BUILDING STRONGSM
Offshore Debris Disposal: a path to assistHaiti Earthquake Reconstruction
Creating Artificial Reefs usingClean Concrete Rubble and Debris A Concept Presented by: Date:
Camilien J.W. Saint-Cyr – USAID 28 July 2010Richard A. Benoit – USACE / Author
![Page 2: Haiti: Artificial Reefs - A solution](https://reader033.vdocument.in/reader033/viewer/2022060116/557dbc4dd8b42a8a4e8b4775/html5/thumbnails/2.jpg)
BUILDING STRONGSM
The Concept
To deposit clean cement rubble created by the12 Jan 10 earthquake at a designated site(s)intending to create new marine life habitat; anartificial reef, in greater Port au Prince Harbor.
![Page 3: Haiti: Artificial Reefs - A solution](https://reader033.vdocument.in/reader033/viewer/2022060116/557dbc4dd8b42a8a4e8b4775/html5/thumbnails/3.jpg)
BUILDING STRONGSM
For the past 17 years, the University of Florida has built & placed 26-miles of concrete artificial reefs in the Gulf of Mexico to study impact on grouper, a popular food fish.
![Page 4: Haiti: Artificial Reefs - A solution](https://reader033.vdocument.in/reader033/viewer/2022060116/557dbc4dd8b42a8a4e8b4775/html5/thumbnails/4.jpg)
BUILDING STRONGSM
Why Artificial Reefs?
1. Assists earthquake recovery / reconstruction
by including an ocean-based rubble disposal option;
2. Does not require land to be taken from inventory;
3. It is environmentally friendly with positive impacts;
![Page 5: Haiti: Artificial Reefs - A solution](https://reader033.vdocument.in/reader033/viewer/2022060116/557dbc4dd8b42a8a4e8b4775/html5/thumbnails/5.jpg)
BUILDING STRONGSM
Why Artificial Reefs?
4. Relieves pressure on damaged natural coral reefs;5. Assists and enhances local marine ecosystems;6. Has a positive local economic impact:
A. Fishing – Additional habitat, enhances stocks;B. Tourism – Develop diving / snorkeling industry.
![Page 6: Haiti: Artificial Reefs - A solution](https://reader033.vdocument.in/reader033/viewer/2022060116/557dbc4dd8b42a8a4e8b4775/html5/thumbnails/6.jpg)
BUILDING STRONGSM
Fishing Communities ofPetit Goave and L’Arcahaie
![Page 7: Haiti: Artificial Reefs - A solution](https://reader033.vdocument.in/reader033/viewer/2022060116/557dbc4dd8b42a8a4e8b4775/html5/thumbnails/7.jpg)
BUILDING STRONGSM
Where rubble is “Officially” disposed
Truitier, Truitier, TruitierAdvantages Disadvantages1. It’s Operational 1. Capacity unknown;
2. It’s Authorized 2. Not an engineered site;
3. It’s large (215 Hectares, 531 acres) 3. Distance from removal sites.
![Page 8: Haiti: Artificial Reefs - A solution](https://reader033.vdocument.in/reader033/viewer/2022060116/557dbc4dd8b42a8a4e8b4775/html5/thumbnails/8.jpg)
BUILDING STRONGSM
Projected Capacityfor .5-square mile ocean disposal area
(.5 square mile equals 320 acres or about 160 soccer fields)
1 acre, one foot deep = 43,560 cf / 27 = 1,613.3 cy1,613 cy X 10 foot deep = 16,130 cy per acre
16,130 cy X 320 acres =
5,161,600 cubic yardsdebris 10 feet high
* Does not factor 15% void / settlement factor
![Page 9: Haiti: Artificial Reefs - A solution](https://reader033.vdocument.in/reader033/viewer/2022060116/557dbc4dd8b42a8a4e8b4775/html5/thumbnails/9.jpg)
BUILDING STRONGSM
20 - 25,000,000 cubic yards of rubbleWhere is it going to go? … How is it going to be disposed of?
![Page 10: Haiti: Artificial Reefs - A solution](https://reader033.vdocument.in/reader033/viewer/2022060116/557dbc4dd8b42a8a4e8b4775/html5/thumbnails/10.jpg)
BUILDING STRONGSM
Cost Estimates / ComparisonsLAND-BASED TOTAL 90 DAYS C&D DISPOSAL AND MITIGATION
ITEM COST379,242 CY X $73 per CY $27,684,666
OCEAN-BASED TOTAL 90 DAYS C & D DISPOSAL379,242 CY X $40 per CY $15,169,680
SAVINGS UTILIZING Artificial Reef option $12,514,986
![Page 11: Haiti: Artificial Reefs - A solution](https://reader033.vdocument.in/reader033/viewer/2022060116/557dbc4dd8b42a8a4e8b4775/html5/thumbnails/11.jpg)
BUILDING STRONGSM
Location Survey Checklist1. Away from navigation channels;2. At a depth approximately 30 to 90 feet;3. Away from live corals (at least one mile);4. Away from areas where sedimentation will occur;5. In areas of enriched nutrient tidal flow and current;6. At a height approximately one-third the water column;7. On a flat, hard-packed or silt bottom away from active growth.
![Page 12: Haiti: Artificial Reefs - A solution](https://reader033.vdocument.in/reader033/viewer/2022060116/557dbc4dd8b42a8a4e8b4775/html5/thumbnails/12.jpg)
BUILDING STRONGSM
Relieving Pressures on Natural Reefs
Source: World Resources Institute
![Page 13: Haiti: Artificial Reefs - A solution](https://reader033.vdocument.in/reader033/viewer/2022060116/557dbc4dd8b42a8a4e8b4775/html5/thumbnails/13.jpg)
BUILDING STRONGSM
Success Stories1. Haiti - Coast of Arcadins, near Wahoo Beach
(Constructed in partnership among local fishing association, USAID / ASSET, UNDP)
2. Georgia – Off-shore Reef Network;(24 permitted sites, 3 to 55 miles off shore, two square mile sites)
3. NY - Dept of Environmental Conservation;(More than 300 reef sites, mostly made from rock, concrete, steel)
4. Cancun, Mexico – National Marine Park(Utilizes man-made concrete “Reef Balls” for Rehab and Remediation)
![Page 14: Haiti: Artificial Reefs - A solution](https://reader033.vdocument.in/reader033/viewer/2022060116/557dbc4dd8b42a8a4e8b4775/html5/thumbnails/14.jpg)
BUILDING STRONGSM
A diver inspects an artificial reef made of about4,000 concrete blocks at Loch Linnhe, the Isle ofLismore, Scotland. At depths between 30 to 90 feet,it created by the Scottish Association for MarineScience to study man-made structures as habitat.
![Page 15: Haiti: Artificial Reefs - A solution](https://reader033.vdocument.in/reader033/viewer/2022060116/557dbc4dd8b42a8a4e8b4775/html5/thumbnails/15.jpg)
BUILDING STRONGSM
The Way Ahead1. Engage GoH, UN, and Partners;2. Identify funding streams;3. Develop implementation strategy;4. Identify artificial reef site(s);5. Expedite site(s) evaluation and review process;6. Identify debris removal, processing & transport sites;
(i.e. Port au Prince, Leogane, L’Arcahaie);7. Begin program implementation (RFP, contract solicitation, etc.).