PUB Corenet Form Changes
Table of Contents
Summary of Corenet Form Changes ................................................................................................ 1 – 5
Forms with Changes ............................................................................................................................ 1
Forms with No Changes ...................................................................................................................... 5
Corenet Forms with Changes ......................................................................................................... 7 – 37
1 Development Control (DC) Clearance Forms ................................................................................... 7
1.1 Guide for Development Control (DC) Clearance Forms ....................................................... 7
1.2 Select Fields – DC Clearance Forms ................................................................................... 11
2 Detailed Plan (DP) Form ................................................................................................................. 22
2.1 Guide for Detailed Plan (DP) Form ..................................................................................... 22
2.2 Select Fields – DP Form ...................................................................................................... 24
3 Completion of Work Form ............................................................................................................. 27
3.1 Guide for Completion of Work Form ................................................................................. 27
3.2 Select Fields – Completion of Work Form.......................................................................... 29
4 Temporary Occupation Permit (TOP) Forms .................................................................................. 30
4.1 Guide for Temporary Occupation Permit (TOP) Forms ..................................................... 30
4.2 Select Fields – TOP Forms .................................................................................................. 32
5 Certificate of Statutory Completion (CSC) Forms .......................................................................... 33
5.1 Guide for Certificate of Statutory Completion (CSC) Forms .............................................. 33
5.2 Select Fields – CSC Forms ................................................................................................... 34
6 Water Submission Forms ............................................................................................................... 35
6.1 Guide for Water Submission Forms ................................................................................... 35
6.2 Select Fields – Water Submission Forms ........................................................................... 36
Appendix ............................................................................................................................... 38 – 149
1
Summary of Corenet Form Changes
Forms with Changes
File Number Form Name Changes
ENV-CBPU-DCCLR-NEW SUBMISSION Application for Development Control
(DC) Clearance - New Submission
Includes fields to classify minor and major projects;
For minor projects, fields will be included to allow DC and DP to be submitted at
the same time.
PUB (C&W) Checklist will be a section of the DC form
(No need for separate checklist to be submitted)
ENV-CBPU-DCCLR-
RESUBMISSION/AMENDMENT/REVISION
Application for Development Control
(DC) Clearance –
Resubmission/Amendment/Revision
PUB-DD-CHECKLIST Checklist for Drainage DC Plans
PUB-BPU-CLRDP01 Application for Clearance Certificate
for Detailed Plan on Drainage and
Sewerage (Sanitary/Sewer) Works
[Under Section 33(1) of the
Sewerage and Drainage Act (SDA),
Chapter 294]
Drainage DP, Sewerage DP, Sewerage Form A, Sewerage Form D and Sewerage
RC Trench combined into 1 form. Previously known as PUB-DD-CLRDPDRA01 &
PUB-SEW-CLRDPSEW01.
• For Form A & Form D, please fill Section A1: Sanitary Work
• For RC Trench, please fill Section A2: Sewerage Work, RC Trench
PUB-BPU-COMPOFWORK Certificate of Completion and
Inspection of Sanitary, Sewerage and
Drainage Works
[Under Section 35(1)(e) and (f) of
the Sewerage and Drainage Act
(Chapter 294)]
All completion of work forms for Sewerage, Sanitary, M&E and Drainage to
merge into one form. Previously known as Form C, Form C1, Annex A, Annex C
and Annex D.
• For Form C, please fill the COMPOFWORK form
• For Annex A, Annex C and Form C1, please fill in Section A2: Sanitary
Work
• For Annex D, please fill in Section A1: Sewerage Work
2
File Number Form Name Changes
PUB-BPU-COMPOFWORK Certificate of Completion and
Inspection of Sanitary, Sewerage and
Drainage Works
[Under Section 35(1)(e) and (f) of
the Sewerage and Drainage Act
(Chapter 294)]
It is known that these different forms are submitted by different QPs at different
stages of the development of the project. Hence built into the form is the
feature which allows one particular section of the form to be submitted. (For
example, if only the civil PE is ready to make his submissions, he can proceed to
do so using the form). If more than one QP/PE is ready to make theirs, more
sections of the form may be submitted at the same time by selecting the
relevant sections.
ENV-CBPU-CLRTOP01-NEW SUBMISSION Application for Clearance of
Temporary Occupation Permit (TOP)
- New Submission
New declarations added for developer/owner to endorse with regards to:
• maximum allowable peak surface runoff stipulated in the COP and
constructed according to approved plans
• SOP of the maintenance, operation and monitoring of the detention
tank system
• Inspection of crest levels being constructed to approved plans
annually/every 3 years upon obtaining the TOP
• Submission of the following documents as required annually upon
obtaining the TOP
New attachments added:
• “As – built drawings for detention tank systems”
• “SOP for pumped drainage system”
• “SOP for flood barrier”
ENV-CBPU-CLRTOP01-RESUBMISSION Application for Clearance of
Temporary Occupation Permit (TOP)
- Resubmission
ENV-CBPU-CLRCSC01-NEW SUBMISSION Application for Compliance
Certificate - New Submission
[Under Section 33(7) of the
Environmental Protection and
Management Act (Chapter 94A) and
Compliance Certificate under
Section 33(8) of the Sewerage and
Drainage Act (Chapter 294)]
Attachments section modified to comply with revised Code of Practice on
Surface Water Drainage.
3
File Number Form Name Changes
ENV-CBPU-CLRCSC01-RESUBMISSION Application for Compliance
Certificate – Resubmission
[Under Section 33(7) of the
Environmental Protection and
Management Act (Chapter 94A) and
Compliance Certificate under
Section 33(8) of the Sewerage and
Drainage Act (Chapter 294)]
Attachments section modified to comply with revised Code of Practice on
Surface Water Drainage.
PUBWTR-0-PPC01 Pre-Planning Consultation Modified fields to indicate water demand for Potable and NEWater.
PUBWTR-0-WLP01 Notification of Water Service Work
by Licensed Water Service Plumber
Modified fields to indicate water demand for Potable and NEWater.
PUBWTR-0-WSW01 Notification of Water Service Work
by Professional Engineer
Modified fields to indicate water demand for Potable and NEWater.
PUBWTR-0-CSC01 Certificate of Satisfactory
Completion of Water Service Work
by Professional Engineer
Added new section - “Particulars of the Licensed Water Service Plumber”
PUBWTR-0-MCG01 Form for Manufacturing Category Include fields to indicate water demand for Potable and NEWater.
PUBWTR-0-NMC01 Form for Non-Manufacturing
Category
PUBWTR-0-RCG01 Form for Residential Category
PUBWTR-0-TSP01 Form for Temporary Category
PUB-SEW-FORM_A Notice to Commencement of
Sanitary/Sewerage Works
Not in Use from 28 Feb 2014
4
File Number Form Name Changes
PUB-SEW-FORM_C1 Certificate of Completion and
Inspection for the Mechanical and
Electrical Works for Sewerage
Installation
Not in Use from 28 Feb 2014
PUB-SEW-FORM_D Supplementary Information to the
Application for Clearance Certificate
for Detailed Plan on Sewerage
(M&E) Works
Not in Use from 28 Feb 2014
PUB-SEW-FORM_D1 Details of Standby Generator &
Automatic Transfer Switch
Not in Use from 28 Feb 2014
PUB-SEW-FORM_D2 Omission of Standby Generator/
Alternate Power Supply Owner's
Undertaking Form
Not in Use from 28 Feb 2014
PUB-SEW-FORM_DP Application for Clearance Certificate
for Detailed Plans on Sewerage
(M&E Works)
Not in Use from 28 Feb 2014
PUB-SEW-ANNEX_A Declaration By Qualified Person on
Chargeable Sanitary Appliances
Installed
Not in Use from 28 Feb 2014
PUB-SEW-ANNEX_C
Plumbers/Contractor's Confirmation
of Completion of Sanitary/Sewerage
Works
Not in Use from 28 Feb 2014
PUB-SEW-ANNEX_D Hydrostatic (Water) Tests for
Sanitary Drainlines & Sewers
(<600mm DIA) and CCTV Inspection
Survey (>600mm DIA Sewers)
[Annex D to Form C/QP]
Not in Use from 28 Feb 2014
5
PUB-SEW-RC TRENCH Certificate of Completion for RC
Trench
Not in Use from 28 Feb 2014
PUBWTR-0-WSP01 Application for License As a Water
Service Plumber
Not in Use from 28 Feb 2014
PUBWTR-0-WSR01 Application for Renewal of Water
Service Plumber Licence
Not in Use from 28 Feb 2014
PUBWTR-0-PWS01 Application for Potable Water
Supply
Not in Use from 28 Feb 2014
6
Forms with No Changes
File Number Form Name
PUB-SEW-CLR-OVER-SEW Application for Approval of Works Affecting Public Sewerage System
PUB-SEW-FORM DLP End of Defects Liability Period Inspection for Public Sewers
PUB-SEW-FORM_B Application for Work in Public Sewerage System
PUB-SEW-FORM_B1 Notice for Carrying out Sewer Connection Work
PUBWTR-0-WSW02 Certification of Satisfactory Completion of Water Service Work by Licensed Water Service Plumber
PUB-DD-CSIDRA Certificate of Inspection for Drainage Works
PUB-DD-PCWVDRA Pre-consultation /Waiver Application Form on Drainage Matters
PUB-SEW-PCWVSEW Pre-consultation /Waiver Application Form on Sewerage Matters
6
Corenet Forms with Changes
7
1.1 Guide for Development Control (DC) Clearance Forms
ENV-CBPU-DCCLR-NEW SUBMISSION
Application for Development Control (DC) Clearance – New Submission
a) The DC clearance form is updated to support the work flow process. As part of an effort to
improve our service to the industry, PUB has introduced the classification of projects into
major and minor. This allows processing through separate tracks so that minor projects can be
processed more quickly.
b) A development is considered a minor project if it meets all of the following criteria:
• The development area is less than 0.2 Ha
• The development is 3 storeys or less
• No linkage to MRT
• No Basements (no pumping system)
• No Drainage Reserve affected
• Single Residential, shophouse or simple infrastructure projects that does not generate
used water or Change of Use (e.g. conversion of void deck to Child Care Centre)
• Has used water discharge flow rate of less than 2 litres per second
c) All other projects are classified as major projects.
d) For minor projects, QPs may submit both the DC plan and Detailed Plan (DP) at the same time,
allowing for shorter processing time. Previously, QPs need to obtain DC clearance before DP
can be submitted.
e) On the second page of the forms, there is a section called Development Details. This section
must be filled to allow the sorting of the project – into major or minor – to take place.
Accurate information is necessary to facilitate processing of the submissions.
Please refer to Section 1.2 for more information on the “Select” fields and how they can affect
your submissions.
8
f) For projects sorted as minor, QP will be directed to the next section – “SUBMISSION FOR
DEVELOPMENTAL CONTROL (DC) CLEARANCE WITH DETAIL PLAN”.
g) For projects sorted as major, QP will be directed to the next section – “SUBMISSION FOR
DEVELOPMENTAL CONTROL (DC) PLAN”.
h) There are sections in the form that must be selected and filled only when the project involves
the respective sections. For example, if the project involves:
(i) sanitary/sewerage work, Section A needs to be selected and filled by QP
(ii) sanitary/sewerage AND drainage work, Section A and Section B need to be selected and
filled by QP
i) The selection of the section can be done by marking the checkbox.
Please select name of owner or QP
Please select name of QP/PE
submitting
Please select name of owner or QP
9
j) If the box is unchecked, the whole section will be greyed out and the QP will not be able to fill
that particular section.
k) Compulsory fields within these sections must be duly filled only when the section is selected
for submission. The sections are listed as follows:
Submission for Development Control (DC) Clearance Plan (for MAJOR projects only)
Section A – Sanitary/ Sewerage Work
Section B – Drainage Work
Submission for Development Control (DC) Clearance with Detail Plan (for MINOR projects only)
Section A1 – Sanitary, M&E Work (Used Water)
Section A2 – Sewerage Work, RC Trench
Section B – Drainage Work
Section C – Infrastructure or other works affecting Sewer & Drainage (e.g. covered link way,
bus stop)
l) To make attachments and declarations, QPs can similarly mark the provided checkboxes.
m) The Catchment & Waterways department’s Checklist for DC plans is now part of the DC
clearance forms. Please fill up the fields in the checklist if the project involves drainage works.
QPs need not submit a separate signed copy of the checklist for DC submission.
(i) Development site with area less than 0.2 hectares will be directed to the checklist
below.
10
(ii) Development site with area greater than or equal to 0.2 hectares will be directed to the
checklist below.
n) There are a number of “Select” fields that can be found throughout the forms. These fields,
when clicked, will show a drop-down menu with options for the QP to choose accordingly.
Please refer to Section 1.2 for more information on the “Select” fields and how they can affect
your submissions.
o) Compulsory fields are highlighted in yellow, as shown in Appendix 1. These must be filled to
enable successful submission of the forms in Corenet.
ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION
Application for Development Control (DC) Clearance –
Resubmission/Amendment/Revision
p) Please refer to Appendix 2 for the ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION
form.
11
1.2 Select Fields – DC Clearance Forms
Field Detail
This field can be found on Page 41
This field can be found on Page 42
This field can be found on Page 42
Industrial
Factories, warehouses, power plants, industrial parks
Non Industrial
Residential, commercial and institutional developments
Please select one of the three options:
New Erection
Reconstruction
A&A (Addition and Alteration)
Please select the most appropriate type of development for
your project.
12
Field Detail
This field can be found on Page 42
This field can be found on Page 42
Please choose the catchment where your project is located.
For projects that take place in more than one catchment, please
select one catchment.
Used Water Catchment No.
The used water catchments in Singapore are divided into 6 regions:
1) Bedok
2) Jurong
3) Kim Chuan
4) Kranji
5) Seletar
6) Ulu Pandan
Drainage Catchment No.
The drainage catchments in Singapore are divided into 10 regions:
The used water and drainage catchment maps are available at the link
below.
http://www.pub.gov.sg/customer/QPPortal/Pages/CatchmentMaps.as
px
1) Jurong 6) Bukit Timah
2) Kranji 7) (A) Singapore River
3) Pandan (B) Stamford Marina
4) Woodlands 8) Geylang
5) Kallang 9) Punggol
10) Changi
13
Field Detail
This field can be found on Page 52
This field can be found on Page 52
Items have to be clearly indicated on plan.
Select YES from the corresponding fields in the checklist in order
to proceed with the DC submission.
Select YES if items are provided.
Select NOT APPLICABLE if items are not relevant to the project.
14
Field Detail
This field can be found on Page 52 – 53
Select YES if items are provided.
Select NOT APPLICABLE if items are not relevant to the project.
15
Field Detail
This field can be found on Page 53 – 54
Select YES if items are provided.
Select NOT APPLICABLE if items are not relevant to the project.
16
Field Detail
This field can be found on Page 54
Select YES if items are provided.
Select NOT APPLICABLE if items are not relevant to the project.
17
Field Detail
This field can be found on Page 54 – 55
This field can be found on Page 55
Select YES if items are provided.
Select NOT APPLICABLE if items are not relevant to the project.
With direct / indirect linkage
Developments with linkages (direct or indirect) to special
underground facilities such as MRT stations shall comply with
the minimum platform level and crest level (Clause 2.1.1c and
Clause 2.2) as stated in the latest addendum or edition to the
Code of Practice on Surface Water Drainage.
Quoting the example of Orchard MRT station, developments with
direct linkage are Ion Orchard and Wisma Atria which are directly
connected to Orchard MRT station. Developments with indirect
linkages are Ngee Ann City and Lucky Plaza which are indirectly
connected to MRT Station through another building with direct
or indirect connection to Orchard MRT Station.
18
Field Detail
This field can be found on Page 55 – 56
Select YES if items are provided.
Select NOT APPLICABLE if items are not relevant to the project.
19
Field Detail
’
This field can be found on Page 56 – 57
Select YES if items are provided.
Select NOT APPLICABLE if items are not relevant to the project.
20
Field Detail
This field can be found on Page 58
Select YES if items are provided.
Select NOT APPLICABLE if items are not relevant to the project.
21
Field Detail
This field can be found on Page 58
This field can be found on Page 45
Select YES if items are provided.
Select NOT APPLICABLE if items are not relevant to the project.
Pumping Installation
A minimum of two pumps – duty and standby pumps – shall be
provided.
