Harley DavidsonWalking SAP Tour Guide
![Page 2: Harley Davidson - オルタナティブ・ブログ Davidson - Walking Guide.pdfHARLEY DAVIDSON MANUFACTURING PROCESS • Stamps VIN to the frame • Start of the use of carts to transport](https://reader033.vdocument.in/reader033/viewer/2022041911/5e6799baf080382fe46930ba/html5/thumbnails/2.jpg)
Welcome
3
WELCOME TO THE PLANT TOUR.
• What you will see. • About the SAP & Harley relationship. • Do we have any public press on what Harley has said
about SAP? • Use quotes . . . . . • Overview of the solutions Harley has deployed. . . .
TABLE OF CONTENTS
2
“Four wheels move the body. Two wheels move the soul.”“Four wheels move the body. Two wheels move the soul.”
![Page 3: Harley Davidson - オルタナティブ・ブログ Davidson - Walking Guide.pdfHARLEY DAVIDSON MANUFACTURING PROCESS • Stamps VIN to the frame • Start of the use of carts to transport](https://reader033.vdocument.in/reader033/viewer/2022041911/5e6799baf080382fe46930ba/html5/thumbnails/3.jpg)
RepairRoll-Test
Crate & Ship
Assembly
Paint
Paint Touch-up &
Staging
VIN Stamp & Tank
�I-/=� & Cafeteria
Paint StagingPress
(Fenders & Tanks)
Bend Frames. Weld Frames & Tanks
Lean Supplier Parts Market
5
Harley Davidson PlantA Day in The Life of an Order
4
IT Support
QA
Tank Leak Test CMMS
Maintenance
Recycling of Steel Scrap
<39<3>C�]��+8+1/��98G3->=
All orders
Fabrication
ASsmbly
Individual CustomerSupplier Stocking
New Parts
PLM – Variant �98F1
APO
Available
Version
Sales Order
Tells Suppliers Demand for Parts
Paint Schedule – 6 hours prior locked in for Plant
Sequence Carts for Assembly
Interface to SAP ME Control of AGC + Wrenches
+ Screw Guns (KLECO)
Based on mix and backlog of bike by type – Trike, Custom, Hard/
Soft Tail, etc.
Rolling 3 Month #
of Planned Orders
![Page 4: Harley Davidson - オルタナティブ・ブログ Davidson - Walking Guide.pdfHARLEY DAVIDSON MANUFACTURING PROCESS • Stamps VIN to the frame • Start of the use of carts to transport](https://reader033.vdocument.in/reader033/viewer/2022041911/5e6799baf080382fe46930ba/html5/thumbnails/4.jpg)
76
Press (Fenders & Tanks)
RepairRoll-Test
Crate & Ship
Assembly
Paint
Paint Touch-up &
Staging
VIN Stamp
& Tank
�I-/=��E��+0/>/<3+
Paint StagingPress
(Fenders & Tanks)
Bend Frames.
