    1 Period of report : JULY 2010 - DECEMBER 2010

    2 Name of the Grid Sub-Station :

    3 Name of the Office-in-charge & designation :

    DEPUTY MANAGER

    4 Name of the Circle : T & T CIRCLE, TEZPUR

    5 Information of EHV tranformers :

    Transformer-I Transformer-2 Transformer-3

    1.0 TRANSFO RMER BAY

    1.1.0 Transformer

    MVA Capacity 50 50 50

    Voltage ratio220/132kV 220/132kV 220/132kV

    Tap charger typeON LOAD ON LOAD ON LOAD

    % impendance12.45 ILLIGIBLE 12.76

    MakeCROMOTON-GREAVES CROMOTON-GREAVES CROMOTON-GREAVES

    Sl. No. 24241 T-8265 T-8265/2

    Batch of manufacturing 1980 1990 1991

    Date of commissioning NOT KNOWN NOT KNOWN Aug-10

    ASSAM ELECTRICITY GRID CORPORATION LIMITED

    Sl.

    No.Type of information

    HALF YEARLY STATUS REPORT OF GRID SUB-STATIONS

    1.1.1

    220 KV GRID SUB-STATION SAMAGURI

    ASHUTOSH BHATTACHARJEE

    Particulars of transformers

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    2/45

    Date of commissioning NOT KNOWN NOT KNOWN Aug-10

    Transformer-I Transformer-2 Transf

    3. S-E

    4. T-E

    Voltage of tester : 5KV

    Weather : SUNNYAmbient temperature : 24DEG

    Date of testing :22.11.10

    3. N/A

    4. 400M

    3. N/A

    4. 50M

    3. N/A

    4. 500M

    1.1.4 DES of oil

    1. Top

    2. Bottom

    3. Tap changer

    Voltage of tester :60KV

    Weather : SUNNY

    Ambient temperature : 28DEG

    1. 45KV

    2. 42KV

    3. 45KV

    1. 40KV

    2. 32KV

    3. 40KV

    1. 60KV

    2. 60KV

    3. 60KV

    1.1.5 Water content, Tan delta of oil

    (Yearly once at MRT laboratory or any

    test lab as required)NOT DONE NOT DONE NOT

    1.1.6 Earth resistance :

    1. HV neutral

    2. Lvneutral

    3. tertiary

    1. 1.54

    2. 1.54

    3. 0.9

    1. 2.52

    2. 2.52

    3. 2

    1. 2.2

    2. 2.2

    3. 3.4

    1.1.7 Tan delta of bushing

    (Yearly once by MRT) NOT DONE NOT DONE NOT

    Sl.

    No.Type of information

    Particulars of transfo

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    3/45

    Transformer-I Transformer-2 Transformer-3

    9. Breather

    10. Oil level of conservator

    11. Oil level TC conservator

    12. Oil level of conservator

    9. OK

    10. NOT WORKING

    11. NOT WORKING

    12. ----------------------

    9. OK

    10. NOT WORKING

    11. NOT WORKING

    12. ----------------------

    9. OK

    10. NOT WORKING

    11. NOT WORKING

    12. ----------------------

    1.1.9 Tap changer unit :

    1. RTCC operation healthiness2. No. of tap change operation

    during the period

    3. Master follower scheme

    4. Tap position indicator

    5. Wdg temp indicator

    1. NOT HEALTHY

    2. NIL

    3. NOT WORKING

    4. NOT WORKING

    5. NOT WORKING

    1. NOT HEALTHY

    2. NIL

    3. NOT WORKING

    4. NOT WORKING

    5. NOT WORKING

    1. NOT HEALTHY

    2. NIL

    3. NOT WORKING

    4. NOT WORKING

    5. NOT WORKING

    1.1.10 Loading information :

    1. Peak load

    2. Off peak load

    3. Highest oil temperature4. Corresponding load

    5. Highest widning temperature

    6. Corresponding load

    1. 41MW

    2. 28MW

    3. 72DEG4. 38MW

    5. 77DEG

    6. 42MW

    1. 40MW

    2. 32MW

    3. 70DEG4. 40MW

    5. 75DEG

    6. 40MW

    1. 44MW

    2. 33MW

    3. 66DEG4. 43MW

    5. 70DEG

    6. 42MW

    1.1.10 General status :1. General condition

    2. Abnormal sound, if any

    3. Cooling system

    4. Painting

    5. Leakage

    (Describe why leakage could not be

    attended/View of MRT/manufacturer)

    6. Any other observation

    1. GOOD

    2. NIL

    3. OK

    4. REQUIRED5. MINUTE LEAKAGE

    6. NONE

    1. AVERAGE

    2. NIL

    3. OK

    4. REQUIRED5. VERY MINUTE LEAKAGE

    6. NONE

    1. GOOD

    2. NIL

    3. INSUFFICIENT

    4. NOT REQUIRED5. LEAKAGE IN MANY LOCA

    6. NONE

    Type of information

    Particulars of transformersSl.

