hcal – integration plans mathias reineckehcal – main meeting18.4.2007 1.introduction 2.hcal base...

14
HCAL – Integration Plans Mathias Reinecke HCAL – Main meeting 18.4.2007 1.Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System (LCS) – Constraints

Upload: martin-douglas

Post on 05-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting18.4.2007 1.Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System

HCAL – Integration Plans

Mathias Reinecke HCAL – Main meeting 18.4.2007

1. Introduction2. HCAL Base Unit (HBU) - Update3. Testboards4. Light Calibration System (LCS) –

Constraints

Page 2: HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting18.4.2007 1.Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System

HCAL Base Unit (HBU) – first idea

Mathias Reinecke HCAL – Main meeting 18.4.2007

Sector wall

Reflector Foil100µm

Polyimide Foil100µm PCB

1mm

Bolt with innerM3 threadwelded to bottom plate

SiPM

Tile3mm

HBU Interface500µm gap

Bottom Plate600µm

ASICLQFP-1441.4mm high

Top Plate600µm steel

Component Area: 1.7 mm highHBU height:7.2mm(6.0mm without covers => absorber)

AbsorberPlates(steel)

Spacer1.7mm

Top Plate fixing

Page 3: HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting18.4.2007 1.Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System

HBU – Constraints

Mathias Reinecke HCAL – Main meeting 18.4.2007

ASIC - TQFP10036 inputs (1mm)

PCB (shown transparent):Two signal layers (50): - CLK, Control, Data, LED - SiPM Readout, HV

SiPM Contact Pins(soldering, ~1mm)

Connector (1.1mm)

Page 4: HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting18.4.2007 1.Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System

HBU – PCB layer structure I

Mathias Reinecke HCAL – Main meeting 18.4.2007

-6 layer design with cut-outs for ASICS and connectors-75 Lines for high-gain SiPM setup-Three signal layers for impedance-controlled routing-Total height (PCB + components): 1.32mm- Feasibility / Cost-factor under investigation

Page 5: HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting18.4.2007 1.Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System

HBU – PCB Layer Structure II

Mathias Reinecke HCAL – Main meeting 18.4.2007

-6 layer design with standard setup-75 Lines for high-gain SiPM setup-Two signal layers for impedance- controlled routing-Total height (PCB + components): 1.72mm (old value: 2.7mm)

Page 6: HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting18.4.2007 1.Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System

Testboard I : LED

Mathias Reinecke HCAL – Main meeting 18.4.2007

Test LED integration into HBU (LCS): Proof of principle together with our colleagues from Prague

-Crosstalk of driving circuit to SiPM?

-Integration to PCB / coupling to tile?

-Connector test: stability, number of connection-cycles?

Features:- SMD LEDs (two types) LED size 1.6 x 0.8 x 0.6 mm³- Several LED driving circuits- >2 Tiles with analog output- proposed HBU Connector- Multilayer PCB needed!! (crosstalk test)- No ASIC…

Page 7: HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting18.4.2007 1.Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System

Testboard II : SPIROC

Mathias Reinecke HCAL – Main meeting 18.4.2007

SPIROC (ASIC) Testboard IS HBU prototype!

Test of:-Cassette (=HBU) assembly (tiles, electronics, cover)

-Performance of SPIROC in the dense HBU setup (noise, crosstalk, power, gain, …)

-LCS with LEDs on board

-Signal Integrity (see Testboard III), Communication with DAQ

-Analog AND digital outputs / interfaces (next slide)

Page 8: HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting18.4.2007 1.Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System

Testboard II : Integration

Mathias Reinecke HCAL – Main meeting 18.4.2007

Interface to HCAL prototype?(SPIROC timinginformation needed)

Environment of the SPIROC Testboard:

Stand-alone, or Integration into old DAQ?(Menpower problem …)When using CRC:

Analog or digital readout?

Page 9: HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting18.4.2007 1.Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System

Testboard III : Power-System

Mathias Reinecke HCAL – Main meeting 18.4.2007

Test Power-Ground System (2.20m):

-Oscillations when switching?

-Voltage drop, signal integrity (traces, connectors)?

-SPIROC performance @ far end (blocking caps sufficient)?

‚LayerConcentrator‘

SPIROCTestboard

Extenders(Power-Gnd, Traces)

Page 10: HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting18.4.2007 1.Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System

Light Cal.-System - Constraints

Mathias Reinecke HCAL – Main meeting 18.4.2007

1. Photons per second into tile:

2. Optical output power (LED):

snst

Nn PHPH

11020

5

100 9

nWhc

nP PHopt 10

nms

mc

Jsh

LEDUV 400

103

10626.6

_

8

34

Tile: For 1 MIP ≈ 15 pixels ↔ 12 photons * 5 * 1.75 ≈ 100 photons

Crosstalk (1.25px)

SiPM efficiency (20%)

Losses

Page 11: HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting18.4.2007 1.Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System

Light Cal.-System - Constraints

Mathias Reinecke HCAL – Main meeting 18.4.2007

3. From LED data sheet:

4. Charge in single pulse:

VmAmWPopt 5.3&[email protected]

fCnsnAtIQ drive 91.05181

nAInW drive 181:10

Current/Charge is dominated by LED capacitance and/or parasitics

=>

Page 12: HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting18.4.2007 1.Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System

Light Cal.-System - Constraints

Mathias Reinecke HCAL – Main meeting 18.4.2007

5. LED Input Power (Heat, only when active)

WVIP diodedrivein 633.0

nWPPP optinheat 623

LED driver has to be added (not yet clear)

Promising parameters for a low-crosstalk LED implementation!Verification together with our colleagues from Prague.

Page 13: HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting18.4.2007 1.Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System

LED Drive Circuits

Mathias Reinecke HCAL – Main meeting 18.4.2007

Analog Driver

12

6.0

R

VUI inLED

110

10

25

5181

k

mVnA

Digital Driver

2,

R

VVVI satTLEDCalibLED

Transistor is ‚on‘ or ‚off‘

k

VVVnA

250

25.05.38.3200

To be tested: Transistor Speed, LED Speed (Capacitance), Output Power, Driver Power ???

Page 14: HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting18.4.2007 1.Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System

Conclusion

Mathias Reinecke HCAL – Main meeting 18.4.2007

-LED Testboard design starts now.

-HBU PCB structure in discussion with companies.

-SPIROC Testboard (HBU protot.) design started summer/autumn 2007 (ASIC Pinout and loading sequence is not fixed).