ERA-NET ROAD CEDR TGR meeting 22 nd of January 2009 , Brussels ENR Work Package 6 - Progress Report New trans-national research formulation and implementation. Hans INGVARSSON, edited by Martin Steward for CEDR TGR 22 Jan 09. 50 000 € per country in 3 years, in total 1.65 M € - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Hans INGVARSSON, edited by Martin Steward for CEDR TGR 22 Jan 09

Hans INGVARSSON, edited by Martin Steward for CEDR TGR 22 Jan 09

ERA-NET ROAD

CEDR TGR meeting 22nd of January 2009, Brussels

ENR Work Package 6 - Progress Report

New trans-national research formulation and implementation

Page 2: Hans INGVARSSON, edited by Martin Steward for CEDR TGR 22 Jan 09

Work Package Progress and Risk Report 2

First Joint Funded Research Programme

50 000 € per country in 3 years, in total 1.65 M €

• Austria (PEB Chair)• Denmark• Finland• Germany• Ireland• Norway• Poland• Spain• Sweden (PL)• The Netherlands• United Kingdom

Page 3: Hans INGVARSSON, edited by Martin Steward for CEDR TGR 22 Jan 09

Work Package Progress and Risk Report 3

SRO 3 PEB Progress

• Selected Project Proposals (Project Costs incl. VAT) - RIMAROCC (Sweden, France, the Netherlands and Norway) 366 000

Euro - IRWIN (Finland and Sweden) 320 000 Euro - P2R2C2 (UK, Finland, Norway and Slovenia) 214 000 Euro - SWAMP (Denmark and Sweden) 289 000 Euro

1 189 000 Euro• Evaluation Principles

- Excellence- Transparency- Fairness and Impartiality- Confidentiality- Efficiency and Speed

• Selection Criteria- Competence (10 %)- Experience (10 %)- Content (50 %)- Management (20 %)- Quality Price Ratio (10 %)

Page 4: Hans INGVARSSON, edited by Martin Steward for CEDR TGR 22 Jan 09

Work Package Progress and Risk Report 4

WP 6 – Task 2

ENR1 WP 6 Interregnum Programme (Task 2):

Make Second Joint Programme/Call in Spring 2009

Actions to undertake:

1. Review SROs and hold further workshop if necessary.

2. Develop 2nd call, using same methodology as SRO3 call.

3. Complete in Spring 2009, to coincide with start of ENR2.

Page 5: Hans INGVARSSON, edited by Martin Steward for CEDR TGR 22 Jan 09

Work Package Progress and Risk Report 5

CA & DoRN (SRO1)

Page 6: Hans INGVARSSON, edited by Martin Steward for CEDR TGR 22 Jan 09

Work Package Progress and Risk Report 6

SRO 1 Commitments

Participating countries:• Austria• Belgium (Flanders)• Finland• Germany• Ireland• Norway• Slovenia• Sweden• The Netherlands• United Kingdom

Perhaps:• Denmark• SwitzerlandNo wish to participate:• France• Poland

To date no response:• Belgium (Wallonia)• Hungary• Lithuania

Page 7: Hans INGVARSSON, edited by Martin Steward for CEDR TGR 22 Jan 09

Work Package Progress and Risk Report 7

SRO 1 Commitments

Participating countries:• Austria• Belgium (Flanders)• Finland• Germany• Ireland• Norway• Slovenia• Sweden• The Netherlands• United Kingdom

PEB Chair (offer):• Austria• Sweden

Programme Leader (offer)

• Austria

Page 8: Hans INGVARSSON, edited by Martin Steward for CEDR TGR 22 Jan 09

Work Package Progress and Risk Report 8

PEB (SRO 1)

Country PEB Member Deputy PEB Member

Austria Christian Pecharda (PL)

Günter Breyer

Belgium (Flanders) Armand Rouffaert ?

Finland Saara Toivonen Mikko Räsänen

Germany Roland Weber Stefan Matena

Ireland Harry Cullen Albert Daly

Norway Jon Krokeborg Randi Eggen

Slovenia Tomaž Pavčič Bojan Leben

Sweden Claes Tingvall (Chair)

Per Strömgren

The Netherlands Herman Moning Karin Holthuis

United Kingdom Sandra Brown Graham Harper

Page 9: Hans INGVARSSON, edited by Martin Steward for CEDR TGR 22 Jan 09

Work Package Progress and Risk Report 9

WP 6 Progress (Milestones)

Milestones:

1. SRO chosen for further ellaboration (Cracow 4 September 2009).2. SRO workshop undertaken (Copenhagen 18 -19 November 2009).3. Task Force set up (Ljubljana 18 December 2009).4. Description of Research Needs (DoRN) exists (5 January 2009).5. SRO 1 PEB set up (Brussels 20 January 2009)6. Kick Off Meeting undertaken (in Malmö on 3rd of February 2009)7. Second Joint Call launched (to be done 1st half of February 2009).8. CA’s (with appended DoRN’s) signed by all participating NRAs at latest at

the end of March 2009.9. Second Joint Call closed (1st half of April 2009)10. Selection of approved project proposals (to be finalized in MidMay 2009).11. Evaluate project proposals/applications (end of April and beginning of May

2009).12. Contract Negotiations will take place during June 2009.13. Start of approved projects is foreseen in July 2009 by signing Project

Contracts.

Page 10: Hans INGVARSSON, edited by Martin Steward for CEDR TGR 22 Jan 09

Hans Ingvarsson (WP6 Leader)

ERA-NET ROAD (WP 6)

Interregnum Mission

Almost Completed !