harald lückfor the geo600 comissioning team 1ilias meeting, palma, oct. 2005 title geo 600...
TRANSCRIPT
Harald Lück for the GEO600 Comissioning team 1 ILIAS Meeting, Palma, Oct. 2005
Title
GEO 600Commissioning Status
Based on a talk of Stefan Hild for the WG1 meeting in Perugia
Max-Planck-Institut für Gravitationsphysik(Albert-Einstein-Institut)
Harald Lück for the GEO600 Comissioning team ILIAS meeting Palma, Oct. 2005
Harald Lück for the GEO600 Comissioning team 2 ILIAS Meeting, Palma, Oct. 2005
GEO 600 layout
1.5-2 kW
0.09
Harald Lück for the GEO600 Comissioning team 3 ILIAS Meeting, Palma, Oct. 2005
Tuning signal recycling to 300 Hz
Better knowledge of IFO parameters:
more accurate parameter predictions from simulations
downtuning to 200 Hz realized
Fixed instability of MI auto-alignment by setting up a new telescope for DWS.
We will stay at 330 Hz !
Harald Lück for the GEO600 Comissioning team 4 ILIAS Meeting, Palma, Oct. 2005
GEO 600 design sensitivity
Harald Lück for the GEO600 Comissioning team 5 ILIAS Meeting, Palma, Oct. 2005
RF setup
OLD setup
New setup:
• Using a less noisy splitter(0/90°)
• Using a cable as phaseshifter
NEW setup
Old setup:
• Dominated by phase noise in the LO path (phaseshifter and splitter(0/90°)
• Due to this noise Q was mixed into P quadrature.
Harald Lück for the GEO600 Comissioning team 6 ILIAS Meeting, Palma, Oct. 2005
Shot noise
Green line is the shot noise level calculated from the DC current of the photodiode.
We are within a factor sqrt(2) shot noise limited above 1kHz !
Harald Lück for the GEO600 Comissioning team 7 ILIAS Meeting, Palma, Oct. 2005
Next step in RF setup (next week)
Proposed by Rana and others
GOALS: • Using only high quality hardware • Guaranteeing high RF levels in all components
Harald Lück for the GEO600 Comissioning team 8 ILIAS Meeting, Palma, Oct. 2005
Noise projections 21st of july
Harald Lück for the GEO600 Comissioning team 9 ILIAS Meeting, Palma, Oct. 2005
Noise in the SR-long loop
Noise in the detection band is entirely limited by front-end-noise (shot noise from the detector).Limits sensitivity from 100 to 500 Hz
PROBLEM
• Large locking range• OLG of 10^6 at 0.1 Hz• No feedback noise above100 Hz
Requirements
1. Servo has a locking mode and a running mode2. Lowering UGF to get less gain in detection band3. Using lowpass filter with very steep roll off above UGF
(implemeted digitally using a dSPACE system)
Solution
Harald Lück for the GEO600 Comissioning team 10 ILIAS Meeting, Palma, Oct. 2005
Analog SR electronics
Red = acq amp, green = acq phaDark blue = run amp, brown = run phaseLight blue = run2 amp, pink = run2 pha
Harald Lück for the GEO600 Comissioning team 11 ILIAS Meeting, Palma, Oct. 2005
Signal Recycling digital
Phase @18 Hz = -147 deg
Harald Lück for the GEO600 Comissioning team 12 ILIAS Meeting, Palma, Oct. 2005
SR feedback: analog vs. digital
Harald Lück for the GEO600 Comissioning team 13 ILIAS Meeting, Palma, Oct. 2005
Sensitivity improvement July to August
High frequency improvements: reduction of RF phase noiseLow frequency improvements: reduction of Signal recycling feedback noise
Harald Lück for the GEO600 Comissioning team 14 ILIAS Meeting, Palma, Oct. 2005
PR-bench
Historically grown layout of PR-bench not optimal !
• beam clipping• too many
transmissive optical components
• too many polarizing components
• acoustic coupling
Goal:Shorten and simplify the HPD path
Harald Lück for the GEO600 Comissioning team 15 ILIAS Meeting, Palma, Oct. 2005
Sensitivity after PR bench work
Removed resonance structures between 100 and 200 Hz.
Harald Lück for the GEO600 Comissioning team 16 ILIAS Meeting, Palma, Oct. 2005
Noise projections 4th of August
Harald Lück for the GEO600 Comissioning team 17 ILIAS Meeting, Palma, Oct. 2005
Michelson length control
< 0.1Hz
Harald Lück for the GEO600 Comissioning team 18 ILIAS Meeting, Palma, Oct. 2005
< 10 Hz
< 0.1Hz
Michelson length control
Reaction Pendulum:
3 coil-magnet actuators at intermediate mass, range ~ 100µm
Harald Lück for the GEO600 Comissioning team 19 ILIAS Meeting, Palma, Oct. 2005
< 10 Hz
> 10 Hz
< 0.1Hz
Michelson length control
Reaction Pendulum:
3 coil-magnet actuators at intermediate mass, range ~ 100µm
Electrostatic actuation on test mass bias 630V, range 0-900V= 3.5µm
Harald Lück for the GEO600 Comissioning team 20 ILIAS Meeting, Palma, Oct. 2005
Using ESD as actuator
• Force is proportional to square of applied voltage.
• high voltages are needed
• for bipolar actuation a bias voltage needs to be applied
Noise is introduced:
• loop electronics
• sqrt circuits
• intrinsic HV amplifier noise
Harald Lück for the GEO600 Comissioning team 21 ILIAS Meeting, Palma, Oct. 2005
Sqrt circuits in MI loop
ESD: F U^2
Sqrt circuits are necessary to give full linear force range for acquisition.