Ejector
The pit for the sewage ejector or solids divertor installation shall
be adequately sized (min. 3m x 3m) and shall include a working
space for maintenance.
Sump
A screen chamber shall be provided before the pump sump.
When the depth of pump sump or screen chamber exceeds 6m,
intermediate platforms shall be provided.
Access opening shall be provided directly above the pumps for
ease of maintenance.
Carpark
A screen chamber is NOT needed for carpark pump sump.
Swimming Pool
Backwash from swimming pool filter.
22
2.1 Guide for Detailed Plan (DP) Form
PUB-BPU-CLRDP01
Application for Clearance Certificate for Detailed Plan on Drainage and Sewerage
(Sanitary / Sewer) Works
[Under Section 33(1) of the Sewerage and Drainage Act (SDA), Chapter 294]
a) Projects classified as major, as described in Chapter 1, will undergo a separate DP submission
process. This can be done with the PUB-BPU-CLRDP01 form.
b) Previously, there were two forms for DP submissions, one for sewerage works (PUB-SEW-
CLRDPSEW01) and one for drainage works (PUB-DD-CLRDPDRA01). These two forms are now
combined into one single PUB-BPU-CLRDP01 form.
c) There are sections in the form that must be selected and filled only when the project involves
the respective sections. For example, if the project involves:
(i) sanitary work, Section A1 needs to be selected and filled by QP
(ii) sanitary AND drainage work, Section A1 and Section B need to be selected and filled by
QP
d) The selection of the section can be done by marking the checkbox.
e) If the box is unchecked, the whole section will be greyed out and the QP will not be able to fill
that particular section.
f) Compulsory fields within these sections must be duly filled only when the section is selected
for submission. The sections are listed as follows:
Section A1 – Sanitary Work
Section A2 – M&E Works (Used Water)
Section A3 – Sewerage Work, RC Trench
Section B – Drainage Work
OLD DP Forms NEW DP Form
PUB-SEW-CLRDPSEW01
PUB-DD-CLRDPDRA01 PUB-BPU-CLRDP01
23
g) To make attachments and declarations, QPs can similarly mark the provided checkboxes.
h) There are a number of “Select” fields that can be found throughout the forms. These fields,
when clicked, will show a drop-down menu with options for the QP to choose accordingly.
Please refer to Section 2.2 for more information on the “Select” fields and how they can affect
your submissions.
i) Compulsory fields are highlighted in yellow, as shown in Appendix 3. These must be filled to
enable successful submission of the forms in Corenet.
t
24
2.2 Select Fields – DP Form
Field Detail
This field can be found on Page 92
Sanitary
Includes works on any sanitary plumbing or drainage system and
the fixing, alteration and repair of a sanitary appliance
Sewer
Includes engineering works for the construction, alteration and
maintenance of any sewerage system
Sewage Treatment Plant
Refers to sewage treatment works, septic tank, imhoff tank,
percolating filter, sludge digestion tank, or any tank designed for
the pre-treatment, treatment or the stabilisation of sewage
Drainage
If the project involves drainage works only, this field can be left
unfilled. QP can proceed to fill up Section B: Drainage Work of
the PUB-BPU-CLRDP01 form to submit for DP clearance.
25
Field Detail
This field can be found on Page 92
This field can be found on Page 92
New Submission
First DP submission for the particular project
Resubmission
Subsequent DP submission(s) of the same project
- Revised Plan Submission
- Amendment Plan Submission
Industrial
Factories, warehouses, power plants, industrial parks
Non Industrial
Residential, commercial and institutional developments
26
Field Detail
This field can be found on Page 94
Pumping Installation
A minimum of two pumps – duty and standby pumps – shall be
provided.
Ejector
The pit for the sewage ejector or solids divertor installation shall
be adequately sized (min. 3m x 3m) and shall include a working
space for maintenance.
Sump
A screen chamber shall be provided before the pump sump.
When the depth of pump sump or screen chamber exceeds 6m,
intermediate platforms shall be provided.
Access opening shall be provided directly above the pumps for
ease of maintenance.
Carpark
A screen chamber is NOT needed for carpark pump sump.
Swimming Pool
Backwash from swimming pool filter.
27
3.1 Guide for Completion of Work Form
PUB-BPU-COMPOFWORK
Certificate of Completion and Inspection of Sanitary, Sewerage and Drainage Works
[Under Section 35(1)(e) and (f) of the Sewerage and Drainage Act (Chapter 294)]
a) The PUB-BPU-COMPOFWORK form puts together all the Completion of Work forms for
Sewerage, Sanitary, M&E and Drainage. These forms were previously known as Form C, Form
C1, Annex A, Annex C and Annex D. This is to give the Lead QP an overview of the various
Completion of Work forms that has to be submitted to PUB over the course of the project.
b) It is known that these different forms are submitted by different QPs at different stages of the
development of the project. Hence, built into the form is a feature which allows one particular
section of the form to be submitted even if other required sections are not ready for
submission. (For example, if only the Civil PE is ready to make his submissions, he can proceed
to do so using the form even if the M&E PE is not ready to submit theirs). If more than one
QP/PE are ready to make their submissions, more sections of the form may be submitted at
the same time by selecting the relevant sections.
c) The table below shows the options and the respective sections that will be made available.
Selection Options Sections Available for Submission
Completion of Sewerage
Work only
Section A1 – Sewerage Work
Application for PUB
Clearance for Temporary
Occupation Permit (TOP)
Section A2 – Sanitary Work
Section A3 – RC Trench Completion
Section B – Drainage Work
Section C – Infrastructure Works Affecting Sewer & Drainage
Application for PUB
Clearance for
Certificate of Statutory
Completion (CSC)
Section D – Application for PUB Clearance for CSC
Application for PUB
Clearance for both
Temporary Occupation
Permit (TOP) &
Certificate of Statutory
Completion (CSC)
Section A2 – Sanitary Work
Section A3 – RC Trench Completion
Section B – Drainage Work
Section C – Infrastructure Works Affecting Sewer & Drainage
Section D – Application for PUB Clearance for CSC
28
d) The options are available on the first page of the PUB-BPU-COMPOFWORK form.
e) For Application for PUB Clearance for Certificate of Statutory Completion (CSC), please be
reminded to submit the Certificate of Inspection for Drainage Works (PUB-DD-CSIDRA)
together with the PUB-BPU-COMPOFWORK form.
f) There are a number of “Select” fields that can be found throughout the forms. These fields,
when clicked, will show a drop-down menu with options for the QP to choose accordingly.
Please refer to Section 3.2 for more information on the “Select” fields and how they can affect
your submissions.
g) Compulsory fields are highlighted in yellow, as shown in Appendix 4. These must be filled to
enable successful submission of the forms in Corenet. Compulsory fields under the sections
A1, A2, A3, B, C and D must be duly filled only when the section is selected for submission.
29
3.2 Select Fields – Completion of Work Form
Field Detail
This field can be found on Page 101 & 106
Please select the appropriate options:
a change
no change
This field can be found on Page 101 & 106
Please select one of the three options:
New Erection
Reconstruction
A&A (Addition and Alteration)
30
4.1 Guide for Temporary Occupation Permit (TOP) Forms
ENV-CBPU-CLRTOP01-NEW SUBMISSION
ENV-CBPU-CLRTOP01-RESUBMISSION
Application for Clearance of Temporary Occupation Permit (TOP) – New Submission
Application for Clearance of Temporary Occupation Permit (TOP) – Resubmission
a) The following new declarations are added:
• The crest levels, platform levels, flood protection levels are in compliance with Code
of Practice on Surface Water Drainage and constructed according to approved plans.
• The maximum stormwater discharge from the development is in compliance with the
maximum allowable peak runoff stipulated in the COP and constructed according to
approved plans.
• As the QP, you will need to declare the following “I have liaised with the Developer/
Owner to ensure that a Maintenance/Managing Agent has been established to
undertake the SOP of the maintenance, operation and monitoring of the detention
tank system.”
b) The following new attachments are added to allow the submission of the following documents
(in line with the current edition of Code of Practice on Surface Water Drainage):
• As – built survey plans indicating crest levels, platform levels, flood protection levels
based on approved flood protection measures
• As – built drawings for detention tank systems and final design calculations, and
factory test report for its pumping system
• Standard Operating Procedure for pumped drainage system(basement / detention
tank)
• Standard Operating Procedure for flood barrier
• Developer/Owner declaration on the following - I shall inspect and declare that the
crest levels are constructed to approved plans annually / every 3 years upon obtaining
the TOP
• Developer/Owner declaration on the following:
- I shall submit the following documents as required annually upon obtaining
the TOP
- Certificate of inspection on flood barriers on site, including leak test
certificate
- Amendments to SOP for flood barrier
- Certificate of inspection on pumped drainage system (basement/detention
tank)
- Certificate of inspection on ABC Waters design features
31
c) To make attachments and declarations, QPs can mark the checkboxes provided.
d) Compulsory fields are highlighted in yellow, as shown in Appendix 5 & Appendix 6. These must
be filled to enable successful submission of the forms in Corenet.
32
4.2 Select Fields – TOP Forms
Field Detail
This field can be found on Page 110 & 114
Industrial
Factories, warehouses, power plants, industrial parks
Non Industrial
Residential, commercial and institutional developments
33
5.1 Guide for Certificate of Statutory Completion (CSC) Forms
ENV-CBPU-CLRCSC01-NEW SUBMISSION
ENV-CBPU-CLRCSC01-RESUBMISSION
Application for Compliance Certificate – New Submission
Application for Compliance Certificate – Resubmission
[Under Section 33(7) of the Environmental Protection and Management Act (Chapter 94A) and
Compliance Certificate under Section 33(8) of the Sewerage and Drainage Act (Chapter 294)]
a) To indicate attachments and declarations, QPs can mark the checkboxes provided.
b) Compulsory fields are highlighted in yellow, as shown in Appendix 7 and Appendix 8. These
must be filled to enable successful submission of the forms in Corenet.
34
5.2 Select Fields – CSC Forms
Field Detail
This field can be found on Page 119 & 124
Industrial
Factories, warehouses, power plants, industrial parks
Non Industrial
Residential, commercial and institutional developments
35
6.1 Guide to Water Submission Forms
PUBWTR-0-MCG01
PUBWTR-0-NMC01
PUBWTR-0-RCG01
PUBWTR-0-TSP01
PUBWTR-0-PPC01
PUBWTR-0-WLP01
PUBWTR-0-WSW01
PUBWTR-0-CSC01
Form for Manufacturing Category
Form for Non-Manufacturing Category
Form for Residential Category
Form for Temporary Category
Pre-Planning Consultation
Notification of Water Service Work by Licensed Water Service Plumber
Notification of Water Service Work by Professional Engineer
Certificate of Satisfactory Completion of Water Service Work by Professional Engineer
a) New fields are included to indicate water demand for PUB Water (Potable Water) and
NEWater in the following forms:
File Name Form Name
PUBWTR-0-PPC01 Pre-Planning Consultation
PUBWTR-0-WLP01 Notification of Water Service Work by Licensed
Water Service Plumber
PUBWTR-0-WSW01 Notification of Water Service Work by
Professional Engineer
PUBWTR-0-MCG01 Form for Manufacturing Category
PUBWTR-0-NMC01 Form for Non-Manufacturing Category
PUBWTR-0-RCG01 Form for Residential Category
PUBWTR-0-TSP01 Form for Temporary Category
b) New section is added to indicate the particulars of Licensed Water Service Plumber in the
following form:
File Name Form Name
PUBWTR-0-CSC01 Certificate of Satisfactory Completion of Water Service Work by
Professional Engineer
c) Compulsory fields are highlighted in yellow, as shown in Appendix 9 – 16. These must be filled
to enable successful submission of the forms in Corenet.
36
6.2 Select Fields – Water Submission Forms
Field Detail
This field can be found on Page 137, 143 and 147
Please select the most appropriate type of development for
your project.
This field can be found on Page 143 and 147
Please select the most appropriate work nature of your project.
37
Field Detail
This field can be found on Page 140
Please select the most appropriate work nature of your project.
38
Appendix
39
List of Appendix
Appendix 1 – ENV-CBPU-DCCLR-NEW SUBMISSION .................................................................. 41 – 64
Application for Development Control (DC) Clearance – New Submission
Appendix 2 – ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION ............................. 65 – 90
Application for Development Control (DC) Clearance – Resubmission/Amendment/Revision
Appendix 3 – PUB-BPU-CLRDP01 ................................................................................................ 91 – 96
Application for Clearance Certificate for Detailed Plan on Drainage and Sewerage (Sanitary/Sewer)
Works
Appendix 4 – PUB-BPU-COMPOFWORK ................................................................................... 97 – 109
Certificate of Completion and Inspection of Sanitary, Sewerage and Drainage Works
Appendix 5 – ENV-CBPU-CLRTOP01-NEW SUBMISSION ........................................................ 110 – 113
Application for Clearance of Temporary Occupation Permit (TOP) – New Submission
Appendix 6 – ENV-CBPU-CLRTOP01-RESUBMISSION/AMENDMENT/REVISION ................... 114 – 118
Application for Clearance of Temporary Occupation Permit (TOP) –
Resubmission/Amendment/Revision
Appendix 7 – ENV-CBPU-CLRCSC01-NEW SUBMISSION ......................................................... 119 – 123
Application for Compliance Certificate – New Submission
Appendix 8 – ENV-CBPU-CLRCSC01-RESUBMISSION/AMENDMENT/REVISION ................... 124 – 128
Application for Compliance Certificate – Resubmission/Amendment/Revision
Appendix 9 – PUBWTR-0-MCG01 ............................................................................................ 129 – 130
Form for Manufacturing Category
Appendix 10 – PUBWTR-0-NMC01 ......................................................................................... 131 – 132
Form for Non-Manufacturing Category
Appendix 11 – PUBWTR-0-RCG01 ..................................................................................................... 133
Form for Residential Category
Appendix 12 – PUBWTR-0-TSP01 ............................................................................................ 134 – 136
Form for Temporary Category
Appendix 13 – PUBWTR-0-PPC01 ........................................................................................... 137 – 139
Pre-Planning Consultation
Appendix 14 – PUBWTR-0-WLP01 .......................................................................................... 140 – 142
Notification of Water Service Work by Licensed Water Service Plumber
Appendix 15 – PUBWTR-0-WSW01 ......................................................................................... 143 – 146
Notification of Water Service Work by Professional Engineer
Appendix 16 – PUBWTR-0-CSC01 ............................................................................................ 147 – 148
Certificate of Statutory Completion of Water Service Work by Professional Engineer
40
Appendix 17 – Contact List ................................................................................................................ 149
41
APPLICATION FOR DEVELOPMENT CONTROL (DC)CLEARANCE - NEW SUBMISSION
ENV-CBPU-DCCLR-NEW SUBMISSION
This form may take you 10 minutes to fill in. You will need the following information to fill in the form:-
- Particulars of Project - Particulars of Qualified Person
Date: 19/03/2014
To: Central Building Plan Unit
National Environment Agency40, Scotts Road #13-00Environment BuildingSingapore 228231
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for theworks.
2. This form is to be accompanied by the relevant attachments.
3. Please read the DC checklist before filling the form.
Particulars of Project
Project Reference Number
Project Title
Location Description[Include Lot/Plot, MK/TS,Building Address, HouseNo and Road information]
Particulars of Application
Development ProposalApplication
Select
File Ref No/Case ID
Dated
SIP/DIP from CBPU(if applicable)
Appendix 1
42
ENV-CBPU-DCCLR-NEW SUBMISSION
Particulars of Qualified Person
Name Select
Role In Project
Registration No
Firm Name
UEN
Firm Address
Telephone No.
Extension No
Fax No.
Email Address
Development Details
Type of Submission Select
Type of Development Select
Is there basement? Yes No
Is there sewer connection to neighbour house?
Yes No
Is there public sewer in the development lot?
Yes No
No.of storeys in development
Storeys
Total used water discharge
Area of development
DR in the development?
Proposed MIN PLATFORM LEVEL
Max Adjacent Road
Any linkage to MRT
Used Water Catchment No.
Drainage Catchment No.
Select
Select
L/s
ha
mRL
mRL
Please refer to www.pub.gov.sg for catchment maps of used water and drainage.