    No.

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    4/45

    1.2.0 Breakers

    HV Breaker

    Make ABB ABB CGL

    Type SF6 SF6 SF6

    Sl. No.

    24500251 20000009 22710CDate of commissioning 2005 2005 2010

    Status :1. Healthines

    2. Condition of MB

    3. Spring motor

    4. Gas monitors

    5. Oil level in case of MOCB & change

    of oil during the period

    6. Pneumatic leakage

    7. Frequency of operation of

    comperssor

    8. Space heater

    9. No. of C.B. operation

    10. Operational defect observed, if

    any rectification done

    1. HEALTHY

    2. GOOD

    3. NA

    4. OK

    5. NA

    6. NIL7. LOW

    8. OK

    9. VERY MINIMUM

    10. NONE

    1. HEALTHY

    2. GOOD

    3. NA

    4. OK

    5. NA

    6. NIL7. LOW

    8. OK

    9. VERY MINIMUM

    10. NONE

    1. HEALTHY

    2. GOOD

    3. NA

    4. OK

    5. NA

    6. NIL7. LOW

    8. OK

    9. VERY MINIMUM

    10. NONE

    1.2.2 LV Breaker

    Make ABB ABB ABB

    Type SF6 SF6 SF6

    Sl. No. 17000522 17000511 17000512

    Batch of manufacturing 2005 2005 2005

    Particulars of transformers

    Transformer-I Transformer-2 Transformer-31.2.1

    Sl.

    No.Type of information

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    5/45

    Transformer-I Transformer-2 Transfor

    6. Pneumatic leakage

    7. Frequency of operation of

    comperssor

    8. Space heater

    9. No. of C.B. operation

    10. Operational defect observed, if

    any rectification done

    6. NA

    7. NA

    8. OK

    9. MINIMUM

    10. NONE

    6. NA

    7. NA

    8. OK

    9. MINIMUM

    10. NONE

    6. NA

    7. NA

    8. OK

    9. MINIMUM

    10. NONE

    1.3.0 C&R Panel

    1. Make

    2. Date of commissioning

    3. Cleanliness

    4. Differential Relay

    5. Back up relays (HV)

    6. Back up relays (LV)

    7. Indicating Meters

    9. ABT meters

    10. Annunciation

    11. Indication

    12. Semaphore

    13. Trip healthy circuits

    14. Terminal connections

    15. Periodic testing of relays

    (Periodic testing shall be done with the

    help of MRT once a year)

    1. ENGLISH ELECTRIC CO.

    2. NOT KNOWN

    3. CLEAN

    4. TYPE - 7UT6131

    5. TYPE - CDG61

    6. TYPE - CDG31

    7. ALL NOT WORKING

    9. INSTALLED

    10. NOT WORKING

    11. WORKING

    12. WORKING

    13. NOT WORKING

    14. OK

    15. NOT DONE

    1. ENGLISH ELECTRIC CO.

    2. NOT KNOWN

    3. CLEAN

    4. TYPE - 7UT6131

    5. TYPE - CDG61

    6. TYPE - CDG31

    7. ALL NOT WORKING

    9. INSTALLED

    10. NOT WORKING

    11. WORKING

    12. WORKING

    13. NOT WORKING

    14. OK

    15. NOT DONE

    1. SYSTEM & CONTROL

    2. AUG-2010

    3. CLEAN

    4. TYPE-612

    5. TYPE - CDG 61

    6. TYPE - CDG 31

    7. WORKING

    9. INSTALLED

    10. WORKING

    11. WORKING

    12. WORKING

    13. WORKING

    14. OK

    15.NOT DONE

    1 3 0 Lightning Arrestors

    Sl.

    No.

