0 download

TRANSCRIPT

Page 1: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Harrigan Centennial Hall RenewalAssembly Work Session

1‐22‐2013

McCool Carlson Green ArchitectsJohn Weir & Garrett Burtner

Page 2: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Presentation AgendaHarrigan Centennial Hall Renewal

Facility Assessment Update

Project Costs & Available Funding

Planning Process Update

Schedule

Next Steps

Page 3: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Facility Assessment UpdateHarrigan Centennial Hall Renewal

Purpose & Structure

Examine the Building• Health & Safety• Protection of Structure• Code & Accessibility• Program Space Deficiencies• Operating Cost Savings• Standard Facility Maintenance

Review Existing Documentation and Previous Studies

Identify Opportunities and Deficiencies

Prepare a Professional Cost Estimate

Document the Existing Conditions

Page 4: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Facility Assessment UpdateHarrigan Centennial Hall Renewal

Program – Original Building

Page 5: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Facility Assessment UpdateHarrigan Centennial Hall Renewal

Program ‐ Additions

Page 6: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Facility Assessment UpdateHarrigan Centennial Hall Renewal

Program – Current Use

Page 7: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Facility Assessment UpdateHarrigan Centennial Hall Renewal

Program – Attribute Sheets

Catalog  Characteristics of Rooms

Identifies Systems

Spatial Qualities

Finishes

Recommendations

Page 8: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Facility Assessment UpdateHarrigan Centennial Hall Renewal

Program – Area Analysis

Groups the Types Of Use For Spaces

Lists Areas Of Each Space

Catalogs Existing Area

Structures Tiers of Program

Page 9: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Facility Assessment UpdateHarrigan Centennial Hall Renewal

Findings

Building Envelope Is Under‐insulated

Exiting & Plumbing Fixtures Code Violations

Replace Interior Finishes 

Program Area Deficiencies

Structural Code Upgrades

Replace Sprinkler, And Plumbing Distribution

Page 10: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Facility Assessment UpdateHarrigan Centennial Hall Renewal

Findings

Replace Heating And Ventilation Systems

Replace Kitchen Ventilation Equipment And Food Service 

Equipment

Improve Acoustics In MPR

Replace AV Systems

Abate Hazardous Materials

Page 11: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Project Costs & Available FundingHarrigan Centennial Hall Renewal

Tiers of Improvements & Priorities

Tier 1 Improvements 

• Basic Centennial Hall  Upgrades

• Code Deficiencies

• Energy Deficiencies

• Maintenance Deficiencies

Tier 2 Improvements

• Address Core Program Deficiencies

• Require Additions 

Tier 3 Improvements

• Program Area For Sitka Historical Society Museum

• Program Area For Visitor Services

Tier 4 Improvements

• Other Deficient Program Areas

Page 12: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Project Costs & Available FundingHarrigan Centennial Hall Renewal

Project Budget Diagram

Page 13: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Project Costs & Available FundingHarrigan Centennial Hall Renewal

Funds Available

Page 14: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Planning Process UpdateHarrigan Centennial Hall Renewal

Overview

Building Design Committee (BDC)

Technical Committee

Public Involvement

Assembly 

Page 15: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Planning Process UpdateHarrigan Centennial Hall Renewal

Goals

Meets convention and visitor needs

Meets local cultural and civic 

needs

Attractive to locals and visitors 

Appropriate to the place ‐

climate & culture

Affordable ‐ good value

Sustainable ‐energy efficient and healthy

Flexible ‐ diverse, hard‐working 

spaces

Coordinate construction 

with ongoing useWord Cloud from BDC vision Session

Page 16: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Planning Process UpdateHarrigan Centennial Hall Renewal

BDC Meeting #1

Kick‐off meeting

Outlined the Planning Process

Facility Assessment

Programing and Concept Design

Schematic Design

Design Development

Construction Documents

Reviewed the BDC Guide

Outlines roles and 

responsibilities

Discussed Visioning Survey

Visual Vocabulary Exercise

Schedule Open Forum

Page 17: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Planning Process UpdateHarrigan Centennial Hall Renewal

BDC Meeting #2

Review Goals

Discuss initial Findings  of Facility Assessment

Region and Site Analysis

Sustainable Strategies

Open Forum

Focus Group Meetings

Page 18: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Planning Process UpdateHarrigan Centennial Hall Renewal

BDC Meeting #3

Review Goals

Review Facility Assessment & Recommendations

Develop Consensus on Scope of Tiers

Review Costs and Funding

Open Forum

Page 19: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Planning Process UpdateHarrigan Centennial Hall Renewal

BDC Meeting #4

Review Goals

Site Analysis

Review Costs and Funding

Program Diagrams

Kit of Parts

Master Plan Options

Open Forum

Page 20: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Planning Process UpdateHarrigan Centennial Hall Renewal

BDC Meeting #4

Page 21: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Planning Process UpdateHarrigan Centennial Hall Renewal

BDC Meeting #4 – Tier 1 & 2Option A

Page 22: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Planning Process UpdateHarrigan Centennial Hall Renewal

BDC Meeting #4 – Tiers 1, 2, 3, & 4Option F

Page 23: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Planning Process UpdateHarrigan Centennial Hall Renewal

Public Meetings 1 & 2

Planning Process

Findings of Assessment

Open Forum

Your Goals and Expectation

Project Update

Schedule

Page 24: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

ScheduleHarrigan Centennial Hall Renewal

Ideal Timetable

2014 – Construction (Phased)

2013/2014 – Bidding

Fall 2013 – Construction Documents

June 2013 ‐ Design Development

March 2013‐ Schematic Design

February 2013 ‐ Conceptual Design & Consensus 

December 2012 – Facility Assessment

Page 25: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

Next StepsHarrigan Centennial Hall Renewal

Reaching Schematic Design

Refine Conceptual Design

Gain Consensus on Concept Design & Master Plan

Update Costs

Complete Schematic Design

Reviews

Approvals

Page 26: Harrigan Centennial Hall Renewal Assembly Work Sessionmcg.clutchmedia.net/wp-content/uploads/2014/09/HCH... · Harrigan Centennial Hall Renewal Facility Assessment Update Purpose

QuestionsHarrigan Centennial Hall Renewal

City and Borough of SitkaKelli Cropper, Project Manager

[email protected] Weatherman, Municipal Engineer

[email protected]