Yes No
Yes No
43
Confirmation
ENV-CBPU-DCCLR-NEW SUBMISSION
Roof gutters (including rain water down pipes and outlets, and roof scupper drains) are banned as an anti-mosquito breeding measure for all new developments. Waiver in writing must be obtained from National Environment Agency to erect roof gutters at the DC stage prior to BP submission
I confirm that :
a) there are no roof gutters (including rain water down pipes andoutlets, and roof supper drains) provided for in the developmentproposal; or
b) waiver for roof gutter has been obtained from the National Environment
Agency in writing on : File Ref No:
Dated:
c) There are roof gutters (including rain water down pipes and outlets,and roof scupper drains) provided in the development proposal. Waiverapplication from ENV-CBPU-WVRG is attached.
d) Confirmation for a), b) or c) not applicable, for A & A and reconstructionbuilding projects.
Attachments
Development Control Plan
Others, please specify
Add Delete
44
SUBMISSION FOR DEVELOPMENT CONTROL (DC)CLEARANCE WITH DETAIL PLAN
Instruction:1. This page of the form is applicable for minor projects.2. First storey plan/site plan for section A1 and B can be submitted as one plan
with clear layer and identification3. Please check all the relevant infromations have been indicated and provided
before submitting
Particulars of Owner(s)
Name
Address
Contact No
Select
SECTION A1: SANITARY, M&E WORK (Used Water)
Attachments
1. Site plan and first storey plan(indicate the sewer setback, propose and existing sewerconnection, top/invert level of manhole(s), and platform levels,propose and existing sanitary drainline.
2. Detailed sanitary plan (to show sanitary line)
3. Is there pumping system(s) for used water? Yes No
Declaration: Name Role
By QP/PE:I have carried out athorough investigation of the existingsewerage system withinand adjacent to the siteand will take everypractical measure toensure that theproposed development will not disrupt or affect any existingsewer/drain-line thatserves other properties/premises.
Phone Email Firm Arch/PEReg No
Select
by QP/PE:I hereby certify that these plans and the works shown therein comply with the provisions of the Sewerage and
Select
(Tick if applicable)
45
Drainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works) Regulationsand the current Codeof Practice on the Sewerage and SanitaryWorks
by PE(M/E) if there is pumping system(s)I, being a Professional Engineer hereby certify that the propose mechanical and electrical(M&E) works of the abovementioned project are design in accordance with the current Code of Practice onSewerage and Sanitary Works, Sewerage andDrainage Act (Chapter 294) and other sewerage requirements as stipulated by Water Reclamation (Network) Department.
Select
Attachments:
1. Detail plan drawings of used water pumping system(s)
2. Attached Form D2/QP if an alternate power source is not available
3. Design calculations
4. Pump and system curves
5. Relevant equipment catalogues
Please state if any deviation from the COP
Pump Design Condition
Pump Application
Brand Model Estimated Inflow (l/s)
Pumpoperatingcapacity (l/s)
Pumpoperatinghead (m)
Solidsfreepassage Size (mm)
Motor Rating (kw)
Select
Add Delete
46
Particulars of Plumber/Contractor
Name Select
Firm Details
Contact No
please indicate your membership/license
PUB LP
SPS registered
N.A.
Expected Date of Commencement
Expected Date of Completion
Tick if ApplicableSECTION A2: SEWERAGE WORK, RC Trench
Attachments:
1. Detail sewerage planTo show: propose sewer alignment with diameter, material,
top/invert level, existing sewer alignment to be abandoned (if any)
2. Design & calculation of RC trench (if applicable)
Declaration Name Role Phone Email Firm Arch/PEReg No
by PE (Civil):I hereby certify that the sewerage plans and the works shown therein comply with the provisions of the Sewerage andDrainageAct (Chapter 294), theSewerage andDrainage (Sanitary Works) Regulations, the currentCode of Practice on theSewerage and SanitaryWorks.
Select
Particulars of Plumber/ContractorTick if same as in Sanitary Work
Name
NRIC/Passport No.
Firm Details
Contact No
Select
47
please indicate your membership/license
PUB LP
SPS registered
N.A.
Expected Date of Commencement
Expected Date of Completion
Tick if applicableSECTION B: DRAINAGE WORK
Attachment:
1. Site Plan and First Sty Plan
2. Basement Plans
3. Detail of Drainage Work
4. DC Checklist
5. Proposed plan showing crest levels, platform levels with andwithout flood barriers at various entrance and exit points, andflood barrier installed at all points of entry and exit for buildingpremises or for entire development
Declaration Name Role Phone Email Firm Arch/PEReg No
I certify that the drainagework are designed in fullcompliance with PUBrequirements includingSewerage and DrainageAct (Chapter 294) andcurrent edition of COP onSurface Water Drainage
Select
Please state if any deviation from the COP
SECTION C: Infrastructure or other works affecting Sewer & Drainage (eg. Covered link way, bus stop)
Attachment:
1. First storey plan, showing sewer setback, sewer alignment, diameter,manhole & sewer ID.
2. Cross sectional plan
3. Sewer and drainage plan
4. Proposed plan showing crest levels, platform levels with and withoutflood barriers at various entrance and exit points, and flood barrierinstalled at all pints of entry and exit for building premises or for entiredevelopment.
Tick if applicable
48
Declaration Name Role Phone Email Firm Arch/PEReg No
I hereby certify that theseplans and the works showntherein comply with theprovisions of the Sewerageand Drainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works)Regulations, the currentCode of Practice onSewerage and Sanitary Works.
Select
49
SUBMISSION FOR DEVELOPMENT CONTROL (DC) PLAN
DC SUBMISSION
1. This page of the form is applicable for major projects2. First Storey Plan/Site Plan for Section A and B can be submitted as one plan
with clear layer and identification3. Please check all the relevant information have been indicated and provided
before submitting4. Detailed Plan for sanitary, sewer, and drainage works shall be submitted after the
DC clearance is obtained.
Particulars of Owner(s)
Name Select
Address
Contact No
(Tick if applicable) SECTION A: SANITARY / SEWERAGE WORK
Attachments:
1. Site plan and first storey plan
to show: The sewer setback, propose and existing sewer connection,top/invert level of MH, and platform levels, propose and existing sanitary drainline, propose public sewer (if any), manhole and sewer identification number
2. Is there any sewerage pump system required? Yes No
Declaration
I hereby certify that these plans and theworks shown thereincomply with the provisions of the Sewerage andDrainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works) Regulationsand the current Code of Practice on the Sewerage and Sanitary Works.
I have carried out a thorough investigation of the existing sewerage system within the site and will take every practical measure to ensure that the proposed development will not disrupt or affect any existing sewer / drain-line that serves other properties / premises.
Select
Name Role Contact Email FirmArch/PEReg No
Select
Please state if any
50
COP
51
DC SUBMISSION
(Tick if applicable) SECTION B: DRAINAGE WORK
Attachments:
1. Site Plan and First Sty Plan
2. Basement Plans
3. DC Checklist
4. Proposed plan showing crest levels, platform levelswith and without flood barriers at various entranceand exit points, and flood barrier installed at all pointsof entry and exit for building premises or for entiredevelopment
Declaration
I certify that the drainage workare designed infull compliancewith PUB requirementsincluding Sewerage andDrainage Act(Chapter 294)and currentedition of COPon Surface WaterDrainage
Please state if any deviation from the COP
Select
Name Role Contact Email FirmArch/PEReg No
52
PUBLIC UTILITIES BOARD (PUB)CATCHMENT & WATERWAYS DEPARTMENT
CHECKLIST FOR DC PLANS
PUB-DD-CHECKLIST
*Please use this form if development site is equal to orgreater than 0.2 Ha*
(A) General
1. Date of Drainage InterpretationPlan (DIP) issuance (Please indicate the date of DIP)
2. Site boundary lines are clearlyindicated on plan
Select
3. Existing drains alignment, drain size,drain type, summit point, flow directionand discharge points of internal surfacedrain system are clearly indicated on plan
Select
4. All addition and alteration worksare highlighted
Select
5. For JTC, HDB, URA developments,the drainage masterplan of thedevelopment site is attached togetherwith the submission.
Select
6. There is provision of peak runoff controlmeasures within the development site.
Select
Size of development site Ha
(a) Post-development Runoff Coefficient
(Please indicate value between 0 to 1)
(b) Type of measures to reduce peak runoff
(i) Detention tanks: Volume
*For developments with detention tank systems, please alsofill out section 6 (c) in the form*
(Please indicate size< width (m) x length (m) x
effective depth (m) >)
(ii) Retention/ sedimentation ponds Select
(iii) Green roofs Select
(iv) Planter boxes Select
(v) Porous pavements Select
(vi) ABC Waters Design Features (to be endorsed by an ABC Waters Professional - please fill out Section 7 in the form)
Constructed Wetlands Select
53
Bioretention Swales/Basins Select
Rain Gardens Select
(vii) Others
(Please indicate if any)
(c) For developments with detention tank systems
(i) Detention tank incorporates rainwater harvesting feature
Detention volume
Detention volume to meet the requirement as stated in Clause 7.1.5 of the latest edition of Code of Practice on Surface Water Drainage (Detention V)
(Please indicate volume in cubic metre)
Volume set aside for rainwater harvesting storage (Rainwater Harvesting V) (Please indicate volume
in cubic metre)
Total volume of tank (Total V)
Total V = Detention V + Rainwater Harvesting V
0
Select
(ii) Proposed drainage plan indicating catchment and sub-catchment boundaries, and the specific subcatchment of each tank including the outlet discharge point of the internal drainage system to the public drain is attached with the submission.
(iii) Proposed site plan with runoff coefficients and area of development with varying characteristics of catchment/sub-catchment clearly indicated.
Select
(iv) Proposed site plan with features, and catchment/sub-catchment of each feature, to attenuate stormwater runoff to comply with COP requirements clearly indicated.
Select
(v) PE (Civil) -endorsed design calculations or modelling results as per the design calculations templates or equivalent, are included in the submission. If there is any pumped drainage system involved, the civil and structural components shall be endorsed by a PE (Civil) while the mechanical and electrical components shall be endorsed by a PE (Mechanical/Electrical).
Select
(vi) Proposed site layout plans indicating the location and footprint of the detention tank(s), pumping facilities (if applicable), the effective depth of the detention tank(s) and the connection point to the internal drainage system are attached in the submission.
Select
Select
54
7. ABC Waters design features are incorporatedwithin the development. *If yes, please also respond
to 7(a), 7(b)*
(a) Names & Registration No. of ABC Waters Professional (Please indicate name & registration
no. of ABC professional)
(b) Concept design and design calculations (e.g. catchment area, treatment area and detainment volume etc for the ABC Waters design feature), endorsed by the ABC Waters Professional are submitted to PUB.
(c ) Hydraulic calculation for the overflow system, endorsed by ABC Waters Professional (PE) are submitted to PUB.
8. If the proposed development site areaexceeds 0.4 ha, hydraulic calculationsfor the proposed internal drainage facilities,including sub-catchment plans for theproposed development site endorsed by aProfessional Engineer (Civil) to be submittedfor PUB record.
9. There is upstream drainage connectionfrom the neighbouring lots into thedevelopment site.
(B) DRAINAGE RESERVE
10. Drainage Reserve lines and lot boundariesare indicated, dimensioned and highlighted.
11. All embankments and structures are setoutside the Drainage Reserve
12. Drainage Reserve are free from encumbrances
13. Design of embankment and structuresnear a drain or Drainage Reserve (within 2m)must not take into consideration the passiveresistance offered by the existing orproposed drainage structures.(Note clause 5.3 of the latest edition ofCode of Practice on Surface WaterDrainage). The structural and stabilitycalculations for an embankment or a structurewithin 2 m from the edge of Drainage Reserveshall be endorsed by a Professional Engineerand submitted to the Board for record atDetailed Planning stage.
(C)MINIMUM PLATFORM LEVEL (MPL)
14. MPL of development mRL
15. All proposed/existing platform levelsare clearly indicated on plan
55
16. The proposed platform levels androad/ground levels adjacent to theinternal drain outlet discharge point areclearly indicated
17. For addition and alteration workssubmission, the existing platform levelsare indicate
18. Linkages (direct/indirect) to specialunderground facilities and basements,if any, are indicated and complied withthe latest Code of Practice on SurfaceWater Drainage
Select
19. Flood barrier (as stipulated in Section 2.4 ofthe latest Code of Practice on SurfaceWater Drainage), if any, is incorporated intothe development site.
*If Yes, please also respond to 19(a)*
(a) Proposed plans indicating the crest levels and/or platform levels with and without flood barrier at various entrance and exit points are attached together with the submission
For developments where flood barriers are automated and/or with more than 2points of entry/exit, the following document shall be submitted at Detailed Planningstage.-- Details on the Standard Operating Procedure (SOP) including the operation and maintenance of the flood barrier to be endorsed by Mechanical and/ or ElectricalQP or PE, and the developer/ building owner.-- Details on the size, type and design of the flood barrier.
56
(D) PROPOSED DRAINAGE WORKS
20. Proposed/ existing drains and drains to bedeleted are clearly indicated usingdifferent colour
Select
21. Alignment, summit point, flow direction, type& size and outlet discharge points of theproposed internal surface drains are clearlyindicated.
Select
22. Connection point to existing drain is indicated Select
23. Proposed internal surface drains are able todischarge into roadside/ outlet drain asshown on plan.
Select
24. Sump size is indicated Select
25. Vertical grating at internal drain outletdischarge point is provided
Select
26. External drainage works (including culvertdetails) to be submitted separately duringDetailed Planning stage. This shall be clearlyannotated on plan
Select
(E) OPENING LEADING TO BASEMENT LEVEL
27. Crest level of access ways and openingsleading into the basement is indicated andcomplied with the latest Code of Practiceon Surface Water Drainage
Select
28. Proposed sizes and flow direction of cut offdrains are indicated
Select
(F) COMMON DRAIN
29. Alignment, size and flow of existingcommon drain within the developmentlot are indicated.
Select
30. If there is common drain within thedevelopment site, the following shall beendorsed on the plan:
Select
"Surface runoff from the site and allneighbouring lots shall continue to beallowed to discharge through the commondrain within the site."
31. There is no permanent structure erectedabove and over the common drain
Select
32. If the proposal involves the reconstructionof common drain, the proposed commondrain shall be at least 450mm wide asstipulated in Section 4.5 of Code ofPractice on Surface Water Drainage or
Select
57
any other sizes as directed by PUB
33. Details of the proposed common drain tobe submitted by Professional Engineer(Civil) separately to PUB for approvalduring Detailed Planning/ Building Planstage. This is to be annotated on the plan
Select
34. The position of the existing/proposedboundary wall/fence is clearly indicated
Select
58
(G) PUMPED DRAINAGE SYSTEM
35. Pumped drainage system complies with thelatest Code of Practice on Surface WaterDrainage. Details of pumped drainagesystem and design computations dulyendorsed by PE shall be submittedseparately to PUB for record during DetailedPlanning stage
Select
36. Source catchment area with surface runoffleading into the pumped drainage system isclearly indicated
Select
37. The location, size, inlet and outletconnections of the rainwater pump sumpfor the proposed pumped drainage systemare clearly indicated
Select
(H) RETAINING WALL
38. If a retaining wall is erected to raise theground level of the development site aboveadjacent premises, adequate internaldrainage system provided to effectivelyintercept and drain away runoff including thesub-soil flow from the development site
Select
39. If a retaining wall is erected to lower theground level of the development site,adequate internal drainage system providedto effectively intercept and drain awayexisting sub-soil and overland flowsdischarging through the development sitefrom the adjacent premises
Select
(I) DRAINAGE AFFECTING OTHER PREMISES
40. Minimum 600mm high solid boundary wallaround development site is erected toprevent surface runoff from overflowing intoadjacent premises on lower ground
Select
I hereby confirm that the above items have been complied with and endorsed on the plans.
I hereby certify that the standard endorsement below will also be certified on the plans:-
(a) The planning, design, construction activities and procedures for plan submission shall comply fully with the requirements as stipulated in the latest edition of the Code of Practice on Surface Water Drainage and the Sewerage and Drainage (Surface Water Drainage) Regulations 2007.
(b) The capacity of internal drains shall be sufficient to intercept and discharge all runoff from the development site.(c) The runoff within, upstream of and adjacent to the development lot can be
effectively drained away without causing flooding within the lot or in areas outside the lot.(d) There is no direct connection from the internal drains within the basement or
59
sub-basement to the external roadside drains.
