hda-in deputy commissioner capital program management …indiana division 575 n. pennsylvania st,...
TRANSCRIPT
Indiana Division 575 N. Pennsylvania St, Room 254 Indianapolis, IN 46204 July 25, 2019 317-226-7475 317-226-7341 In Reply Refer To: HDA-IN Ms. Heather Kennedy Deputy Commissioner Capital Program Management 100 North Senate Avenue Indianapolis, IN 46204 Dear Ms. Kennedy: We have completed our review of INDOT’s Amendment #20-01 to the FY 2020-2024 Indiana Statewide Transportation Improvement Program (STIP) dated July 25, 2019. INDOT has re-demonstrated fiscal constraint, air quality conformity, where applicable, and provided opportunity for public comment and involvement on Amendment #20-01. FHWA considers this amendment to be in substantial compliance with the applicable requirements as sufficient to support a consistency finding for inclusion into the STIP. Should you have any questions regarding this approval please contact Joyce Newland at 317-226-5353 or e-mail at [email protected].
Sincerely,
For: Mayela Sosa Division Administrator
Enclosure cc: Michael McNeil, INDOT
www.in.gov/dot/ An Equal Opportunity Employer
100 North Senate Avenue Room N955 Indianapolis, Indiana 46204
PHONE: (317) 232-0223 FAX: (317) 232-1499 Eric Holcomb, Governor
Joe McGuinness, Commissioner
July 25, 2019 Ms. Mayela Sosa, Division Administrator FHWA Indiana Division 575 North Pennsylvania Street, Room 254 Indianapolis, Indiana 46204 Dear Ms. Sosa: The Indiana Department of Transportation requests the projects listed in STIP Amendment 20-01 to be incorporated into the 2020-2024 Statewide Transportation Improvement Program (STIP). The required Metropolitan Planning Organization (MPO) Transportation Improvement Program (TIP) documents have been included in this request and duly noted in the Amendment. We have determined that the proposed amendments are: 1) consistent with the transportation plan; 2) the TIP remains fiscally constrained in that federal funding resources are sufficient to support the new or modified projects; and 3) conform to state and national air quality standards. At the time USDOT approved the FY 2020-2024 STIP, INDOT had a balance of $258,808,206 in funds for “Cost yet to be identified from future needs for FY 2020.” The grand total of this amendment is $54,030,694. The new balance is $204,777,512. A draft of this amendment was posted on INDOT’s STIP website http://www.in.gov/indot/STIP for comments. No comments were given about any project listed. We request your review and approval of the subject amendment. Should you have any questions pertaining to this amendment, please contact Michael McNeil, STIP Specialist at (317) 232-0223 or at [email protected]. Sincerely,
Roy Nunnally, Director Asset Planning & Management Division
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Adams County
Adams County IR 1005 Bike/Pedestrian
Facilities
Adams Co BP: from the
Wabash River to CR 850 S
Fort Wayne .32 STBG Local Funds CN $0.00 $461,823.00 $461,823.00 A 01 $3,107,855.0035191 /
1173218
Local
Transportation
Alternatives
CN $2,646,032.00 $0.00 $2,646,032.00
Comments:Add CN to STIP for CN FY 2020. No MPO
Indiana Department
of Transportation
US 27 Concrete Pavement
Restoration (CPR)
From 0.11 Miles North of US 33
(Borum Run Bridge) to 2.53
Miles North of US 224 North Jct
Fort Wayne 4.44 NHPP Road
Construction
CN $1,396,989.60 $349,247.40 $1,746,237.00 A 01 $1,848,237.0040486 /
1900624
Road Consulting PE $81,600.00 $20,400.00 $102,000.00
Comments:NO MPO. DES 1900624 adding PE to FY 2020 and CN to FY 2022 into FY 2020 - 2024 STIP.
Adams County Total
Federal: $4,124,621.60 Match :$831,470.40 2020: $3,209,855.00 2021: 2022: $1,746,237.00 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 1 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Benton County
Indiana Department
of Transportation
SR 55 Road Rehabilitation (3
R/4R Standards)
From 0.59 mi N of US 52 N jct to
US 24
Crawfordsville 8.992 STPBG Road ROW RW $450,400.00 $112,600.00 $563,000.00 A 01 $12,203,984.3040578 /
1700117
Comments:RW phase for $563,000 FY20, No MPO.
Indiana Department
of Transportation
SR 352 Br Repl, Comp.Cont.Pr
es.Conc. I-Beam
01.61 E US 41at Mud Pine
Creek
Crawfordsville 0 STBG Bridge ROW RW $31,200.00 $7,800.00 $39,000.00 A 01 $4,679,906.0040579 /
1601083
Comments:ROW phase for $39,000 FY20 No MPO.
Benton County Total
Federal: $481,600.00 Match :$120,400.00 2020: $602,000.00 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 2 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Blackford County
Montpelier ST 1001 Sign Modernization (S
eries Of Units)
Sign replacement in the City of
Montpelier
Fort Wayne 14.2 Safety Local Funds CN $0.00 $22,380.00 $22,380.00 A 01 $257,000.0041149 /
1702855
Local Safety
Program
PE $29,790.00 $0.00 $29,790.00
Local Funds PE $0.00 $3,310.00 $3,310.00
Local Safety
Program
CN $201,420.00 $0.00 $201,420.00
Comments:Add new Project to STIP for PE
Indiana Department
of Transportation
SR 3 Bridge Deck Overlay Bridge over LITTLE LICK CREEK
, 00.67 South of SR 26.
Fort Wayne 0 STBG Bridge
Construction
CN $616,909.60 $154,227.40 $771,137.00 A 01 $856,137.0042468 /
1901488
Bridge Consulting PE $68,000.00 $17,000.00 $85,000.00
Comments:NO MPO. DES 1901488 adding PE to FY 2020 and CN to FY 2022 into FY 2020 - 2024 STIP.
Blackford County Total
Federal: $916,119.60 Match :$196,917.40 2020: $118,100.00 2021: 2022: $994,937.00 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 3 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Boone County
Indiana Department
of Transportation
SR 75 Bridge Replacement,
Other Construction
Bridge over Wells Ditch, 2.15 mi
N of I-74
Crawfordsville 0 STPBG Bridge ROW RW $8,000.00 $2,000.00 $10,000.00 A 01 $1,203,846.0038767 /
1400219
Comments:ROW Phase for $10,000 FY20, No MPO
Boone County IR 1033 Bridge Replacement On CR 500W, approximately
750' South of Middle
Jamestown Road
Crawfordsville .18 STPBG Local Funds CN $0.00 $204,412.50 $204,412.50A 01 $1,073,340.0040874 /
1800246
Local Bridge
Program
RW $58,400.00 $0.00 $58,400.00
Local Funds RW $0.00 $14,600.00 $14,600.00
Local Bridge
Program
CN $817,650.00 $0.00 $817,650.00
Comments:No MPO please add RW funds to FY 20 in the amount of 58,400 federal and 14,600 local. please add CN funds to FY 21 in the amount 817,650 federal and 204,412.50 local
Boone County Total
Federal: $884,050.00 Match :$221,012.50 2020: $83,000.00 2021: $1,022,062.50 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 4 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Carroll County
Indiana Department
of Transportation
US 421 Bridge Replacement,
Steel
Over Wildcat Creek, 4.06mi N
of SR 26
LaPorte 0 NHPP Bridge Consulting PE $1,296,085.60 $324,021.40 $1,620,107.00 A 01 $4,977,139.0040607 /
1700101
Comments:Please amend FY20 PE phase into the STIP. No MPO.
Carroll County Total
Federal: $1,296,085.60 Match :$324,021.40 2020: $1,620,107.00 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 5 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Cass County
Indiana Department
of Transportation
SR 218 Bridge Replacement,
Other Construction
Over Government Ditch, 2.00
mi W of US 31
LaPorte 0 STBG Bridge ROW RW $40,000.00 $10,000.00 $50,000.00 A 01 $663,173.0038755 /
1500087
Comments:Please amend RW phase into the STIP. No MPO.
Cass County Total
Federal: $40,000.00 Match :$10,000.00 2020: $50,000.00 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 6 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Clay County
Indiana Department
of Transportation
SR 59 Bridge Deck
Replacement
over Connelley Ditch; 02.11 mi
N of SR 246
Crawfordsville 0 STBG Bridge
Construction
CN $2,418,316.80 $604,579.20 $3,022,896.00A 01 $3,382,896.0039762 /
1800504
Bridge Consulting PE $72,040.00 $18,010.00 $90,050.00
Comments:PE phase for $90,050 FY20
Indiana Department
of Transportation
SR 42 Small Structure Pipe
Lining
0.69 mi E of SR 59 Crawfordsville 0 STBG Bridge ROW RW $40,000.00 $10,000.00 $50,000.00 A 01 $694,344.0040537 /
1500118
Comments:RW phase for $50,000 FY20, No MPO
Indiana Department
of Transportation
I 70 Bridge Maintenance
And Repair
WB over Honey Creek, Priv Rd,
04.86 mi W of SR 59
Crawfordsville 0 NHPP Bridge Consulting PE $46,800.00 $5,200.00 $52,000.00 A 01 $659,363.0042090 /
1900768
Bridge
Construction
CN $546,626.70 $60,736.30 $607,363.00
Comments:PE phase for $52,000 FY20
Clay County Total
Federal: $3,123,783.50 Match :$698,525.50 2020: $192,050.00 2021: $3,630,259.00 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 7 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Clinton County
Indiana Department
of Transportation
SR 28 Pavement
Replacement
From 1.64 mi W of SR 39 to SR
39 (Jackson St)
Crawfordsville 1.632 STBG Road ROW RW $628,000.00 $157,000.00 $785,000.00 A 01 $14,829,779.0038221 /
1005600
Comments:RW phase for $785,000 FY20, No MPO
Indiana Department
of Transportation
US 52 Small Structure
Replacement
1.12 mi E of SR 28 S Jct Crawfordsville 0 STPBG Bridge ROW RW $16,000.00 $4,000.00 $20,000.00 A 01 $2,484,762.0039956 /
1600874
Comments:RW phase for $20,000 FY20, No MPO
Indiana Department
of Transportation
SR 75 Small Structure
Replacement
0.80 mi S of SR 26 Crawfordsville 0 STPBG Bridge ROW RW $60,000.00 $15,000.00 $75,000.00 A 01 $887,979.0040536 /
1500107
Comments:RW phase for $75,000 FY20, No MPO
Indiana Department
of Transportation
SR 38 HMA Overlay Minor
Structural
From 0.31 mi W of US 421 E Jct
to 0.52 mi E of US 421 E Jct
Crawfordsville .835 STPBG Road Consulting PE $112,569.76 $28,142.44 $140,712.20 A 01 $971,773.2041609 /
1800271
Comments:PE phase for $140,712.20 FY20, No MPO
Clinton County Total
Federal: $816,569.76 Match :$204,142.44 2020: $1,020,712.20 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 8 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Crawford County
Indiana Department
of Transportation
SR 66 Bridge Deck Overlay Over Branch Brandywine Fork,
01.32 mi W SR-64
Vincennes 0 STPBG Bridge Consulting PE $141,520.00 $35,380.00 $176,900.00 A 01 $922,112.0041125 /
1800951
Comments:Amend 2020-2024 STIP. Adding FY20 PE $176,900.00. No MPO.
Crawford County Total
Federal: $141,520.00 Match :$35,380.00 2020: $176,900.00 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 9 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Daviess County
Indiana Department
of Transportation
US 231 Bridge Thin Deck
Overlay
Over First Creek, 01.52 mi S SR
-558
Vincennes 0 NHPP Bridge
Construction
CN $2,600,000.00 $650,000.00 $3,250,000.00 A 01 $3,697,500.0042143 /
1900784
Bridge Consulting PE $358,000.00 $89,500.00 $447,500.00
Comments:Amend 2020-2024 STIP. Adding FY20 PE $447,500.00, FY22 CN $3,250,000.00. No MPO.