Weld Frames & TanksLean Supplier Parts Market
IT Support
QA
Tank Leak
Test CMMSMaintenance
HARLEY DAVIDSON MANUFACTURING PROCESS
• Steel rolls are cut and pressed • Cycle counts are captured for dyes and presses for
maintenance tracking purposes • Steel inventory is pulled based on schedule – not
schedule adherence
BUSINESS ISSUE
• Operated based on an assumed schedule – no re-al-time feedback
• Unsure of how much to produce • Steel inventory is pulled based on schedule not ac-
tual schedule adherence which caused excess inventory
SAP SOLUTION: SAP MANUFACTURING INTEGRA-TION AND INTELLIGENCE (SAP MII)
VALUE FOR HARLEY
• Real-time visibility into inventory and schedule at-tainment (SAP MII)
• · Integration to Plant Maintenance for mainte-nance of dyes and presses (SAP MII_
• · Track press quality based on benchmark using SPC/SQC – non-conformance, weld defects, and patterns to reduce scrap (SAP MII)
![Page 5: Harley Davidson - オルタナティブ・ブログ Davidson - Walking Guide.pdfHARLEY DAVIDSON MANUFACTURING PROCESS • Stamps VIN to the frame • Start of the use of carts to transport](https://reader033.vdocument.in/reader033/viewer/2022041911/5e6799baf080382fe46930ba/html5/thumbnails/5.jpg)
HARLEY DAVIDSON MANUFACTURING PROCESS
• Frames and tanks arrive • Frames are bent and the tanks are welded onto the
bent frames
BUSINESS ISSUE
• Lack of vis3,363>C�0<97�=29:[G99<�>9�>2/�/8>/<:<3=/ • Inability to track non-conformance, weld defects,
or patterns • Excess inventory stemming from weld wire con-
sumed inventory, which was not captured in real-time
• Manually intensive process to move the right frames and tanks to the correct location based on schedule
SAP SOLUTION: SAP MII, RFID TAGS
VALUE FOR HARLEY
• Real-time visibility into weld wire inventory and schedule attainment (SAP MII)
• Integration to Plant Maintenance for maintenance (SAP MII)
• Track weld quality non-conformance, weld defects, and patterns to reduce scrap. In some weld cells, the non-conformance is captured automatically and in others through manual entry. (SAP MII)
• Post-weld, RFID tags are applied to the tanks and fenders for tracking (RFID tags)
Frames
RepairRoll-Test
Crate & Ship
Assembly
Paint
Paint Touch-up &
Staging
VIN Stamp
& Tank
�I-/=��E��+0/>/<3+
Paint StagingPress
(Fenders & Tanks)
Bend Frames.
Weld Frames & TanksLean Supplier Parts Market
IT Support
QA
Tank Leak
Test CMMSMaintenance
![Page 6: Harley Davidson - オルタナティブ・ブログ Davidson - Walking Guide.pdfHARLEY DAVIDSON MANUFACTURING PROCESS • Stamps VIN to the frame • Start of the use of carts to transport](https://reader033.vdocument.in/reader033/viewer/2022041911/5e6799baf080382fe46930ba/html5/thumbnails/6.jpg)
11
HEADELINE 1
Headline 2Headline 3Body copy. • Bullet • Bullet • Bullet
– Bullet 2
Paint Staging
HARLEY DAVIDSON MANUFACTURING PROCESS
• Paint colors are batched based on schedule • Prior to painting a tank leak test is performed
BUSINESS ISSUE
• Lack of real-time visibility into production and schedule – at the time a 3.5 week window
• Unable to prioritize based on orders – for example premium vs. regular
• Missing integration of CMMS for quality tracking which resulted in islands of information
SAP SOLUTION: SAP MII, CMMS
VALUE FOR HARLEY
• Integration to paint scheduling based on locking in schedule in 6 hour windows (SAP MII)
• Integration to CMMS for quality checks (SAP MII) • Integration into tank leak test results – providing
real-time visibility to schedule attainment (SAP MII)
• Checks on bends in bars/frame (CMMS) • Measures jig setup and accuracy in bend (CMMS) • Integration with CMMS tracks maintenance for PM
(CMMS)
RepairRoll-Test
Crate & Ship
Assembly
Paint
Paint Touch-up &
Staging
VIN Stamp
& Tank
�I-/=��E��+0/>/<3+
Paint StagingPress
(Fenders & Tanks)
Bend Frames.