    Particulars of transform

    Type of information

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    6/45

    1.4.0 CURRENT TRANSFORMERS:

    Transformer-I Transformer-2 Transfor

    1.4.1 HV Current Transformer

    1. Make

    2. General condition

    3. CT ratio available

    4. CT ratio connected

    5. Terminal connection

    6. Condition of MB

    7. Oil level

    8. Earthing

    1. NAGPUR ELECTRICALS

    2. MODERATE

    3. 300-150/1/1

    4. 300/15. OK

    6. NOT GOOD

    7. OK

    8. OK

    1. NAGPUR ELECTRICALS

    2. MODERATE

    3. 300-150/1/1

    4. 300/15. OK

    6. NOT GOOD

    7. OK

    8. OK

    1. CGL

    2. GOOD

    3. 500-250/1/1

    4. 250/15. OK

    6. GOOD

    7. OK

    8. OK

    1.4.2 LV Current Transformer

    1. Make

    2. General condition

    3. CT ratio available

    4. CT ratio connected5. Terminal connection

    6. Condition of MB

    7. Oil level

    8. Earthing

    1. TRANSFORMER ELECTRICALS

    2. OLD

    3. 300-150/1/1

    4. 300/1

    5. GOOD

    6. GOOD

    7. NOT CHECKED

    8. OK

    1. TRANSFORMER ELECTRICALS

    2. OLD

    3. 300-150/1/1

    4. 300/1

    5. GOOD

    6. GOOD

    7. NOT CHECKED

    8. OK

    1. CGL

    2. GOOD

    3. 500-250/1/1

    4. 250/1

    5. OK

    6. GOOD

    7. OK

    8. OK

    1.4.3 Neutral Current Transformer

    1. Make

    2. General condition

    3. CT ratio available

    1. CGL

    2. GOOD

    3. 600-300/1/0.577

    1. CGL

    2. GOOD

    3. 600-300/1/0.578

    1. HIVOLTRANS

    2. GOOD

    3. 500-250/1/0.577

    4. CT ratio connected5. Terminal connection

    6. Condition of MB

    7. Oil level

    8 Earthing

    4. 300/0.5775. GOOD

    6. MODERATE

    7. CANNOT BE CHECKED

    8 OK

    4. 300/0.5775. GOOD

    6. MODERATE

    7. CANNOT BE CHECKED

    8 OK

    4. 300/0.5775. GOOD

    6. MODERATE

    7. CANNOT BE CHECKED

    8 OK

    Sl.

    No.Type of information

    Particulars of transform

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    7/45

    ASSAM ELECTRICITY GRID CORPORATION LIMITED

    HALF YEARLY STATUS REPORT OF GRID SUB-STATIO

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    8/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    9/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    10/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    11/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    12/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    13/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    14/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    15/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    16/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    17/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    18/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    19/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    20/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    21/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    22/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    23/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    24/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    25/45

    2.0 LINE BAY SAMAGURI - SANKARDEV NAGAR SAMAGURI - PAVO

    2.1.0 Line Voltage132kV 132kV

    2.1.1 Peak load of the period (MW)42 43

    Off peak load of the period (MW)30 12

    Aggregate No. of tripping during the period of report 2 3

    2.1.2 Total outage time of line during the period of report6 HOURS 5 HOURS

    2.2.0 Circuit Breaker :

    2.2.1 Make CROMPTON - GREAVES BHEL

    Type SF6 MOCB

    Sl. No. 23701C 306383

    Batch of manufacturing 2007 ILLIGIBLE

    Date of commissioning 2007 NOT KNOW

    Status

    1. Healthiness

    2. Condition of MB

    3. Spring motor

    4. Gas monitors

    5. Oil level in case of MOCB & change of oil during the period

    6. Pneumatic leakage

    7. Frequency of operation of compressor

    8. Space heater9. No. of C.B. operation

    10. Operational defect observed, if any & rectinfication done

    11. Any other information

    1. HEALTHY

    2. GOOD

    3. WORKING

    4. OK

    5. NA

    6. NA

    7. NA

    8. OK9. NOT CHECKED

    10. NONE

    11. NONE

    1. MODERATE

    2. MODERATE

    3. WORKING

    4. NA

    5. OK

    6. NA

    7. NA

    8. OK9. NOT CHECKED

    10. NONE

    11. MECHANICAL PROB

    HALF YEARLY STATUS REPORT OF GRID SUB-STATIONS [132KV FEEDERS]

    Type of information

    Sl.