Daviess County Total
Federal: $2,958,000.00 Match :$739,500.00 2020: $447,500.00 2021: 2022: $3,250,000.00 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 10 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Dekalb County
Indiana Department
of Transportation
SR 101 HMA Overlay,
Preventive
Maintenance
From 2.60 Miles North of 37 (All
en/Dekalb CL) to SR 8
Fort Wayne 5.976 STPBG Toll Lease
Amendment
Proceeds
RW $80,000.00 $20,000.00 $100,000.00 A 01 $5,922,281.0041083 /
1800545
Comments:NO MPO. DES 1601022 adding RW to FY 2020 into FY 2020 - 2024 STIP.
Indiana Department
of Transportation
SR 8 HMA Overlay,
Preventive
Maintenance
From I-69 to 3.12 Miles East of I
-69 (CR 35) (Auburn).
Fort Wayne 3.03 STPBG Road
Construction
CN $2,651,978.40 $662,994.60 $3,314,973.00 A 01 $3,850,599.0042152 /
1900623
Road Consulting PE $428,500.80 $107,125.20 $535,626.00
Comments:NO MPO. DES 1900623 adding PE to FY 2020 and CN to FY 2022 into FY 2020 - 2024 STIP.
Indiana Department
of Transportation
SR 327 HMA Overlay,
Structural
From US 6 to SR 4. Fort Wayne 6.17 STPBG Road
Construction
CN $7,631,989.60 $1,907,997.40 $9,539,987.00 A 01 $10,682,227.0042373 /
1601023
Toll Lease
Amendment
Proceeds
PE $793,792.00 $198,448.00 $992,240.00
Toll Lease
Amendment
Proceeds
CN $120,000.00 $30,000.00 $150,000.00
Comments:NO MPO. DES 1601023, and 1800144 adding PE to FY 2020 and CN to FY 2023
Indiana Department
of Transportation
I 69 Bridge Replacement,
Other Construction
Bridge carrying CR27, 1.74
Miles South of SR 6.
Fort Wayne 2 NHPP Bridge
Construction
CN $3,326,487.30 $369,609.70 $60,000.00 $3,636,097.00 A 01 $4,236,097.0042374 /
1900058
Bridge Consulting PE $486,000.00 $54,000.00 $540,000.00
Comments:NO MPO. DES 1900058
Indiana Department
of Transportation
SR 1 Box Culvert
Replacement
Over Wade Ditch, 3.4 miles
north of the Allen/ DeKalb
County Line
Fort Wayne .2 STPBG Bridge
Construction
CN $1,232,168.80 $308,042.20 $40,000.00 $1,500,211.00 A 01 $2,015,211.0042377 /
1900068
Bridge Consulting PE $328,000.00 $82,000.00 $410,000.00
Bridge ROW RW $52,000.00 $13,000.00 $65,000.00
Comments:NO MPO. DES 1900075
Indiana Department
of Transportation
US 6 Replace
Superstructure
Bridge over Matson Ditch, 1.19
miles Eof SR 427
Fort Wayne 0 NHPP Bridge
Construction
CN $749,468.80 $187,367.20 $936,836.00 A 01 $1,332,436.0042392 /
1701393
Bridge ROW RW $4,000.00 $1,000.00 $5,000.00
Comments:NO MPO. DES 1701393
Dekalb County Total
Federal: $17,884,385.70 Match :$3,941,584.30 2020: $2,582,866.00 2021: 2022: $4,416,809.00 2023: $150,000.00 2024: $14,676,295.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 11 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Elkhart County
Goshen US 33 Auxiliary Lanes from Fairfield to Plymouth Ave Fort Wayne .26 STBG Local Funds PE $0.00 $41,260.00 $41,260.00 A 01 $1,031,450.0041587 /
1801613
Local Funds CN $0.00 $165,040.00 $165,040.00
Elkhart-Goshen
MPO
PE $165,040.00 $0.00 $165,040.00
Elkhart-Goshen
MPO
CN $660,160.00 $0.00 $660,160.00
Comments:Add project to STIP for PE
Goshen ST 1029 Auxiliary Lanes, Two-
way Left Turn Lanes
College Ave from US 33 to NS
Railroad Line (East Entrance of
parking lot)
Fort Wayne .84 STBG Local Funds PE $0.00 $75,000.00 $75,000.00 A 01 $5,107,000.0042000 /
1900739
Local Funds RW $0.00 $171,400.00 $96,400.00 $75,000.00
Elkhart-Goshen
MPO
PE $300,000.00 $0.00 $300,000.00
Elkhart-Goshen
MPO
RW $685,600.00 $0.00 $385,600.00 $300,000.00
Comments:Add project to STIP for PE
Elkhart County Total
Federal: $1,810,800.00 Match :$452,700.00 2020: $581,300.00 2021: $825,200.00 2022: $482,000.00 2023: $375,000.00 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 12 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Fountain County
Indiana Department
of Transportation
US 136 Br Repl, Comp.Cont.Pr
es.Conc. I-Beam
Bridge over East Fork Coal
Creek, 1.97 mi W of SR 25
Crawfordsville 0 STPBG Bridge ROW RW $24,000.00 $6,000.00 $30,000.00 A 01 $3,013,043.0039957 /
1601095
Comments:RW Phase for $30,000 FY20, No MPO
Indiana Department
of Transportation
US 136 HMA Overlay Minor
Structural
From 1.53 mi W of US 41 N Jct
to US 41 W Jct
Crawfordsville 1.52 STPBG Road Consulting PE $267,953.04 $66,988.26 $334,941.30 A 01 $3,956,354.3041614 /
1800192
Comments:PE phase for $334,941 FY20, No MPO
Fountain County Total
Federal: $291,953.04 Match :$72,988.26 2020: $364,941.30 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 13 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Franklin County
Indiana Department
of Transportation
US 52 HMA Overlay,
Preventive
Maintenance
0.7 miles E of SR 252 (Blue
Creek Rd) to E Jct of SR 1
Seymour 4.51 STPBG District Other
ROW
RW $20,000.00 $5,000.00 $25,000.00A 01 $1,911,928.0041868 /
1900690
District Other
Construction
CN $460,000.00 $115,000.00 $575,000.00
Road
Construction
CN $889,542.40 $222,385.60 $1,111,928.00
Road Consulting PE $160,000.00 $40,000.00 $200,000.00
Comments:Amend to the current STIP. No MPO.
Franklin County Total
Federal: $1,529,542.40 Match :$382,385.60 2020: $200,000.00 2021: $25,000.00 2022: $1,686,928.00 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 14 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Fulton County
Indiana Department
of Transportation
SR 114 HMA Overlay,
Preventive
Maintenance
From SR 14 to SR 15 Fort Wayne 7.747 STBG Road
Construction
CN $1,512,966.40 $378,241.60 $1,891,208.00A 01 $2,091,208.0039890 /
1800541
Comments:NO MPO. Des. 1800541, Adding CN to FY 2021 into FY 2020 - 2024 STIP.
Fulton County Total
Federal: $1,512,966.40 Match :$378,241.60 2020: 2021: $1,891,208.00 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 15 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Gibson County
Indiana Department
of Transportation
SR 64 Pavement
Replacement
From 1.79 mi W of I-69 to 1.33
mi W of I-69 (Francisco)
Vincennes .54 STPBG Bridge
Construction
CN $0.00 $0.00 A 01 $6,430,807.0039768 /
1593061
Bridge ROW RW $16,000.00 $4,000.00 $20,000.00
Road
Construction
CN $1,080,000.00 $270,000.00 $1,350,000.00
Road ROW RW $385,600.00 $96,400.00 $482,000.00
Comments:Amend 2020-2024 STIP. Adding FY20 RW Bridge $20,000.00, FY20 RW Road $482,000.00, FY20 CN Road $1,350,000.00. No MPO.
Indiana Department
of Transportation
SR 64 HMA Overlay,
Preventive
Maintenance
2.45 mi W I-69 (ECL of
Francisco) to SR-57
Vincennes 3.95 STPBG Road
Construction
CN $1,201,600.00 $300,400.00 $1,502,000.00 A 01 $1,682,240.0042121 /
1900560
Road Consulting PE $144,192.00 $36,048.00 $180,240.00
Comments:Amend 2020-2024 STIP. Adding FY20 PE $180,240.00, FY22 CN $1,502,000.00. No MPO.
Indiana Department
of Transportation
I 69 Retaining Wall Repair
or Replacement
Over CR-550 South, NB and SB
1.85 miles N of SR-168
Vincennes 0 NHPP Bridge
Construction
CN $98,640.00 $10,960.00 $109,600.00 A 01 $338,300.0042402 /
1901746
Bridge Consulting PE $72,000.00 $8,000.00 $80,000.00
Gainsharing CN $133,830.00 $14,870.00 $148,700.00
Comments:Amend 2020-2024 STIP. Adding FY20 PE $80,000.00, FY20 CN 148,700.00, FY20 CN $109,600.00. No MPO.
Gibson County Total
Federal: $3,131,862.00 Match :$740,678.00 2020: $2,370,540.00 2021: 2022: $1,502,000.00 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 16 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Grant County
Indiana Department
of Transportation
SR 26 HMA Overlay Minor
Structural
From SR 13 to I-69 Greenfield 14.508 STBG Bridge Consulting PE $124,380.80 $31,095.20 $155,476.00 A 01 $11,706,687.0040496 /
1700031
Road Consulting PE $306,915.20 $76,728.80 $383,644.00
Comments:Added PE Phase
Sweetser ST 1019 Bike/Pedestrian
Facilities
SR 18 sidewalks: from Main St
to Allen Dr & Main St: SR 18 to
Peterson Dr
Fort Wayne .504 TA Local Funds PE $0.00 $10,860.00 $10,860.00 A 01 $323,000.0041152 /
1702856
Local Funds CN $0.00 $53,780.00 $53,780.00
Local
Transportation
Alternatives
PE $43,440.00 $0.00 $43,440.00
Local
Transportation
Alternatives
CN $215,120.00 $0.00 $215,120.00
Comments:Add new Project to STIP. All Phases and costs: No MPO
Grant County IR 1021 Bridge Rehabilitation
Or Repair
Bridge No. 254 on
Pennsylvania St over the
Mississinewa River
Fort Wayne .25 STBG Local Funds CN $0.00 $414,920.00 $414,920.00A 01 $2,075,000.0041951 /
1802916
Local Bridge
Program
CN $1,659,680.00 $0.00 $1,659,680.00
Comments:Add new Project to STIP. No MPO
Indiana Department
of Transportation
US 35 Bridge Replacement,
Other Construction
0.09 Miles East of SR 15, Over
The Mississinewa River
Fort Wayne .1 NHPP Bridge
Construction
CN $5,555,762.40 $1,388,940.60 $30,000.00 $6,914,703.00 A 01 $7,999,703.0042363 /
1900047
Bridge Consulting PE $796,000.00 $199,000.00 $995,000.00
Bridge ROW RW $48,000.00 $12,000.00 $60,000.00
Comments:NO MPO. DES 1900048
Indiana Department
of Transportation
I 69 Bridge Deck Overlay NB Bridge over MISSISSINEWA
RIVER, 01.78 South of US 35.
