HDD PA-YO-0063.0000-RR (S-A22) Given the design, the threat of inadvertent return has been reduced to the maximum extent practicable and in this case that threat is considered to be low. Implementing this design, along with adherence to the Pennsylvania Pipeline Project Inadvertent Return Contingency Plan will ensure inadvertent impacts, if they were to occur, are also minimized to the maximum extent. The drill will pass 75’ below the river. The geotechnical results, as well as other data points, were used to determine the entry/exit angles, and depths to pass through the best substrates while maintaining the pipe integrity (e.g., no large bends). According to the geotechnical report primary substrates being drilled through are sandstone beneath layers of silt and clays. Based on the geotechnical report and the drill profile minimal inadvertent returns are expected. Due to the river width additional inspection is recommended to observe for inadvertent returns. Revised: February 6, 2017 The drill will enter/exit 1800 feet from the western edge of the Susquehanna River (S-A22) and enter/exit 1,050 feet from the eastern edge. The drill will enter/exit 800 feet from the western edge Stream H56 and enter/exit 5,900 feet from the eastern edge, crossing 42 feet below the stream.

Upload: phamkhanh

Post on 28-Mar-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

HDD PA-YO-0063.0000-RR (S-A22)

Given the design, the threat of inadvertent return has been reduced to the maximum extent practicable and in this case that threat is considered to be low. Implementing this design, along with adherence to the Pennsylvania Pipeline Project Inadvertent Return Contingency Plan will ensure inadvertent impacts, if they were to occur, are also minimized to the maximum extent.

The drill will pass 75’ below the river. The geotechnical results, as well as other data points, were used to determine the entry/exit angles, and depths to pass through the best substrates while maintaining the pipe integrity (e.g., no large bends). According to the geotechnical report primary substrates being drilled through are sandstone beneath layers of silt and clays. Based on the geotechnical report and the drill profile minimal inadvertent returns are expected. Due to the river width additional inspection is recommended to observe for inadvertent returns.

Revised: February 6, 2017

The drill will enter/exit 1800 feet from the western edge of the Susquehanna River (S-A22) and enter/exit 1,050 feet from the eastern edge. The drill will enter/exit 800 feet from the western edge Stream H56 and enter/exit 5,900 feet from the eastern edge, crossing 42 feet below the stream.

E

Q

N

B

K

1

1

2

3

1

+

5

7

.

0

0

E

Q

N

A

H

D

1

1

2

3

1

+

5

0

.

6

1

0+

00

2+

00

4+

00

6+

00

8+

00

10+

00

12+

00

14+

00

16+

00

18+

00

20+

00

22+

00

24+

00

26+

00

28+

00

30+

00

32+

00

34+

00

36+

00

38+

00

40+

00

HDD EXIT/ENTRY

N40.203490

W76.781825

GEOTECH SB-03

D

A

U

P

H

I

N

C

O

U

N

T

Y

0

200

400

600

800

-2+000+002+004+006+008+0010+0012+0014+0016+0018+0020+0022+0024+0026+0028+0030+0032+0034+0036+00

93'

4110'

7+

48 B

UC

KE

Y P

PL

11+

00 E

DG

E O

F

SU

SQ

UE

HA

NA

R

IV

ER

S-A

22

73'

82'

57'

STA. 0+88

EL. 283'

STA. 6+39

EL. 206'

GRADE

3+

70 S

UN

OC

O P

PL

0+

94 G

EO

TE

CH

S

B-03

61' R

T.

16°

2+

78 N

FS

R R

AILW

AY

APPROXIMATE

BEDROCK

1+

02 B

UC

KE

YE

P

PL

2+

98 O

H E

LE

CT

RIC

0+

36 T

IE

-IN

,

EL. 308'

TIE

-IN

E

L. 298'

5+

01 A

CC

ES

S R

OA

D

2+

51 N

FS

R R

AILW

AY

2+

18 N

FS

R R

AILW

AY

1+

93 O

H E

LE

CT

RIC

3+

06 U

G E

LE

CT

RIC

HD

D E

XIT

/E

NT

RY

0+

00

EL.309'

29+

20 C

L

SU

SQ

UE

HA

NN

A

RIV

ER

S

-A

22

ED

GE

O

F W

ET

LA

ND

A18

ED

GE

O

F W

ET

LA

ND

A18

77'

0150 150 300

FEET

PROPOSED 20" PIPELINE

PA-DA-0003.0000

PA-YO-0064.0000

PA-DA-0001.0000

PA-DA-0001.0001

PA-DA-0002.0000

SUSQUEHANNA RIVER S-A22

EXISTING PIPELINE

BUCKEYE

EXISTING PIPELINE

SUNOCO

EXISTING PIPELINE

BUCKEYE

-INCH HORIZONTAL DIRECTIONAL DRILL

REF. DRAWING

EROSION & SEDIMENT PLAN

AERIAL SITE PLAN

PLAN VIEW

PROFILE VIEW

NO. DESCRIPTION DATEBY CHK DATE

REVISIONS

DATEAPP

NOTES Sunoco LogisticsPartners L.P.

