h5 wet weather pump station
TRANSCRIPT
AgendaProject Needs/Benefits
Site PlanConstruction Process
Access at the SiteNoise ReductionEffect on BusinessesCommunications with Residents
Restoration of the SiteOn-going Maintenance ScheduleQuestions
2
Project Needs/Benefits Reduce and Protect Against Flooding
Pump Station Minimizes /Eliminates Street Flooding in Northern Hoboken
Integral Part of Overall Plan (“Rebuild by Design”) to Guard Against Rising Sea Levels/Superstorm Sandy Event
3
Project Needs/BenefitsProvides Maxwell Place Infrastructure with Greater Resiliency
Pump Station Reduces Potential for Backups in Long-Term for Maxwell Place Private System
New Emergency Generator for Backup Power at 11th Street Pump Station
Protects the PSE&G Substation that provides power to Maxwell Place
4
Construction Process: Noise Reduction Noise Reduction
Hours of Construction Limited to Reduce Community Disruption:
Monday through Friday Only Between Hours of 8 am to 5 pm No Weekend or Off-Hour Construction Activity
No Pile Driving East of Hudson Street Substantially Less Noise without Need for Piles
Limited Truck Traffic Concentrated During Excavation and Concrete
Placement No Need for Constant Trucks In and Out of Site
6
Construction Process: AccessAccess at the Site
Sidewalks South Sidewalk: Open at All Times South Sidewalk: Maintain Drop-Offs for School North Sidewalk: Brief Intervals of Closure Between
Sinatra Drive North and Hudson StreetTraffic
Uninterrupted Access to Parking Garage East-Bound Traffic Lanes (Between Sinatra Drive
North and Hudson Street): Open at All Times West-Bound Traffic Lanes: Temporary Closures
Parking No Street Parking During Construction Hours Parking During Non-Construction Hours & on
Weekends7
Construction Process: BusinessesEffect on Local Businesses
Sidewalk Access Permits Unimpeded Foot Traffic to Local Businesses
Traffic Controls at Site Should Not Impact Businesses Drop-off Point Will Be Maintained During
Construction Parking Access May Have Limited Effect
Parking Garage Access Remains In Place Restrictions on Street Parking May Have Limited
Impact
8
Construction Process: CommunicationsKeeping Residents Informed
Monthly Progress Report Posted on North Hudson Sewerage Authority Website http://www.nhudsonsa.com/
Onsite Construction Field Office Executive Director and Authority Engineer
Available for Update Meetings24/7 Community Outreach Hotline
9
Restoration of SiteStreet
Complete repaving of 11th Street Both Sides Between Sinatra Drive North & Hudson Street
Restoration of Island Landscaping
Blend Covers into Landscape Plan
10
On-Going MaintenancePump Station
2 Hours Monthly Maintenance VisitsSafety ChecksEquipment Inspection & Preventative
MaintenanceControl Vault
2 Hours Weekly Maintenance VisitsControls CheckPreventative Maintenance
13
ScheduleNovember/December 2014 – Public
AdvertisementJanuary/February 2015 – Contract Award April 2015 – Commence ConstructionFebruary 2016 – Construction CompletedMarch 2016- Ribbon Cutting
14
Questions?
North Hudson Sewerage Authority1600 Adams StreetHoboken, NJ 07030
Phone: (201)-963-4685http://www.nhudsonsa.com/