* Public Utilities Board (PUB) reserves the right to report any false declaration ofinformation to the relevant professional bodies for action in accordance to theAct/ethnics governing all the Qualified Professional.*
60
PUBLIC UTILITIES BOARD (PUB)CATCHMENT & WATERWAYS DEPARTMENT
CHECKLIST FOR DC PLANS*Please use this form if development site is less than 0.2 Ha*
PUB-DD-CHECKLIST
(A) General
1. Date of Drainage Interpretation Plan (DIP) issuance
2. Site boundary lines are clearly indicated on plan
3. Existing drains alignment, drain size, drain type,summit point, flow direction and dischargepoints of internal surface drain system areclearly indicated on plan
4. All addition and alteration works are highlighted
5. For JTC, HDB, URA developments, the drainagemasterplan of the development site is attachedtogether with the submission.
6. ABC Waters design features are incorporated withinthe development.
Select
(a) Names & Registration No. of ABC Waters Professional
(b) Concept design and design calculations, endorsed by the ABC Waters Professional are submitted to PUB.
Select
(c ) Hydraulic calculation for the overflow system, endorsed by ABC Waters Professional (PE) are submitted to PUB.
Select
7. If the proposed development site area exceeds0.4 ha, hydraulic calculations for the proposedinternal drainage facilities, includingsub-catchment plans for the proposed developmentsite endorsed by a Professional Engineer (Civil) tobe submitted for PUB record.
Select
8. There is upstream drainage connection from the neighbouring lots into the development site.
Select
Select
Select
Select
Select
61
PUB-DD-CHECKLIST
(B) DRAINAGE RESERVE
9. Drainage Reserve lines and lot boundaries are indicated, dimensioned and highlighted.
Select
10. All embankments and structures are set outsidethe Drainage Reserve
11. Drainage Reserve are free from encumbrances
12. Design of embankment and structures near a drainor Drainage Reserve (within 2m) must not take intoconsideration the passive resistance offered by theexisting or proposed drainage structures. (Noteclause 5.3 of the latest edition of Code of Practiceon Surface Water Drainage). The structural andstability calculations for an embankment or astructure within 2 m from the edge of DrainageReserve shall be endorsed by a ProfessionalEngineer and submitted to the Board for record atDetailed Planning stage.
(C)MINIMUM PLATFORM LEVEL (MPL)
13. MPL of development mRL
14. All proposed/existing platform levels are clearlyindicated on plan
Select
15. The proposed platform levels and road/ground levels adjacent to the internal drain outlet discharge point are clearly indicated
Select
16. For addition and alteration works submission, theexisting platform levels are indicated
Select
17. Linkages (direct/indirect) to special undergroundfacilities and basements, if any, are indicated andcomplied with the latest Code of Practice onSurface Water Drainage
Select
18. Flood barrier (as stipulated in Section 2.4 of thelatest Code of Practice on Surface WaterDrainage), if any, is incorporated into thedevelopment site.
Select
(a) Proposed plans indicating the crest levels and/or platform levels with and without flood barrier at various entrance and exit points are attached together with the submission
Select
For developments where flood barriers are automated and/or with more than 2 points of entry/exit, the following document shall be submitted at Detailed Planning/ Building Plan stage.-- Details on the standard operating procedure (SOP) including the proposed maintenance plan of the flood barrier to be endorsed by a Civil and/or Mechanical Qualified Person, and the developer/owner.-- Details on the size, type and design of the flood barrier.
(D) PROPOSED DRAINAGE WORKS
62
19. Proposed/ existing drains and drains to be deletedare clearly indicated using different colour
Select
20. Alignment, summit point, flow direction, type & sizeand outlet discharge points of the proposedinternal surface drains are clearly indicated
Select
21. Connection point to existing drain is indicated Select
22. Proposed internal surface drains are able todischarge into roadside/ outlet drain asshown on plan
Select
23. Sump size is indicated Select
24. Vertical grating at internal drain outlet dischargepoint is provided
Select
25. External drainage works to be submitted separatelyduring Detailed Planning/ Building Plan stage. Thisshall be clearly annotated on plan
Select
(E) OPENING LEADING TO BASEMENT LEVEL
26. Crest level of access ways and openings leadinginto the basement is indicated and complied withthe latest Code of Practice on Surface WaterDrainage
Select
27. Proposed sizes and flow direction of cut off drainsare indicated
Select
63
PUB-DD-CHECKLIST
(F) COMMON DRAIN
28. Alignment, size and flow of existing common drainwithin the development lot are indicated
Select
29. If there is common drain within the developmentsite, the following shall be endorsed on the plan:
Select
“Surface runoff from the site and all neighbouring lots shall continue to be allowed to discharge through the common drain within the site.”
30. There is no permanent structure erected aboveand over the common drain
Select
31. If the proposal involves the reconstruction ofcommon drain, the proposed common drainshall be at least 450mm wide as stipulated inSection 4.5 of Code of Practice on Surface WaterDrainage or any other sizes as directed by PUB
Select
32. Details of the proposed common drain to besubmitted by Professional Engineer (Civil)separately to PUB for approval during DetailedPlanning/ Building Plan stage. This is to beannotated on the plan
Select
33. The position of the existing/proposed boundary wall / fence is clearly indicated
Select
(G) PUMPED DRAINAGE SYSTEM
34. Pumped drainage system complies with the latestCode of Practice on Surface Water Drainage.Details of pumped drainage system and designcomputations duly endorsed by PE shall besubmitted separately to PUB for record duringDetailed Planning / Building Plan stage
Select
35. Source catchment area with surface runoff leadinginto the pumped drainage system is clearly indicated
Select
36. The location, size, inlet and outlet connections ofthe rainwater pump sump for the proposedpumped drainage system are clearly indicated
Select
(H) RETAINING WALL
37. If a retaining wall is erected to raise the groundlevel of the development site above adjacentpremises, adequate internal drainage systemprovided to effectively intercept and drain away runoff including the sub-soil flow from thedevelopment site
Select
38. If a retaining wall is erected to lower the groundlevel of the development site, adequate internaldrainage system provided to effectively interceptand drain away existing sub-soil and overland flowsdischarging through the development site from theadjacent premises
Select
(I) DRAINAGE AFFECTING OTHER PREMISES
39. Minimum 600mm high solid boundary wall arounddevelopment site is erected to prevent surfacerunoff from overflowing into adjacent premises onlower ground
Select
I hereby confirm that the above items have been complied with and endorsed on the plans.
64
(a) The planning, design, construction activities and procedures for plan submission shall comply fully with the requirements as stipulated in the latest edition of the Code of Practice on Surface Water
Drainage and The Sewerage and Drainage (Surface Water Drainage) Regulations 2007. (b) The capacity of internal drains shall be sufficient to intercept and discharge all runoff from the development site.
(c) The runoff within, upstream of and adjacent to the development lot can be effectively drained away without causing flooding within the lot or in areas outside the lot.(d) There is no direct connection from the internal drains within the basement or sub-basement to the external roadside drains.
* Public Utilities Board (PUB) reserves the right to report any false declaration of information to the relevant professionalbodies for action in accordance to the Act/ethnics governing all the Qualified Professional. *
65
APPLICATION FOR DEVELOPMENT CONTROL (DC)CLEARANCE - RESUBMISSION/AMENDMENT/REVISION
ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION
This form may take you 10 minutes to fill in. You will need the following information to fill in the form:- - Particulars of Project - Particulars of Qualified Person
Date: 19/03/2014
To: Central Building Plan Unit
National Environment Agency40, Scotts Road #13-00Environment BuildingSingapore 228231
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for theworks.
2. This form is to be accompanied by the relevant attachments.
3. Please read the DC checklist before filling the form.
Information
1. For enquiries on application of status, please call 67319681 / 67319513
Particulars of Project
Project Reference Number
New Project Title
(if original project title is revised)
Location Description for
revised project titleabove
[Include Lot/Plot, MK/TS,Building Address, HouseNo and Road information]
Particulars of Application
Submission Type Select
File Ref No/Case ID
Dated
Previous DC Advice fromCBPU (for resubmissioncase)
Previous DC Clearancefrom CBPU (foramendment/revision)
Appendix 2
66
CBPU Processing Officergiven in DC advice/clearance
Remarks
Particulars of Qualified Person
Name Please Select
Role In Project
Registration No
67
ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION
Particulars of Qualified Person (Continue)
Firm Name
UEN
Firm Address
Telephone No.
Extension No
Fax No.
Email Address
Development Details
Type of Submission Select
Type of Development Select
Is there basement? Yes No
Is there sewer connection to neighbour house?
Yes No
Is there public sewer in the development lot?
Yes No
No.of storeys in development
Total used water discharge
Area of development
DR in the development?
Proposed MIN PLATFORM LEVEL
Max Adjacent Road
Any linkage to MRT
Used Water Catchment No.
Drainage Catchment No.
Select
Select
Storeys
L/s
ha
mRL
mRL
Please refer to www.pub.gov.sg for catchment maps of used water and drainage.
Yes No
Yes No
68
Confirmation (Applicable for amendment/revised DC submission only)
ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION
Roof gutters (including rain water down pipes and outlets, and roof scupper drains) are banned as an anti-mosquito breeding measure for all new developments. Waiver in writing must be obtained from National Environment Agency to erect roof gutters at the DC stage prior to BP submission
I confirm that :
a) there are no roof gutters (including rain water down pipes andoutlets, and roof supper drains) provided for in the developmentproposal; or
b) waiver for roof gutter has been obtained from the National Environment
Agency in writing on : File Ref No:
Dated:
c) There are roof gutters (including rain water down pipes and outlets,and roof scupper drains) provided in the development proposal. Waiverapplication from ENV-CBPU-WVRG is attached.
d) Confirmation for a), b) or c) not applicable, for A & A and reconstructionbuilding projects.
Attachments
Development Control Plan
Any change to previous PUB (C&W) checklist under same projectreference number? (If yes, please tick and enclose updated checklist)
Others, please specify
Add Delete
69
SUBMISSION FOR DEVELOPMENT CONTROL (DC)CLEARANCE WITH DETAIL PLAN
Instruction:1. This page of the form is applicable for minor projects.2. First storey plan/site plan for section A1 and B can be submitted as one plan
with clear layer and identification3. Please check all the relevant infromations have been indicated and provided
before submitting
Particulars of Owner(s)
Name
Address
Contact No
Select
SECTION A1: SANITARY, M&E WORK (Used Water)
Attachments:
1. Site plan and first storey plan(indicate the sewer setback, propose and existing sewerconnection, top/invert level of manhole(s), and platform levels,propose and existing sanitary drainline.
2. Detailed sanitary plan (to show sanitary line)
3. Is there pumping system(s) for used water? Yes No
Declaration: Name Role
By QP/PE:I have carried out athorough investigation of the existingsewerage system withinand adjacent to the siteand will take everypractical measure toensure that theproposed development will not disrupt or affect any existingsewer/drain-line thatserves other properties/premises.
Phone Email Firm Arch/PEReg No
Select
by QP/PE:I hereby certify that these plans and the works shown therein comply with the provisions of the Sewerage and
Select
(Tick if applicable)
70
Drainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works) Regulationsand the current Codeof Practice on the Sewerage and SanitaryWorks
by PE(M/E) if there is pumping system(s)I, being a Professional Engineer hereby certify that the propose mechanical and electrical(M&E) works of the abovementioned project are design in accordance with the current Code of Practice onSewerage and Sanitary Works, Sewerage andDrainage Act (Chapter 294) and other sewerage requirements as stipulated by Water Reclamation (Network) Department.
Select
Attachments:
1. Detail plan drawings of used water pumping system(s)
2. Attached Form D2/QP if an alternate power source is not available
3. Design calculations
4. Pump and system curves
5. Relevant equipment catalogues
Please state if anydeviation from the COP
Pump Design Condition
Pump Application
Brand Model Estimated Inflow
(l/s)
Pumpoperating
capacity (l/s)
Pumpoperatinghead (m)
Solidsfree
passage Size (mm)
Motor Rating (kw)
Select
Add Delete
71
Particulars of Plumber/Contractor
Name
Firm Details
Contact No
Select
please indicate your membership/license
PUB LP
SPS registered
N.A.
Expected Date of Commencement
Expected Date of Completion
SECTION A2: SEWERAGE WORK, RC Trench
Attachment:
1. Detail sewerage planTo show: propose sewer alignment with diameter, material,
top/invert level, existing sewer alignment to be abandoned (if any)
2. Design & calculation of RC trench (if applicable)
Declaration Name Role Phone Email Firm Arch/PEReg No
by PE (Civil):I hereby certify that the sewerage plans and the works shown therein comply with the provisions of the Sewerage andDrainageAct (Chapter 294), theSewerage andDrainage (Sanitary Works) Regulations, the currentCode of Practice on theSewerage and SanitaryWorks.
Select
Particulars of Plumber/ContractorTick if same as in Sanitary Work
Tick if applicable
Name
NRIC/Passport No.
Firm Details
Contact No
Select
72
please indicate your membership/license
PUB LP
SPS registered
N.A.
Expected Date of Commencement
Expected Date of Completion
SECTION B: DRAINAGE WORKTick if applicable
Attachment:
1. Site Plan and First Sty Plan
2. Basement Plans
3. Detail of Drainage Work
4. DC Checklist
5. Proposed plan showing crest levels, platform levels with andwithout flood barriers at various entrance and exit points, andflood barrier installed at all points of entry and exit for buildingpremises or for entire development
Declaration Name Role Phone Email Firm Arch/PEReg No
I certify that the drainagework are designed in fullcompliance with PUBrequirements includingSewerage and DrainageAct (Chapter 294) andcurrent edition of COP onSurface Water Drainage
Select
Please state if any deviation from the COP
SECTION C: Infrastructure or other works affecting Sewer & Drainage (eg. Covered link way, bus stop)
Tick if applicable
Attachment:
1. First storey plan, showing sewer setback, sewer alignment, diameter,manhole & sewer ID.
2. Cross sectional plan
3. Sewer and drainage plan
4. Proposed plan showing crest levels, platform levels with and withoutflood barriers at various entrance and exit points, and flood barrierinstalled at all pints of entry and exit for building premises or for entiredevelopment.
73
Declaration Name Role Phone Email Firm Arch/PEReg No
I hereby certify that theseplans and the works showntherein comply with theprovisions of the Sewerageand Drainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works)Regulations, the currentCode of Practice onSewerage and Sanitary Works.
Select
75
SUBMISSION FOR DEVELOPMENT CONTROL (DC) PLAN
DC SUBMISSION
1. This page of the form is applicable for major projects2. First Storey Plan/Site Plan for Section A and B can be submitted as one plan
with clear layer and identification3. Please check all the relevant information have been indicated and provided
before submitting4. Detailed Plan for sanitary, sewer, and drainage works shall be submitted after the
DC clearance is obtained.
Particulars of Owner(s)
Name Select
Address
Contact No
(Tick if applicable) SECTION A: SANITARY / SEWERAGE WORK
Attachments:
1. Site plan and first storey plan
to show: The sewer setback, propose and existing sewer connection,top/invert level of MH, and platform levels, propose and existing sanitary drainline, propose public sewer (if any), manhole and sewer identification number
2. Is there any sewerage pump system required? Yes No
Declaration
I hereby certify that these plans and theworks shown thereincomply with the provisions of the Sewerage andDrainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works) Regulationsand the current Code of Practice on the Sewerage and Sanitary Works.
I have carried out a thorough investigation of the existing sewerage system within the site and will take every practical measure to ensure that the proposed development will not disrupt or affect any existing sewer / drain-line that serves other properties / premises.
Select
Name Role Contact Email FirmArch/PEReg No
Select
Please state if any
76
COP
77
DC SUBMISSION
(Tick if applicable) SECTION B: DRAINAGE WORK
Attachments:
1. Site Plan and First Sty Plan
2. Basement Plans
3. DC Checklist
4. Proposed plan showing crest levels, platform levelswith and without flood barriers at various entranceand exit points, and flood barrier installed at all pointsof entry and exit for building premises or for entiredevelopment
Declaration
I certify that the drainage workare designed infull compliancewith PUB requirementsincluding Sewerage andDrainage Act(Chapter 294)and currentedition of COPon Surface WaterDrainage
Please state if any deviation from the COP
Select
Name Role Contact Email FirmArch/PEReg No
78
PUBLIC UTILITIES BOARD (PUB)CATCHMENT & WATERWAYS DEPARTMENT
CHECKLIST FOR DC PLANS
PUB-DD-CHECKLIST
*Please use this form if development site is equal to orgreater than 0.2 Ha*
(A) General
1. Date of Drainage InterpretationPlan (DIP) issuance (Please indicate the date of DIP)
2. Site boundary lines are clearlyindicated on plan
Select
3. Existing drains alignment, drain size,drain type, summit point, flow directionand discharge points of internal surfacedrain system are clearly indicated on plan
Select
4. All addition and alteration worksare highlighted
Select
5. For JTC, HDB, URA developments,the drainage masterplan of thedevelopment site is attached togetherwith the submission.