Weld Frames & TanksLean Supplier Parts Market
IT Support
QA
Tank Leak
Test CMMSMaintenance
![Page 7: Harley Davidson - オルタナティブ・ブログ Davidson - Walking Guide.pdfHARLEY DAVIDSON MANUFACTURING PROCESS • Stamps VIN to the frame • Start of the use of carts to transport](https://reader033.vdocument.in/reader033/viewer/2022041911/5e6799baf080382fe46930ba/html5/thumbnails/7.jpg)
1312
Paint/Paint Touchup Staging
HARLEY DAVIDSON MANUFACTURING PROCESS
• Paint schedule and batching – managed outside SAP – a black box
• Paint touch up and staging is based on quality inspections
BUSINESS ISSUE
• Lack of inventory visibility and rework times – es-sentially an independent not integrated operation
SAP SOLUTION: SAP MII
VALUE FOR HARLEY
• Provide inventory visibility, rework times etc. for staging for fabrication (SAP MII
RepairRoll-Test
Crate & Ship
Assembly
Paint
Paint Touch-up &
Staging
VIN Stamp
& Tank
�I-/=��E��+0/>/<3+
Paint StagingPress
(Fenders & Tanks)
Bend Frames.
Weld Frames & TanksLean Supplier Parts Market
IT Support
QA
Tank Leak
Test CMMSMaintenance
![Page 8: Harley Davidson - オルタナティブ・ブログ Davidson - Walking Guide.pdfHARLEY DAVIDSON MANUFACTURING PROCESS • Stamps VIN to the frame • Start of the use of carts to transport](https://reader033.vdocument.in/reader033/viewer/2022041911/5e6799baf080382fe46930ba/html5/thumbnails/8.jpg)
1514
�I-/=�E��+0/>/<3+
HARLEY DAVIDSON MANUFACTURING PROCESS
• Area that provides performance management dashboards
• %>363D/.�,C�=29:�G99<�:/<=988/6�38-6?.381�=230>� supervisors, team leads etc.
BUSINESS ISSUE
• No real-time live data feedback on performance metrics
SAP SOLUTION: SAP MII
VALUE FOR HARLEY
• Gain insight into KPIs and order status (SAP MII)
SAMPLE PERFORMANCE MANAGEMENT DASHBOARDS
RepairRoll-Test
Crate & Ship
Assembly
Paint
Paint Touch-up &
Staging
VIN Stamp
& Tank
�I-/=��E��+0/>/<3+
Paint StagingPress
(Fenders & Tanks)
Bend Frames.
Weld Frames & TanksLean Supplier Parts Market
IT Support
QA
Tank Leak
Test CMMSMaintenance
![Page 9: Harley Davidson - オルタナティブ・ブログ Davidson - Walking Guide.pdfHARLEY DAVIDSON MANUFACTURING PROCESS • Stamps VIN to the frame • Start of the use of carts to transport](https://reader033.vdocument.in/reader033/viewer/2022041911/5e6799baf080382fe46930ba/html5/thumbnails/9.jpg)
17
VIN Stamp & Tank
HARLEY DAVIDSON MANUFACTURING PROCESS
• Stamps VIN to the frame • Start of the use of carts to transport components
to the work cells • Tank sub-assembly as well as electric components,
caps etc. built
BUSINESS ISSUE
• No ability to optimally schedule production
SAP SOLUTION: SAP ME, SAP MII, AUTOMATED GUIDED CARTS (AGCS)
VALUE FOR HARLEY
• Provides the routing and the execution control for the build process, tracking the build, and recording any non-conformance (SAP ME)
• Provides the real-time connectivity for inventory as well as coordination of the delivery of parts (SAP MII)
• Provides information to the automated guided carts (AGCs). VIN # is added to the cart and the route is pulled from PP and interfaced with SAP ME eventually through MEINT. Information is pro-vided by VIN # to load and move the frames and the tank pieces to the appropriate location to be welded in place. (AGCs)
• Monitor AGC battery levels and light sensors (monitoring movement) and tracks based on VIN # (AGCs) (SAP MII)
RepairRoll-Test
Crate & Ship
Assembly
Paint
Paint Touch-up &
Staging
VIN Stamp
& Tank
�I-/=��E��+0/>/<3+
Paint StagingPress
(Fenders & Tanks)
Bend Frames.