Fort Wayne 0 NHPP Bridge
Construction
CN $3,023,298.90 $335,922.10 $3,359,221.00 A 01 $3,669,221.0042466 /
1901490
Bridge Consulting PE $279,000.00 $31,000.00 $310,000.00
Comments:NO MPO. DES 1901490 adding PE to FY 2020 and CN to FY 2022 into FY 2020 - 2024 STIP.
Indiana Department
of Transportation
I 69 Bridge Deck Overlay SB Bridge over MISSISSINEWA
RIVER, 01.78 South of US 35.
Fort Wayne 0 NHPP Bridge
Construction
CN $3,023,298.90 $335,922.10 $3,359,221.00 A 01 $3,614,221.0042466 /
1901491
Bridge Consulting PE $229,500.00 $25,500.00 $255,000.00
Comments:NO MPO. DES 1901491 adding PE to FY 2020 and CN to FY 2022 into FY 2020 - 2024 STIP.
Grant County Total
Federal: $15,304,396.20 Match :$2,915,668.80 2020: $2,153,420.00 2021: $2,343,500.00 2022: $6,808,442.00 2023: 2024: $6,914,703.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 17 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Hamilton County
Indiana Department
of Transportation
SR 47 Road Reconstruction
(3R/4R Standards)
From the Boone/Hamilton Co
Line to SR 38
Greenfield 1.622 STBG Road Consulting PE $19,280.00 $4,820.00 $24,100.00 A 01 $8,657,300.0039288 /
1601982
Comments:Adding PE Phase
Indiana Department
of Transportation
US 31 New Bridge, Other New Bridge over US 31 at 226t
h Street
Greenfield 0 NHPP Mobility Consulting PE $544,000.00 $136,000.00 $680,000.00 A 01 $7,480,000.0042397 /
1900096
Mobility
Construction
CN $5,440,000.00 $1,360,000.00 $6,800,000.00
Comments:IMPO, PE in 2020 for $680,000 and CN in 2023 for $6,800,000.
Hamilton County Total
Federal: $6,003,280.00 Match :$1,500,820.00 2020: $704,100.00 2021: 2022: 2023: $6,800,000.00 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 18 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Hancock County
Indiana Department
of Transportation
SR 234 Small Structure
Replacement
, 5.191 MI E SR 9 Greenfield 0 STBG Bridge Consulting PE $120,000.00 $30,000.00 $150,000.00 A 01 $390,000.0042268 /
1900201
Bridge
Construction
CN $180,000.00 $45,000.00 $225,000.00
Bridge ROW RW $12,000.00 $3,000.00 $15,000.00
Comments:New Project
Hancock County Total
Federal: $312,000.00 Match :$78,000.00 2020: $150,000.00 2021: 2022: $15,000.00 2023: 2024: $225,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 19 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Hendricks County
Indiana Department
of Transportation
SR 75 Slide Correction on SR 75, 1.20 miles south of
SR 234
Crawfordsville 0 STPBG Road Consulting PE $81,538.80 $20,384.70 $101,923.50 A 01 $439,791.5041619 /
1801720
Comments:PE phase for $101,923.50, No MPO
Indiana Department
of Transportation
SR 39 ADA Sidewalk Ramp
Construction
From 1.70 mi N of US 40 to 2.73
mi N of US 40 (Clayton)
Crawfordsville 1.04 Safety Safety
Construction
CN $332,800.00 $83,200.00 $416,000.00 A 01 $416,000.0041932 /
1900487
Comments:CN phase for $416,000 FY20 via IMPO TIP Amend 20-00
Indiana Department
of Transportation
I 70 Erosion Control 1.08 mi W of SR 267, over
White Lick Creek EB & WB
Crawfordsville 0 NHPP Mobility ROW RW $22,500.00 $2,500.00 $25,000.00 A 01 $3,771,434.0042172 /
1600396
Bridge
Construction
CN $3,371,790.60 $374,643.40 $25,000.00 $3,721,434.00
Comments:CN phase for $3,746,434 FY20
Hendricks County Total
Federal: $3,808,629.40 Match :$480,728.10 2020: $567,923.50 2021: $3,721,434.00 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 20 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Henry County
Indiana Department
of Transportation
US 40 Bridge Replacement,
Other Construction
Over Big Blue River, 0.36 mi E
of SR 140
Greenfield 0 STBG Bridge Consulting PE $286,634.40 $71,658.60 $358,293.00 A 01 $18,824,728.0039294 /
1701338
Road Consulting PE $372,342.40 $93,085.60 $465,428.00
Comments:Added PE Phase
Indiana Department
of Transportation
SR 38 Bridge Replacement,
Concrete
Over Big Blue River, .16 miles
W. of SR 3
Greenfield .01 STBG Bridge Consulting PE $309,360.00 $77,340.00 $386,700.00 A 01 $1,909,874.0040502 /
1593238
Comments:Added PE Phase
Indiana Department
of Transportation
SR 103 HMA Overlay,
Preventive
Maintenance
from 2.21 miles S. of SR 38(SC
L New Castle) to SR 38
Greenfield 2.213 STBG Road Consulting PE $146,640.00 $36,660.00 $183,300.00 A 01 $1,109,281.0041096 /
1800744
Comments:Added PE Phase
Henry County IR 1001 Signing Various Roads in Henry County Greenfield 223 Safety Local Funds PE $0.00 $4,120.00 $4,120.00 A 01 $751,200.0041304 /
1702758
Local Safety
Program
PE $37,080.00 $0.00 $37,080.00
Comments:No MPO - Add PE FY 20 Federal 37,080 and Local 4,120.
Indiana Department
of Transportation
SR 103 HMA Overlay,
Preventive
Maintenance
3.08 mi S of SR 38 (CR 300 S)
to 2.21 mi S of SR 38 (SCL
New Castle)
Greenfield .86 STBG Road
Construction
CN $324,000.00 $81,000.00 $405,000.00 A 01 $405,000.0042259 /
1901504
Comments:Added CN
Indiana Department
of Transportation
US 36 Small Structure Pipe
Lining
9.73 miles E of MADISON/HEN
RY Line
Greenfield 0 STBG Bridge
Construction
CN $101,600.00 $25,400.00 $127,000.00 A 01 $292,000.0042265 /
1702918
Bridge Consulting PE $120,000.00 $30,000.00 $150,000.00
Bridge ROW RW $12,000.00 $3,000.00 $15,000.00
Comments:New Project
Indiana Department
of Transportation
SR 103 Replace
Superstructure
SR over I-70 EB/WB, 03.16 N
US 40
Greenfield 0 STBG Bridge
Construction
CN $1,672,800.00 $418,200.00 $2,091,000.00 A 01 $2,526,000.0042266 /
1900124
Bridge Consulting PE $320,000.00 $80,000.00 $400,000.00
Bridge ROW RW $28,000.00 $7,000.00 $35,000.00
Comments:New Project
Henry County Total
Federal: $3,730,456.80 Match :$927,464.20 2020: $1,984,921.00 2021: $15,000.00 2022: $440,000.00 2023: 2024: $2,218,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 21 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Howard County
Indiana Department
of Transportation
US 31 Bridge Maintenance
And Repair
US 31 -NB @ Wildcat Creek -19
01366
Greenfield 0 NHPP District Other
Construction
CN $580,735.20 $145,183.80 $725,919.00A 01 $725,919.0042059 /
1901366
Comments:Added CN
Indiana Department
of Transportation
SR 931 Bridge Thin Deck
Overlay
over US 31 SB/NB, 00.48 S SR
931-(1901523 L)
Greenfield 0 NHPP Bridge
Construction
CN $690,400.00 $172,600.00 $863,000.00 A 01 $863,000.0042208 /
1901523
Comments:Added CN
Howard County Total
Federal: $1,271,135.20 Match :$317,783.80 2020: 2021: $725,919.00 2022: $863,000.00 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 22 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Huntington County
Indiana Department
of Transportation
I 69 HMA Overlay,
Preventive
Maintenance
From 5.64 Miles North of SR 18
to 0.37 Miles South of SR 5.
Fort Wayne 7.77 NHPP Road
Construction
CN $5,502,849.30 $611,427.70 $6,114,277.00 A 01 $7,111,585.001900618
Road Consulting PE $897,577.20 $99,730.80 $997,308.00
Comments:NO MPO. DES 1900618 adding PE to FY 2020 and CN to FY 2022 into FY 2020 - 2024 STIP.
Indiana Department
of Transportation
SR 124 Small Structure
Replacement
Carries UNT Salamonie River,
0.38 Miles East of SR 9
Fort Wayne .18 STPBG Bridge
Construction
CN $2,754,518.40 $688,629.60 $90,000.00 $3,353,148.00 A 01 $4,228,148.0042385 /
1900242
Bridge Consulting PE $528,000.00 $132,000.00 $660,000.00
Bridge ROW RW $100,000.00 $25,000.00 $125,000.00
Comments:NO MPO. DES 1900084, 1900238, 1900241, 1900242 adding PE to FY 2020, ROW to FY22 and CN to FY 2022 into FY 2020 - 2024 STIP.
Huntington County Total
Federal: $9,782,944.90 Match :$1,556,788.10 2020: $1,657,308.00 2021: 2022: $6,329,277.00 2023: 2024: $3,353,148.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 23 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Jackson County
Jackson County IR 1001 Replace
Superstructure
Bridge #154 on CR 300 S over
Rider Ditch
Seymour .02 STPBG Local Funds PE $0.00 $48,922.60 $48,922.60 A 01 $1,238,613.0040895 /
1703020
Local Bridge
Program
PE $195,690.40 $0.00 $195,690.40
Comments:Amending FY 2020 PE funds in the total amount of $244,613. No MPO
Jackson County Total
Federal: $195,690.40 Match :$48,922.60 2020: $244,613.00 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 24 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Jay County
Portland MS 7 ADA Sidewalk Ramp
Construction
Local-State Road 67 / Votaw
Street in Portland, Indiana -170
2762
Greenfield .617 TA Local Funds PE $0.00 $12,228.00 $12,228.00 A 01 $722,695.0041308 /
1702762
Local
Transportation
Alternatives
PE $48,912.00 $0.00 $48,912.00
Comments:NO MPO - Add PE FY 20 Federal 48,912 and Local 12,228.
Dunkirk MS 5301 Bike/Pedestrian
Facilities
Multi-use path in the Dunkirk
City Park Along Speedcat Alley
Greenfield .284 TA Local Funds PE $0.00 $14,000.00 $14,000.00 A 01 $300,000.0042075 /
1802925
Local
Transportation
Alternatives
PE $56,000.00 $0.00 $56,000.00
Comments:No MPO - Add PE FY 20 Federal 56,000 and Local 14,000
Indiana Department
of Transportation
SR 67 Bridge Thin Deck
Overlay
Bridge over LIMBERLOST
CREEK, 02.37 North of US 27.
Fort Wayne 0 STPBG Bridge
Construction
CN $257,617.60 $64,404.40 $322,022.00 A 01 $372,022.0042156 /
1901489
Bridge Consulting PE $40,000.00 $10,000.00 $50,000.00
Comments:NO MPO. DES 1901489 adding PE to FY 2020, and CN to FY 2022 into FY 2020 - 2024 STIP.
Indiana Department
of Transportation
SR 67 Bridge Deck Overlay over NORFOLK SOUTHERN RR,
00.63 S SR 1
Greenfield 0 STBG Bridge
Construction
CN $520,000.00 $130,000.00 $650,000.00 A 01 $650,000.0042207 /
1901542
Comments:Added CN
Jay County Total
Federal: $922,529.60 Match :$230,632.40 2020: $181,140.00 2021: 2022: $972,022.00 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 25 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Jefferson County
Indiana Department
of Transportation
SR 250 Bridge Deck Overlay 0.05 mile E of SR 62 over
Wilson Fork Creek
Seymour 0 STPBG Bridge Consulting PE $105,120.00 $26,280.00 $131,400.00 A 01 $644,871.0040994 /
1600307
Bridge
Construction
CN $410,776.80 $102,694.20 $513,471.00
Comments:Amend to the current STIP. No MPO.