Select
6. There is provision of peak runoff controlmeasures within the development site.
Select
Size of development site Ha
(a) Post-development Runoff Coefficient
(Please indicate value between 0 to 1)
(b) Type of measures to reduce peak runoff
(i) Detention tanks: Volume
*For developments with detention tank systems, please alsofill out section 6 (c) in the form*
(Please indicate size< width (m) x length (m) x
effective depth (m) >)
(ii) Retention/ sedimentation ponds Select
(iii) Green roofs Select
(iv) Planter boxes Select
(v) Porous pavements Select
(vi) ABC Waters Design Features (to be endorsed by an ABC Waters Professional - please fill out Section 7 in the form)
Constructed Wetlands Select
79
Bioretention Swales/Basins Select
Rain Gardens Select
(vii) Others
(Please indicate if any)
(c) For developments with detention tank systems
(i) Detention tank incorporates rainwater harvesting feature
Detention volume
Detention volume to meet the requirement as stated in Clause 7.1.5 of the latest edition of Code of Practice on Surface Water Drainage (Detention V)
(Please indicate volume in cubic metre)
Volume set aside for rainwater harvesting storage (Rainwater Harvesting V) (Please indicate volume
in cubic metre)
Total volume of tank (Total V) 0
Total V = Detention V + Rainwater Harvesting V
Select
(ii) Proposed drainage plan indicating catchment and sub-catchment boundaries, and the specific subcatchment of each tank including the outlet discharge point of the internal drainage system to the public drain is attached with the submission.
(iii) Proposed site plan with runoff coefficients and area of development with varying characteristics of catchment/sub-catchment clearly indicated.
Select
(iv) Proposed site plan with features, and catchment/sub-catchment of each feature, to attenuate stormwater runoff to comply with COP requirements clearly indicated.
Select
(v) PE (Civil) -endorsed design calculations or modelling results as per the design calculations templates or equivalent, are included in the submission. If there is any pumped drainage system involved, the civil and structural components shall be endorsed by a PE (Civil) while the mechanical and electrical components shall be endorsed by a PE (Mechanical/Electrical).
Select
(vi) Proposed site layout plans indicating the location and footprint of the detention tank(s), pumping facilities (if applicable), the effective depth of the detention tank(s) and the connection point to the internal drainage system are attached in the submission.
Select
Select
80
7. ABC Waters design features are incorporatedwithin the development.
Select
*If yes, please also respond to 7(a), 7(b)*
(a) Names & Registration No. of ABC Waters Professional (Please indicate name & registration
no. of ABC professional)
(b) Concept design and design calculations (e.g. catchment area, treatment area and detainment volume etc for the ABC Waters design feature), endorsed by the ABC Waters Professional are submitted to PUB.
(c ) Hydraulic calculation for the overflow system, endorsed by ABC Waters Professional (PE) are submitted to PUB.
8. If the proposed development site areaexceeds 0.4 ha, hydraulic calculationsfor the proposed internal drainage facilities,including sub-catchment plans for theproposed development site endorsed by aProfessional Engineer (Civil) to be submittedfor PUB record.
9. There is upstream drainage connectionfrom the neighbouring lots into thedevelopment site.
(B) DRAINAGE RESERVE
10. Drainage Reserve lines and lot boundariesare indicated, dimensioned and highlighted.
11. All embankments and structures are setoutside the Drainage Reserve
12. Drainage Reserve are free from encumbrances
13. Design of embankment and structuresnear a drain or Drainage Reserve (within 2m)must not take into consideration the passiveresistance offered by the existing orproposed drainage structures.(Note clause 5.3 of the latest edition ofCode of Practice on Surface WaterDrainage). The structural and stabilitycalculations for an embankment or a structurewithin 2 m from the edge of Drainage Reserveshall be endorsed by a Professional Engineerand submitted to the Board for record atDetailed Planning stage.
(C)MINIMUM PLATFORM LEVEL (MPL)
14. MPL of development mRL
15. All proposed/existing platform levelsare clearly indicated on plan
Select
81
16. The proposed platform levels androad/ground levels adjacent to theinternal drain outlet discharge point areclearly indicated
17. For addition and alteration workssubmission, the existing platform levelsare indicate
18. Linkages (direct/indirect) to specialunderground facilities and basements,if any, are indicated and complied withthe latest Code of Practice on SurfaceWater Drainage
Select
19. Flood barrier (as stipulated in Section 2.4 ofthe latest Code of Practice on SurfaceWater Drainage), if any, is incorporated intothe development site.
Select
*If Yes, please also respond to 19(a)*
(a) Proposed plans indicating the crest levels and/or platform levels with and without flood barrier at various entrance and exit points are attached together with the submission
Select
For developments where flood barriers are automated and/or with more than 2points of entry/exit, the following document shall be submitted at Detailed Planningstage.-- Details on the Standard Operating Procedure (SOP) including the operation and maintenance of the flood barrier to be endorsed by Mechanical and/ or ElectricalQP or PE, and the developer/ building owner.-- Details on the size, type and design of the flood barrier.
82
(D) PROPOSED DRAINAGE WORKS
20. Proposed/ existing drains and drains to bedeleted are clearly indicated usingdifferent colour
Select
21. Alignment, summit point, flow direction, type& size and outlet discharge points of theproposed internal surface drains are clearlyindicated.
Select
22. Connection point to existing drain is indicated Select
23. Proposed internal surface drains are able todischarge into roadside/ outlet drain asshown on plan.
24. Sump size is indicated Select
25. Vertical grating at internal drain outletdischarge point is provided
Select
26. External drainage works (including culvertdetails) to be submitted separately duringDetailed Planning stage. This shall be clearlyannotated on plan
Select
(E) OPENING LEADING TO BASEMENT LEVEL
27. Crest level of access ways and openingsleading into the basement is indicated andcomplied with the latest Code of Practiceon Surface Water Drainage
Select
28. Proposed sizes and flow direction of cut offdrains are indicated
Select
(F) COMMON DRAIN
29. Alignment, size and flow of existingcommon drain within the developmentlot are indicated.
Select
30. If there is common drain within thedevelopment site, the following shall beendorsed on the plan:
Select
"Surface runoff from the site and allneighbouring lots shall continue to beallowed to discharge through the commondrain within the site."
31. There is no permanent structure erectedabove and over the common drain
Select
32. If the proposal involves the reconstructionof common drain, the proposed commondrain shall be at least 450mm wide asstipulated in Section 4.5 of Code ofPractice on Surface Water Drainage or
Select
83
any other sizes as directed by PUB
33. Details of the proposed common drain tobe submitted by Professional Engineer(Civil) separately to PUB for approvalduring Detailed Planning/ Building Planstage. This is to be annotated on the plan
Select
34. The position of the existing/proposedboundary wall/fence is clearly indicated
Select
84
(G) PUMPED DRAINAGE SYSTEM
35. Pumped drainage system complies with thelatest Code of Practice on Surface WaterDrainage. Details of pumped drainagesystem and design computations dulyendorsed by PE shall be submittedseparately to PUB for record during DetailedPlanning stage
Select
36. Source catchment area with surface runoffleading into the pumped drainage system isclearly indicated
Select
37. The location, size, inlet and outletconnections of the rainwater pump sumpfor the proposed pumped drainage systemare clearly indicated
Select
(H) RETAINING WALL
38. If a retaining wall is erected to raise theground level of the development site aboveadjacent premises, adequate internaldrainage system provided to effectivelyintercept and drain away runoff including thesub-soil flow from the development site
Select
39. If a retaining wall is erected to lower theground level of the development site,adequate internal drainage system providedto effectively intercept and drain awayexisting sub-soil and overland flowsdischarging through the development sitefrom the adjacent premises
Select
(I) DRAINAGE AFFECTING OTHER PREMISES
40. Minimum 600mm high solid boundary wallaround development site is erected toprevent surface runoff from overflowing intoadjacent premises on lower ground
Select
I hereby confirm that the above items have been complied with and endorsed on the plans.
I hereby certify that the standard endorsement below will also be certified on the plans:-
(a) The planning, design, construction activities and procedures for plan submission shall comply fully with the requirements as stipulated in the latest edition of the Code of Practice on Surface Water Drainage and the Sewerage and Drainage (Surface Water Drainage) Regulations 2007.
(b) The capacity of internal drains shall be sufficient to intercept and discharge all runoff from the development site.(c) The runoff within, upstream of and adjacent to the development lot can be
effectively drained away without causing flooding within the lot or in areas outside the lot.(d) There is no direct connection from the internal drains within the basement or
85
sub-basement to the external roadside drains.
* Public Utilities Board (PUB) reserves the right to report any false declaration ofinformation to the relevant professional bodies for action in accordance to theAct/ethnics governing all the Qualified Professional.*
86
PUBLIC UTILITIES BOARD (PUB)CATCHMENT & WATERWAYS DEPARTMENT
CHECKLIST FOR DC PLANS*Please use this form if development site is less than 0.2 Ha*
PUB-DD-CHECKLIST
(A) General
1. Date of Drainage Interpretation Plan (DIP) issuance
2. Site boundary lines are clearly indicated on plan
3. Existing drains alignment, drain size, drain type,summit point, flow direction and dischargepoints of internal surface drain system areclearly indicated on plan
4. All addition and alteration works are highlighted
5. For JTC, HDB, URA developments, the drainagemasterplan of the development site is attachedtogether with the submission.
6. ABC Waters design features are incorporated withinthe development.
Select
(a) Names & Registration No. of ABC Waters Professional
(b) Concept design and design calculations, endorsed by the ABC Waters Professional are submitted to PUB.
Select
(c ) Hydraulic calculation for the overflow system, endorsed by ABC Waters Professional (PE) are submitted to PUB.
Select
7. If the proposed development site area exceeds0.4 ha, hydraulic calculations for the proposedinternal drainage facilities, includingsub-catchment plans for the proposed developmentsite endorsed by a Professional Engineer (Civil) tobe submitted for PUB record.
Select
8. There is upstream drainage connection from the neighbouring lots into the development site.
Select
Select
Select
Select
Select
87
PUB-DD-CHECKLIST
(B) DRAINAGE RESERVE
9. Drainage Reserve lines and lot boundaries are indicated, dimensioned and highlighted.
Select
10. All embankments and structures are set outsidethe Drainage Reserve
Select
11. Drainage Reserve are free from encumbrances Select
12. Design of embankment and structures near a drainor Drainage Reserve (within 2m) must not take intoconsideration the passive resistance offered by theexisting or proposed drainage structures. (Noteclause 5.3 of the latest edition of Code of Practiceon Surface Water Drainage). The structural andstability calculations for an embankment or astructure within 2 m from the edge of DrainageReserve shall be endorsed by a ProfessionalEngineer and submitted to the Board for record atDetailed Planning stage.
Select
(C)MINIMUM PLATFORM LEVEL (MPL)
13. MPL of development mRL
14. All proposed/existing platform levels are clearlyindicated on plan
Select
15. The proposed platform levels and road/ground levels adjacent to the internal drain outlet discharge point are clearly indicated
Select
16. For addition and alteration works submission, theexisting platform levels are indicated
Select
17. Linkages (direct/indirect) to special undergroundfacilities and basements, if any, are indicated andcomplied with the latest Code of Practice onSurface Water Drainage
Select
18. Flood barrier (as stipulated in Section 2.4 of thelatest Code of Practice on Surface WaterDrainage), if any, is incorporated into thedevelopment site.
Select
(a) Proposed plans indicating the crest levels and/or platform levels with and without flood barrier at various entrance and exit points are attached together with the submission
Select
For developments where flood barriers are automated and/or with more than 2 points of entry/exit, the following document shall be submitted at Detailed Planning/ Building Plan stage.-- Details on the standard operating procedure (SOP) including the proposed maintenance plan of the flood barrier to be endorsed by a Civil and/or Mechanical Qualified Person, and the developer/owner.-- Details on the size, type and design of the flood barrier.
(D) PROPOSED DRAINAGE WORKS
88
19. Proposed/ existing drains and drains to be deletedare clearly indicated using different colour
Select
20. Alignment, summit point, flow direction, type & sizeand outlet discharge points of the proposedinternal surface drains are clearly indicated
Select
21. Connection point to existing drain is indicated Select
22. Proposed internal surface drains are able todischarge into roadside/ outlet drain asshown on plan
Select
23. Sump size is indicated Select
24. Vertical grating at internal drain outlet dischargepoint is provided
Select
25. External drainage works to be submitted separatelyduring Detailed Planning/ Building Plan stage. Thisshall be clearly annotated on plan
Select
(E) OPENING LEADING TO BASEMENT LEVEL
26. Crest level of access ways and openings leadinginto the basement is indicated and complied withthe latest Code of Practice on Surface WaterDrainage
Select
27. Proposed sizes and flow direction of cut off drainsare indicated
Select
89
PUB-DD-CHECKLIST
(F) COMMON DRAIN
28. Alignment, size and flow of existing common drainwithin the development lot are indicated
Select
29. If there is common drain within the developmentsite, the following shall be endorsed on the plan:
Select
“Surface runoff from the site and all neighbouring lots shall continue to be allowed to discharge through the common drain within the site.”
30. There is no permanent structure erected aboveand over the common drain
Select
31. If the proposal involves the reconstruction ofcommon drain, the proposed common drainshall be at least 450mm wide as stipulated inSection 4.5 of Code of Practice on Surface WaterDrainage or any other sizes as directed by PUB
Select
32. Details of the proposed common drain to besubmitted by Professional Engineer (Civil)separately to PUB for approval during DetailedPlanning/ Building Plan stage. This is to beannotated on the plan
Select
33. The position of the existing/proposed boundary wall / fence is clearly indicated
Select
(G) PUMPED DRAINAGE SYSTEM
34. Pumped drainage system complies with the latestCode of Practice on Surface Water Drainage.Details of pumped drainage system and designcomputations duly endorsed by PE shall besubmitted separately to PUB for record duringDetailed Planning / Building Plan stage
Select
35. Source catchment area with surface runoff leadinginto the pumped drainage system is clearly indicated
Select
36. The location, size, inlet and outlet connections ofthe rainwater pump sump for the proposedpumped drainage system are clearly indicated
Select
(H) RETAINING WALL
37. If a retaining wall is erected to raise the groundlevel of the development site above adjacentpremises, adequate internal drainage systemprovided to effectively intercept and drain away runoff including the sub-soil flow from thedevelopment site
Select
38. If a retaining wall is erected to lower the groundlevel of the development site, adequate internaldrainage system provided to effectively interceptand drain away existing sub-soil and overland flowsdischarging through the development site from theadjacent premises
Select
(I) DRAINAGE AFFECTING OTHER PREMISES
39. Minimum 600mm high solid boundary wall arounddevelopment site is erected to prevent surfacerunoff from overflowing into adjacent premises onlower ground
Select
I hereby certify that the standard endorsement below will also be certified on the plans:-
I hereby confirm that the above items have been complied with and endorsed on the plans.
90
(a) The planning, design, construction activities and procedures for plan submission shall comply fully with the requirements as stipulated in the latest edition of the Code of Practice on Surface Water
Drainage and The Sewerage and Drainage (Surface Water Drainage) Regulations 2007. (b) The capacity of internal drains shall be sufficient to intercept and discharge all runoff from the development site.
(c) The runoff within, upstream of and adjacent to the development lot can be effectively drained away without causing flooding within the lot or in areas outside the lot.(d) There is no direct connection from the internal drains within the basement or sub-basement to the external roadside drains.
