CONSTRUCTION UPDATE August 18, 2016 HADDON TOWNSHIP SCHOOLS

Upload: others

Post on 13-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HADDON TOWNSHIP SCHOOLS · Haddon Township Schools 4 Edison Elementary School (1930/2003) 24,500 SF Ground Floor Main Floor Second Floor Grade Level What has been accomplished •

CONSTRUCTION UPDATE August 18, 2016

HADDON TOWNSHIP SCHOOLS

Page 2: HADDON TOWNSHIP SCHOOLS · Haddon Township Schools 4 Edison Elementary School (1930/2003) 24,500 SF Ground Floor Main Floor Second Floor Grade Level What has been accomplished •

Haddon Township Schools

2

AGENDA •  Timeline - referendum & construction

•  Edison renovations

•  Jennings renovations

•  Stoy renovations & addition

•  Strawbridge renovations & addition

•  Van Sciver renovations & addition

•  Haddon Township High School renovations

Page 3: HADDON TOWNSHIP SCHOOLS · Haddon Township Schools 4 Edison Elementary School (1930/2003) 24,500 SF Ground Floor Main Floor Second Floor Grade Level What has been accomplished •

Haddon Township Schools

3

July 2011 Garrison Architects presents draft of proposed facility improvements with preliminary costs  July 2013 Grant applications submitted to the NJ Department of Education November 2013 NJ Department of Education requires re-submission of applications – (program over

subscribed)  Jan – July 2014 NJ Department of Education grant approval letters received Sept. 30, 2014 Bond referendum passed by Haddon Township voters  Jan – Feb 2015 NJ School Development Authority grant agreements executed    

BOND REFERENDUM PROGRAM TIMELINE

CONSTRUCTION SCHEDULE TIMELINE

Green indicates complete / Blue indicates remaining

Construction  Schedule     2015   2016  Project     1st  

QTR  2nd  QTR  

3rd  QTR  

4th  QTR  

1st  QTR  

2nd  QTR  

3rd  QTR  

4th  QTR  

Boiler  System                  Van  Sciver                  Stoy                  Strawbridge                  Edison                  Jennings                  High  School                  Electrical  Systems  

               

 

Page 4: HADDON TOWNSHIP SCHOOLS · Haddon Township Schools 4 Edison Elementary School (1930/2003) 24,500 SF Ground Floor Main Floor Second Floor Grade Level What has been accomplished •

Haddon Township Schools

4

Edison Elementary School (1930/2003) 24,500 SF

Ground Floor Main Floor

Second Floor

Grade Level

What has been accomplished •  New boilers and hot water heater •  New exterior doors •  Interior renovations & new doors •  New roofing •  New HVAC system •  New electrical distribution •  Asbestos abatement

What remains •  Complete the elevator & stair

tower •  New public address system •  New clock system •  New security cameras •  Site work improvements •  Air conditioning

Page 5: HADDON TOWNSHIP SCHOOLS · Haddon Township Schools 4 Edison Elementary School (1930/2003) 24,500 SF Ground Floor Main Floor Second Floor Grade Level What has been accomplished •

Haddon Township Schools

5

Jennings Elementary School (1924/2003) 22,500 SF

Ground Floor

Main Floor

Upper Floor

What has been accomplished •  New boilers and hot water heater •  New exterior doors •  Interior renovations & new doors •  New roofing •  New HVAC system •  New electrical distribution •  Asbestos abatement

What remains •  Complete the elevator & stair

tower •  New public address system •  New clock system •  New security cameras •  Exterior brick re-pointing •  Site work improvements •  Air conditioning

Page 6: HADDON TOWNSHIP SCHOOLS · Haddon Township Schools 4 Edison Elementary School (1930/2003) 24,500 SF Ground Floor Main Floor Second Floor Grade Level What has been accomplished •

Haddon Township Schools

6

Stoy Elementary School (1928/1955) 22,300 SF

Main Floor

Second Floor Upper Floor

What has been accomplished •  New boilers and hot water heater •  New exterior doors •  Interior renovations & new doors •  New roofing •  New HVAC system •  New electrical service & distribution •  New fire alarm system •  New student drop off loop •  Asbestos abatement

What remains •  Complete the multi-purpose room •  Complete the elevator & stair

tower •  New public address system •  New clock system •  New security cameras •  Exterior brick re-pointing •  Site work improvements •  Air conditioning