Jefferson County Total
Federal: $515,896.80 Match :$128,974.20 2020: $131,400.00 2021: $513,471.00 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 26 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Knox County
Indiana Department
of Transportation
US 50 Bridge Thin Deck
Overlay
Bridge over Wabash River and
ILL 33 WBL, 01.85 mile W of US
41
Vincennes 0 NHPP Bridge
Construction
CN $160,000.00 $40,000.00 $200,000.00 A 01 $230,000.001901942
Bridge Consulting PE $24,000.00 $6,000.00 $30,000.00
Comments:No MPO- Amend 20-24 STIP for this project for FY 2020 PE and FY 2022 CN.
Indiana Department
of Transportation
US 50 Bridge Thin Deck
Overlay
Bridge over Wabash River and
ILL 33 WBL, 01.85 mile W of US
41
Vincennes 0 NHPP Bridge
Construction
CN $160,000.00 $40,000.00 $200,000.00 A 01 $230,000.001901943
Bridge Consulting PE $24,000.00 $6,000.00 $30,000.00
Comments:New Des Number for US Thin Deck Overlay. CN $200,000 FY 21 PE $30,000 FY20
Indiana Department
of Transportation
US 50 Bridge Painting Bridge over Wabash River and
ILL 33 WBL, 01.85 mile W of US
41
Vincennes 0 NHPP Bridge
Construction
CN $1,520,000.00 $380,000.00 $1,900,000.00 A 01 $1,995,000.001901987
Bridge Consulting PE $76,000.00 $19,000.00 $95,000.00
Comments:New Des US 50 PE $95K FY 21 CN $1.9M FY 23 Painting
Indiana Department
of Transportation
US 50 Bridge Painting Bridge over Wabash River and
ILL 33 EBL, 01.85 mile W of US
41
Vincennes 0 NHPP Bridge
Construction
CN $1,520,000.00 $380,000.00 $1,900,000.00 A 01 $1,995,000.001901988
Bridge Consulting PE $76,000.00 $19,000.00 $95,000.00
Comments:No MPO
Indiana Department
of Transportation
US 50 HMA Overlay,
Preventive
Maintenance
From Illinois State Line to W Jct
US 41
Vincennes 1.63 NHPP Road
Construction
CN $4,412,800.00 $1,103,200.00 $5,516,000.00 A 01 $6,178,000.0042136 /
1900567
Road Consulting PE $529,600.00 $132,400.00 $662,000.00
Comments:Amend 2020-2024 STIP. Adding FY20 PE $662,000.00, FY22 CN $5,516,000.00. No MPO.
Knox County Total
Federal: $8,502,400.00 Match :$2,125,600.00 2020: $722,000.00 2021: $190,000.00 2022: $5,916,000.00 2023: $3,800,000.00 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 27 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Kosciusko County
Indiana Department
of Transportation
SR 14 Small Structure
Replacement
Carrying Joseph Metzger Ditch,
4.00 miles E of SR 15
Fort Wayne 0 STBG Bridge
Construction
CN $613,502.40 $153,375.60 $758,878.00 $8,000.00A 01 $1,202,363.0040476 /
1701383
Bridge ROW RW $54,000.00 $13,500.00 $15,000.00 $52,500.00
Comments:MACOG MPO Initial TIP 2020-2024 for DES 1701383 & 1383626. Adding RW to 2020 for $67,500 and CN to 2021 for $766,878.
Kosciusko County Total
Federal: $667,502.40 Match :$166,875.60 2020: $15,000.00 2021: $60,500.00 2022: $758,878.00 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 28 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
LaGrange County
Lagrange ST 1010 Pavement
Replacement
Hawpatch St: from S Townline
Road to W Central Avenue
Fort Wayne .663 STBG Group IV Program PE $523,728.00 $0.00 $523,728.00 A 01 $4,240,000.0041148 /
1702844
Local Funds PE $0.00 $130,932.00 $130,932.00
Comments:add new project to STIP for PE. NO-MPO
Indiana Department
of Transportation
US 20 Box Culvert
Replacement
4.07 Miles East of SR 9, Carries
East Fly Creek
Fort Wayne 1.02 NHPP Bridge
Construction
CN $707,390.40 $176,847.60 $884,238.00 A 01 $1,179,238.0042371 /
1900076
Toll Lease
Amendment
Proceeds
PE $188,000.00 $47,000.00 $235,000.00
Toll Lease
Amendment
Proceeds
RW $32,000.00 $8,000.00 $40,000.00
Toll Lease
Amendment
Proceeds
CN $16,000.00 $4,000.00 $20,000.00
Comments:NO MPO. DES 1900076 adding PE to FY 2020, RW to FY 2022 and CN to FY 2022 into FY 2020 - 2024 STIP.
LaGrange County Total
Federal: $1,467,118.40 Match :$366,779.60 2020: $889,660.00 2021: 2022: $60,000.00 2023: 2024: $884,238.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 29 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Lake County
Indiana Department
of Transportation
US 41 Traffic Signals, New
Or Modernized
101st Place at US 41, 0.95mi N
of US 231
LaPorte 0 NHPP District Other
Construction
CN $104,000.00 $26,000.00 $130,000.00 A 01 $150,000.001901898
District Other
Consulting
PE $16,000.00 $4,000.00 $20,000.00
Comments:Please amend all phases into the STIP. NIRPC amendment 19-22.
Gary ST 1047 Road Reconstruction
(3R/4R Standards)
Industrial Highway Phase III.
Cline Ave to EJ&E RR Bridge
LaPorte 1.32 STBG Local Funds RW $0.00 -$40,000.00 ($40,000.00) A 01 $3,292,600.0040733 /
1600418
Northwest Indiana
MPO
RW -$160,000.00 $0.00 ($160,000.00)
Comments:MPO Funds June 2019 NIRPC amendment Removing RW funds and adding in CN funds for FY20
Gary US 20 Enhancement Complete Streets
Enhancements
LaPorte .05 STPBG Northwest Indiana
MPO
CN $2,060,000.00 $0.00 $2,060,000.00A 01 $2,775,544.0041770 /
1801738
Local Funds CN $0.00 $515,000.00 $515,000.00
Comments:NIRPC amendment #22 adding CN phase FY21 MPO funds 80/20
Lowell ST 2375 Bike/Pedestrian
Facilities
State Road 2 from Harding
Street west to 920 feet west
of Willow Street
LaPorte .86 STPBG Local Funds PE $0.00 $147,082.10 $147,082.10 A 01 $2,902,298.8042064 /
1802924
Local
Transportation
Alternatives
PE $588,328.40 $0.00 $588,328.40
Comments:19-15 Amendment April 21 New project adding PE funds for FY20 Local transportation funds 80/20
Lake County Total
Federal: $2,608,328.40 Match :$652,082.10 2020: $685,410.50 2021: $2,575,000.00 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 30 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Madison County
Indiana Department
of Transportation
SR 28 Pavement
Replacement
from WCL of Elwood to SR 37 Greenfield 2.78 STBG Road
Construction
CN $6,178,380.00 $1,544,595.00 $7,722,975.00 A 01 $8,422,975.0042307 /
1900254
Road Consulting PE $560,000.00 $140,000.00 $700,000.00
Comments:New Project MCCOG Resolution
Madison County Total
Federal: $6,738,380.00 Match :$1,684,595.00 2020: $700,000.00 2021: 2022: 2023: 2024: $7,722,975.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 31 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Marion County
Indiana Department
of Transportation
US 36 Added Travel Lanes From 3 miles west of I-465 to 1.
65 miles west of I-465.
Greenfield 1.403 NHPP Mobility Consulting PE $1,577,600.00 $394,400.00 $1,972,000.00 A 01 $32,394,813.0041781 /
1800035
Comments:Adding PE Phase. IMPO 20-00
Marion County Total
Federal: $1,577,600.00 Match :$394,400.00 2020: $1,972,000.00 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 32 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Marshall County
Indiana Department
of Transportation
US 31 New Interchange
Construction
At SR 10 LaPorte 0 NHPP Safety
Construction
CN $23,580,536.00 $5,895,134.00 $500,000.00 $28,975,670.00 A 01 $32,975,670.0041777 /
1802051
Safety Consulting PE $2,400,000.00 $600,000.00 $3,000,000.00
Safety ROW RW $400,000.00 $100,000.00 $500,000.00
Comments:Please amend all phases into the current STIP. MACOG approval Resolution 27-19 uploaded.
Marshall County Total
Federal: $26,380,536.00 Match :$6,595,134.00 2020: $3,000,000.00 2021: 2022: $1,000,000.00 2023: $28,975,670.00 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 33 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Miami County
Indiana Department
of Transportation
SR 16 Pavement
Replacement
2.90 miles E of US 31 to 3.71
miles E of US 31 (Denver Small
Towns)
Fort Wayne .045 STBG Road ROW RW $80,000.00 $20,000.00 $100,000.00 A 01 $4,361,891.001600294
Road
Construction
CN $2,946,272.80 $736,568.20 $3,682,841.00
Comments:NO MPO. DES 1600294 adding ROW to FY 2020 into FY 2020 - 2024 STIP.
Miami County IR 1005 Replace
Superstructure
Bridge #501 on Wayne Street
over Wabash River
Fort Wayne .14 STBG Local Funds CN $0.00 $737,500.00 $737,500.00A 01 $3,687,500.0041950 /
1802959
Local Bridge
Program
CN $2,950,000.00 $0.00 $2,950,000.00
Comments:Add new project to STIP. No MPO
Indiana Department
of Transportation
SR 19 HMA Overlay Minor
Structural
From SR 18 to 1.39 Miles South
of SR 124 (South Limit Peru, CR
150)
Fort Wayne 13.938 STPBG Road
Construction
CN $5,751,008.80 $1,437,752.20 $7,188,761.00 A 01 $7,907,641.0042364 /
1601006
Road Consulting PE $575,104.00 $143,776.00 $718,880.00
Comments:NO MPO. DES 1601006 adding PE to FY 2020 and CN to FY 2024 into FY 2020 - 2024 STIP.
Indiana Department
of Transportation
US 24 Small Structure
Replacement
2.53 Miles East of SR 19,
Carries UNT of Schrock Creek
Fort Wayne .2 NHPP Bridge
Construction
CN $4,156,868.80 $1,039,217.20 $70,000.00 $5,126,086.00 A 01 $6,203,586.0042367 /
1900079
Bridge Consulting PE $706,000.00 $176,500.00 $882,500.00
Bridge ROW RW $100,000.00 $25,000.00 $125,000.00
Comments:NO MPO. DES 1900079, 1900087, 1900086, 1900234 adding PE to FY 2020, RW to FY 2022 and CN to FY 2022 into FY 2020 - 2024 STIP.
Indiana Department
of Transportation
US 24 Small Structure
Replacement
2.83 Miles East of US 31,
Carries UNT of Prairie Creek
Fort Wayne .2 NHPP Bridge
Construction
CN $1,948,635.20 $487,158.80 $45,000.00 $2,390,794.00 A 01 $3,090,794.0042368 /
1900078
Bridge Consulting PE $304,000.00 $76,000.00 $380,000.00
Bridge ROW RW $64,000.00 $16,000.00 $80,000.00
Comments:NO MPO. DES 1900077, 1900078, 1900230 adding PE to FY 2020, RW to FY 2022 and CN to FY 2022 into FY 2020 - 2024 STIP.
