem Need 1 month of a SSD Engineer and Tonko
Solve the problem with one of the LV power supply boards (ladder 5)
Check all cooling pipes. Understand HV trips (cooling problem?) Solved if SVT removed
One ladder side (7P) is silent Fix ADC Board Might need to replace ladder
Check optical fibers Need specialized equipment. At BNL?
Fix L2 abort problem Need 1 month of a SSD Engineer and Tonko
H. Matis Tracking Upgrade Review – Dec. 7, 2006 13
SSD Electronics and the FutureSSD Electronics and the Future
Module level - 768 strips per side ( P and N side ) - Analog signal of 1.5 s - 50 mV/MIP - Readout speed : 3 MHz
Ladder level - 2 Connexion boards ( 1 per side ) - 2 ADC boards ( 1 per side )
SSD level - 4 Readout Boards (RB) located on the TPC wheels - Each RB interfaces 10 ladders with trigger / daq / slowcontrol - Readout speed : 30 MHz
H. Matis Tracking Upgrade Review – Dec. 7, 2006 14
Current Readout SpeedCurrent Readout Speed Front end Digitization
FEE runs at 3 MHz 96 chips/ladder side with 128
channels/chip 4.1 ms to digitize a ladder side
Transfer to DAQ via RDO Readout at 30 MHz 1 RDO/10 ladder sides 4.1 ms for readout 3 ms for 0’s to match TPC DAQ format 7 ms total
Front end Digitization FEE runs at 3 MHz 96 chips/ladder side with 128
channels/chip 4.1 ms to digitize a ladder side
Transfer to DAQ via RDO Readout at 30 MHz 1 RDO/10 ladder sides 4.1 ms for readout 3 ms for 0’s to match TPC DAQ format 7 ms total
RDO Board
H. Matis Tracking Upgrade Review – Dec. 7, 2006 15
How to Upgrade for DAQ1000How to Upgrade for DAQ1000 For 1.2 ms readout time
Digitize at 10 MHz Have a RDO for 3 ladder sides - 3 No zeros to fill the ASICS – 2
Opportunity to upgrade firmware Solve L2 abort problem
Estimated cost (mostly to produce new RDOs ) : ~100 k$ Must verify power distribution and cooling Need to test concept
To go faster Add more ADCs on a ladder Increase # of RDOs Maximum readout speed at FEE level – 10 MHz
For 1.2 ms readout time Digitize at 10 MHz Have a RDO for 3 ladder sides - 3 No zeros to fill the ASICS – 2
Opportunity to upgrade firmware Solve L2 abort problem
Estimated cost (mostly to produce new RDOs ) : ~100 k$ Must verify power distribution and cooling Need to test concept
To go faster Add more ADCs on a ladder Increase # of RDOs Maximum readout speed at FEE level – 10 MHz
H. Matis Tracking Upgrade Review – Dec. 7, 2006 16
Lessons Learned from STAR OperationsLessons Learned from STAR Operations Detector must be tested with full system
before each run at BNL Experts must be available to assist ASAP
Come to BNL if necessary Train shift crews
Testing slots are limited Schedule access is not fixed “Scheduled” accesses should stick to the schedule
SSD must have a “mother” at BNL making sure detector is being used
Detector must be tested with full system before each run at BNL
Experts must be available to assist ASAP Come to BNL if necessary Train shift crews
Testing slots are limited Schedule access is not fixed “Scheduled” accesses should stick to the schedule
SSD must have a “mother” at BNL making sure detector is being used
H. Matis Tracking Upgrade Review – Dec. 7, 2006 17
Need a team to succeed Need a team to succeed
Physicists Subsystem leader (1/4 time) Software coordinator (1/2 time) Calibration and detector expert (1/2 time and @ BNL) Subsystem Expert (need at least 2 @ 1/4 time) Slow controls (1/8 time) Advice from present experts People who want to use it for physics
Engineers French Support (need shops and some travel to BNL) Mechanical and electrical tech support (several weeks during
shutdowns) Electrical Engineer (when problems occur)
Physicists Subsystem leader (1/4 time) Software coordinator (1/2 time) Calibration and detector expert (1/2 time and @ BNL) Subsystem Expert (need at least 2 @ 1/4 time) Slow controls (1/8 time) Advice from present experts People who want to use it for physics
Engineers French Support (need shops and some travel to BNL) Mechanical and electrical tech support (several weeks during
shutdowns) Electrical Engineer (when problems occur)
H. Matis Tracking Upgrade Review – Dec. 7, 2006 18
Runtime hardware supportRuntime hardware support
Requires less effort than the TPC or EMC Needs person at BNL watching SSD
Advocating and assuring for its inclusion in the run Basic knowledge of system Answer simple questions from shift crews
At least two people who can provide Backup Advise Help in access (need fixed access times from RHIC)
Real expert who can consult FPGA Programming support
Should only need this help during shutdowns
Requires less effort than the TPC or EMC Needs person at BNL watching SSD
Advocating and assuring for its inclusion in the run Basic knowledge of system Answer simple questions from shift crews
At least two people who can provide Backup Advise Help in access (need fixed access times from RHIC)
Real expert who can consult FPGA Programming support
Should only need this help during shutdowns
H. Matis Tracking Upgrade Review – Dec. 7, 2006 19
Shutdown hardware supportShutdown hardware support Fix known problems Tend to routine maintenance Assist if changes needed to SVT cone area Routine work on infrastructure People
Team of physicists to work on the detector Electrical and hardware techs to do infrastructure
maintenance
Fix known problems Tend to routine maintenance Assist if changes needed to SVT cone area Routine work on infrastructure People
Team of physicists to work on the detector Electrical and hardware techs to do infrastructure
maintenance
H. Matis Tracking Upgrade Review – Dec. 7, 2006 20
Software supportSoftware support
One person doing daily calibration and checks of the performance
Jerome Lauret requires a software detector leader responsible for making sure SSD is ready
when production starts People who need SSD for their physics
analysis
One person doing daily calibration and checks of the performance
Jerome Lauret requires a software detector leader responsible for making sure SSD is ready
when production starts People who need SSD for their physics
analysis
H. Matis Tracking Upgrade Review – Dec. 7, 2006 21
H. Matis Tracking Upgrade Review – Dec. 7, 2006 22
H. Matis Tracking Upgrade Review – Dec. 7, 2006 23
SummarySummary
SSD provides valuable tracking for current detector and the Inner Tracker
“Low” maintenance calibration Should be supported by STAR Can be maintained Should work for this Au-Au run STAR must provide sufficient manpower
for the SSD to succeed
SSD provides valuable tracking for current detector and the Inner Tracker
“Low” maintenance calibration Should be supported by STAR Can be maintained Should work for this Au-Au run STAR must provide sufficient manpower
for the SSD to succeed