    No.

    6. INFORMATION OF LINE BAYS:

    Particulars of lines

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    26/45

    2.3.0 C&R Panel

    SAMAGURI - SANKARDEV NAGAR SAMAGU

    2.3.1 MakeENGLISH ELECTRIC CO. ENGLI

    Date of commissioningNOT KNOWN N

    1. Cleanliness

    2. Main Relays (DPR)

    3. Back up relays

    4. Indicating Meters

    5. Energy Meters

    6. ABT meters, if available

    7. Annunciation

    8. Indication

    9. Semaphore

    10. Trip healthy ckts.

    11. Terminal connections

    12. Periodic testing of relays

    (Periodic testing shall be done with

    the help of MRT onece a year)

    1. CLEAN

    2. SIEMENS 7SA522

    3. CDD 21

    4. NOT WORKING

    5. OK

    6. YES

    7. FAULTY

    8. OK

    9. OK

    10. NOT WORKING

    11. OK

    12. NOT DONE

    1. CLEAN

    2. SIEMENS 7SA

    3. CDD 26

    4. NOT WORKI

    5. OK

    6. YES

    7. FAULTY

    8. FAULTY

    9. NOT WORKI

    10. NOT WORKI

    11. OK

    12. NOT DONE

    2.4.0 LA:

    1. Current / last Surge counter

    reading in each phase

    2. Maximum leakage current in

    each phase in mA

    3. Any missing LA

    1. NOT KNOWN

    2. NOT KNOWN

    3. NONE

    1. NOT KNOWN

    2. NOT KNOWN

    3. NONE

    2.5.0 Current Transformers :

    1. Make

    2 General condition

    1. NAGPUR TRANSFORMER CO.

    2 OLD

    1. BHEL

    2 OLD

    Sl.

    No.Type of information

    Particulars of lines

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    27/45

    SAMAGURI - SANKARDEV NAGAR SAMAGUR

    2.6.0 Communcation equipment :

    2.6.1 WAVE TRAP :1. Condition of wave trap

    2. Date of commissioning

    1. GOOD

    2. 2008

    1. OLD

    2. NOT KNOWN

    2.6.2 CVTs :

    1. Make

    2. Date of commissioning

    3. Status

    4. No. of CVTs

    5. Condition of coupling device

    6. Condition of coaxial cable

    7. Connection of VT for line hot

    condition

    1. AREVA

    2. 2008

    3. ON LINE4. TWO

    5. GOOD

    6. OK

    7. ABSENT

    1. HINDUSTAN B

    2. NOT KNOWN

    3. ON LINE4. TWO

    5. ABSENT

    6. ABSENT

    7. ABSENT

    2.6.3 Coupling capacitors :

    1. Make

    2. Date of commissioning NOT AVAILABLE NOT

    2.6.4 COMMUNICATION PANELS :

    1. Make & type

    2. Date of communication

    3. Panel status

    4. Panel alarm status

    5. General condition as regard toA) Speech quality

    B) Availability

    PLCC PANEL IS NOT IDENTIFIED/ ABSENT PLCC PANEL IS N

    Sl.

    No.Type of information

    Particulars of lines

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    28/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    29/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    30/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    31/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    32/45

    2.4.0 LA:1. Current / last Surge counter

    reading in each phase

    2. Maximum leakage current in

    each phase in mA

    3. Any missing LA

    1. NOT KNOWN 2.

    NOT KNOWN

    3. NONE

    1. NOT KNOWN 2.

    NOT KNOWN

    3. NONE

    1. NOT KNOWN 2.

    NOT KNOWN

    3. NONE

    1.

    NOT

    3.

    2.5.0 Current Transformers :

    1. Make

    2. General condition3. CT ratio available

    4. CT ratio connected

    5. Terminal connection

    6. Condition of MB

    7. Oil level

    8. Earthing

    1. LAMCO

    2. GOOD3. 400-200/5/5

    4. 400/5

    5. OK

    6. POOR

    7. OK

    8. OK

    1. AUTOMATIC ELECTRIC

    2. NOT GOOD3. 400-200/5/5

    4. 200/5

    5. POOR

    6. POOR

    7. OK

    8. OK

    1. AUTOMATIC ELECTRIC

    2. GOOD3. 400-200/5/5

    4. 400/5

    5. OK

    6. OK

    7. OK

    8. OK

    1. A

    2. G3. 2

    4. 2

    5. O

    6. O

    7. O

    8. O

    Signature of Officer Reporting with Seal

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    33/45

    7. COMMON EQUPIMENT STATUS

    (a) DC SYSTEM :

