• Rebuild approximately 12-miles of existing 69-kilovolt (kV) transmission line • Construct approximately 2-miles of new 69 kV line • Remove approximately 2-miles of aging 69 kV line • Replace wood poles with steel monopoles The existing infrastructure is aging. Proactively rebuilding the 1950s line improves reliability for customers across the region by strengthening the transmission infrastructure. Enhancements ensure dependable electric service is available and reduces the possibility of outages. The transmission line, located in Paulding and Van Wert counties, travels between Haviland and Van Wert. AEP Ohio is investing about $20 million to upgrade the transmission infrastructure in northwest Ohio. Rebuilding the transmission line between Haviland and Van Wert is essential to ensure continued reliable power is available across the region. WHAT WHERE WHY Project Schedule* Haviland - Van Wert Transmission Line Rebuild Project Engineering & Design Engineering & Design Construction Begins Construction Begins Right-of-Way Acquisition Right-of-Way Acquisition Construction Complete Construction Complete Restoration Complete Restoration Complete *Timeline is approximate and is subject to change due to weather and other factors. *Timeline is approximate and is subject to change due to weather and other factors. 2016 2017 2018 2019

Upload: trancong

Post on 30-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

• Rebuild approximately 12-miles

of existing 69-kilovolt (kV)

transmission line

• Construct approximately 2-miles

of new 69 kV line

• Remove approximately 2-miles of

aging 69 kV line

• Replace wood poles with steel

monopoles

The existing infrastructure is aging.

Proactively rebuilding the 1950s line

improves reliability for customers

across the region by strengthening

the transmission infrastructure.

Enhancements ensure dependable

electric service is available and

reduces the possibility of outages.

The transmission line, located in

Paulding and

Van Wert

counties, travels

between

Haviland and Van

Wert.

AEP Ohio is investing about $20 million to upgrade the transmission infrastructure in northwest Ohio.

Rebuilding the transmission line between Haviland and Van Wert is essential to ensure continued

reliable power is available across the region.

WHAT WHEREWHY

Project Schedule*

Haviland - Van WertTransmission Line Rebuild Project

Engineering &Design

Engineering &Design

ConstructionBeginsConstructionBegins

Right-of-WayAcquisition

Right-of-WayAcquisition

ConstructionComplete

ConstructionComplete

RestorationComplete

RestorationComplete

*Timeline is approximate and is subject to change due to weather and other factors.*Timeline is approximate and is subject to change due to weather and other factors.

2016 2017 2018 2019

Project Map

AEP Ohio will construct steel monopole structures averaging approximately 75 to 80-feet high. Structures will be located in the center of a right-of-way averaging 60-feet wide.

AEP Ohio is committed to carefully balancing the energy needs of residential and business customers while protecting the environment and natural beauty of the region.

Typical Structures*

Exact structure may vary from the one shown.*

Contact:

AEP Ohio values your input about this project. Please send comments and questions to:

EASic/o Brian Recker630 Morrison Rd, Suite 210.Gahanna, OH 43230

[email protected]

(614) 327-2030

www.AEPOhio.com/Haviland-VanWert

@

114

118

214

168

87 12

127

127

224

224

224

30

SCOTT

HAVILAND

VAN WERTWEST VAN WERT

SUBSTATION

HAVILANDSUBSTATION

MAP LEGEND

LINE TO BE REBUILT LINE TO BE REMOVEDPROPOSED RE-ROUTE