* Public Utilities Board (PUB) reserves the right to report any false declaration of information to the relevant professionalbodies for action in accordance to the Act/ethnics governing all the Qualified Professional. *
91
APPLICATION FOR CLEARANCE CERTIFICATE FOR DETAILED PLAN ON DRAINAGE AND SEWERAGE
(SANITARY/SEWER) WORKS
PUB-BPU-CLRDP01
[UNDER SECTION 33(1) OF THE SEWERAGE AND DRAINAGEACT (SDA), CHAPTER 294]
This form may take you 10 minutes to fill in. You will need the following information to fill in the form:-
- Particulars of Project - Particulars of Qualified Person
Date: 19/03/2014
To: Central Building Plan Unit
National Environment Agency40, Scotts Road, #13-00Environment BuildingSingapore 228231
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for theworks.
2. This form is to be accompanied by the relevant attachments.
Information
1. For enquiries on application of status for :a) Industrial development,please call 67319637
b) Non-industrial development,please call 67319628 / 67319653
Particulars of Project
Project Reference Number
Project Title
Location Description[Include Lot/Plot, MK/TS,House No, Building Address and Road information]
Project Address
Plan Type Please Select 001
Appendix 3
92
Particulars of Application
Application for
Clearance Certificatefor Detailed Plan onSewerage
Please Select
Submission Type Please Select
Development ProposalApplication
Please Select
NAFile Ref. No. /Case ID
Dated
SIP Reference Numberfrom CBPU (if applicable)
DC Clearance ReferenceNumber from CBPU(if applicable)
Department File ReferenceNo (if applicable)
93
PUB-BPU-CLRDP01
(Tick if applicable) SECTION A1: SANITARY WORK
Attachments:
1. Detail Sanitary Plan
2. Detail of Holding Tank/STP/Retention tank (if applicable)
Declaration
I hereby certify that these plans and the works shown therein comply with the provisions of the Sewerage and Drainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works) Regulations and the current Code of Practice on the Sewerage and Sanitary Works.
Name
Select
Role Phone Email FirmArch / PEReg. No
Please state if any deviance from the COP
Particulars of Plumber/Contractor
Name Please select
Firm Details
Contact No
Please indicate your Registration / LicenseNumber
SPS registered
PUB LP
N.A
Date of Commencement Date of Completion
3. Details of M&E Works (Used Water) Yes No
Declaration
I, being a Professional Engineer hereby certify that the proposed mechanical and electrical (M&E) works of the above mentioned project are in accordance with the current Code of Practice on Sewerage and Sanitary Works, Sewerage andDrainage Act (Chapter 294) and other sewerage requirements as stipulated by Water Reclamation (Network) Department and have been fully and accurately reflected in the submitted detail plan drawings.
Name
Select
Role Phone Email FirmArch / PEReg. No
Attachments
94
1. Detail plan drawings of used water pumping system(s)
2. Attached Form D2/QP if an alternate power source is not available
3. Design calculations
4. Pump and system curves
5. Relevant equipment catalogues
Please state if anydeviation from the COP
Pump DesignCondition
Pump Application
Brand Model Estimated Inflow
(l/s)
Pumpoperating
capacity (l/s)
Pumpoperatinghead (m)
Solidsfree
passage Size (mm)
Motor Rating (kw)
Select
Add Delete
95
PUB-BPU-CLRDP01
(Tick if applicable) SECTION A2: SEWERAGE WORK, RC Trench
Attachments:
1. Detail Sewerage Plan (to indicate: diameter, pipe material, gradient, manhole detail, andlongitudinal section)
2. Design & Calculation of RC Trench (if structure is proposed over sewer). PE to endorse in drawing
Declaration
by PE (Civil):I hereby certify that the sewerage plans and the works shown therein comply with the provisions of the Sewerage and Drainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works)Regulations, the current Code of Practice on the Sewerage and Sanitary Works.
I also declare that I have carried out a thorough investigation of theexisting sewerage system within the site and will take every practical measure to ensure that the proposed developmentwill not disrupt or affect anyexisting sewer/drain-line that serves other properties/premises.
Name
Select
Please state if any deviation from the COP
Date of Commencement
Particulars of Plumber/Contractor
Name Please select
Firm Details
Contact No
Please indicate your Registration / LicenseNumber
SPS registered
PUB LP
N.A
Date of Completion
Role Contact Email FirmArch / PEReg. No
96
PUB-BPU-CLRDP01
Please tick if this submission pertains to:
Internal drainage works
External drainage works (entrance culvert/ roadside drain)
(Tick if applicable) SECTION B: DRAINAGE WORK
Attachments:
1. Detail Plan on Drainage Works as required under Section 33(3) and 33(4) of the SDA, Chapter 294
2. As built drawings for drainage works and piling records
3. Leak Test Certificates on installed flood barriers
4. As built survey plans for detention tank system
Declaration
I hereby certify that the drainage work shown on the detailed plans have been designed in accordance with the provisions of the SDA, Chapter 294, Sewerage and Drainage (Surface Water Drainage) Regulations, current Codeof Practice on Surface Water Drainage and the drainage requirements stipulated during planning stage (if applicable) except for those provisions where waivers have been obtained from the Public Utilities Board in writing.
Select
Name Role Contact Email FirmArch / PEReg. No
Please state if any deviation from the COP
97
CERTIFICATE OF COMPLETION AND INSPECTION OF SANITARY, SEWERAGE AND DRAINAGE WORKS
[UNDER SECTION 35(1)(e) AND (f) OF THE SEWERAGE ANDDRAINAGE ACT (CHAPTER 294)]
Date: 28/08/2012
To: PUB
Building Plan UnitPUB40 Scotts Road #15-01Environment BuildingSingapore 228231
Instructions
1. The form shall be digitally signed by the appropriate QP/PE
2. The form is to be submitted by the QP/PE appointed undersection 8,9 & 11 of Building Control Act.
Particulars of Project
Project Ref No
Project Title
PUB-BPU-COMPOFWORK
MK-LOT( ie, MK03-12345)
Project Address
Please Select Your Application:
Completion of Sewerage Work only
Application for PUB Clearance for Temporary Occupation Permit (TOP)
Application for PUB Clearance for Certificate of Statutory Completion (CSC)
Application for PUB Clearance for both Temporary Occupation Permit (TOP) & Certificate of Statutory Completion (CSC) (this option is applicable if the QP could confirm that there is no outstanding matters related to PUB (sewerage and drainage)
Appendix 4
98
SECTION A1: SEWERAGE WORK
Attachments
1. Site plan and first storey plan
2. As built sewerage plan
To Show:2.1 Length, diameter, gradient, material of the sewer pipe, top & invert level of the manhole2.2 Position of manholes shall follow SVY21 coordinate cadastral base
established by SLA
3. CCTV for the newly constructed sewer (applicable for sewer withdiameter 600mm or larger) to be sent to: 82 Toh Guan Road East#C2-14, Singapore 608575
4 As built pumping installation plan (if applicable)
5 Others (Eg: Sewage Treatment Plant (STP), holding tank)
Declaration (PE Civil)
PE Name
PE Reg no
Role
Ph No
Firm
Select
Declaration (PE Mech.)
PE Name
PE Reg no
PE Reg no
Role
Ph No
Firm
Select
Declaration (PE Elec. )
PE Name
PE Reg no
Role
Ph No
Firm
Select
99
I/We, the above name, hereby certify that to the best of my knowledge andbelief, the works were carried out in accordance with the above building plans and detailed plans, the current Code of Practice on Sewerage and Sanitary Works, Sewerage and Drainage Act (Chapter 294) and the Sewerage and Drainage (Sanitary Works) Regulations and any other conditions under which the plans and amendments thereto were approved by PUB.
I
I confirm that I have received the below plumber/ contractor
has executed the sewerage works in accordance with the plans assupplied by the QP/PE and in accordance with the current Code of Practice on Sewerage and Sanitary Works.
Plumber's/Contractor's name
NRIC No. or Passport No.
Firm Name
Email address
Registration/license type
Select
SPS registered
PUB LP
NA
certify that the hydrostatic test has been conducted for
sewers and manholes and the test results have met the requirementsstipulated in Code of Practice on Sewerage and Sanitary Works.
100
Application for PUB Clearance for TOPSECTION A2: SANITARY WORK
Attachments:
Tick if applicable
1. As built sanitary plan (to be endorsed by QP)
2. Post Construction CCTV to the existing public sewer. To be sent to: 40 Scotts Rd #15-01,Singapore 228231, PUB Water Reclamation (Network) Department
3. As built plans for used-water pumping system(s)
Declaration Name Role Phone Email Firm Arch/PEReg No
SelectI hereby certify that to the best of my knowledge and belief, the works were carried out in accordance with the above building plans and detailed plans, the current Code of Practice on Sewerage and Sanitary Works, Sewerage and Drainage Act (Chapter 294) and the Sewerage and Drainage (Sanitary Works) Regulations and any other conditions under which the plans and amendments thereto were approved.
I have checked and certifiedthat there is no change in the condition of the existingsewer(s) and manhole(s)between the pre and postconstrcution CCTV inspectionreport.
I confirm that I have receivedthe plumber's confirmation that the below plumber/contractor has executed thesanitary plumbing works inaccordance with the plansas supplied by the QP and inaccordance with the currentCode of Practice on Sewerage and SanitaryWorks
I, being a Professional Engineer (M/E) hereby certify that to the best of my knowledge and belief, the completed mechanical and electrical (M&E) works of the above mentioned project are in accordance
Select
Select
Select
101
with the current Code of Practice on Sewerage and Sanitary Works, Sewerage and Drainage Act (Chapter 294) and other sewerage requirements as stipulated by Water Reclamation (Network) Department and have been fully and accurately reflected in the submitted "As built" plans.
I also confirm that the installedM&E equipment are safe for operation
Plumber's/Contractor's name
NRIC No. or Passport No.
Firm Name
Email address
Registration/license type
Select
SPS registered
PUB LP
NA
3. Declaration of Chargeable Sanitary Appliances Installed.
There is Select to the original number of chargeable sanitary appliances in the premises
4. Details of Chargeable Sanitary Appliances
4a. Type of Submission For "New Erections", the existing buildings are unaffected. Select
Attachments:
4b. The allotment of address from the comptroller of property tax
4c. Floor layout plan showing the location of the appliances
4d. SP Services' Ltd Utilities Bill
The number of chargeable sanitary appliances in the premises upon completion of this project are as follows:
House No. or Unit No. (Eg. #01-01)
Previous quantites of chargeablesanitary appliances at the affected area before commencement of project
Quantities of chargeable sanitary appliances after completion of project
WC Urinal Bidet Slop Sink WC Urinal Bidet Slop Sink
Add Delete (Add or Delete row for house no. or unit no.)
#Common Area Previous quantites of chargeablesanitary appliances before commencement of project
Quantities of chargeable sanitaryappliances after commencement of project
WC Urinal Bidet Slop Sink WC Urinal Bidet Slop Sink
102
SECTION A3: RC TRENCH COMPLETION(RC TRENCH shall not be backfilled before inspection)
Declaration Name Role Phone Email Firm Arch/PEReg No
I herby certify that theRC trench has beenconstructed is readyfor PUB (WRN)'s auditinspection beforebackfilling and covering up the trench.
Select
I herby certify that theRC trench has beenconstructed is readyfor PUB (WRN)'s auditinspection beforebackfilling and covering up the trench.
I or my authorised representative (with letter of authorisation to be provided) will be present during PUB (WRN)'s inspection.
After the inspection I will submit the photographs of the RC trench.
[Note: The photographs taken in sequence showing the process ofconstructing, backfilling and covering up the RC trench shall show clearly, among other things, the width, depth, base of the trench, the fill materials and the condition of the sewer pipe. Adequatenumber of photographs taken to capture all details above andpasted on A4 papers and clearly labelled.]
Attachment:
As-built plan (endorsed by PE) showing the layout and dimensions of the RC trench and position of the existing sewer.
If Applicable
If Applicable
103
SECTION B: DRAINAGE WORK
External drainage work has not yet completed
Site Area: ha
Attachment:
1. As constructed drainage plan(to show as built platform level, crest level and floodprotection levels)
2. Internal drainage Hydraulic calculations submissions(for developments more than 0.4 Ha)
Declaration
I certify that the drainagework are designed in full compliance with PUB requirement including Sewerage and Drainage (Chapter 294) Actand COP on Surface Water Drainage
SECTION C: Infrastructure works affecting Sewer & Drainage (eg. Covered link way, bus stop)
Tick if applicable
Name
Select
Declaration by PE(Civil)
Name
PE Reg No
Role
Ph No
Firm
Select
DeclarationI hereby certify that the work has been completed in compliance with the approved drawing, Sewerage and Drainage Act (Chapter 294), and Code of Practice for Sewerage and Sanitary Works.
Attachment:
1. Post Construction CCTV to the public sewer (when required in DC Clearance).Report and DVD should be sent to 40 Scotts Rd #15-01, Singapore 228231,PUB Water Reclamation (Network) Department
2. As constructed drawing showing the sewer setback
3. As built topographical survey plan
Role Phone Email Firm Arch/PEReg No
104
Section D: Application for PUB Clearance for CSC
Attachments:
1. As constructed drainage plan (to show as built platform level, crest leveland flood protection levels)
2. Post rectification CCTV to the public sewer or drainline(when required). To be sent to: 40 Scotts Rd #15-01, Singapore228231, PUB Water Reclamation (Network) Department
3. As built topographical survey plan
Declaration
by PE (Civil):I certify that the drainage workare designed in full compliance with PUB requirement including Sewerage and Drainage Act (Chapter 294) and COP on Surface Water Drainage.
Name Role Phone Email Firm Arch/PEReg No
I am requesting for PUB Clearance for CSC and confirms there is no further outstanding work.
Select
Select
105
Application for PUB Clearance for TOPSECTION A2: SANITARY WORK
Attachments:
Tick if applicable
1. As built sanitary plan (to be endorsed by QP)
2. Post Construction CCTV to the existing public sewer. To be sent to: 40 Scotts Rd #15-01,Singapore 228231, PUB Water Reclamation (Network) Department
3. As built plans for used-water pumping system(s)
Declaration Name Role Phone Email Firm Arch/PEReg No
SelectI hereby certify that to the best of my knowledge and belief, the works were carried out in accordance with the above building plans and detailed plans, the current Code of Practice on Sewerage and Sanitary Works, Sewerage and Drainage Act (Chapter 294) and the Sewerage and Drainage (Sanitary Works) Regulations and any other conditions under which the plans and amendments thereto were approved.
I have checked and certifiedthat there is no change in the condition of the existingsewer(s) and manhole(s)between the pre and postconstrcution CCTV inspectionreport.
I confirm that I have receivedthe plumber's confirmation that the below plumber/contractor has executed thesanitary plumbing works inaccordance with the plansas supplied by the QP and inaccordance with the currentCode of Practice on Sewerage and SanitaryWorks
by PE (M/E)I, being a Professional Engineer hereby certify that to the best of my knowledge and belief, the completed mechanical and electrical (M&E) works of the above mentioned
Select
Select
Select
106
project are in accordance with the current Code of Practice on Sewerage and Sanitary Works, Sewerage and Drainage Act (Chapter 294) and other sewerage requirements as stipulated by Water Reclamation (Network) Department and have been fully and accurately reflected in the submitted "As built" plans.
I also confirm that the installedM&E equipment are safe for operation
Plumber's/Contractor's name
NRIC No. or Passport No.
Firm Name
Email address
Registration/license type
Select
SPS registered
PUB LP
NA
3. Declaration of Chargeable Sanitary Appliances Installed.
There is Select to the original number of chargeable sanitary appliances in the premises
4. Details of Chargeable Sanitary Appliances
4a. Type of Submission For "New Erections", the existing buildings are unaffected Select
Attachments:
4b. The allotment of address from the comptroller of property tax
4c. Floor layout plan showing the location of the appliances
4d. SP Services' Ltd Utilities Bill
The number of chargeable sanitary appliances in the premises upon completion of this project are as follows:
House No. or Unit No. (Eg. #01-01)
Previous quantites of chargeablesanitary appliances at the affected area before commencement of project
Quantities of chargeable sanitary appliances after completion of project
WC Urinal Bidet Slop Sink WC Urinal Bidet Slop Sink
Add Delete (Add or Delete row for house no. or unit no.)