Drawback: sqrt circuits are noisy 1µV/sqrt(Hz)(=100µV/sqrt(Hz) @ ESD)
Harald Lück for the GEO600 Comissioning team 22 ILIAS Meeting, Palma, Oct. 2005
ESD: F U^2
Sqrt circuits are necessary to give full linear force range for acquisition.
Drawback: sqrt circuits are noisy 1µV/sqrt(Hz)(=100µV/sqrt(Hz) @ ESD)
Bypassing sqrt circuits after lock is acquired.
Sqrt circuits in MI loop
Harald Lück for the GEO600 Comissioning team 23 ILIAS Meeting, Palma, Oct. 2005
Noise in MI loop
HVA noise = 100nV/sqrt(Hz) (=10µV/sqrt(Hz) @ ESD)
HV-amplifier noise can be reduced by decreasing bias voltage or active noise suppression.
Suppressing noise introduced by loop electronics needs whitening
Harald Lück for the GEO600 Comissioning team 24 ILIAS Meeting, Palma, Oct. 2005
MI loop whitening / dewhitening
dewhiten
dewhiten
dewhiten
Whiten
Whitening right after mixer:zero 3.5 Hzpole 35 Hz
Dewhitening for both split passes
Passive dewhit-ening done in HV path (0-1kV)
Harald Lück for the GEO600 Comissioning team 25 ILIAS Meeting, Palma, Oct. 2005
Sensitivity after fixing noise from MI loop
Harald Lück for the GEO600 Comissioning team 26 ILIAS Meeting, Palma, Oct. 2005
Noise Projections 6th of October: Excess noise @ 200Hz
Harald Lück for the GEO600 Comissioning team 27 ILIAS Meeting, Palma, Oct. 2005
Current sensitivity vs. Design sensitivity
102
103
10-24
10-23
10-22
10-21
10-20
10-19
10-18
10-17
Freq. [Hz]
ASD
[h/ H
z]GEO600 Theoretical Noise Budget
SeismicSuspension TNSubstrate TNCoating TNThermorefractiveShot 350HzTotalShot Sept 1 h(t) Sept 1
Harald Lück for the GEO600 Comissioning team 28 ILIAS Meeting, Palma, Oct. 2005
Laser Improvements
• Exchanged master laser and slave laser pump diodes for new ones (13.3W from Laser)
• Improved optical path
• Cleaned components on laser bench
→ max. 9.2 W @ MC1
Harald Lück for the GEO600 Comissioning team 29 ILIAS Meeting, Palma, Oct. 2005
Burst events; Start-of-the-second glitches
Harald Lück for the GEO600 Comissioning team 30 ILIAS Meeting, Palma, Oct. 2005
Start-of-the-second glitches: A cal. issue
Harald Lück for the GEO600 Comissioning team 31 ILIAS Meeting, Palma, Oct. 2005
New MI longitudinal loop: reduce longitudinal dark fringe deviations
Old
NewMuch more gain @ low f
Overall gain
Overall gain
Harald Lück for the GEO600 Comissioning team 32 ILIAS Meeting, Palma, Oct. 2005
Low Frequency EP Reduction
10-1
100
101
102
103
104
10-7
10-6
10-5
10-4
10-3
10-2
10-1
100
Frequency (Hz)
Am
plitu
de (
Vrm
s /
Hz1/
2 )
nfft/fs = 10.00 : navs = 30 : enbw = 0.15 : nsecs = 300
G1:LSC_MID_EP-P_HPfs = 16384 : 2005-09-26 09:08:28
Optional:
Digital IM Feedback
= analog + res. @ 2.5Hz
Harald Lück for the GEO600 Comissioning team 33 ILIAS Meeting, Palma, Oct. 2005
MI AA digital (dSpace) servo 14th Sept.
Digital
Analog
Added res. gain stages
Harald Lück for the GEO600 Comissioning team 34 ILIAS Meeting, Palma, Oct. 2005
MI AA digital (dSpace) servo 8th Oct.
Tilt (Pitch) Rotation (Yaw)
Digital filter TFs contain resonant gain stages for suspension resonances
Harald Lück for the GEO600 Comissioning team 35 ILIAS Meeting, Palma, Oct. 2005
Reducing Noise in MI AA Loop 19th Oct.
• Optimization of gain distribution in MI AA loop reduced FB noise
Camera dark noise
BeforeAfter
BeforeAfter
Feedback noise
BeforeAfter
BeforeAfter
Rotation (Yaw) Tilt (Pitch)
Harald Lück for the GEO600 Comissioning team 36 ILIAS Meeting, Palma, Oct. 2005
Stationarity / GaussianityL
og(N
)Histograms of BLRMS
Harald Lück for the GEO600 Comissioning team 37 ILIAS Meeting, Palma, Oct. 2005
Current work / next steps
• Non stationary noise (already partly? cured)
• Decrease low frequency EP deviations for most loops, i.e. increase gain (partly done)
• Improve RF set-up
• Enhance to full input power
• Join S5. First in overnight/weekend mode– When close to design sensitivity join in 24/7 mode
Harald Lück for the GEO600 Comissioning team 38 ILIAS Meeting, Palma, Oct. 2005
Sensitivity improvement of GEO
102
103
10-21
10-20
10-19
10-18
10-17
Frequency [Hz]
h(t
) [H
z-1/2
]
Jan 02
Aug 02 (S1)
Jan 04 (S3)
Sept 05
Feb 05 (S4)
Aug 04
Harald Lück for the GEO600 Comissioning team 39 ILIAS Meeting, Palma, Oct. 2005
¿Preguntas? Translation Alta Vista Babelfish
Sunset in Ruthe