Indiana Department
of Transportation
SR 16 Small Structure
Replacement
Carries UNT of Eel River, 3.36
Miles East of SR 19, North
Junction.
Fort Wayne .1 STPBG Bridge
Construction
CN $318,995.20 $79,748.80 $20,000.00 $378,744.00 A 01 $588,744.0042369 /
1800016
Bridge Consulting PE $128,000.00 $32,000.00 $160,000.00
Bridge ROW RW $24,000.00 $6,000.00 $30,000.00
Comments:NO MPO. DES 1800016 adding PE to FY 2020, RW to FY 2022 and CN to FY 2022 into FY 2020 - 2024 STIP.
Miami County Total
Federal: $20,052,884.80 Match :$5,013,221.20 2020: $2,241,380.00 2021: $7,370,341.00 2022: $370,000.00 2023: 2024: $15,084,385.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 34 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Montgomery County
Indiana Department
of Transportation
SR 59 Br Repl, Pipe Arch Bridge over Little Raccoon
Creek, 1.02 mi S of SR 47
Crawfordsville 0 STPBG Bridge ROW RW $40,000.00 $10,000.00 $50,000.00 A 01 $1,965,304.0039958 /
1601080
Comments:RW phase for $50,000 FY20, No MPO
Indiana Department
of Transportation
SR 32 Bridge Replacement,
Other Construction
over Mill Creek; 3.70 mi W of
SR 47
Crawfordsville 0 STPBG Bridge Consulting PE $184,806.96 $46,201.74 $231,008.70 A 01 $6,091,306.7041590 /
1800075
Comments:PE phase for $231,008.70 FY20, No MPO
Montgomery County Total
Federal: $224,806.96 Match :$56,201.74 2020: $281,008.70 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 35 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Morgan County
Indiana Department
of Transportation
SR 135 Bridge Rehabilitation
Or Repair
0.33 miles S of SR 252 on SR
135 at Indian Creek
Seymour 0 STPBG Bridge ROW RW $14,400.00 $3,600.00 $18,000.00 A 01 $2,434,849.0030773 /
1600025
Comments:Amend RW phase to current STIP. No MPO.
Indiana Department
of Transportation
SR 142 Erosion Control over BR Mill Hollow Branch; 00.
09 mi W of SR 39
Crawfordsville 0 STPBG Bridge
Construction
CN $41,859.20 $10,464.80 $52,324.00 A 01 $52,324.0041973 /
1801307
Comments:CN phase for $52,324 FY20, No MPO
Morgan County Total
Federal: $56,259.20 Match :$14,064.80 2020: $70,324.00 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 36 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Newton County
Indiana Department
of Transportation
US 41 HMA Overlay,
Preventive
Maintenance
SR 14 to SR 10 LaPorte 9.14 NHPP Road
Construction
CN $5,274,476.80 $1,318,619.20 $6,518,096.00 $75,000.00A 01 $7,934,196.0042221 /
1901363
Bridge
Construction
CN $246,940.80 $61,735.20 $308,676.00
Road Consulting PE $1,072,880.00 $268,220.00 $991,100.00 $350,000.00
Comments:Please amend all phases into the STIP. No MPO.
Newton County Total
Federal: $6,594,297.60 Match :$1,648,574.40 2020: $991,100.00 2021: $75,000.00 2022: $7,176,772.00 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 37 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Noble County
Indiana Department
of Transportation
SR 3 Other Intersection
Improvement
SR 3 at Waits Road, 2.22 miles
S of US 6
Fort Wayne .37 STPBG Safety
Construction
CN $1,101,393.60 $275,348.40 $1,376,742.00 A 01 $1,476,742.0042375 /
1900138
Safety Consulting PE $80,000.00 $20,000.00 $100,000.00
Comments:NO MPO. DES 1900138 adding PE to FY 2020 and CN to FY 2024 into FY 2020 - 2024 STIP.
Indiana Department
of Transportation
SR 205 Bridge Replacement,
Other Construction
0.65 Miles South of SR 3 Over
Black Creek
Fort Wayne .1 STPBG Bridge
Construction
CN $754,487.20 $188,621.80 $20,000.00 $923,109.00 A 01 $1,198,109.0042376 /
1900052
Bridge Consulting PE $172,000.00 $43,000.00 $215,000.00
Bridge ROW RW $32,000.00 $8,000.00 $40,000.00
Comments:NO MPO. DES 1900052 adding PE to FY 2020, RW to FY 2022 and CN to FY 2022 into FY 2020 - 2024 STIP.
Noble County Total
Federal: $2,139,880.80 Match :$534,970.20 2020: $315,000.00 2021: 2022: $60,000.00 2023: 2024: $2,299,851.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 38 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Owen County
Indiana Department
of Transportation
SR 42 Small Structure
Replacement
5.82 mi W of SR 243 Crawfordsville 0 STPBG Bridge ROW RW $20,000.00 $5,000.00 $25,000.00 A 01 $811,327.0039965 /
1601019
Comments:RW phase for $25,000 FY20, No MPO
Owen County Total
Federal: $20,000.00 Match :$5,000.00 2020: $25,000.00 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 39 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Posey County
Indiana Department
of Transportation
I 64 Bridge Deck Patching I 64 EB over the Wabash Vincennes 0 NHPP Bridge
Construction
CN $540,000.00 $60,000.00 $600,000.00 A 01 $300,000.0040782 /
1702645
Comments:New Des, Deck Patching, I64. CN $150,000 FY 2020
Posey County Total
Federal: $540,000.00 Match :$60,000.00 2020: $600,000.00 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 40 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Pulaski County
Indiana Department
of Transportation
SR 114 Bridge Deck Patching Over MP Hill Ditch, 0.89mi W of
US 421
LaPorte 0 STBG Bridge
Construction
CN $115,290.40 $28,822.60 $144,113.00A 01 $196,113.0042212 /
1900817
Bridge Consulting PE $41,600.00 $10,400.00 $40,000.00 $12,000.00
Comments:No MPO. Please amend all phases into the STIP.
Pulaski County Total
Federal: $156,890.40 Match :$39,222.60 2020: $40,000.00 2021: $156,113.00 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 41 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Putnam County
Indiana Department
of Transportation
US 40 HMA Overlay,
Preventive
Maintenance
From 0.07 mi W of US 231 to
SR 75
Crawfordsville 8.593 STPBG Bridge ROW RW $20,000.00 $5,000.00 $25,000.00 A 01 $10,220,854.0039259 /
1592687
Comments:ROW phase for $25,000 FY20, No MPO
Indiana Department
of Transportation
US 231 Road Rehabilitation (3
R/4R Standards)
From 0.03 mi S of SR 240 to 1.6
1 mi N of SR 240 (Greencastle)
Crawfordsville 1.63 STPBG Road ROW RW $360,000.00 $90,000.00 $450,000.00 A 01 $8,091,587.0040573 /
1700121
Comments:ROW phase for $450,000 FY20, No MPO
Indiana Department
of Transportation
US 40 Slide Correction 3.55 mile E of US 231, Mt.
Meridian
Crawfordsville 0 STBG Road Consulting PE $40,769.28 $10,192.32 $50,961.60 A 01 $220,833.6041618 /
1801719
Comments:PE phase for $50,961.60 FY20, No MPO
Indiana Department
of Transportation
I 70 Bridge Maintenance
And Repair
7.10 mi W of SR 243 (EB) Crawfordsville 0 NHPP Bridge
Construction
CN $297,963.00 $33,107.00 $331,070.00 A 01 $371,070.0042093 /
1901581
Bridge Consulting PE $36,000.00 $4,000.00 $40,000.00
Comments:PE phase for $40,000 FY20 & CN phase for $331,070 FY20, No MPO
Putnam County Total
Federal: $754,732.28 Match :$142,299.32 2020: $897,031.60 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 42 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Randolph County
Indiana Department
of Transportation
SR 28 HMA Overlay,
Preventive
Maintenance
from SR 1 to WCL of Ridgeville Greenfield 6.178 STBG Road Consulting PE $160,000.00 $40,000.00 $200,000.00 A 01 $3,668,502.0040612 /
1700900
Comments:Added PE Phase
Indiana Department
of Transportation
SR 1 HMA Overlay,
Preventive
Maintenance
SR 1 from SR 32 N. Jct. To SR
28
Greenfield 7.928 STBG Road Consulting PE $160,000.00 $40,000.00 $200,000.00 A 01 $1,994,459.0041102 /
1800743
Comments:Added PE Phase
Union City IR 1889 Road Reconstruction
(3R/4R Standards)
The project is located approx.
350' north of the Intersection of
W. Chestnut St. and Jackson
Greenfield .109 STPBG Group III Program PE $108,000.00 $0.00 $108,000.00 A 01 $1,184,575.0042071 /
1802944
Group III Program RW $36,000.00 $0.00 $36,000.00
Group III Program CN $803,660.00 $0.00 $799,660.00$4,000.00
Local Funds PE $0.00 $27,000.00 $27,000.00
Local Funds RW $0.00 $9,000.00 $9,000.00
Local Funds CN $0.00 $200,915.00 $199,915.00$1,000.00
Comments:No MPO - Add PE FY 20 Federal 108,000 and Local 27,000, Add CN FY 21 Federal 4,000 and Local 1,000, Add RW FY 22 Federal 36,000 and Local 9,000, Add CN FY 24 Federal 799,660 and Local 199,915.
Randolph County Total
Federal: $1,267,660.00 Match :$316,915.00 2020: $535,000.00 2021: $5,000.00 2022: $45,000.00 2023: 2024: $999,575.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 43 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Ripley County
Indiana Department
of Transportation
SR 229 HMA Overlay Minor
Structural
1.07 mile S of SR 46 to SR 46 Seymour 1.162 STBG Road Consulting PE $160,000.00 $40,000.00 $200,000.00 A 01 $1,986,469.0040429 /
1700054
Comments:Amend PE to current STIP. No MPO.
Ripley County Total
Federal: $160,000.00 Match :$40,000.00 2020: $200,000.00 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 44 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Rush County
Indiana Department
of Transportation
SR 44 HMA Overlay,
Preventive
Maintenance
SR 44 from 0.31 mi E of SR 3 to
7.40 mi E of SR 3 (WCL)-Rush
Co.
Greenfield 7.087 STBG Road Consulting PE $148,000.00 $37,000.00 $185,000.00 A 01 $2,033,263.0041105 /
1800763
Comments:Added PE
Glenwood IR 1014 ADA Sidewalk Ramp
Construction
Various locations on North and
South Main Street and State
Street (SR 44)
Greenfield .48 TA Local Funds PE $0.00 $28,192.60 $28,192.60 A 01 $461,819.0041311 /
1702774
Local
Transportation
Alternatives
PE $112,770.40 $0.00 $112,770.40
Comments:No MPO - Add PE FY 20 Federal 112,770.40 and Local 28,192.60.
Indiana Department
of Transportation
SR 244 Slide Correction At North Branch Clifty Creek, S
Side Roadway, 4.79 mi East SR
3
Greenfield 0 STBG District Other
Construction
CN $88,491.20 $22,122.80 $10,000.00 $100,614.00A 01 $215,614.0042031 /
1901370
District Other
Consulting
PE $80,000.00 $20,000.00 $100,000.00
District Other
ROW
RW $4,000.00 $1,000.00 $5,000.00
Comments:New Project
Rush County IR 4940 Bridge Replacement Rush County Bridge No. 1 on
CR 1100 N over Six Mile Creek
Greenfield .16 STPBG Local Funds PE $0.00 $41,272.00 $41,272.00 A 01 $2,196,360.0042073 /
1802929
Local Funds RW $0.00 $20,000.00 $20,000.00
Local Funds CN $0.00 $378,000.00 $378,000.00
Local Bridge
Program
PE $165,088.00 $0.00 $165,088.00
Local Bridge
Program
RW $80,000.00 $0.00 $80,000.00
Local Bridge
Program
CN $1,512,000.00 $0.00 $1,512,000.00
Comments:NO MPO - Add PE FY 20 Federal 165,088 and Local 41,272, Add RW FY 22 Federal 80,000 and Local 20,000, Add CN FY 24 Federal 1,512,000 and Local 378,000.
