halrb/design review committee report...p:\dwg-temp\temp-2\2900 facade\transmit\2900 columbia...
TRANSCRIPT
-
P:\dwg-temp\temp-2\2900 FACADE\TRANSMIT\2900 Columbia Pike.DARCEYLLC.docx
HALRB/Design Review Committee Report Meeting Date: September 3, 2014 For DRC (circle those present): Robert Dudka, Charles Craig, Charles Matta, Andrew Wenchel,
Tova Solo, Erin May, Joan Lawrence For Arlington County (circle those present): Cynthia Liccese-Torres, Rebeccah Ballo, John Liebertz
Case # 14-22 Agenda Item #4
Application Complete Application Incomplete
Applicant(s): Darcey, LLC For Applicant(s): (See attached application for applicant, address, name of property and property description, drawings, photographs, and proposed scope of work.) Design Recommendations: ARCHITECTS RESPONSE IN RED
1. Correct side elevation (incorrectly drawn) and update other photo simulations and drawings. RESPONSE: Refer to construction document A3.1 attached
2. Retain/repair roof tiles; consider looking for salvaged tiles. RESPONSE: Refer to elevation note (EN:3) on A2.0 & A2.1 which addresses the roof tile
3. New window on front elevation – moved header up to match adjacent window height. RESPONSE: Refer to note and elevation change on A3.1
4. New single-leaf door on the side elevation – add transom to match height of the adjacent windows to the south.
RESPONSE: Refer to note and elevation change on A3.1. However, aligning the transom as
requested would look awkward and is unnecessary (unless we went with a 8'-6"h door). Refer to
existing front elevation door to window height relationships. We would prefer to go with what is
indicated on 1/A3.1
5. New front door should be of similar design to the existing, but may include glass. RESPONSE: Door TBD and it's specification will be submitted at a later date for approval. The
new door and door surround's appropriateness will be taken into consideration
6. Choose more appropriate lighting to the Spanish Revival style of the building RESPONSE: Exterior lights TBD and their specification/s will be submitted at a later date for
approval. The new light fixture's appropriateness will be taken into consideration
7. Consider repair of the existing metal windows; please include specification for proposed windows showing design, material, profile, etc.
RESPONSE: Will provide for approval
8. For canopies, show drawing with and without (DRC likely will prefer it without canopies as the arched windows are a character defining element of the building)
RESPONSE: No canopies per A3.1 are called for
9. Include specification sheets and details for all proposed materials. 10. RESPONSE: Will provide at a later date for approval
11. Study signage. RESPONSE: Will provide at a later date for approval
Findings:
-
P:\dwg-temp\temp-2\2900 FACADE\TRANSMIT\2900 Columbia Pike.DARCEYLLC.docx
Return to next DRC meeting X Send to HALRB on Discussion Agenda
COMMENTS BY SCOTT GREENBERG (project manager) for GORDON & GREENBERG ARCHITECTS 9/4/14
-
2EN1EN
1EN
1EN
1EN
3EN
3EN 3EN
3EN
3EN
4EN
4EN4EN
5EN
6EN 6EN 6EN
6EN 6EN
6EN
7EN
8EN
9EN
9EN
9EN
11EN
12EN
12EN
12EN
12EN
#EN
-
ADDITIONAL ELEVATION PHOTOS
DESCRIPTIVE NOTES OF THE
EXISTING CONDITION BUILDING
EXTERIOR
FRONT FACADE
REAR FACADE
SIDE FACADE
-
#EN
2900 Columbia Pike.DARCEYLLCA2.1-Layout1A2.2-Layout1A3.0-Layout1A3.1-Layout1