SUNOCO PIPELINE, L.P.

1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83

2. STATIONING IS BASED ON HORIZONTAL DISTANCES.

3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION

OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS

FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE,

LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN.

4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO

DIGGING.

5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440.

PENNSYLVANIA PIPELINE PROJECT

LEGEND

PERMANENT ROW

TEMPORARY CONSTRUCTION ROW

TEMPORARY WORKSPACE

TEMPORARY ACCESS ROAD

PERMANENT ACCESS ROAD

SPOIL SPACE ONLY

PROPOSED HDD

PROPOSED 20" PIPELINE

PROPOSED 16" PIPELINE

HDD ENTRY-EXIT

PEM WETLANDS

PSS WETLANDS

PFO WETLANDS

TO

TO

DWG NO DWG NO DESCRIPTION

DESIGN AND CONSTRUCTION:

1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON

THIS DRAWING.

2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS

THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED

PIPELINE.

3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4

4. CROSSING PIPE SPECIFICATION:

HDD HORZ. LENGTH (L=):

HDD PIPE LENGTH (S=):

20" x 0.456" W.T., X-65, API5L, PSL2, ERW, BFW

COATING: 14-16 MILS FBE WITH 40 MILS MIN. ARO (POWERCRETE R95)

5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGN FACTOR 0.50 (HOOP STRESS)).

6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD).

7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND

STREAM CROSSINGS.

8. CARRIER PIPE NOT ENCASED.

9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR

WRITTEN APPROVAL FROM THE ENGINEER.

10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG.

11. PIPELINE AND CROSSING TO BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH LAST APPROVED

AMERICAN RAILWAY ENGINEERING AND MAINTENANCE OF WAY ASSOCIATION SPECIFICATIONS FOR

PIPELINES CONVEYING FLAMMABLE AND NON-FLAMMABLE SUBSTANCES.

12. BLASTING NOT PERMITTED.

13. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT.

20

01/19/16

02/01/17

08/31/16

01/30/17

SUSQUEHANNA RIVER

1"=300'

PA-YO-0063.0000-RRa

YORK COUNTY, PENNSYLVANIA - FAIRVIEW TOWNSHIP

DAUPHIN COUNTY, PENNSYLVANIA - LOWER SWATARA TOWNSHIP

S2-0280A

0 ISSUED FOR CONSTRUCTION MRS RMB AAW01/19/16

06/29/16

01/19/16

EP3 REVISED PER PADEP COMMMENTS RECEIVED 01-30-17DLM RMB CAG02/01/17

01/30/17

02/01/17

4 DESIGN CHANGE - RELOCATED DRILL ENTRY/EXITMRS RMB AAW01/30/17

ES-4.20

01/30/17

3 REVISED PER ENGINEERING COMMENTS MRS RMB AAW08/31/16

SHEET 2

08/31/16

2 ADDED UTILITY CROSSING LABELMRS RMB AAW06/29/16

ES-4.04

06/29/16

1 REVISED PER COMMENTS FROM REI REVIEWMRS RMB AAW02/19/16

SHEET 13

02/19/16

6711'

6745'

PROPOSED 16" PIPELINE

MA

TC

HL

IN

E S

TA

. 3

5+

00

SE

E P

A-Y

O-0

06

3.0

00

0-R

Rb

GEOTECH SB-03

-NG EL. 308'

-COMPLETION

DEPTH EL. 255'

-FILL (0.0' - 14.7')

-SILTSTONE \ SANDSTONE

(37.0' - 43.2')

-CL (14.7' - 37.0')

-MAROON SANDSTONE

(43.2' - 53.0')