Weld Frames & TanksLean Supplier Parts Market
IT Support
QA
Tank Leak
Test CMMSMaintenance
NEEDS TO BE CUT DOWN
![Page 10: Harley Davidson - オルタナティブ・ブログ Davidson - Walking Guide.pdfHARLEY DAVIDSON MANUFACTURING PROCESS • Stamps VIN to the frame • Start of the use of carts to transport](https://reader033.vdocument.in/reader033/viewer/2022041911/5e6799baf080382fe46930ba/html5/thumbnails/10.jpg)
19
Assembly
HARLEY DAVIDSON MANUFACTURING PROCESS
• Bikes are assembled onto the frames with the tanks – belt, engines, sub-assemblies etc.
• �3H/</8>�A9<5�-/66=�+6981�>2/�+==/7,6C�638/�manned by operators with terminals are shown or-ders and order execution process
• IT support is available to provide any manual over-rides etc. to help drive order execution
BUSINESS ISSUE
• Inability to optimally schedule and execute produc-tion, including capturing non-compliance, genealo-gy tracking etc.
SAP SOLUTION: SAP ME, SAP MII
VALUE FOR HARLEY
• Consoles provide the routing and the execution control for the build process, tracking the build, and recording inventory consumption in real-time as well as any non-conformance (SAP ME)
• Time clock integration for labor tracking (SAP ME, SAP MII)
• Andon Board signal functionality is used at each work cell - each work cell plays a unique song when there is an issue (SAP MII)
• Provides the co-ordination of the lean supplier parts needed for assembly together with SAP ME – MEINT (SAP MII)
RepairRoll-Test
Crate & Ship
Assembly
Paint
Paint Touch-up &
Staging
VIN Stamp
& Tank
�I-/=��E��+0/>/<3+
Paint StagingPress
(Fenders & Tanks)
Bend Frames.
Weld Frames & TanksLean Supplier Parts Market
IT Support
QA
Tank Leak
Test CMMSMaintenance
![Page 11: Harley Davidson - オルタナティブ・ブログ Davidson - Walking Guide.pdfHARLEY DAVIDSON MANUFACTURING PROCESS • Stamps VIN to the frame • Start of the use of carts to transport](https://reader033.vdocument.in/reader033/viewer/2022041911/5e6799baf080382fe46930ba/html5/thumbnails/11.jpg)
21
SAP Enterprise Resource Planning
PLant Maintenance
Inventory and Warehouse Management
Quality Management
Master Data Authoring and Engineering Change Mgmt
Production Planning
SAP Manufacturing Execution
WIP (Lot and Serial #) Tracking and Genealogy
Manufacturing Process Control
Defect Tracking and Resolution
Data Collection
Labor Trading
ME 6.1
*Inventory is referred to as Floor Stock in SAP ME
• Production Order (Shop) • Planned Order (Repetitive • Order Changes • Services Order (RMA) • �+>/<3+6l�6+==3F-+>398= • Serial Number (Product) • BOM • Routing • Operation • Work Center • HR�%=/<�'l�/<>3F-+>398 • Inventory1 Receipt W/Batch • Inventory1 Reservation • Inventory1 Locations • Equipment Scheduled Downtime • Quality Inspection Lot • Work Instructions • Alternate Components • Phantom BOM Components • Co- and By-Products
• Production/Planned Order Yield �98F<7+>398
• Production/Planned Order Scrap �98F<7+>398
• Production/Planned Order �+-5G?=2
• #/<@3-/��<./<�)3/6.��98F<7+>398 • Component Goods Movement • Parent Batch Number • !?+63>C��9>3F-+>398= • Equipment Unscheduled Down-
time • Equipment Usage • Inventory1 Return • Inventory1 Scrap • Inventory1 Unreserved • Inventory1 Locations • DC Batch And Batch Characteris-
tics • Serial Number (Components) • Quality Inspection Lot Results • Direct Labor • Routing
![Page 12: Harley Davidson - オルタナティブ・ブログ Davidson - Walking Guide.pdfHARLEY DAVIDSON MANUFACTURING PROCESS • Stamps VIN to the frame • Start of the use of carts to transport](https://reader033.vdocument.in/reader033/viewer/2022041911/5e6799baf080382fe46930ba/html5/thumbnails/12.jpg)
23
Repair and Roll-Test
HARLEY DAVIDSON MANUFACTURING PROCESS:
• The assembled bikes are provided a roll-test and repaired based on any non-compliance
BUSINESS ISSUE:
• This capability did not exist. Typically bikes were <+8.976C�:?66/.�9H�>2/�638/=�+8.�>/=>[.<3@/8�,C�9:-/<+>398=�0965=�]�3./8>3F/.�+</+�90�<3=5�09<�38=?<+8-/�etc.