Page 7: HADDON TOWNSHIP SCHOOLS · Haddon Township Schools 4 Edison Elementary School (1930/2003) 24,500 SF Ground Floor Main Floor Second Floor Grade Level What has been accomplished •

Haddon Township Schools

7

Strawbridge Elementary School (1928/1955) 26,500 SF

Lower Floor

Main Floor

Second Floor

What has been accomplished •  New boilers and hot water heater •  New exterior doors •  Interior renovations & new doors •  New roofing •  New HVAC system •  New electrical service & distribution •  New fire alarm system •  New student drop off loop •  Asbestos abatement

What remains •  Complete the multi-purpose room •  Complete the elevator & stair tower •  New public address system •  New clock system •  New security cameras •  Exterior brick re-pointing •  Site work improvements •  Air conditioning

Page 8: HADDON TOWNSHIP SCHOOLS · Haddon Township Schools 4 Edison Elementary School (1930/2003) 24,500 SF Ground Floor Main Floor Second Floor Grade Level What has been accomplished •

Haddon Township Schools

8

Van Sciver Elementary School (1957/1973) 34,875 SF

What has been accomplished •  New boilers and hot water heater •  New exterior doors •  Interior renovations & new doors •  New roofing •  New HVAC system •  New electrical service & distribution •  New fire alarm system •  New addition and classrooms •  Exterior stucco repairs •  Site work •  Asbestos abatement

What remains •  New public address system •  New clock system •  New security cameras •  Renovation of existing MPR •  Air conditioning

Page 9: HADDON TOWNSHIP SCHOOLS · Haddon Township Schools 4 Edison Elementary School (1930/2003) 24,500 SF Ground Floor Main Floor Second Floor Grade Level What has been accomplished •

Haddon Township Schools

9

Haddon Township High School (1951/1962/1972/1993)

What has been accomplished •  New boilers and hot water heater •  New exterior doors •  Interior renovations & new doors •  New roofing •  New HVAC system •  New electrical service & distribution •  New fire alarm system •  Exterior brick repairs •  New student drop off loop •  Asbestos abatement

What remains •  New public address system •  New clock system •  Additional security cameras •  New green house •  Auditorium renovations (partial) •  Interior renovations (partial) •  New dust collector •  Site work improvements •  Air conditioning

Page 10: HADDON TOWNSHIP SCHOOLS · Haddon Township Schools 4 Edison Elementary School (1930/2003) 24,500 SF Ground Floor Main Floor Second Floor Grade Level What has been accomplished •

Haddon Township Schools

10

Haddon Township High School

Lower Floor

Main Floor Second Floor

Will be available but parts to be completed by the end of Dec. 2016

Page 11: HADDON TOWNSHIP SCHOOLS · Haddon Township Schools 4 Edison Elementary School (1930/2003) 24,500 SF Ground Floor Main Floor Second Floor Grade Level What has been accomplished •

Haddon Township Schools

11

Budget as of 18 August 2016

At this time, approximately $514K over budget •  How did this occur?

•  Referendum time line- started 2011 / construction occurred in 2015 & 2016

•  Estimates did include escalation; however, once the budget was complete, approvals were stalled at NJSDA for approximately 1.5 years

•  Construction economy became less competitive in 2015 & 2016 due to other referendums being bid at the same time

•  What are we doing to reduce the budget over-run?

•  Strategized 6 separate bid packages in an effort to increase competition and maximize efficiencies

•  Review the fixed furnishings and equipment (desks, chairs, tables, etc.) to determine what is exactly needed and purchase over time

•  Review the remaining site work improvements

Page 12: HADDON TOWNSHIP SCHOOLS · Haddon Township Schools 4 Edison Elementary School (1930/2003) 24,500 SF Ground Floor Main Floor Second Floor Grade Level What has been accomplished •

Haddon Township Schools

12

CONCLUSION

•  THE CONSTRUCTION SCHEDULE IS A 2 YEAR ENDEAVOR •  THE SAFETY OF THE STUDENTS, FACULTY AND STAFF

ARE PARAMOUNT •  ON SEPTEMBER 8, 2016 THE STUDENTS, FACULTY AND

STAFF WILL RETURN TO A SAFE AND SECURE LEARNING ENVIRONMENT

•  THE REMAINING WORK WILL BE PERFORMED IN A

CONTROLLED MANNER TO PROTECT THE SAFETY AND SECURITY OF ALL AND NOT DISRUPT THE LEARNING ENVIRONMENT

QUESTIONS ?