NOTE: REFER TO TEST BORING LOG S2-0280

FOR COMPLETE SOIL MATERIAL DESCRIPTION

SUNOCO EASEMENT

LIMITS - NOT LOD

35+

HDD EXIT/ENTRY

N40.197484

W76.804536

PM

GEOTECH SB-01

GEOTECH SB-01

APPROXIMATE LOCATION

32+

00

34+

00

36+

00

38+

00

40+

00

42+

00

44+

00

46+

00

48+

00

50+

00

52+

00

54+

00

56+

00

58+

00

60+

00

62+

00

64+

00

66+

00

67+

11

NFSR RAILWAY

N40.198853

W76.799448

NFSR RAILWAY

N40.198868

W76.799404

YORK COUNTY

D

A

U

P

H

I

N

C

O

U

N

T

Y

0

100

200

300

400

500

600

700

800

36+0038+0040+0042+0044+0046+0048+0050+0052+0054+0056+0058+0060+0062+0064+0066+0068+0070+00

1669'

51+

91 N

FS

R

RA

ILW

AY

HD

D E

XIT

/E

NT

RY

67+

11

EL.492'

STA. 47+49

EL. 206'

STA. 50+62

EL. 231'

59+

69 C

L S

TR

EA

M

S-H

56

60'

50+

04 E

DG

E

OF

S

US

QU

EH

AN

NA

RIV

ER

S

-A

22

NF

SR

R

AILW

AY

52+

04

OV

ER

HE

AD

P

OW

ER

51+

73

R=2000'

L=312'

S=314'

61+

09 E

X C

OLU

MB

IA

PIP

ELIN

E

42'

65'

4110'

62'

ED

GE

O

F W

ET

LA

ND

BB

1

ED

GE

O

F W

ET

LA

ND

BB

1

0150 150 300

FEET

PROPOSED 20" PIPELINE

SUSQUEHANNA RIVER

S-A22

Y

O

R

K

C

O

U

N

T

Y

,

P

A

D

A

U

P

H

I

N

C

O

U

N

T

Y

,

P

A

-INCH HORIZONTAL DIRECTIONAL DRILL

REF. DRAWING

EROSION & SEDIMENT PLAN

AERIAL SITE PLAN

PLAN VIEW

PROFILE VIEW

NO. DESCRIPTION DATEBY CHK DATE

REVISIONS

DATEAPP

NOTES Sunoco LogisticsPartners L.P.

SUNOCO PIPELINE, L.P.

1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83

2. STATIONING IS BASED ON HORIZONTAL DISTANCES.

3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION

OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS

FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE,

LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN.

4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO

DIGGING.

5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440.

PENNSYLVANIA PIPELINE PROJECT

LEGEND

PERMANENT ROW

TEMPORARY CONSTRUCTION ROW

TEMPORARY WORKSPACE

TEMPORARY ACCESS ROAD

PERMANENT ACCESS ROAD

SPOIL SPACE ONLY

PROPOSED HDD

PROPOSED 20" PIPELINE

PROPOSED 16" PIPELINE

HDD ENTRY-EXIT

PEM WETLANDS

PSS WETLANDS

PFO WETLANDS

TO

TO

DWG NO DWG NO DESCRIPTION

DESIGN AND CONSTRUCTION:

1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON

THIS DRAWING.

2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS

THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED

PIPELINE.

3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4

4. CROSSING PIPE SPECIFICATION:

HDD HORZ. LENGTH (L=):

HDD PIPE LENGTH (S=):

20" x 0.456" W.T., X-65, API5L, PSL2, ERW, BFW

COATING: 14-16 MILS FBE WITH 40 MILS MIN. ARO (POWERCRETE R95)

5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGN FACTOR 0.50 (HOOP STRESS)).

6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD).

7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND

STREAM CROSSINGS.

8. CARRIER PIPE NOT ENCASED.

9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR

WRITTEN APPROVAL FROM THE ENGINEER.

10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG.

11. PIPELINE AND CROSSING TO BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH LAST APPROVED

AMERICAN RAILWAY ENGINEERING AND MAINTENANCE OF WAY ASSOCIATION SPECIFICATIONS FOR

PIPELINES CONVEYING FLAMMABLE AND NON-FLAMMABLE SUBSTANCES.

12. BLASTING NOT PERMITTED.

13. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT.

