FRANÇAIS AU VERSO 2020/07/09 DIV3016A HAND SPLIT SHAKE SUMMARY INSTALLATION GUIDE Shake See www.tandobp.com for the complete installation guide. CAUTION: ALWAYS INSTALL PRODUCT FROM LEFT TO RIGHT AND REMEMBER THAT POLYMER UNDERGOES EXPANSION/CONTRACTION DUE TO TEMPERATURE VARIATIONS. FOR A BETTER LOOK WE RECOMMAND TO INSTALL PRODUCT ON FLAT SURFACES (EX: PLYWOOD PANELS OR OSB PANELS). IF SECTIONS ARE INSTALLED ON A WALL WITH FURRINGS, FURRING STRIPS MUST BE INSTALLED OBLIQUELY AND SPACED BY 8”(20,32CM). When using TandoShake TM corners. When used with J-channel or outside corner. 1/16” (0,16cm) Outside corner or J-channel 1/4” (0,64cm) 2 For full length section. Maximum 8’’(20,32cm) between each nails. x 6 3 For each nail. Fasten each section at its center. When installing a cut section, nail in its center as shown. When installing a full section, nail in the center hole first. 1/16’’ (0,16cm) Minimum Minimum 7/16’’ 7/16’’ (1,11cm) (1,11cm) Minimum Minimum 1 1/2’’ 1 1/2’’ (3,81cm) (3,81cm) 4 6 Alternate the joints between rows. 7 If you need to attach the section in an area other than the installation hole, create a 1”(2,54 cm) long slot to allow nailling. Always nail in the middle of the slot. 1’’ (2,54cm) Center 1 2 3/8” (6,03cm) 1/2” (1,27cm) 8’’ MAX. (20,32cm) Floor Wall 1/2” (1,27cm) 1 2 3 3 1/2” (8,89cm) 5 Install sections and space equally according to the outside temperature when installing and the temperature chart below. Over 90°F(32°C) : 3/8”(0,95cm) Between 90°F(32°C) and 60°F(15°C) : 1/2”(1,27cm) Below 60°F(15°C) : 5/8”(1,59cm) 8 CORNER INSTALLATION First TandoShake TM corner. Next TandoShake TM corners. 1 2 3 4 3/8’’ (0,95cm) 1/4’’ (0,64cm)

Upload: others

Post on 31-Jan-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

  • FR

    AN

    ÇA

    IS

    AU

    VE

    RS

    O

    2020/07/09 DIV3016A

    HAND SPLIT SHAKESUMMARY INSTALLATION GUIDE Shake

    See www.tandobp.com for the complete installation guide.

    CAUTION: ALWAYS INSTALL PRODUCT FROM LEFT TO RIGHT AND REMEMBER THAT POLYMER UNDERGOES EXPANSION/CONTRACTION DUE TO TEMPERATURE VARIATIONS. FOR A BETTER LOOK WE RECOMMAND TO INSTALL PRODUCT ON FLAT SURFACES (EX: PLYWOOD PANELS OR OSB PANELS). IF SECTIONS ARE INSTALLED ON A WALL WITH FURRINGS, FURRING STRIPS MUST BE INSTALLED OBLIQUELY AND SPACED BY 8”(20,32CM).

    When using TandoShakeTM corners. When used with J-channel or outside corner.

    1/16”(0,16cm)

    Outside corneror J-channel

    1/4”(0,64cm)

    2

    For full length section.

    Maximum 8’’(20,32cm) between each nails.

    x 6

    3

    For each nail.Fasten each section at its center.

    When installing a cut section, nail in its center as shown.

    When installing a full section, nail in the center hole first.

    1/16’’(0,16cm) Minimum Minimum

    7/16’’7/16’’(1,11cm)(1,11cm)

    Minimum Minimum 1 1/2’’1 1/2’’

    (3,81cm)(3,81cm)

    4

    6

    Alternate the joints between rows.

    7

    If you need to attach the section in an area other than the installation hole, create a 1”(2,54 cm) long slot to allow nailling. Always nail in the middle of the slot.

    1’’(2,54cm)

    Center

    12 3/8”

    (6,03cm)

    1/2”(1,27cm)

    8’’ MAX.(20,32cm)

    Floor

    Wall

    1/2”(1,27cm)

    1 2 33 1/2”(8,89cm)5 Install sections and space equally according to the outside temperature when installing and the temperature chart below.

    Over 90°F(32°C) : 3/8”(0,95cm)Between 90°F(32°C) and 60°F(15°C) : 1/2”(1,27cm)

    Below 60°F(15°C) : 5/8”(1,59cm)

    8 CORNER INSTALLATION

    First TandoShakeTM corner. Next TandoShakeTM corners.

    1 2 3 4

    3/8’’(0,95cm)

    1/4’’(0,64cm)