SECTION 08 7100 DOOR HARDWARE
Heery #0818500.00 University of Iowa Hospital & Clinics June 11, 2013 Children’s Hospital SIM 21 SIM 79 SIM 215 SIM 332 SIM 549 SIM 588 SIM 653 SIM 673 SIM 699 UIHC #208-009-13,-15,-16,-17 Bid Packages #13, #15, #16, #17 08 71 00-29
Hardware Group No. D05-A.5 (SIM 699)
For use on mark/door #(s): 002320-Z Provide each PR door(s) with the following: Qty Description Catalog Number Finish Mfr
6 EA HW HINGE 5BB1HWSC 5 652 IVE 1 EA POWER TRANSFER
(SIM 79) EL-CEPT (SIM 79) 689 SEC
1 EA ELEC FIRE EXIT HARDWARE
QEL+-9447-EO-F-LBR WITH FIRE BOLT (SIM 79)
626 VON
1 EA ELEC FIRE EXIT HARDWARE
QEL+-9447-L-F-LBR-LP373-06 626 VON
1 EA CYLINDER BLDG STD 626 MED 1 EA AUTO OPERATOR 4100 - DOUBLE DOOR 626 HOR 2 EA ACTUATOR C-1260-4 630 HOR 2 EA ARMOR PLATE K-6 34" X 1" LDW VFY IPC 2 EA DOOR EDGE GUARD 543-SS 630 IVE 2 EA WALL STOP WS407CVX 630 IVE 1 SET SEALS 2525CL CLR NGP 1 SET WIRING DIAGRAMS AS REQUIRED
Operational Description Free Egress at all times. Pressing Push Bar retracts latchbolts. Latchbolt retracted by lever unless locked by key. Key locks and unlocks lever. Control contact electrically retracts the latchbolt either for momentary unlatching or for extended periods of time. Provides quiet operation. Wire actuators for this door to also operate door 52305-Z simultaneously.
EP403
7
EP405
2
EP405
4
EP408
3
EP408
5
EP408
6
1
EP402
7
EP408
4
EP408
EP408
2
EP405
3
EP405
5
1
EP405
PROJECT DATA
KEY PLAN
N
JPP
UICH
PROJECT DATA
ISSUANCE AND DATE
SHEET INFORMATION
UNIVERSITY OF IOWACHILDREN'S HOSPITAL
200 Hawkins DriveIowa City, IA 52242
125 S. Dubuque StreetSuite 500
Iowa City, IA 52240-4003t 319.354.4700f 319.354.4707
www.heery.com
ORIGINAL ISSUE
DRAWN
CHECKED
APPROVED
HII-0818500HEERY PROJECT #
UIHC PROJECT #
BUILD UI # 0111013, 15, 16, 17
208-009-13, 15, 16, 17
June 11, 2013
BID RELEASE 4
OWNER CONSULTANTS
DESIGN CONSULTANTS
GilbaneConstruction Managment
Chicago, IL773-695-3520
Balfour Resource GroupMedical Equipment Planner
Nashville, TN
Koffel AssociatesLife Safety Consultants
Columbia, MD
RWDIWind ConsultantGuelph, Ontario
SSRCxCommissionerNashville, TN
TerraconSoils
Iowa City, IA
Wiss, Janney, ElstnerAssociates, Inc
Envelope CommissionerChicago, IL
HeeryStructural Engineering
Orlando, FL
HeeryInterior Architecture
Atlanta,GA
Foster + PartnersExterior Architecture
London
Stanley Beaman & SearsInterior Architecture
Atlanta, GA
CCRDMechanical, Plumbing,Electrical Engineering
Dallas, TX
CD+MLighting Design
Atlanta, GA
CMH & AssociatesVertical Transport
Dallas, TX
GGNLandscape Architecture
Seattle, WA
Robert Rippe & AssociatesFood Service
Minneapolis, MN
Shive-HatteryCivil/Site Utilities
Iowa City, IA
Release-4
SCALE
August 1, 2013CONSTRUCTION SET
PLAN N
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
1
EP105
LEVEL FIVE FLOOR PLAN - ELECTRICAL POWERSCALE 1/8 " = 1'-0"
DML
RLR
HSC
LEVEL FIVE
FLOOR PLAN
ELECTRICAL POWER
EP105
August 15, 2014SIM-00076
October 10, 2014SIM-00129
June 16, 2015SIM-00284
July 24, 2015SIM-00317
April 5, 2015SIM-00104
July 10, 2015SIM-00282
July 9, 2015SIM-00309
August 28, 2015SIM-00295
September 18, 2015SIM-00257
September 21, 2015SIM-00354
September 29, 2015RFI 1583
September 11, 2015SIM-00347
October 14, 2015SIM-00333
October 30, 2015SIM-00329
November 06, 2015RFI 1813
November 20, 2015SIM-00396
November 20, 2015SIM-00366
December 2, 2015RFI 1937
December 2, 2015RFI 1936
December 3, 2015RFI 1934
December 16, 2015SIM 00406
December 8, 2015RFI 1809
December 10, 2015RFI 1977
December 22, 2015RFI 1935
January 7, 2016RFI 2101
January 8, 2016RFI 2100
SIM 438 January 22, 2016
SIM 451 February 19, 2016
RFI 2389 March 15, 2016
RFI 2534 May 12, 2016
SIM 510 May 16, 2016
SIM 602 September 23, 2016
SIM 600 September 27, 2016
SIM 611 October 3, 2016
SIM 629 October 26, 2016
SIM 636 November 11, 2016
December 14, 2016RFI 3138
December 16, 2016SIM 665
January 12, 2017SIM 682
February 03, 2017SIM 715
March 02, 2017SIM 699