Fidelity National Environmental Solutions, LLC H 2 S Case Study Produced Water Treatment for H2S in the Permian Basin Successfully Treated ~ 450,000 Barrels of H 2 S laden Produced Fluid The objective of this case study was to treat produced water specifically for Hydrogen Sulfide (“H2S”). Based on the findings of this study, FNES displayed the Ozonix ® treatment system’s ability to eliminate H2S and allow our customer to reuse this produced fluid. The customer had traditionally disposed of this fluid but would prefer to reuse it once treated through the Ozonix ® process. FNES processed approximately 450,000 barrels (“bbl”) of the produced water with an EF80 Ozonix ® treatment unit; rig-up is shown below. The fluid was batch treated and reached non-detectable limits after four (4) days of treatment; samples were taken at different locations and times throughout the treatment process. FNES measured H2S concentration in each sample immediately on-site, using an DR890 colorimeter, which utilizes the USEPA Methylene Blue Method. All field readings were third party verified by Martin Water Laboratory located in Midland, Texas. Using these readings FNES can calculate reaction rates and create predictive modeling tools to estimate treatment times for other fluids. BACKGROUND DATE: October 27 - November 03, 2014 EQUIPMENT: EcosFrac 80 BPM (“EF80”)Ozonix ® Units FORMATION: Permian Basin (NM) FLUID TYPE: Produced Water VOLUME: ~450,000 barrels TREATMENT RATE: ~80 BPM batch treatment LABORATORY: Martin Water Laboratory TESTS & METHOD: S 2 as H2S (SM 4500) S 2 as H2S (USEPA Methylene Blue Method) Figure 1: Hydrogen Sulfide Concentration Graphical Results Figure 2: Hydrogen Sulfide Concentration Numerical Results 0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00 001 002 003 004 005 006 007 008 009 010 011 012 013 014 015 016 017 018 019 020 021 022 023 024 025 H 2 S Concentra6on (mgL 9 ) Sample I.D. Sulfide (as H 2 S) Sulfide (as H2S) Water Transfer Pump 450k Containment Pond EF80 Ozonix ® Unit Generator Effluent Line Discharge Point Influent Line Suction Point Confidential Information Fidelity National Environmental Solutions, LLC Rig Up Diagram Covington Pond N Producing Well Rupture Disc Flow Meter Date and Time Sample I.D. Sulfide Sulfide (as H 2 S) 10/27/14 0:00 001 127.04 135.00 10/27/14 15:30 002 124.21 132.00 10/28/14 15:45 003 117.63 125.00 10/28/14 15:45 004 112.92 120.00 10/28/14 18:00 005 94.10 100.00 10/29/14 9:00 006 66.81 71.00 10/29/14 9:45 007 61.45 65.30 10/29/14 10:15 008 64.44 68.48 10/29/14 11:30 009 42.65 45.32 10/29/14 12:30 010 37.64 40.00 10/29/14 12:30 011 29.17 31.00 10/29/14 18:00 012 11.16 11.86 10/30/14 8:30 013 13.12 13.94 10/30/14 8:30 014 4.02 4.27 10/30/14 14:23 015 5.27 5.60 10/30/14 18:15 016 5.37 5.71 10/31/14 8:30 017 2.50 2.66 10/31/14 15:00 018 1.35 1.43 10/31/14 19:30 019 0.00 0.00 10/31/14 20:30 020 0.00 0.00 10/31/14 9:30 021 0.00 0.00 10/31/14 10:30 022 0.00 0.00 11/1/14 8:30 023 0.00 0.00 11/2/14 8:30 024 0.00 0.00 11/3/14 9:00 025 0.00 0.00 Field Analytics Log

Upload: others

Post on 20-Jan-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: H2S Case Study 01.25 - content.equisolve.net...Methylene Blue Method. All field readings were third party verified by Martin Water Laboratory located in Midland, Texas. Using these

F i d e l i t y N a t i o n a l E n v i r o n m e n t a l S o l u t i o n s , L L C

!

H2S Case StudyProduced Water Treatment for H2S in the Permian Basin Successfully Treated ~ 450,000 Barrels of H2S laden Produced Fluid

The objective of this case study was to treat produced water specifically for Hydrogen Sulfide (“H2S”). Based on the findings of this study, FNES displayed the Ozonix® treatment system’s ability to eliminate H2S and allow our customer to reuse this produced fluid. The customer had traditionally disposed of this fluid but would prefer to reuse it once treated through the Ozonix® process.

FNES processed approximately 450,000 barrels (“bbl”) of the produced water with an EF80 Ozonix®

treatment unit; rig-up is shown below.

The fluid was batch treated and reached non-detectable limits after four (4) days of treatment; samples were taken at different locations and times throughout the treatment process. FNES measured H2S concentration in each sample immediately on-site, using an DR890 colorimeter, which utilizes the USEPA Methylene Blue Method. All field readings were third party verified by Martin Water Laboratory located in Midland, Texas.