Rush County IR 5000 Bridge Replacement Rush County Bridge 155 on CR
450 South over Branch of Little
Flatrock River
Greenfield .22 STPBG Local Funds PE $0.00 $34,738.00 $34,738.00 A 01 $1,778,690.0042074 /
1802927
Local Funds RW $0.00 $12,000.00 $12,000.00
Local Funds CN $0.00 $309,000.00 $309,000.00
Local Bridge
Program
PE $138,952.00 $0.00 $138,952.00
Local Bridge
Program
RW $48,000.00 $0.00 $48,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 45 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Rush County IR 5000 Bridge Replacement Rush County Bridge 155 on CR
450 South over Branch of Little
Flatrock River
Greenfield .22 STPBG Local Bridge
Program
CN $1,236,000.00 $0.00 $1,236,000.00 A 01 $1,778,690.0042074 /
1802927
Comments:No MPO - Add PE FY 20 Federal 138,952 and Local 34,738, Add RW FY 22 Federal 48,000 and Local 12,000, Add CN FY 24 Federal 1,236,000 and Local 309,000.
Rush County Total
Federal: $3,613,301.60 Match :$903,325.40 2020: $821,013.00 2021: $100,614.00 2022: $160,000.00 2023: 2024: $3,435,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 46 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Shelby County
Indiana Department
of Transportation
US 52 Intersection
Improvement,
Roundabout
At SR 9 Greenfield 0 STBG Bridge ROW RW $40,000.00 $10,000.00 $50,000.00 A 01 $6,501,000.0039730 /
1600625
Mobility ROW RW $40,000.00 $10,000.00 $50,000.00
Comments:RW $100,00 in FY 2020. No MPO.
Indiana Department
of Transportation
I 74 Road Reconstruction
(3R/4R Standards)
From 0.11 mi W of SR 244 to 0.
11 mi E of SR 244
Greenfield .22 STBG Road Consulting PE $33,210.00 $3,690.00 $36,900.00 A 01 $5,712,129.0040506 /
1601973
Comments:Added PE Phase
Indiana Department
of Transportation
SR 9 Bridge Thin Deck
Overlay
over N BRANCH LEWIS CREEK,
04.54 S SR 44
Greenfield 0 STBG Bridge
Construction
CN $278,400.00 $69,600.00 $348,000.00 A 01 $348,000.0042211 /
1901538
Comments:Added CN
Indiana Department
of Transportation
SR 9 HMA Overlay,
Preventive
Maintenance
1.56 mi S of I-74 to 0.29 mi N of
I-74
Greenfield 1.85 STBG Road
Construction
CN $1,024,000.00 $256,000.00 $1,280,000.00 A 01 $1,280,000.0042260 /
1901508
Comments:Added CN
Indiana Department
of Transportation
SR 244 Road Rehabilitation (3
R/4R Standards)
from 0.06 mi E of I-74 (E ramps
I-74) to 5.18 mi E of I-74 at Deer
Creek
Greenfield 5.098 STBG Bridge
Construction
CN $323,200.00 $80,800.00 $404,000.00 A 01 $6,957,451.0042264 /
1600801
Bridge Consulting PE $32,800.00 $8,200.00 $41,000.00
Road
Construction
CN $3,449,960.80 $862,490.20 $4,312,451.00
Road Consulting PE $560,000.00 $140,000.00 $700,000.00
Road ROW RW $1,200,000.00 $300,000.00 $500,000.00 $1,000,000.00
Comments:New Project
Shelby County Total
Federal: $6,981,570.80 Match :$1,740,780.20 2020: $877,900.00 2021: 2022: $2,128,000.00 2023: $1,000,000.00 2024: $4,716,451.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 47 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Steuben County
Indiana Department
of Transportation
SR 427 Small Structure
Replacement
Carries Baker Ditch, 2.39 Miles
East of SR 1, RP 12+39
Fort Wayne .2 STPBG Bridge
Construction
CN $420,603.20 $105,150.80 $525,754.00 A 01 $760,754.0042372 /
1900243
Toll Lease
Amendment
Proceeds
PE $132,000.00 $33,000.00 $165,000.00
Toll Lease
Amendment
Proceeds
RW $36,000.00 $9,000.00 $45,000.00
Toll Lease
Amendment
Proceeds
CN $20,000.00 $5,000.00 $25,000.00
Comments:NO MPO. DES 1900243 adding PE to FY 2020, RW to FY 2022 and CN to FY 2022 into FY 2020 - 2024 STIP.
Steuben County Total
Federal: $608,603.20 Match :$152,150.80 2020: $165,000.00 2021: 2022: $70,000.00 2023: 2024: $525,754.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 48 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Switzerland County
Indiana Department
of Transportation
SR 156 Slide Correction 4.7 miles west of the junction
with SR 56
Seymour .05 STPBG Road Consulting PE $160,000.00 $40,000.00 $200,000.00 A 01 $3,954,281.0042288 /
1900351
Comments:Amend PE to current STIP. No MPO.
Indiana Department
of Transportation
SR 156 Slide Correction 2.0 miles west of the junction
with SR 101
Seymour .14 STPBG Road Consulting PE $400,000.00 $100,000.00 $500,000.00 A 01 $8,543,535.0042290 /
1900349
Comments:Amend PE phase to current STIP. NO MPO.
Switzerland County Total
Federal: $560,000.00 Match :$140,000.00 2020: $700,000.00 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 49 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Tippecanoe County
Indiana Department
of Transportation
US 231 Auxiliary Lanes,
Passing
From 4.19 mi N of I-74 to 2.53
mi N of SR 28
Crawfordsville 10.856 STBG Mobility Consulting PE $157,420.00 $39,355.00 $196,775.00 A 01 $9,566,690.0041623 /
1700190
Comments:PE Phase for $196,775 FY20 via TCAPC MPO 2020-2024 TIP
Indiana Department
of Transportation
SR 25 Small Structure
Replacement
SR 25, 1.51 mi S of SR 28, W
Jct, Over Wallace Ditch
Crawfordsville 0 STPBG Bridge ROW RW $40,000.00 $10,000.00 $50,000.00 A 01 $760,995.0041880 /
1500120
Comments:ROW phase for $50,000 FY20 via TCAPC 2020-2024 TIP
Indiana Department
of Transportation
I 65 Bridge Maintenance
And Repair
0.23 mi S of SR 43 (NB) Crawfordsville 0 NHPP Bridge
Construction
CN $297,963.00 $33,107.00 $331,070.00 A 01 $351,070.0042092 /
1901578
Bridge Consulting PE $18,000.00 $2,000.00 $20,000.00
Comments:PE phase for $20,000.00 FY20 & CN phase for $331,070.00 FY20 via TCAPC 2020-2024 TIP (CN) & Mod (PE) dated 7/11/2019
Indiana Department
of Transportation
I 65 Bridge Deck Patching 0.58 mi S of SR 43 Crawfordsville 0 NHPP Bridge
Construction
CN $111,906.00 $12,434.00 $124,340.00 A 01 $134,340.0042095 /
1901585
Bridge Consulting PE $9,000.00 $1,000.00 $10,000.00
Comments:PE phase for $10,000 FY20 & CN phase for $124,340 FY20 via TCAPC 2020-2024 TIP and mod dated 7/11/2019
Indiana Department
of Transportation
SR 38 Bridge Deck Overlay WB over Elliott Ditch Crawfordsville 0 STBG Bridge
Construction
CN $569,451.20 $142,362.80 $711,814.00 A 01 $711,814.0042148 /
1701561
Comments:CN phase for $711,814.00 via TCAPC 2020-2024 TIP
Tippecanoe County Total
Federal: $1,203,740.20 Match :$240,258.80 2020: $732,185.00 2021: 2022: 2023: 2024: $711,814.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 50 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Tipton County
Indiana Department
of Transportation
US 31 New Bridge, Other .97 miles N of SR 28 over the N
/S Railroad
Greenfield .778 NHPP Safety ROW RW $1,840,000.00 $460,000.00 $2,300,000.00 A 01 $23,880,465.0039052 /
1592421
Comments:Adding ROW Phase.
Indiana Department
of Transportation
SR 19 HMA Overlay,
Preventive
Maintenance
from 1.05 mi. S. of SR 28(SCL
Tipton) to .41 mi. S. of SR 28 (C
icero Ck.)
Greenfield .643 STBG District Other
Consulting
PE $49,200.00 $12,300.00 $61,500.00 A 01 $1,058,548.0041043 /
1800752
Comments:Added PE Phase
Indiana Department
of Transportation
SR 28 Pavement
Replacement
from WCL of Tipton to SR 19 W
junct
Greenfield .86 STBG Road
Construction
CN $7,819,320.80 $1,954,830.20 $9,774,151.00 A 01 $10,648,176.0042230 /
1900253
Road Consulting PE $619,220.00 $154,805.00 $774,025.00
Road ROW RW $80,000.00 $20,000.00 $100,000.00
Comments:New Project
Tipton County Total
Federal: $10,407,740.80 Match :$2,601,935.20 2020: $3,135,525.00 2021: 2022: $100,000.00 2023: 2024: $9,774,151.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 51 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Union County
Indiana Department
of Transportation
US 27 HMA Overlay,
Preventive
Maintenance
0.31 mi S of SR 44 S junct (SE
City Limits of Liberty) to 0.33 mi
N of SR 44 N junct (NCL of
Greenfield 1.13 NHPP Road Consulting PE $60,000.00 $15,000.00 $75,000.00 A 01 $513,260.0042261 /
1901509
Safety
Construction
CN $36,000.00 $9,000.00 $45,000.00
Comments:New Project
Union County Total
Federal: $96,000.00 Match :$24,000.00 2020: $75,000.00 2021: 2022: $45,000.00 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 52 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Vanderburgh County
Evansville ST 1 Road Reconstruction
(3R/4R Standards)
Walnut Street from US 41 to
Weinbach Ave. - Phase 1
Vincennes 2.07 STBG Local Funds RW $0.00 $10,000.00 $10,000.00 A 01 $2,940,000.0040124 /
1700400
Evansville MPO RW $28,000.00 $0.00 $28,000.00
Evansville MPO -
PYB
RW $12,000.00 $0.00 $12,000.00
Comments:Adding FY20 RW Federal $40,000.00, FY20 RW Local $10,000.00. Per EMPO TIP Letter dated 7/22/2019
Vanderburgh County Total
Federal: $40,000.00 Match :$10,000.00 2020: $50,000.00 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 53 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Various County
Indiana Department
of Transportation
VA VARI Traffic Signals, New
Or Modernized
Traffic Mods in Various
locations in Seymour District
2020
Seymour 0 STPBG Safety
Construction
CN $16,000.00 $4,000.00 $20,000.00 A 01 $783,630.0040185 /
1700314
Comments:Amend RR/PE (CN phase) to current STIP. Amended to KIPDA's TIP per Administrative Modification 31 dated 5/23/19.
Indiana Department
of Transportation
VA VARI ITS Traffic
Management Systems
DMS Box Truss Structure
Upgrade in Indianapolis,
Northwest IN, Southern IN, &
Greenfield 0 NHPP Statewide
Construction
CN $1,161,951.30 $129,105.70 $1,291,057.00 A 01 $1,291,057.0041220 /
1800723
Comments:Federal Funds were De-obligated. DES 1800723 Adding CN to FY 2020 into FY 2020-2024 STIP.