SAP SOLUTION: SAP ME
VALUE FOR HARLEY:
• Provides the test sequences for any non-compli-ance testing (SAP ME)
• <9@3./=�>2/�=/;?/8-/=�09<�</:+3<�98�+8C�3./8>3F/.�non-compliance (SAP ME)
• Inventory, genealogy, labor tracking etc. all done as part of the execution
RepairRoll-Test
Crate & Ship
Assembly
Paint
Paint Touch-up &
Staging
VIN Stamp
& Tank
�I-/=��E��+0/>/<3+
Paint StagingPress
(Fenders & Tanks)
Bend Frames.
Weld Frames & TanksLean Supplier Parts Market
IT Support
QA
Tank Leak
Test CMMSMaintenance
![Page 13: Harley Davidson - オルタナティブ・ブログ Davidson - Walking Guide.pdfHARLEY DAVIDSON MANUFACTURING PROCESS • Stamps VIN to the frame • Start of the use of carts to transport](https://reader033.vdocument.in/reader033/viewer/2022041911/5e6799baf080382fe46930ba/html5/thumbnails/13.jpg)
25
Crate & Ship
HARLEY DAVIDSON MANUFACTURING PROCESS:
• Final bike/trike is crated and shipped
BUSINESS ISSUE:
• Lack of visibility of which VIN #s going to which trucks
• Inability to optimize by grouping based on vehicle type, location etc.
SAP SOLUTION: SAP ME
VALUE FOR HARLEY:
• �8.[>9[/8.�><+-5381�90�>2/�F83=2/.�,35/�>2<9?12�manufacturing based on VIN# (SAP ME)
RepairRoll-Test
Crate & Ship
Assembly
Paint
Paint Touch-up &
Staging
VIN Stamp
& Tank
�I-/=��E��+0/>/<3+
Paint StagingPress
(Fenders & Tanks)
Bend Frames.
Weld Frames & TanksLean Supplier Parts Market
IT Support
QA
Tank Leak
Test CMMSMaintenance
![Page 14: Harley Davidson - オルタナティブ・ブログ Davidson - Walking Guide.pdfHARLEY DAVIDSON MANUFACTURING PROCESS • Stamps VIN to the frame • Start of the use of carts to transport](https://reader033.vdocument.in/reader033/viewer/2022041911/5e6799baf080382fe46930ba/html5/thumbnails/14.jpg)
27
![Page 15: Harley Davidson - オルタナティブ・ブログ Davidson - Walking Guide.pdfHARLEY DAVIDSON MANUFACTURING PROCESS • Stamps VIN to the frame • Start of the use of carts to transport](https://reader033.vdocument.in/reader033/viewer/2022041911/5e6799baf080382fe46930ba/html5/thumbnails/15.jpg)
www.sap.com/contactsapŀ�����#� �#��9<�+8�#� �+I63+>/�-97:+8CL��66�<312>=�</=/<@/.L
�9�:+<>�90�>23=�:?,63-+>398�7+C�,/�</:<9.?-/.�9<�><+8=73>>/.�38�+8C�09<7�9<�09<�+8C�:?<:9=/�A3>29?>�>2/�/B:</==�:/<73==398�90�#� �#��9<�+8�#� �+I63+>/�-97:+8CL
#� �+8.�9>2/<�#� �:<9.?->=�+8.�=/<@3-/=�7/8>398/.�2/</38�+=�A/66�+=�>2/3<�</=:/->3@/�6919=�+</�><+./7+<5=�9<�</13=>/</.�><+./7+<5=�90�#� �#��U9<�+8�#� �+I63+>/�-97:+8CV�38��/<7+8C�+8.�9>2/<�-9?8><3/=L�Please see http://www.sap.com/corporate-en/legal/copyright/index.epx#trademark for additional trademark information and notices. Some software products marketed by SAP SE and its distributors contain proprietary software components of other software vendors.