Using these readings FNES can calculate reaction rates and create predictive modeling tools to estimate treatment times for other fluids.

BACKGROUND

DATE: October 27 - November 03, 2014

EQUIPMENT: EcosFrac 80 BPM (“EF80”)Ozonix® Units

FORMATION: Permian Basin (NM)

FLUID TYPE: Produced Water

VOLUME: ~450,000 barrels

TREATMENT RATE: ~80 BPM batch treatment

LABORATORY: Martin Water Laboratory

TESTS & METHOD: • S2 as H2S (SM 4500)

• S2 as H2S (USEPA Methylene Blue Method)

Figure 1: Hydrogen Sulfide Concentration Graphical Results

Figure 2: Hydrogen Sulfide Concentration Numerical Results

Client: Limestone,ExplorationLocation:

Date: October,27,8,November,03,,2014Job,#:Well,#:

Date,and,Time Sample,I.D. Sulfide Sulfide,(as,H2S)10/27/14,0:00 001 127.04 135.0010/27/14,15:30 002 124.21 132.0010/28/14,15:45 003 117.63 125.0010/28/14,15:45 004 112.92 120.0010/28/14,18:00 005 94.10 100.0010/29/14,9:00 006 66.81 71.0010/29/14,9:45 007 61.45 65.3010/29/14,10:15 008 64.44 68.4810/29/14,11:30 009 42.65 45.3210/29/14,12:30 010 37.64 40.0010/29/14,12:30 011 29.17 31.0010/29/14,18:00 012 11.16 11.8610/30/14,8:30 013 13.12 13.9410/30/14,8:30 014 4.02 4.2710/30/14,14:23 015 5.27 5.6010/30/14,18:15 016 5.37 5.7110/31/14,8:30 017 2.50 2.6610/31/14,15:00 018 1.35 1.4310/31/14,19:30 019 0.00 0.0010/31/14,20:30 020 0.00 0.0010/31/14,9:30 021 0.00 0.0010/31/14,10:30 022 0.00 0.0011/1/14,8:30 023 0.00 0.0011/2/14,8:30 024 0.00 0.0011/3/14,9:00 025 0.00 0.00

Field&Analytics&Log

0.00,

20.00,

40.00,

60.00,

80.00,

100.00,

120.00,

140.00,

001, 002, 003, 004, 005, 006, 007, 008, 009, 010, 011, 012, 013, 014, 015, 016, 017, 018, 019, 020, 021, 022, 023, 024, 025,

H 2S&Co

ncen

tra6

on&(m

gL9 )&

Sample&I.D.&

Sulfide&(as&H2S)&

Sulfide,(as,H2S),

Water Transfer Pump

450k Containment Pond

EF80 Ozonix® Unit

Generator Effluent Line

Discharge Point

Influent Line

Suction Point

Confidential Information

Fidelity National Environmental Solutions, LLC Rig Up Diagram Covington Pond

N

Producing Well

Rupture Disc Flow Meter

Client: Limestone,ExplorationLocation:

Date: October,27,8,November,03,,2014Job,#:Well,#:

Date,and,Time Sample,I.D. Sulfide Sulfide,(as,H2S)10/27/14,0:00 001 127.04 135.0010/27/14,15:30 002 124.21 132.0010/28/14,15:45 003 117.63 125.0010/28/14,15:45 004 112.92 120.0010/28/14,18:00 005 94.10 100.0010/29/14,9:00 006 66.81 71.0010/29/14,9:45 007 61.45 65.3010/29/14,10:15 008 64.44 68.4810/29/14,11:30 009 42.65 45.3210/29/14,12:30 010 37.64 40.0010/29/14,12:30 011 29.17 31.0010/29/14,18:00 012 11.16 11.8610/30/14,8:30 013 13.12 13.9410/30/14,8:30 014 4.02 4.2710/30/14,14:23 015 5.27 5.6010/30/14,18:15 016 5.37 5.7110/31/14,8:30 017 2.50 2.6610/31/14,15:00 018 1.35 1.4310/31/14,19:30 019 0.00 0.0010/31/14,20:30 020 0.00 0.0010/31/14,9:30 021 0.00 0.0010/31/14,10:30 022 0.00 0.0011/1/14,8:30 023 0.00 0.0011/2/14,8:30 024 0.00 0.0011/3/14,9:00 025 0.00 0.00

Field&Analytics&Log

0.00,

20.00,

40.00,

60.00,

80.00,

100.00,

120.00,

140.00,

001, 002, 003, 004, 005, 006, 007, 008, 009, 010, 011, 012, 013, 014, 015, 016, 017, 018, 019, 020, 021, 022, 023, 024, 025,

H 2S&Co

ncen

tra6

on&(m

gL9 )&

Sample&I.D.&

Sulfide&(as&H2S)&

Sulfide,(as,H2S),