    3.0 SUB STATION BATTERY BANK

    & CHARGERS

    3.1.0 110/220 V Charger

    1. Make AMARA-RAJA CALDYNE

    2. Year of commissioning 2007 2009

    3. Condition of boost charger GOOD GOOD

    4. Condition of float charger GOOD GOOD

    3.1.1 110/220 V DCDB

    1. Make DCDB NOT AVAILABLE JYOTI LIMITED

    2. Year of commissioning NA 1986

    3. Condition of DB NA POOR

    3.1.2 110/220 V BATTERY BANK1. Make AMARA-RAJA EXIDE

    2. Year of commissioning 2007 2009

    3. Ampere hour capacity 100 300

    4. Float charging current 2.5 Amps 4.5 Amps

    5. Bank voltage 110 V 220 V

    6. Any defective cell NONE NONE

    7. No of cells in circuit 54 110

    8. Condition of battery bank GOOD GOOD

    3.1.3

    COMMUNCATION BATTERY

    BANK & CHARGERSBANK - I BANK - II

    3.1.4 48 V Charger & DB

    1 Make AMARA-RAJA AMARA-RAJA

    Particulars of DC system

    Bank - 1 [110V] Bank - 2 [220V]

    Sl. No. Type of information

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    34/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    35/45

    (b) AC SYSTEM

    Bus-1 Bus-2

    4.0 SUB STATION AUX TRANSFORMER

    4.1.0

    1. Make HINDUSTAN ELECTRIC CO. NOT AVAILABLE

    2. Year of commissioning 1965 NOT AVAILABLE

    3. KVA rating 315 NOT AVAILABLE

    4. Condition of transformer VERY OLD NOT AVAILABLE

    5. Condition of transformer protection POOR NOT AVAILABLE

    6. Transformer earthing OK NOT AVAILABLE

    4.1.2 AC distribution board NOT AVAILABLE

    1. Make ILLIGIBLE NOT AVAILABLE

    2. Age of AC distribution board 35 YEARS NOT AVAILABLE

    3. General condition POOR NOT AVAILABLE

    4. Adequacy of feeders INFERIOR NOT AVAILABLE

    5. Healthiness of protection POOR NOT AVAILABLE

    (c) SUB STATION BUS PTS :

    Bus-1 Bus-2

    4.0 BUS PT

    4.1.0 VOLTAGE : 220 KV1. Make

    2. Date of commissioning

    3. General condition

    4. Terminal connection

    5. Condition of MB

    6. Oil level

    7. Earthing

    1. BHEL

    2. 1993

    3. OK

    4. OK

    5. OK

    6. OK

    7. OK

    1. CGL

    2. 2006

    3. OK

    4. OK

    5. OK

    6. OK

    7. OK

    4.1.0 VOLTAGE : 132 KV

    Type of informationParticulars of AC system

    Sl. No. Type of informationParticulars of bus system

    Sl. No.

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    36/45

    4.1.0 VOLTAGE : 33 KV

    Bus-1 Bus-24.1.1

    1. Make

    2. Date of commissioning

    3. General condition

    4. Terminal connection

    5. Condition of MB

    6. Oil level

    7. Earthing

    1. TARIT APPLIANCES

    2. 1969

    3. VERY OLD

    4. OK

    5. POOR

    6. OK

    7. OK

    1. HIGHVOLTRANS

    2. 2006

    3. GOOD

    4. OK

    5. GOOD

    6. OK

    7. OK

    (d) Remote Terminal Unit (RTU) :