#Common Area Previous quantites of chargeablesanitary appliances before commencement of project
Quantities of chargeable sanitaryappliances after commencement of project
107
WC Urinal Bidet Slop Sink WC Urinal Bidet Slop Sink
SECTION A3: RC TRENCH COMPLETION(RC TRENCH shall not be backfilled before inspection)
Declaration Name Role Phone Email Firm Arch/PEReg No
I herby certify that theRC trench has beenconstructed is readyfor PUB (WRN)'s auditinspection beforebackfilling and covering up the trench.
Select
I herby certify that theRC trench has beenconstructed is readyfor PUB (WRN)'s auditinspection beforebackfilling and covering up the trench.
I or my authorised representative (with letter of authorisation to be provided) will be present during PUB (WRN)'s inspection.
After the inspection I will submit the photographs of the RC trench.
[Note: The photographs taken in sequence showing the process ofconstructing, backfilling and covering up the RC trench shall show clearly, among other things, the width, depth, base of the trench, the fill materials and the condition of the sewer pipe. Adequatenumber of photographs taken to capture all details above andpasted on A4 papers and clearly labelled.]
Attachment:
As-built plan (endorsed by PE) showing the layout and dimensions of the RC trench and position of the existing sewer.
If Applicable
108
SECTION B: DRAINAGE WORKIf Applicable
External drainage work has not yet completed
Site Area: ha
Attachment:
1. As constructed drainage plan(to show as built platform level, crest level and floodprotection levels)
2. Internal drainage Hydraulic calculations submissions(for developments more than 0.4 Ha)
Declaration
I certify that the drainagework are designed in full compliance with PUB requirement including Sewerage and Drainage (Chapter 294) Actand COP on Surface Water Drainage
SECTION C: Infrastructure works affecting Sewer & Drainage (eg. Covered link way, bus stop)
Tick if applicable
Name
Select
Declaration by PE(Civil)
Name
PE Reg No
Role
Ph No
Firm
Select
DeclarationI hereby certify that the work has been completed in compliance with the approved drawing, Sewerage and Drainage Act (Chapter 294), and Code of Practice for Sewerage and Sanitary Works.
Attachment:
1. Post Construction CCTV to the public sewer (when required in DC Clearance).Report and DVD should be sent to 40 Scotts Rd #15-01, Singapore 228231,PUB Water Reclamation (Network) Department
2. As constructed drawing showing the sewer setback
3. As built topographical survey plan
Role Phone Email Firm Arch/PEReg No
109
Section D: Application for PUB Clearance for CSC
Attachments:
1. As constructed drainage plan (to show as built platform level, crest leveland flood protection levels)
2. Post rectification CCTV to the public sewer or drainline(when required). To be sent to: 40 Scotts Rd #15-01, Singapore228231, PUB Water Reclamation (Network) Department
3. As built topographical survey plan
Declaration
by PE (Civil):I certify that the drainage workare designed in full compliance with PUB requirement including Sewerage and Drainage Act (Chapter 294) and COP on Surface Water Drainage.
Name Role Phone Email Firm Arch/PEReg No
I am requesting for PUB Clearance for CSC and confirms there is no further outstanding work.
Select
Select
110
APPLICATION FOR CLEARANCE OF TEMPORARYOCCUPATION PERMIT (TOP) - NEW SUBMISSION
This form may take you 15 minutes to fill in. You will need the following information to fill in the form:-
- Particulars of Project - Particulars of Qualified Person - Supporting completion and inspection certificates.
Date: 19/03/2014
Central Building Plan UnitTo:
National Environment Agency40, Scotts Road #13-00Environment BuildingSingapore 228231
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for theproject(s).
2. This form is to be accompanied by the relevant attachments.
Information
1. Service Standard :Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527
Particulars of Project
Project Reference Number
Project Title
Location Description[Include Lot/Plot, MK/TS,House No, Building Address and Road information]
Please Select 001Plan Type
Add Delete
Particulars of Application
Development Proposal Application
Please Select
ENV-CBPU-CLRTOP01-NEW SUBMISSIONAppendix 5
111
Date of CBPU DC Clearance
19/03/2014
Application for Temporary Occupation Permit
Pollution Control Works
Sewerage Works
Drainage Works (for crest levels , platform levels, flood protection levels based on approved flood protection measures)
Environmental Health (Sanitary Facilities)
Remarks: Application for Partial TOP (if applicable)
File Ref. No. /Case ID
NA Dated
Clearance Certificate for Building Plan on Pollution Control; for Industrial Plant Works (if applicable)
Clearance Certificate for Building Plan on Environmental Health (if applicable)
Clearance Certificate for Detailed Plan on Sewerage (Sanitary Works)(if applicable)
Clearance Certificate for Detailed Plan on Sewerage (Sewer Works)(if applicable)
Clearance Certificate for Detailed Plan on Sewerage (M&E Works)(if applicable)
Clearance Certificate for Detailed Plan on Drainage Works
Plan Submission for the location of Mechanical Equipment and its noise abatement measures tobe incorporated at the development premises
112
Particulars of Qualified Person
Name Please Select
Role In Project
Registration No
Firm Name
UEN
Firm Address
Telephone No.
Extension No
Fax No.
Email Address
Declaration by Qualified Person
I confirm that:
I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the Building Control Act (Cap. 29) in respect of the works described which include Pollution Control, Environmental Health (Sanitary Facilities) Sewerage Works and Drainage Works (platform and crest protection levels only); and my qualification is appropriate to the nature of these works;
The particulars of Project, Application and Submission Checklists given in this form are correct;
The works have been carried out and completed.
The crest levels, platform levels, flood protection levels are in compliancewith COP on Surface Water Drainage and constructed according to approved plans.
The maximum stormwater discharge from the development is in compliance with the maximum allowable peak runoff stipulated in the COP and constructed according to approved plans.
I have liaised with the Developer/ Owner to ensure that a Maintenance/Managing Agent has been established to undertake the SOP of the maintenance, operation and monitoring of the detention tank system.
Development with Public Toilet
If there are deviations from any of the above, please indicate in detail, attachments and PUB approval if applicable
I have inspected the public toilets in this development and that they have
113
been completed in accordance with the provision of sanitary facilities stipulated in the Code of Practice on Environmental Health, except for those provisions where waivers have been obtainted from the National Environment Agency
Development has no public toilet
Attachments
Dated
Certificate of Completion and Inspection for Sanitary Works
(PUB-BPU-COMPOFWORK)
Certificate of Completion and Inspection for SewerageWorks (PUB-BPU-COMPOFWORK)
Certificate of Completion and Inspection for the Mechanical and Electrical Works for Sewerage Installation (PUB-BPU-COMPOFWORK)
Certificate of Inspection for Drainage Works
As built survey plans indicating crest levels, platform levels, flood protection levels based on approved flood protection measures
As built drawings for detention tank systems and final design calculations, and factory test report for its pumping system.
Standard Operating Procedure for pumped drainage system(basement/ detention tank)
Standard Operating Procedure for flood barrier
Developer/Owner declaration on the following - I shall inspect and declare that the crest levels are constructed to approved plans annually/every 3 years upon obtaining the TOP
Developer/Owner declaration on the following - I shall submit the following documents as required annually upon obtaining the TOP.- Certificate of inspection on flood barriers on site, including leak test certificate.- Amendments to SOP for flood barrier.- Certificate of inspection on pumped drainage system (basement/detention tank).- Certificate of inspection on ABC Waters design features.
114
APPLICATION FOR CLEARANCE OF TEMPORARYOCCUPATION PERMIT (TOP) - RESUBMISSION
This form may take you 15 minutes to fill in. You will need the following information to fill in the form:-
- Particulars of Project - Particulars of Qualified Person - Supporting completion and inspection certificates.
Date: 19/03/2014
Central Building Plan UnitTo:
National Environment Agency40, Scotts Road #13-00Environment BuildingSingapore 228231
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for theproject(s).
2. This form is to be accompanied by the relevant attachments.
Information
1. Service Standard :Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527
Particulars of Project
Project Reference Number
Project Title
Location Description[Include Lot/Plot, MK/TS,House No, Building Address and Road information]
Please Select 001Plan Type
Add Delete
Particulars of Application
Development Proposal Application
Please Select
ENV-CBPU-CLRTOP01-RESUBMISSIONAppendix 6
115
Date of CBPU DC Clearance
19/03/2014
Application for Temporary Occupation Permit
Pollution Control Works
Sewerage Works
Drainage Works (for crest levels , platform levels, flood protection levels based on approved flood protection measures)
Environmental Health (Sanitary Facilities)
Remarks: Application for Partial TOP (if applicable)
Previous TOP Advice fromCBPU (if applicable)
CBPU Processing Officer
File Ref. No. /Case ID
NA Dated
Clearance Certificate for Building Plan on Pollution Control; for Industrial Plant Works (if applicable)
Clearance Certificate for Building Plan on Environmental Health (if applicable)
Clearance Certificate for Detailed Plan on Sewerage (Sanitary Works)(if applicable)
Clearance Certificate for Detailed Plan on Sewerage (Sewer Works)(if applicable)
Clearance Certificate for Detailed Plan on Sewerage (M&E Works)(if applicable)
Clearance Certificate for Detailed Plan on Drainage Works (if applicable)
Plan Submission for the location of Mechanical Equipment and its noise abatement measures tobe incorporated at the
116
development premises
117
Particulars of Qualified Person
Name Please Select
Role In Project
Registration No
Firm Name
UEN
Firm Address
Telephone No.
Extension No
Fax No.
Email Address
Declaration by Qualified Person
I confirm that:
I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the Building Control Act (Cap. 29) in respect of the works described which include Pollution Control, Environmental Health (Sanitary Facilities) Sewerage Works and Drainage Works (platform and crest protection levels only); and my qualification is appropriate to the nature of these works;
The particulars of Project, Application and Submission Checklists given in this form are correct;
The works have been carried out and completed.
The crest levels, platform levels, flood protection levels are in compliance with COP on Surface Water Drainage and constructed according to approved plans.
The maximum stormwater discharge from the development is in compliance with the maximum allowable peak runoff stipulated in the COP and constructed according to approved plans.
I have liaised with the Developer/ Owner to ensure that a Maintenance/Managing Agent has been established to undertake the SOP of the maintenance, operation and monitoring of the detention tank system.
If there are deviations from any of the above, pleaseindicate in detail, attachments and PUB approval ifapplicable.
118
Development with Public Toilet
I have inspected the public toilets in this development and that they have been completed in accordance with the provision of sanitary facilities stipulated in the Code of Practice on Environmental Health, except for those provisions where waivers have been obtainted from the National Environment Agency
Development has no public toilet
Attachments
Dated
Certificate of Completion and Inspection for Sanitary Works
(PUB-BPU-COMPOFWORK)
Certificate of Completion and Inspection for SewerageWorks (PUB-BPU-COMPOFWORK)
Certificate of Completion and Inspection for the Mechanical and Electrical Works for Sewerage Installation (PUB-BPU-COMPOFWORK)
Certificate of Inspection for Drainage Works
As built survey plans indicating crest levels, platform levels, flood protection levels based on approved flood protection measures
As built drawings for detention tank systems and final design calculations, and factory test report for its pumping system.
Standard Operating Procedure for pumped drainage system (basement/ detention tank)
Standard Operating Procedure for flood barrier
Developer/Owner declaration on the following - I shall inspect and declare that the crest levels are constructed to approved plans annually/every 3 years upon obtaining the TOP
Developer/Owner declaration on the following - I shall submit the following documents as required annually upon obtaining the TOP.- Certificate of inspection on flood barriers on site, including leak test certificate.- Amendments to SOP for flood barrier.- Certificate of inspection on pumped drainage system (basement/detention tank).- Certificate of inspection on ABC Waters design features.
119
APPLICATION FOR COMPLIANCE CERTIFICATE -NEW SUBMISSION
[UNDER SECTION 33(7) OF THE ENVIRONMENTALPROTECTION AND MANAGEMENT ACT (CHAPTER 94A) AND COMPLIANCE CERTIFICATE UNDER SECTION 33(8)
OF THE SEWERAGE AND DRAINAGE ACT (CHAPTER 294)]
This form may take you 15 minutes to fill in. You will need the following information to fill in the form:-
- Particulars of Project - Particulars of Qualified Person - Supporting completion and inspection certificates.
Date: 19/03/2014
To: Central Building Plan Unit
National Environment Agency40, Scotts Road #13-00Environment BuildingSingapore 228231
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for theproject(s).
2. This form is to be accompanied by the relevant attachments.
Information
1. Service Standard : Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527
Particulars of Project
Project Reference Number
Project Title
Location Description[Include Lot/Plot, MK/TS,House No, Building Address and Road information]
Please Select 001Plan Type
Add Delete
Particulars of Application
ENV-CBPU-CLRCSC01-NEW SUBMISSION
Development Proposal Please Select
Appendix 7
120
Application
Date of CBPU DC Clearance
Application for Compliance Certificate and Clearancefor Certificate of Statutory Completion
Environmental Health Works
Pollution Control Works
Sewerage Works
Drainage Works
File Ref. No. /Case ID
NA Dated
Clearance Certificate for Building Plan on Pollution Control for Industrial Plant Works (if applicable)
Clearance Certificate for Building Plan on Environmental Health (if applicable)
Clearance Certificate for Detailed Plan onSewerage (Sanitary Works) (if applicable)
Clearance Certificate for Detailed Plan on Sewerage (if applicable)
121
Particulars of Application (Continue)
File Ref. No. /NA Dated
Clearance Certificate for Detailed Plan on Sewerage (M&E Works) (if applicable)
Clearance Certificate for Detailed Plan on Drainage Works (if applicable)
Particulars of Qualified Person
Name Please Select
Role In Project
Registration No
Firm Name
UEN
Firm Address
Telephone No.
Extension No
Fax No.
Email Address
Declaration by Qualified Person
I confirm that:
I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the Building Control Act (Cap. 29) in respect of the works described which include
Environmental Health Works,
Pollution Control Works,
Sewerage Works,
Drainage Works; and my
qualification is appropriate to the nature of these works;
The particulars of Project, Application and Submission Checklists given in this form are correct;
The works have been carried out and completed. For industrial plant works, all related pollution control equipment and facilities have been installed/ completed according to the approved plans as listed in Particulars of Project and Application
122
Confirmation
1) I confirm that:
a) there are no roof gutters (including rain water down pipes andoutlets, and roof supper drains) provided for in the developmentproposal; or
b) waiver for roof gutter has been obtained from the National Environment
Agency in writing on : File Ref No:
Date:
c) There are roof gutters (including rain water down pipes and outlets,and roof scupper drains) provided in the development proposal. Waiverapplication from ENV-CBPU-WVRG is attached.
d) Confirmation for a), b) or c) not applicable, for A&A and reconstructionbuilding projects.
Attachments
Dated
1. Certificate of Completion and Inspection for BuildingPlan for Environmental Health
2. Certificate of Completion and Inspection for SanitaryWorks (PUB-BPU-COMPOFWORK)
3. Certificate of Completion and Inspection for SewerageWorks (PUB-BPU-COMPOFWORK)
4. Certificate of Completion and Inspection for theMechanical and Electrical Worksfor Sewerage Installation (PUB-BPU-COMPOFWORK)
5. Certificate of Inspection for Drainage Works
123
Attachments (Continue)
6. As Constructed drainage drawings in accordance to COP forSurface Water Drainage Appendix 5
7. As-built survey plans indicating crest levels, platform levelsand flood protection levels in accordance to COP forSurface Water Drainage Appendix 2
124
APPLICATION FOR COMPLIANCE CERTIFICATE -RESUBMISSION
[UNDER SECTION 33(7) OF THE ENVIRONMENTALPROTECTION AND MANAGEMENT ACT (CHAPTER 94A) AND COMPLIANCE CERTIFICATE UNDER SECTION 33(8)
OF THE SEWERAGE AND DRAINAGE ACT (CHAPTER 294)]
This form may take you 15 minutes to fill in. You will need the following information to fill in the form:-
- Particulars of Project - Particulars of Qualified Person - Supporting completion and inspection certificates.
Date: 19/03/2014
To: Central Building Plan Unit
National Environment Agency40, Scotts Road #13-00Environment BuildingSingapore 228231
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for theproject(s).