Indiana Department
of Transportation
VA VARI Guardrail Attenuators,
New Or Modernize
Various Locations Within the
Vincennes District
Vincennes 0 STPBG Safety Consulting PE $204,800.00 $51,200.00 $256,000.00 A 01 $1,546,422.0041250 /
1801397
Comments:Amend 2020-2024 STIP. Adding FY20 PE $256,000.00. No MPO.
Indiana Department
of Transportation
VA VARI Asphalt Patching Various Locations Throughout
the LaPorte District - Northern
Counties / Winter Damage
LaPorte 0 Multiple Toll Lease
Amendment
Proceeds
PE $0.00 $247,000.00 $247,000.00 A 01 $4,097,305.0041963 /
1900542
Comments:Please amend PE/CE phase into the STIP.
Indiana Department
of Transportation
VA VARI Asphalt Patching Various Locations Throughout
the LaPorte District - Southern
Counties / Winter Damage
LaPorte 0 Multiple Road Consulting PE $80,000.00 $20,000.00 $100,000.00 A 01 $1,949,198.0041964 /
1900543
Comments:No MPO. Please amend PE/CE phase into the STIP.
Indiana Department
of Transportation
VA 1019 Roadside
Maintenance, Tree
Removal/Trimming
Various Tree Locations
Throughout the LaPorte District
LaPorte 0 Multiple Road
Construction
CN $200,000.00 $50,000.00 $250,000.00 A 01 $250,000.0041970 /
1900518
Comments:Please amend CN phase into the STIP. MACOG TIP Resolution 13-19 approved 3/13/19.
Indiana Department
of Transportation
VA 1019 Repair Or Replace
Barrier Wall
Various Roads in the
Greenfield District.
Greenfield 0 STBG District
Maintenance
Work Program -
CN $147,200.00 $36,800.00 $184,000.00 A 01 $184,000.0042021 /
1901334
Comments:Added CN
Indiana Department
of Transportation
VA 1019 Raised Pavement
Markings,
Refurbished
RPM Refurbishment project
Various locations in the
Greenfield District.
Greenfield 0 Multiple Safety
Construction
CN $480,000.00 $120,000.00 $600,000.00 A 01 $600,000.0042082 /
1901564
Comments:Added CN
Indiana Department
of Transportation
SP VARI Demolition, Remove
Buildings,
Foundations
clearing of state-owned
parcels along US 31 in Hamilton
and Tipton County
Greenfield 0 STBG Statewide
Construction
CN $800,000.00 $200,000.00 $1,000,000.00 A 01 $1,000,000.0042098 /
1901630
Comments:IMPO CN in 2020 for $1,000,000
Indiana Department
of Transportation
VA VARI Asphalt Patching Various terminal joints
throughout the Seymour District
Seymour 0 Multiple Bridge
Construction
CN $3,694,292.00 $923,573.00 $4,617,865.00 A 01 $4,617,865.0042099 /
1901448
Comments:Amend CN to current STIP. Amended to KIPDA's TIP per Administrative Modification 31 dated 5/23/19.
Indiana Department
of Transportation
VA 1019 Asphalt Patching Various Terminal Joints
throughout the Crawfordsville
District (TCAPC)
Crawfordsville 0 STBG Statewide
Construction
CN $926,129.16 $231,532.29 $1,157,661.45 A 01 $1,157,661.4542126 /
1901663
Comments:CN phase for $1,157,661.45 FY20 via TCAPC 2024 TIP (1901434)
Indiana Department
of Transportation
VA VARI Patch And Rehab
Pavement
Various Locations throughout
the Vincennes District
Vincennes 0 STPBG Road
Construction
CN $1,254,085.76 $313,521.44 $1,567,607.21 A 01 $1,567,607.2142146 /
1901677
Comments:Amend 2020-2024 STIP. Adding FY20 CN $1,567,607.21. No MPO.
Indiana Department
of Transportation
VA 1019 Asphalt Patching Various Terminal Joints
throughout the Crawfordsville
District (WCIEDD)
Crawfordsville 0 STBG Statewide
Construction
CN $455,428.91 $113,857.22 $569,286.14 A 01 $569,286.1442178 /
1901786
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 54 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Comments:CN phase for $569,286.14 FY20, WCIEDD 2020-2024 TIP
Indiana Department
of Transportation
VA 1019 Asphalt Patching Various Terminal Joints
throughout the Crawfordsville
District
Crawfordsville 0 STBG Statewide
Construction
CN $335,833.64 $83,958.41 $419,792.05 A 01 $419,792.0542180 /
1901787
Comments:CN phase for $419,792.05 FY20, No MPO
Indiana Department
of Transportation
VA 1019 Patch And Rehab
Pavement
Slap Jacking Various Locations
in the Greenfield District
Greenfield 0 Multiple District
Maintenance
Work Program -
CN $80,000.00 $20,000.00 $100,000.00 A 01 $100,000.0042220 /
1901804
Comments:Added CN
Indiana Department
of Transportation
VA 1019 Guardrail,
Maintenance
Various Locations in Marion
County
Greenfield 0 STBG District
Maintenance
Work Program -
CN $800,000.00 $200,000.00 $1,000,000.00 A 01 $1,000,000.0042224 /
1901867
Comments:Added CN
Various County Total
Federal: $10,635,720.77 Match :$2,744,548.06 2020: $13,380,268.85 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 55 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Vermillion County
Indiana Department
of Transportation
SR 71 Small Structure
Replacement
0.20 mi N of SR 163 Crawfordsville 0 STPBG Bridge ROW RW $16,880.00 $4,220.00 $21,100.00 A 01 $694,138.0038771 /
1500138
Comments:RW Phase for $21,100 FY20, No MPO
Indiana Department
of Transportation
SR 163 Bridge Replacement,
Other Construction
Over Brouiletts Creek Crawfordsville 0 STPBG Bridge ROW RW $20,000.00 $5,000.00 $25,000.00 A 01 $5,844,683.0040580 /
1701589
Comments:ROW phase for $25,000 FY20, No MPO
Indiana Department
of Transportation
SR 32 Bridge Maintenance
And Repair
over Wabash River, 01.19 mi E
of SR 63
Crawfordsville 0 STBG Bridge
Construction
CN $1,504,312.00 $376,078.00 $8,000.00 $1,872,390.00A 01 $1,989,390.0040956 /
1900759
Bridge Consulting PE $87,200.00 $21,800.00 $109,000.00
Comments:PE phase for $109,000 FY20
Indiana Department
of Transportation
SR 63 Bridge Maintenance
And Repair
0.24 mi S of SR 234 (NB) Crawfordsville 0 NHPP Bridge
Construction
CN $248,302.40 $62,075.60 $310,378.00 A 01 $351,070.0042091 /
1901576
Bridge Consulting PE $16,000.00 $4,000.00 $20,000.00
Comments:PE Phase for $20,000 FY20
Vermillion County Total
Federal: $1,892,694.40 Match :$473,173.60 2020: $493,478.00 2021: $1,872,390.00 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 56 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Wabash County
Indiana Department
of Transportation
SR 218 Small Structure
Replacement
SR 218 over Metocinah Creek,
2.83 miles E of SR 15
Fort Wayne .1 STPBG Bridge ROW RW $25,280.00 $6,320.00 $31,600.00 A 01 $4,309,751.0038563 /
1600691
Comments:NO MPO. DES 1401737 Adding additional RW to FY 2020 into FY 2020 - 2024 STIP.
Indiana Department
of Transportation
SR 13 Bridge Maintenance
And Repair
Bridge over MISSISSINEWA
RIVER, 04.19 Miles South of SR
124.
Fort Wayne 0 STPBG Bridge
Construction
CN $423,195.20 $105,798.80 $528,994.00A 01 $778,994.0042034 /
1901313
Bridge Consulting PE $200,000.00 $50,000.00 $250,000.00
Comments:NO MPO. DES 1901311, 1901318, 1901321, 1901323, 1901325 adding PE to FY 2020, and CN to FY 2021 into FY 2020 - 2024 STIP.
Indiana Department
of Transportation
SR 124 Box Culvert
Replacement
2.46 Miles west of SR 13,
Carries Mill Creek
Fort Wayne .1 STPBG Bridge
Construction
CN $1,186,491.20 $296,622.80 $40,000.00 $1,443,114.00 A 01 $1,948,114.0042365 /
1900069
Bridge Consulting PE $324,000.00 $81,000.00 $405,000.00
Bridge ROW RW $48,000.00 $12,000.00 $60,000.00
Comments:NO MPO. DES 1900069
Indiana Department
of Transportation
US 24 Small Structure
Replacement
UNT of Helms Creek, 00.55 E
SR 115
Fort Wayne .2 NHPP Bridge
Construction
CN $6,437,242.40 $1,609,310.60 $90,000.00 $7,956,553.00 A 01 $9,454,053.0042366 /
1900240
Bridge Consulting PE $982,000.00 $245,500.00 $1,227,500.00
Bridge ROW RW $144,000.00 $36,000.00 $180,000.00
Comments:NO MPO. DES 1900072, 1900080, 1900081, 1900236, 1900071, 1900240 adding PE to FY 2020, RW to FY 2022 and CN to FY 2022 into FY 2020 - 2024 STIP.
Indiana Department
of Transportation
SR 114 Bridge Replacement,
Other Construction
1.66 Miles East of SR 13, Over
the Eel River
Fort Wayne .1 STPBG Bridge
Construction
CN $4,631,139.20 $1,157,784.80 $50,000.00 $5,738,924.00 A 01 $6,455,174.0042370 /
1900051
Bridge Consulting PE $533,000.00 $133,250.00 $666,250.00
Comments:NO MPO. DES 1900051 adding PE to FY 2020 and CN to FY 2022 into FY 2020 - 2024 STIP.
Wabash County Total
Federal: $14,934,348.00 Match :$3,733,587.00 2020: $2,580,350.00 2021: $528,994.00 2022: $420,000.00 2023: 2024: $15,138,591.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 57 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Warren County
Warren County IR 1004 Bridge Rehabilitation
Or Repair
Bridge #36 over Wabash River
on Warren County Road 100 E
Crawfordsville .153 STBG Local Funds CN $0.00 $495,208.73 $495,208.73 A 01 $1,500,000.0037638 /
1400805
Local Bridge
Program
CN $1,172,084.27 $0.00 $1,172,084.27
Comments:NO MPO, please add CN funds to FY 20 in the amount of 1,172,084.27 federal and 495,208.73 local
Indiana Department
of Transportation
SR 26 Road Rehabilitation (3
R/4R Standards)
From US 41 (E jct) to SR 55 (W
jct)
Crawfordsville 6.195 STPBG Road ROW RW $88,000.00 $22,000.00 $110,000.00 A 01 $15,553,842.5040577 /
1400249
Comments:ROW phase for $110,000 FY20, No MPO
Warren County Total
Federal: $1,260,084.27 Match :$517,208.73 2020: $1,777,293.00 2021: 2022: 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 58 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Wayne County
Indiana Department
of Transportation
SR 38 Bridge Replacement,
Steel
Over Nettle Creek, 1.47 miles W
of SR 1
Greenfield .01 STBG Bridge ROW RW $4,800.00 $1,200.00 $6,000.00 A 01 $3,664,610.0038527 /
1593239
Comments:Adding ROW Phase
Wayne County ST 4780 Bridge Rehabilitation
Or Repair
Bridge #701 carrying South "G"
Street over E Fork Whitewater
River
Greenfield .18 STPBG Local Funds PE $0.00 $90,000.00 $90,000.00 A 01 $3,137,500.0042068 /
1802930
Local Funds RW $0.00 $10,000.00 $10,000.00
Local Funds CN $0.00 $527,500.00 $527,500.00
Local Bridge
Program
PE $360,000.00 $0.00 $360,000.00
Local Bridge
Program
RW $40,000.00 $0.00 $40,000.00
Local Bridge
Program
CN $2,110,000.00 $0.00 $2,110,000.00
Comments:No MPO - Add PE FY 20 Federal 360,000 and Local 90,000, Add RW FY 22 Federal 40,000 and Local 10,000, Add CN FY 24 Federal 2,110,000 and Local 527,500.