�+>398+6�:<9.?->�=:/-3F-+>398=�7+C�@+<CL
$2/=/�7+>/<3+6=�+</�:<9@3./.�,C�#� �#��9<�+8�#� �+I63+>/�-97:+8C�09<�3809<7+>398+6�:?<:9=/=�986CM�A3>29?>�</:</=/8>+>398�9<�A+<<+8>C�90�+8C�538.M�+8.�#� �#��9<�3>=�+I63+>/.�-97:+83/=�=2+66�89>�,/�63+,6/�09<�/<<9<=�9<�973==398=�A3>2�</=:/->�>9�>2/�7+>/<3+6=L�$2/�986C�A+<<+8>3/=�09<�#� �#��9<�#� �+I63+>/�-97:+8C�:<9.?->=�+8.�=/<@3-/=�+</�>29=/�>2+>�+</�=/>�09<>2�38�>2/�/B:</==�A+<<+8>C�=>+>/7/8>=�+--97:+8C381�such products and services, if any. Nothing herein should be construed as constituting an additional warranty.
�8�:+<>3-?6+<M�#� �#��9<�3>=�+I63+>/.�-97:+83/=�2+@/�89�9,631+>398�>9�:?<=?/�+8C�-9?<=/�90�,?=38/==�9?>638/.�38�>23=�.9-?7/8>�9<�+8C�</6+>/.�:</=/8>+>398M�9<�>9�./@/69:�9<�</6/+=/�+8C�0?8->398+63>C�7/8>398/.�>2/</38L�$23=�.9-?7/8>M�9<�+8C�</6+>/.�:</=/8>+>398M�+8.�#� �#�b=�9<�3>=�+I63+>/.�-97:+83/=b�=><+>/1C�+8.�:9==3,6/�0?>?</�./@/69:7/8>=M�:<9.?->=M�+8.l9<�:6+>09<7�.3</->398=�+8.�0?8->398+63>C�+</�+66�=?,4/->�>9�-2+81/�+8.�7+C�,/�-2+81/.�,C�#� �#��9<�3>=�+I63+>/.�-97:+83/=�+>�+8C�>37/�09<�+8C�</+=98�A3>29?>�89>3-/L�$2/�3809<7+>398�38�>23=�.9-?7/8>�3=�89>�+�-9773>7/8>M�:<973=/M�9<�6/1+6�9,631+>398�>9�./63@/<�+8C�7+>/<3+6M�-9./M�9<�0?8->398+63>CL��66�09<A+<.[6995381�=>+>/7/8>=�+</�=?,4/->�>9�@+<39?=�<3=5=�+8.�?8-/<>+38>3/=�>2+>�-9?6.�-+?=/�+->?+6�</=?6>=�>9�.3H/<�7+>/<3+66C�0<97�/B:/->+>398=L�"/+./<=�+</�-+?>398/.�89>�>9�place undue reliance on these forward-looking statements, which speak only as of their dates, and they should not be relied upon in making purchasing decisions.