2. This form is to be accompanied by the relevant attachments.
Information
1. Service Standard : Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527
Particulars of Project
Project Reference Number
Project Title
Location Description[Include Lot/Plot, MK/TS,House No, Building Address and Road information]
Please Select 001Plan Type
Add Delete
Particulars of Application
ENV-CBPU-CLRCSC01-RESUBMISSION
Development Proposal Please Select
Appendix 8
125
Application
Date of CBPU DC Clearance
Application for Compliance Certificate and Clearancefor Certificate of Statutory Completion
Environmental Health Works
Pollution Control Works
Sewerage Works
Drainage Works
Previous CSC Advice fromCBPU (if applicable)
CBPU Processing Officer
File Ref. No. /Case ID
NA Dated
Clearance Certificate for Building Plan on Pollution Control for Industrial Plant Works (if applicable)
Clearance Certificate for Building Plan on Environmental Health (if applicable)
Clearance Certificate for Detailed Plan onSewerage (Sanitary Works) (if applicable)
Clearance Certificate for Detailed Plan on Sewerage (if applicable)
126
Particulars of Application (Continue)
File Ref. No. /NA Dated
Clearance Certificate for Detailed Plan on Sewerage (M&E Works) (if applicable)
Clearance Certificate for Detailed Plan on Drainage Works (if applicable)
Particulars of Qualified Person
Name Please Select
Role In Project
Registration No
Firm Name
UEN
Firm Address
Telephone No.
Extension No
Fax No.
Email Address
Declaration by Qualified Person
I confirm that:
I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the Building Control Act (Cap. 29) in respect of the works described which include
Environmental Health Works,
Pollution Control Works,
Sewerage Works,
Drainage Works; and my
qualification is appropriate to the nature of these works;
The particulars of Project, Application and Submission Checklists given in this form are correct;
The works have been carried out and completed. For industrial plant works, all related pollution control equipment and facilities have been installed/ completed according to the approved plans as listed in Particulars of Project and Application
127
Confirmation
1) I confirm that:
a) there are no roof gutters (including rain water down pipes andoutlets, and roof supper drains) provided for in the developmentproposal; or
b) waiver for roof gutter has been obtained from the National Environment
Agency in writing on : File Ref No:
Date:
c) There are roof gutters (including rain water down pipes and outlets,and roof scupper drains) provided in the development proposal. Waiverapplication from ENV-CBPU-WVRG is attached.
d) Confirmation for a), b) or c) not applicable, for A&A and reconstructionbuilding projects.
Attachments
Dated
1. Certificate of Completion and Inspection for BuildingPlan for Environmental Health
2. Certificate of Completion and Inspection for SanitaryWorks (PUB-BPU-COMPOFWORK)
3. Certificate of Completion and Inspection for SewerageWorks (PUB-BPU-COMPOFWORK)
4. Certificate of Completion and Inspection for theMechanical and Electrical Worksfor Sewerage Installation (PUB-BPU-COMPOFWORK)
5. Certificate of Inspection for Drainage Works
128
Attachments (Continue)
6. As- Constructed drainage drawings in accordance to COP forSurface Water Drainage Appendix 5
7. As-built survey plans indicating crest levels, platform levelsand flood protection levels in accordance to COP forSurface Water Drainage Appendix 2
129
FORM FOR MANUFACTURING CATEGORY
Date: 24/02/2014
Instructions
1. This form is to be digitally signed by the Licensed Water Service Plumber/Professional Engineer.
Details of PUB Water / NEWater requirement
Nature of manufacturing products
BAI (Business ActivityIndicator)
The measure of business activity that takes into account the core businessoperations specific to the site. (e.g. No of wafers for wafer fab plant, no ofoccupants in an office building, metric tonnes of wash load for a laundry etc)
Production rate BAI/mth
If Yes, please complete the following.
PUBWTR-0-MCG01
PUB Water
Manufacturing use
Please submit a copy of the water balance chart indicating the quantity of waterrequired at each manufacturing process. See Annex A.
Any water recycling
No
Percentage of water recycling (See Annex B)
If No, please complete the following.
Reasons for not recycling water
No of occupants
Any Canteen?
%
Yes
NEWater
m³/mth m³/mth
Yes
No
Domestic use
Toilet Flushing
No of staff that take shower
Showering
Cooling Usage
PUB Water NEWater
No of cooling tower
m³/mth
m³/mth m³/mth
m³/mth
Appendix 9
130
Refrigerating capacity and operating hoursof individual cooling towers:
Tons hr/mth
Add Delete
Total make-up water required for cooling towers
m³/mth m³/mth
Reasons for not using air-cooled/refrigerant-cooled air con system
Other Usage
PUB Water NEWater
No of toilets
Toilets washing m³/mth m³/mth
Other usage (Please specify) E.g. General washing, etc
m³/mth m³/mth
Add Delete
Total 0 m³/mth 0 m³/mth
Total water requirements
0 m³/mth 0 m³/mth
Other sources of water
Water usage areas Type of water Water required
m³/mth
Add Delete
Please indicate waterusage areas to be installed with private meters or submeters:
131
FORM FOR NON-MANUFACTURING CATEGORY
Date: 24/02/2014
Instructions
1. This form is to be digitally signed by the Licensed Water Service Plumber/Professional Engineer.
Details of PUB Water / NEWater requirement
PUBWTR-0-NMC01
PUB Water NEWater
Project Description
BAI (Business Activity Indicator)
The measure of business activity that takes intoaccount the core business operations specific tothe site. (e.g. No of wafers for wafer fab plant, noof occupants in an office building, metric tonnesof wash load for a laundry etc)
No of occupants
Any Canteen? Yes
No
Domestic use (m3/mth)
Toilet Flushing (m3/mth) (m3/mth)
No of occupantsthat take shower
Showering (m3/mth)
Cooling usage
PUB Water NEWater
No of cooling towers
Refrigerating capacityand operating hours of individual cooling towers:
Tons hr/mth
Add Delete
Total make-up water required for cooling towers
(m3/mth) (m3/mth)
Reasons for not using air-cooled / refrigerant cooled air con system
Other usage
PUB Water NEWater
Appendix 10
132
No of toilets
Toilets washing (m3/mth) (m3/mth)
Other areas (Please specify, eg: F&B, Shops, Laundry, Fountain, Swimming Pool, General /Car park Washing, Irrigation etc
(m3/mth) (m3/mth)
Add Delete
Total 0 (m3/mth) 0 (m3/mth)
Total water requirements 0 (m3/mth) 0 (m3/mth)(m3/mth)
For Retails (if applicable)
No of shoppers
For Hotels (if applicable)
No of Hotel rooms
Other sources of water
Please indicate waterusage areas Type of water Water required
Add Delete
Please indicate waterusage areas to beinstalled with privatemeters or submeters
(m3/mth)
133
PUBWTR-0-RCG01
FORM FOR RESIDENTIAL CATEGORY
Date: 24/02/2014
Instructions
1. This form is to be digitally signed by the Licensed Water ServicePlumber/Professional Engineer.
Details of PUB Water / NEWater requirement
PUB Water NEWater
No of Units
Household usage m³/mth
Swimming Pool (make-up water)
m³/mth
Common Amenities
m³/mth m³/mth
Add Delete
General Washing m³/mth m³/mth
Gardening m³/mth m³/mth
Other usage (Please specify)
m³/mth m³/mth
Add Delete
Total water requirements 0 m³/mth 0 m³/mth
Other sources of water
Please indicate water usage areas
Type of water Water required
m³/mth
Add Delete
Appendix 11
134
FORM FOR TEMPORARY CATEGORY
Date: 24/02/2014
Instructions
1. This form is to be digitally signed by the Licensed Water Service Plumber/Professional Engineer.
Details of PUB Water / NEWater requirement
Construction Site (Staff / Workers use)
PUBWTR-0-TSP01
PUB Water NEWater
No of staff & construction workers
Domestic use (m3/mth)
Toilet Flushing (m3/mth) (m3/mth)
No of staff & construction workers that take shower
Showering (m3/mth)
Any Canteen? Yes
No
Washing use
PUB Water NEWater
Washing vehicle (m3/mth) (m3/mth)
Washing Frameworks/Steel bars/Moulds
(m3/mth) (m3/mth)
Other washing (pl specify)
(m3/mth) (m3/mth)
Add Delete
Total 0 (m3/mth) 0 (m3/mth)
Concreting use (m3/mth) (m3/mth)
Recycling of wash water Yes
No
If Yes,please complete the following
Percentage of water recycling %
If No,please complete the following
Reasons for not recycling water
Other usage (Please specify)E .g. Architectural works, Canteen Use
Appendix 12
135
(m3/mth) (m3/mth)
Add Delete
Total 0 (m3/mth) 0 (m3/mth)
136
(Continue)
Workers dormitory
PUB Water NEWater
Any workers dormitory? Yes
No
If Yes, please specify the no. of workers
Workers dormitory consumption (m3/mth)
Total water requirements 0 (m3/mth) 0 (m3/mth)
Other sources of water
Please indicate water usage areas
Type of water Water required
(m3/mth)
Add Delete
Type of Project
Construction Site Location
Total Built-Up Floor Area M 2
Started from
137
PRE-PLANNING CONSULTATION
Date: 24/02/2014
PUBWTR-0-PPC01
To: PUB Water
Water Supply (Network) DepartmentPublic Utilities Board40 Scotts Road #22-01Environment BuildingSingapore 228231
Instructions
1. This form is to be digitally signed by the Qualified Person.
2. Design of water service installation including the mode of supply shall complywith the Public Utilities (Water Supply) Regulations and the SingaporeStandard CP 48 - Code of Practice for Water Services.
3. Water meter shall be located above ground near to the main entrance of theabove development and shall be easily accessible for maintenance andreading.
4. There shall be no risk of contamination to PUB potable water supply systemthrough backflow.
5. Potable water storage cisterms should not be located below sanitary pipesand other non-potable water pipes.
6. This form is to be accompanied by the relevant documents (refer toSubmission Checklists).
Particulars of Project
Project Reference Number
Development Type Please Select
Location Description
[Include Lot/lot, MK/TS, Address/Road and Building Name if any]
Project Description
Estimated PUB Water Requirement (m³/mth)
Estimated NEWater Requirement (m³/mth)
Appendix 13
138
Platform Level of Development (mRL)
Reduced Level of Highest Direct SupplyWater Fitting (mRL)
Issue For Discussion
139
Particulars of the Qualified Person
Name Please Select
Name of Company
UEN
Submission Checklists
1 Site Plan
140
NOTIFICATION OF WATER SERVICE WORK BY LICENSEDWATER SERVICE PLUMBER
Date: 24/02/2014
To: PUB Water
Water Supply (Network) DepartmentPublic Utilities Board40 Scotts Road #22-01Environment BuildingSingapore 228231
Instructions
1. This form is to be digitally signed by the Licensed Water Service Plumber.
2. This form is to be accompanied by the relevant documents(refer to Submission Checklists).
Particulars of Project
Notification Number
Project Description
Location Description
[Include Lot/lot, MK/TS, Address/Road and Building Name if any]
Nature of Work Please Select
Estimated Water Requirements
PUB Water (m3/mth)
NEWater (m3/mth)
Commencement Date
Expected Completion Date
Platform Level of Development (mRL)
Reduced Level of Highest Direct SupplyWater Fitting (mRL)
Particulars of Customer
Name Please Select
Name of Company
PUBWTR-0-WLP01Appendix 14
141
UEN
Address
Telephone No.
Extension No.
Fax No.
Particulars of the Licensed Water Service Plumber
Name Please Select
Residential Address
142
Particulars of Licensed Water Service Plumber (Continue)
Mailing Address (if different from above)
Telephone No. (O)
Telephone No. (H)
Extension No.
Fax No.
Pager No.
Handphone No.
Licence No.
I/C No.
Declaration by Licensed Water Service Plumber
1 I, , the undersigned, hereby certify
that the water service installation at the premises is designed infull compliance with the Public Utilities Board's requirementsincluding the Public Utilities (Water Supply) Regulations, Singapore Standard CP 48 - Code of Practice for Water Services, Authorities' requirements and other statutoryrequirements. I also confirm that potable water storage cisterns shall not be located below sanitary pipes and other non-potablewater pipes. All the water fittings installed in the water serviceinstallation are of types that comply with standards prescribed/stipulated by PUB and all water conservation measures willbe adopted.
2 The site plan, the water schematic drawing/s and the breakdownof water requirements, if any, of the above developments areattached herewith.
Submission Checklists
1 Site Plan
2 Water Reticulation Schematic Drawing
143
NOTIFICATION OF WATER SERVICE WORK BYPROFESSIONAL ENGINEER
Date: 24/02/2014
To: PUB Water
Water Supply (Network) DepartmentPublic Utilities Board40 Scotts Road #22-01Environment BuildingSingapore 228231
Instructions
1. This form is to be digitally signed by the Professional Engineer.
2. This form is to be accompanied by the relevant documents(refer to Submission Checklists).
3. Please note that for "Particulars of Licensed Water Service Plumber", themember role of "Licensed Water Service Plumber" is required when updatingthe member's details.
Particulars of Project
Pre-Planning Consultation Yes
No
Date of Pre-Planning Consultation with PUB
Type of Submission New Submission
Resubmission
PUB Ref WSN 92433 / / /
Project Reference Number
Development Type Please Select
Location Description
[Include Lot/lot, MK/TS,Address/Road and Building Name if any]
Project Description
Nature of Work Please Select
PUBWTR-0-WSW01Appendix 15
144
Estimated Water Requirement
PUB Water (m3/mth)
NEWater (m3/mth)
Commencement Date
Expected Completion Date
Particulars of the Professional Engineer
Name Please Select
Name of Company
UEN
Address
145
Particulars of the Professional Engineer (Continue)
Telephone No.
Extension No.
Fax No.
Particulars of the Owner/Developer
Name Please Select
Name of Company
UEN
Address
Telephone No.
Extension No.
Fax No.
Particulars of the Licensed Water Service Plumber
Name Please Select
Address
Telephone No.
Extension No.
Fax No.
Declaration by Professional Engineer
1 I,hereby certify that the water service installation is designed in full compliance with the Public Utilities Board's requirements includingthe Public Utilities (Water Supply) Regulations, Singapore StandardCP 48 - Code of Practice for Water Services, Authorities' requirements and other statutory requirements. I also confirm that potable water storage cisterns shall not be located below sanitary pipes and other non-potable water pipes. All the water fittingsinstalled in the water service installation are of types that complywith standards prescribed/stipulated by PUB and all water conservation measures will be adopted.
2 The site plan, the water schematic drawing/s and the breakdown ofwater requirements, if any, of the above developments are attachedherewith.
Submission Checklists
1 Site Plan
, the Professional Engineer-in-charge
146
2 Water Reticulation Schematic Drawing
147
PUBWTR-0-CSC01
CERTIFICATE OF SATISFACTORY COMPLETION OF WATER SERVICE WORK BY PROFESSIONAL ENGINEER
Date: 19/03/2014
To: PUB Water
Water Supply (Network) DepartmentPublic Utilities Board40 Scotts Road #22-01Environment BuildingSingapore 228231
Instructions
1. This form is to be digitally signed by the Professional Engineer.
Particulars of Project
Project Reference Number
Development Type Please Select
Project Description
Development Address
Nature of Work Please Select
Water Utility Account Number
Commencement Date
Expected Completion Date
Particulars of the Professional Engineer
Name Please Select
Name of Company
UEN
Particulars of the Licensed Water Service Plumber
Name Please Select
Telephone No.
Extension No.
Fax No.
Appendix 16
FORM-PE-CSC Mar 19 2014 at 13:12:53 PM Page 2
148
Declaration by Professional Engineer
1 I, the Professional Engineer-in-charge
hereby certify that I have supervised the construction of the water service installation of the above development and inspected the completed water service installation. I confirm that to the best of my knowledge and belief, the water service installation was carried out in accordance with the Public Utilities Board's requirements including the Public Utilities (Water Supply) regulations, Singapore Standard CP 48-Code of Practice for Water Services, Authorities' requirements and other statutory requirements. I also confirm that potable water storage cisterns have not been located below sanitary pipes and other non-potable water pipes. All the water fittings installed in the water service installation are of the types that comply with standards prescribed / stipulated by PUB and all water conservation measures have been adopted. I further certify that the said water service installation and the associated electrical devices and equipment have been tested and are safe and acceptable for operation.
149
Appendix 17 – Contact List
PUB Building Plan Unit (BPU)
Address
Building Plan Unit
PUB
40 Scotts Road #15-01
Environment Building
Singapore 228231
For further enquiries on Corenet form changes, please contact PUB BPU at:
Hotline: 67313512
Email: [email protected]