Wayne County IR 2225 Bridge Replacement Bridge #149 carrying Fountain
City Pike over Nolands Fork
Greenfield .07 STPBG Local Funds PE $0.00 $48,000.00 $48,000.00 A 01 $1,720,000.0042069 /
1802936
Local Funds RW $0.00 $10,000.00 $10,000.00
Local Funds CN $0.00 $286,000.00 $286,000.00
Local Bridge
Program
PE $192,000.00 $0.00 $192,000.00
Local Bridge
Program
RW $40,000.00 $0.00 $40,000.00
Local Bridge
Program
CN $1,144,000.00 $0.00 $1,144,000.00
Comments:NO MPO - Add PE FY 20 Federal 192,000 and Local 48,000, Add RW FY 22 Federal 40,000 and Local 10,000, Add CN FY 24 Federal 1,144,000 and Local 286,000.
Wayne County ST 3154 Bridge Replacement Bridge #720 carrying Bridge
Avenue over W Fork of
Whitewater River
Greenfield .07 STPBG Local Funds PE $0.00 $52,000.00 $52,000.00 A 01 $1,850,000.0042072 /
1802934
Local Funds RW $0.00 $10,000.00 $10,000.00
Local Funds CN $0.00 $308,000.00 $308,000.00
Local Bridge
Program
PE $208,000.00 $0.00 $208,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 59 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Wayne County ST 3154 Bridge Replacement Bridge #720 carrying Bridge
Avenue over W Fork of
Whitewater River
Greenfield .07 STPBG Local Bridge
Program
RW $40,000.00 $0.00 $40,000.00 A 01 $1,850,000.0042072 /
1802934
Local Bridge
Program
CN $1,232,000.00 $0.00 $1,232,000.00
Comments:No MPO - Add PE FY 20 Federal 208,000 and Local 52,000, Add RW FY 22 Federal 40,000 and Local 10,000, Add CN FY 24 Federal 1,232,000 and Local 308,000.
Indiana Department
of Transportation
SR 227 Small Structure
Replacement
5.676 mile I-70 (SS-227-89-20.
79)
Greenfield 0 STBG Bridge
Construction
CN $198,047.20 $49,511.80 $247,559.00 A 01 $285,559.0042088 /
1296532
Comments:Added CN
Indiana Department
of Transportation
US 27 HMA Overlay,
Preventive
Maintenance
1.46 mi N of I-70 to 5.72 mi N of
I-70 (SCL Fountain City)
Greenfield 4.26 NHPP Bridge
Construction
CN $271,200.00 $67,800.00 $339,000.00 A 01 $1,850,000.0042262 /
1901510
Road
Construction
CN $1,208,800.00 $302,200.00 $1,511,000.00
Comments:Added CN
Indiana Department
of Transportation
I 70 Replace
Superstructure
over PLUM CREEK, 02.44 E SR
1
Greenfield 0 NHPP Bridge
Construction
CN $4,952,700.00 $550,300.00 $5,503,000.00 A 01 $6,218,000.0042267 /
1900184
Bridge Consulting PE $630,000.00 $70,000.00 $700,000.00
Bridge ROW RW $13,500.00 $1,500.00 $15,000.00
Comments:New Project
Indiana Department
of Transportation
US 40 Scour Protection (Ero
sion)
US 40 over Greens Fork Greenfield 0 STBG Bridge
Construction
CN $477,960.00 $119,490.00 $597,450.00 A 01 $762,450.0042270 /
1900228
Bridge Consulting PE $120,000.00 $30,000.00 $150,000.00
Bridge ROW RW $12,000.00 $3,000.00 $15,000.00
Comments:New Project
Indiana Department
of Transportation
US 35 Scour Protection (Ero
sion)
US 35 OVER GREENS FORK,
06.46 N SR 38
Greenfield 0 STBG Bridge
Construction
CN $86,540.00 $21,635.00 $108,175.00 A 01 $108,175.0042271 /
1900257
Comments:Added CN
Wayne County Total
Federal: $13,341,547.20 Match :$2,558,136.80 2020: $2,053,559.00 2021: 2022: $2,030,000.00 2023: 2024: $11,816,125.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 60 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Wells County
Indiana Department
of Transportation
SR 301 Small Structure
Replacement
Carried Eight Mile Creek, 1.85
Miles North of SR 124.
Fort Wayne .1 STPBG Bridge
Construction
CN -$340,473.60 -$85,118.40 ($425,592.00) A 01 $0.0041569 /
1800049
Bridge ROW RW -$16,000.00 -$4,000.00 ($20,000.00)
Comments:No MPO. Removing CN
Indiana Department
of Transportation
SR 1 HMA Overlay,
Preventive
Maintenance
From SR 124 S. Jct. (Wabash
River Bridge) to SR 116 N. Jct. (
Dustman Rd.)
Fort Wayne 1.02 STPBG Road
Construction
CN $2,135,642.40 $533,910.60 $2,669,553.00 A 01 $3,101,553.0041874 /
1900621
Road Consulting PE $345,600.00 $86,400.00 $432,000.00
Comments:NO MPO. DES 1900621 adding PE to FY 2020 and CN to FY 2022 into FY 2020 - 2024 STIP.
Indiana Department
of Transportation
SR 218 Bridge Maintenance
And Repair
Bridge over ELM CREEK, 04.15
West of SR 1.
Fort Wayne 0 STPBG Bridge
Construction
CN $736,151.20 $184,037.80 $920,189.00A 01 $1,570,189.0042033 /
1901340
Bridge Consulting PE $520,000.00 $130,000.00 $600,000.00 $50,000.00
Comments:NO MPO. DES 1900827, 1901326 thru 1901331, 1901339 thru 1901341, 1901343, 1901350 1901351 adding PE to FY 2020
Indiana Department
of Transportation
SR 1 Replace
Superstructure
Over Eight Mile Creek, 2.95
Miles North of US 224
Fort Wayne .11 STPBG Bridge
Construction
CN $938,228.00 $234,557.00 $25,000.00 $1,147,785.00 A 01 $1,477,785.0042383 /
1900035
Bridge Consulting PE $212,000.00 $53,000.00 $265,000.00
Bridge ROW RW $32,000.00 $8,000.00 $40,000.00
Comments:NO MPO. DES 1900035 adding PE to FY 2020
Indiana Department
of Transportation
SR 124 HMA Overlay Minor
Structural
From SR 3 to SR 116 North Jct. Fort Wayne 11.249 STPBG Bridge
Construction
CN $786,231.20 $196,557.80 $35,000.00 $947,789.00 A 01 $7,723,879.0042384 /
1800161
Bridge Consulting PE $216,000.00 $54,000.00 $270,000.00
Bridge ROW RW $56,000.00 $14,000.00 $70,000.00
Road
Construction
CN $4,620,216.00 $1,155,054.00 $5,775,270.00
Road Consulting PE $500,656.00 $125,164.00 $625,820.00
Comments:NO MPO. DES 1800161, 1900085,
Indiana Department
of Transportation
SR 218 Bridge Replacement,
Other Construction
0.68 Miles East of SR 1, Carries
St. John Ditch
Fort Wayne .1 STPBG Bridge
Construction
CN $918,228.00 $229,557.00 $1,147,785.00 A 01 $1,297,785.0042386 /
1900053
Bridge Consulting PE $120,000.00 $30,000.00 $150,000.00
Comments:NO MPO. DES 1900053 adding PE to FY 2020 and CN to FY 2024 into FY 2020 - 2024 STIP.
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 61 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Indiana Department
of Transportation
SR 3 Bridge Replacement,
Other Construction
1.32 Miles South of SR 218 Fort Wayne .1 STPBG Bridge
Construction
CN $2,617,912.80 $654,478.20 $25,000.00 $3,247,391.00 A 01 $3,757,391.0042387 /
1900038
Bridge Consulting PE $356,000.00 $89,000.00 $445,000.00
Bridge ROW RW $32,000.00 $8,000.00 $40,000.00
Comments:NO MPO. DES 1900038 adding PE to FY 2020, ROW to FY22 and CN to FY 2022 into FY 2020 - 2024 STIP.
Wells County Total
Federal: $14,786,392.00 Match :$3,696,598.00 2020: $2,787,820.00 2021: $970,189.00 2022: $2,884,553.00 2023: -$425,592.00 2024: $12,266,020.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 62 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
White County
Indiana Department
of Transportation
US 24 HMA Overlay,
Preventive
Maintenance
0.68mi E of US 421/SR 43 to 2.
65mi W of SR 39 (CR 300E)
LaPorte 2.61 NHPP Bridge
Construction
CN $140,546.40 $35,136.60 $175,683.00 A 01 $1,470,894.0042222 /
1901360
Bridge Consulting PE $105,700.00 $26,425.00 $132,125.00
Road
Construction
CN $968,971.20 $242,242.80 $1,201,214.00 $10,000.00
Road Consulting PE $207,744.00 $51,936.00 $183,940.00 $75,740.00
Comments:Please amend all phases into the STIP. No MPO
Indiana Department
of Transportation
US 421 Bridge Replacement,
Concrete
Over Hoagland Ditch, 3.50mi S
of SR 16
LaPorte 0 NHPP Bridge
Construction
CN $1,911,953.60 $477,988.40 $2,294,942.00 $95,000.00A 01 $1,261,110.0042245 /
1700103
Bridge ROW RW $200,000.00 $50,000.00 $250,000.00
Comments:Please amend all phases into the STIP. No MPO.
White County Total
Federal: $3,534,915.20 Match :$883,728.80 2020: $316,065.00 2021: $355,000.00 2022: $3,747,579.00 2023: 2024:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 63 of 64 Report Created:7/25/2019 7:07:56AM
State Preservation and Local Initiated Projects FY 2020 - 2024
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2020 2021 2022 2023 2024STIP
NAME
Whitley County
Indiana Department
of Transportation
SR 5 HMA Overlay Minor
Structural
From SR 114 to SR 14 North Jct
. (Eel River Bridge).
Fort Wayne 6.239 STPBG Road
Construction
CN $2,509,904.80 $627,476.20 $3,137,381.00 A 01 $3,451,131.0042382 /
1600944
Road Consulting PE $251,000.00 $62,750.00 $313,750.00
Comments:NO MPO. DES 1600944 adding PE to FY 2020 and CN to FY 2024 into FY 2020 - 2024 STIP.
Whitley County Total
Federal: $2,760,904.80 Match :$690,226.20 2020: $313,750.00 2021: 2022: 2023: 2024: $3,137,381.00
Grand Total
Federal: $249,357,659.38 2021: $28,972,194.502020: $65,833,818.65 2023: $40,675,078.002022: $56,478,434.00 2024: $115,899,457.00Match : $58,501,322.75
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 64 of 64 Report Created:7/25/2019 7:07:56AM
www.in.gov/dot/ An Equal Opportunity Employer
100 North Senate Avenue Room N955 Indianapolis, Indiana 46204
PHONE: (317) 232-0223 FAX: (317) 232-1499 Eric Holcomb, Governor
Joe McGuinness, Commissioner