    RTU-1 RTU-2

    5.0 RTU :

    5.1.0 1. Make

    2. Date of commissioning

    3. Alarm status, if any

    4. General condition

    1. ALSTOM

    2. NOT KNOWN

    3. NONE

    4. NOT KNOWN

    1. AREVA

    2. NOT KNOWN

    3. NONE

    4. NOT KNOWN

    Sl. No. Type of informationParticulars of bus system

    Remarks

    Sl. No. Type of informationParticulars of RTU System

    Remarks

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    37/45

    8. GENERAL CONDITION OF CONTROL ROOM, SWITCHYARD & MAN POWER :

    Sl. No. Type of information

    6.0 GENERAL STATUS

    6.1.1 Control room :

    6.1.2 1. General condition

    2. Cleanliness

    3. Painting

    4. Furniture5. Illumination status

    6. Water supply

    7. Emergency lighting

    6.2.1 Switchyard

    6.2.2

    1. General condition

    2. Illumination status

    3. Condition of structures

    4. Weed removal activity & status

    5. Switchyard pebbling condition

    6. Wall/fencing

    7. Security booth

    6.3.3 Man power strength1. Shift staff :

    a) Adequacy

    2. Maintenance staff :

    a) Adequacy3. Security staff :

    a) Adequacy

    b) Arrangement

    a) INADEQUATE

    b) HOMEGUARDS FOR SWITCH YARD's INNER SECURITY AND ASEB's SEC

    SWITCH YARD MAIN GATE.

    1. GOOD.

    2. SATISFATORY.

    3. PAINTING IS URGENTLY REQUIRED FOR ENHANCING THE OVERALL LOO

    4. VERY OLD AND UGLY LOOKING5. ILLUMINATION IS INADEQUATE, NEEDS URGENT INTERVENTION.

    6. OK

    7. INSUFFICIENT. ONLY ONE DC BULB IS AVAILABLE DURING EMERGENCY.

    1. GOOD

    2. VERY MUCH INADEQUATE. HIGH MASTS ARE NEEDED FOR BETTER COVE

    3. OK. BUT DO REQUIRE INTERMITTENT PAINTING JOBS FOR BEAUTIFICATI

    4. WEEDICIDE IS SPRAYED ON REGULAR BASIS, RESULT OBTAINED SATISFA

    5. VERY MUCH POOR. NEED RE-PEBBLING OF MANY AREAS THROUGHOUT

    6. THE PRESENT FENCING CONDITION IS NOT SATISFACTORY. MANY THORTHERE AROUND THE FENCING.

    7. ONLY A SINGLE SECURITY BOOTH IS AVAILABLE AT THE ENTRANCE OF TH

    SECURITY BOOTH IS AVAILABLE AT THE MAIN ENTRANCE OF THE COLONY.

    EXTREME INSECURED CONDITION OF THE COLONY INHABITANTS.

    1. a) ADEQUATE

    2. a) INADEQUATE

    Remarks

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    38/45

    Page 18

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    39/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    40/45

    2.0 LINE BAY

    2.1.0 Line Voltage 220KV 220KV 220

    2.1.1 Peak load of the period (MW) 150 150 10

    Off peak load of the period (MW)

    Aggregate No. of tripping during the period of report 6 4 4

    2.1.2 Total outage time of line during the period of report6 HOURS 1 HOUR 15 HO

    2.2.0 Circuit Breaker :2.2.1 Make ABB CGL BH

    Type SF6 SF6 MO

    Sl. No. 24500252 4910 C 308

    Batch of manufacturing 2005 1991 ILLIG

    Date of commissioning 2005 NOT KNOWN NOT K

    Status

    1. Healthiness2. Condition of MB

    3. Spring motor

    4. Gas monitors

    5. Oil level in case of MOCB & change of oil during the period

    6. Pneumatic leakage

    7. Frequency of operation of compressor

    8. Space heater

    9. No. of C.B. operation

    10. Operational defect observed, if any & rectinfication done

    11. Any other information

    1. HEALTHY2. GOOD

    3. NA

    4. OK

    5. NA

    6. YES

    7. LESS

    8. OK

    9. NOT KNOWN

    10. PROBLEM IN R-PHASE VENTILE

    11. NONE

    1. HEALTHY2. GOOD

    3. NA

    4. OK

    5. NA

    6. YES

    7. FREQUENT

    8. OK

    9. NOT KNOWN

    10. LEAKAGE IN Y-POLE AIR

    RESERVOIR

    11. NONE

    1. HEALTHY2. GOOD

    3. NOT WORKI

    4. NA

    5. OK

    6. NA

    7. NA

    8. OK

    9. NOT KNOWN

    10. NONE

    11. NONE

    HALF YEARLY STATUS REPORT OF GRID SUB-STATIONS [220KV FEEDERS]

    Particulars of lines6. INFORMATION OF LINE BAYS:

    Sl.

