h.b. “trip” doggett president & chief executive officer board of directors meeting ercot...
DESCRIPTION
3 F INANCIAL P ERFORMANCE (U PDATED THROUGH A UGUST ) Y EAR -E ND P ERFORMANCE F ORECAST : $3.0 M ILLION F AVORABLE Tab 4 E XPENSES R EVENUES $5.1 Million favorable 2011 carry forward $4.6 Million unfavorable outside services $2.7 Million favorable salaries & related benefits $0.8 Million favorable facility & equipment costs ERCOT PUBLICTRANSCRIPT
H.B. “Trip” DoggettPresident & Chief Executive Officer
Board of Directors MeetingERCOT PublicSeptember 18, 2012
Tab 4: CEO UPDATE
2
FINANCIAL PERFORMANCE (UPDATED THROUGH AUGUST)
YTD BUDGET VS. ACTUAL PERFORMANCE: $5.2 MILLION FAVORABLE
Tab 4
EXPENSES
REVENUES $5.1 Million favorable 2011 carry forward$0.5 Million favorable other revenues$0.4 Million unfavorable system administration fees
$3.4 Million unfavorable outside services$1.7 Million favorable salary & related benefits$0.7 Million favorable facility & equipment costs$1.2 Million favorable hardware & software maintenance or
licensing
ERCOT PUBLIC
3
FINANCIAL PERFORMANCE (UPDATED THROUGH AUGUST)
YEAR-END PERFORMANCE FORECAST: $3.0 MILLION FAVORABLE
Tab 4
EXPENSES
REVENUES $5.1 Million favorable 2011 carry forward
$4.6 Million unfavorable outside services$2.7 Million favorable salaries & related benefits$0.8 Million favorable facility & equipment costs
ERCOT PUBLIC
4
IMPACTS OF ECONOMY & WEATHER – 2012
ERCOT PUBLIC
Economy Impact
Weather Impact
Model Error
2012 YTD
Forecast Energy 225.7 TWhActual Energy 224.9 TWhError: (-0.3%)
August 2012:
Forecast Energy 35.0 TWhActual Energy 35.4 TWh
Tab 4
5
SUMMER 2012 REVIEW
• As expected, weather was hotter than normal (15 year average), but not as extreme as summer 2011
• The peak demand of 66,626 MW was set June 26, unusually early in the summer, 1,753 MW less than the August 2011 peak of 68,379 MW
• The summer 2012 SARA forecasted a peak of 67,492 MW• No significant challenges serving load
– Generation forced outages were lower than last year possibly due to temperatures and load not sustained at extreme levels
– ERCOT region experienced more rain during the summer of 2012, so drought was not a broad concern
– One watch for Physical Responsive Reserve below 2500 MW due to the tripping of two large generating units on July 30
– No Energy Emergency Alert events• Four Transmission Watches issued for areas of South and West Texas
due to high loads and some transmission outages– Load growth in West Texas due to gas and oil development led to more
transmission congestion in the area
ERCOT PUBLICTab 4
6
SARA RELEASES – SEP 4TH 2012
Fall 2012 (Final) & Winter 2012-13 (Preliminary)
•Sufficient installed generating capacity to serve forecasted peak demands with historical typical generation outages
•Persistent drought conditions in ERCOT do not pose a threat to generation operations
•Extreme load and extreme generation outage conditions can be accommodated in the Fall•Extreme load and extreme generation outage conditions could lead to rotating outages in the Winter
ERCOT PUBLICTab 4
7
NON-BINDING FORWARD PRICE PROJECTION (EVALUATION PHASE)
Analyzed error between 6/28/12 and 8/27/12 looking at the Generation-to-be-Dispatched (GTBD) and Load Zone LMPs
Per NPRR 351, ERCOT must post projected non-binding prices for at least 15 minutes into the future
ERCOT PUBLIC
Mean Absolute Error for GTBD and Load Zone LMPs
Tab 4
8
NON-BINDING FORWARD PRICE PROJECTION (EVALUATION PHASE)
• Observations during the first two months include– Forward Price Projection is reasonable for the first 30 minutes
except in the West Zone– Short-term load and wind forecast errors get amplified by the
shape of the aggregated offer curve resulting in higher errors in Forward Price Projection
– False price spikes have occurred near the top of the hour due to• Timing & modeling of generator start-ups & shut-downs• Handling of differences between COP & telemetered
generator status– Updated logic was implemented on 8/29/12 to mitigate the above
two issues• ERCOT and Stakeholders are continuing to evaluate further
improvements
ERCOT PUBLICTab 4
9
DEPARTMENTAL HIGHLIGHTS
Compliance•Jim Brenton was appointed by the NERC Board of Trustees to the newly created Reliability Issues Steering Committee (RISC).
•RISC is an advisory committee that reports directly to the NERC Board of Trustees and triages and provides front-end, high-level leadership and accountability for nominated issues of strategic importance to Bulk Power System (BPS) reliability. In some cases, that includes solutions other than new or revised standards.
•Jim Brenton represents ERCOT and the NERC CIPC (Critical Infrastructure Protection Committee) on this new steering committee.
ERCOT PUBLICTab 4
Jim BrentonPrincipal, Regional Security CoordinationHired: August 1, 2005
10
DEPARTMENTAL HIGHLIGHTS
Information Technology•Several members of the IT organization have completed a comprehensive draft of a Technology Roadmap forecasting technology needs over the next 2 to 5 years.
•This effort required cross-functional collaboration across IT organizations including IT Strategic Services & Asset Management, Enterprise Architecture, Application Services, Infrastructure, and IT Operations, as well as with Business Integration, Security, and other business stakeholders.
•A high-level presentation was given to the ERCOT Board in March. A more detailed IT Deep Dive, along with a Security Deep Dive, was provided to two Board members in August. An overview will be presented to the November Finance & Audit Committee.
ERCOT PUBLICTab 4
11
IEEE PES GENERAL MEETING, SAN DIEGO, JULY 2012
ERCOT PUBLIC
Topics Included
•Extreme Weather•Phasor Measurements•Situational Awareness•High Wind Penetration•Demand Response•Real-Time Contingency Analysis•State Estimation•Sub-Synchronous Control Interaction•Topology Control•Wide Area Damping Control•Impact of Wind Resource on Prices•Modeling of Wind Parks•Load Modeling
Presentations by 14 ERCOT StaffKent Saathoff Jose Conto David Maggio
Bill Blevins Resmi Surendran Tejaswi Potluri
John Adams Sandip Sharma Jian Chen
Diran Obadina Hong Xiao Mike Legatt
Sarma (NDR) Nuthalapati
Shun-Hsien (Fred) Huang
Tab 4
12
TOP COMMUNITY PARTNER – TAYLOR ISD
Award from Texas Afterschool Centers on Education (ACE), a Texas Education Agency program
ERCOT PUBLIC
ERCOT outreach to Taylor ISD•47 ERCOT employees
•600+ volunteer hours
Programs included•MAPS – Mentors for 2nd grade students•MUNCH – Mentors for 3rd through 12th grade•BLADE – Beginners Learning Alternative Designs for Energy•Duck University – Official Afterschool Center on Education (ACE)
Tab 4