    No.Type of information

    SARUSAJAI - I SARUSAJAI-II MAR

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    41/45

    2.3.0 C&R Panel

    SARUSAJAI - I SARUSAJAI-II MA

    2.3.1 Make ENGLISH ELECTRIC CO. ENGLISH ELECTRIC CO. ENGLISH

    Date of commissioning NOT KNOWN NOT KNOWN NOT

    1. Cleanliness

    2. Main Relays (DPR)

    3. Back up relays

    4. Indicating Meters

    5. Energy Meters

    6. ABT meters, if available7. Annunciation

    8. Indication

    9. Semaphore

    10. Trip healthy ckts.

    11. Terminal connections

    12. Periodic testing of relays

    (Periodic testing shall be done with

    the help of MRT onece a year)

    1. CLEAN

    2. SIEMENS 7SA522

    3. CDD 21

    4. ALL NOT OK

    5. OK

    6. YES7. FAULTY

    8. OK

    9. OK

    10. FAULTY

    11. OK

    12. NOT DONE

    1. CLEAN

    2. SIEMENS 7SA522

    3. CDD 21

    4. ALL NOT OK

    5. OK

    6. YES7. FAULTY

    8. OK

    9. OK

    10. FAULTY

    11. OK

    12. NOT DONE

    1. CLEAN

    2. SIEMENS 7

    3. CDD 21

    4. ALL NOT O

    5. OK

    6. YES7. FAULTY

    8. OK

    9. OK

    10. FAULTY

    11. OK

    12. NOT DON

    2.4.0 LA:1. Current / last Surge counter

    reading in each phase

    2. Maximum leakage current in

    each phase in mA

    3. Any missing LA

    1. NOT KNOWN

    2. NOT KNOWN

    3. NONE

    1. NOT KNOWN

    2. NOT KNOWN

    3. NONE

    1. NOT KNOW

    2. NOT KNOW

    3. NONE

    2.5.0 Current Transformers :

    1. Make

    2. General condition

    3. CT ratio available

    4. CT ratio connected

    5. Terminal connection

    6. Condition of MB

    7. Oil level

    1. NAGPUR TRANSFORMERS

    2. OLD

    3. 800-400-200/1/1/1

    4. 800/1

    5. OK

    6. POOR

    7. LEAKAGE IS THERE IN Y-PHASE

    1. HIVOLTRANS

    2. OK

    3. 800-400-200/1/1/1

    4. 800/1

    5. OK

    6. OK

    7. OK

    1. NAGPUR T

    2. VERY OLD

    3. 800-400-2

    4. 800/1

    5. OK

    6. POOR

    7. LEAKAGE

    Particulars of linesSl.

    No.Type of information

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    42/45

    SARUSAJAI-I SARUSAJAI-II MOR

    2.6.0 Communcation equipment :

    2.6.1 WAVE TRAP :

    1. Condition of wave trap

    2. Date of commissioning

    1. OK

    2. 2008

    1. OK

    2. 2008

    1. OK

    2. 2008

    2.6.2 CVTs :

    1. Make

    2. Date of commissioning3. Status

    4. No. of CVTs

    5. Condition of coupling device

    6. Condition of coaxial cable

    7. Connection of VT for line hot

    condition

    1. AREVA

    2. 20083. ONLINE

    4. TWO

    5. OK

    6. OK

    7. NOT DONE

    1. AREVA

    2. 20083. ONLINE

    4. TWO

    5. OK

    6. OK

    7. NOT DONE

    1. AREVA

    2. 20083. ONLINE

    4. TWO

    5. OK

    6. OK

    7. NOT DONE

    2.6.3 Coupling capacitors :

    1. Make

    2. Date of commissioningNOT APPLICABLE NOT APPLICABLE NOT APPLICABL

    2.6.4 COMMUNICATION PANELS :

    1. Make & type

    2. Date of communication

    3. Panel status

    4. Panel alarm status

    5. General condition as regard to

    A) Speech quality

    B) Availability

    1. AREVA

    2. 2008

    3. WORKING

    4. NOT KNOWN

    5. A) OK

    B) OK

    1. AREVA

    2. 2008

    3. WORKING

    4. NOT KNOWN

    5. A) OK

    B) OK

    1. AREVA

    2. 2008

    3. WORKING

    4. NOT KNOW

    5. A) OK

    B) OK

    Particulars of linesSl.

    No.Type of information

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    43/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    44/45

  • 7/29/2019 Half Yearly Status Report of Grid Sub-station

    45/45