20

01/19/16

01/30/17

02/01/17

SUSQUEHANNA RIVER

1"=300'

PA-YO-0063.0000-RRb

YORK COUNTY, PENNSYLVANIA - FAIRVIEW TOWNSHIP

DAUPHIN COUNTY, PENNSYLVANIA - LOWER SWATARA TOWNSHIP

S2-0280B

0 ISSUED FOR CONSTRUCTION MRS RMB AAW01/19/16

08/31/16

01/19/16

02/19/16

EP3 REVISED PER PADEP COMMENTS RECEIVED 01-30-17DLM RMB CAG02/01/17

ES-4.20

02/01/17

3 DESIGN CHANGE - RELOCATED DRILL ENTRY/EXIT MRS RMB AAW01/30/17

SHEET 2

01/30/17

2 REVISED PER ENGINEERING COMMENTSMRS RMB AAW08/31/16

ES-4.04

08/31/16

1 REVISED PER COMMENTS FROM REI REVIEWMRS RMB AAW02/19/16

SHEET 13

02/19/16

6711'

6745'

PROPOSED 16" PIPELINE

MA

TC

HL

IN

E S

TA

. 3

6+

00

SE

E P

A-Y

O-0

06

3.0

00

0-R

Ra

PA-YO-0062.0001

EXISTING COLUMBIA

GAS PIPELINE

PA-YO-0063.0000

NOTE: REFER TO TEST BORING LOG S2-0280

FOR COMPLETE SOIL MATERIAL DESCRIPTION

-SM (9.0' - 14.0')

-NG EL. 487'

-ML (2.0' - 9.0')

-TOPSOIL (0' - 0.2')

-COMPLETION

DEPTH EL. 465'

-GROUNDWATER (13.0')

GEOTECH SB-01

-SM (14.0' - 20.0')

-SANDSTONE (20.0' - 21.7')

CLEARING

ROW ONLY

-AUGER REFUSAL (21.5')

SUNOCO EASEMENT

LIMITS - NOT LOD

+00

0+

00

2+

00

4+

00

6+

00

8+

00

10+

00

12+

00

14+

00

16+

00

18+

00

20+

00

22+

00

24+

00

26+

00

28+

00

30+

00

32+

00

34+

00

36+

00

38+

00

40+

00

NFSR RAILWAY

N40.203299

W76.782769

NFSR RAILWAY

N40.203327

W76.782661

NFSR RAILWAY

N40.203282

W76.782834

HDD ENTRY / EXIT

N40.203556

W76.781798

GEOTECH SB-03

100

200

300

400

500

600

-1+000+002+004+006+008+0010+0012+0014+0016+0018+0020+0022+0024+0026+0028+0030+0032+0034+00

APPROXIMATE

BEDROCK

5+

16 A

CC

ES

S R

OA

D

11+

15 E

DG

E

OF

S

US

QU

EH

AN

NA

RIV

ER

S

-A

22

7+

31 B

UC

KE

YE

P

PL

1+

10 G

EO

TE

CH

S

B-03

50' R

T.

HD

D E

NT

RY

/ E

XIT

0+

00

EL.309'

4236'

67'

12°

276'

53'

STA. 6+02

EL. 216'

STA. 2+70

EL. 251'

77'

4+

07 S

UN

OC

O P

PL

0+

55 T

IE

-IN

EL. 308'

TIE

-IN

E

L. 296'

3+

06 N

FS

R R

AILW

AY

2+

87 N

FS

R R

AILW

AY

2+

55 N

FS

R R

AILW

AY

1+

32 B

UC

KE

YE

P

PL

3+

32 O

H E

LE

CT

RIC

2+

34 O

H E

LE

CT

RIC

3+

45 U

G E

LE

CT

RIC

29+

48 C

L

SU

SQ

UE

HA

NN

A

RIV

ER

S

-A

22

R=16

00

'

L=

33

3'

S=

33

5'

64'

ED

GE

O

F W

ET

LA

ND

W-A

18

ED

GE

O

F W

ET

LA

ND

W-A

18

63'

0150 150 300

FEET

PROPOSED 20" PIPELINE

PA-DA-0003.0000

PA-YO-0064.0000

PA-DA-0001.0000

PA-DA-0001.0001

PA-DA-0002.0000

SUSQUEHANNA RIVER

S-A22

EXISTING PIPELINE

BUCKEYE

EXISTING PIPELINE

SUNOCO

EXISTING PIPELINE

BUCKEYE

-INCH HORIZONTAL DIRECTIONAL DRILL

REF. DRAWING

EROSION & SEDIMENT PLAN

AERIAL SITE PLAN

PLAN VIEW

PROFILE VIEW

NO. DESCRIPTION DATEBY CHK DATE

REVISIONS

DATEAPP

NOTES Sunoco LogisticsPartners L.P.

SUNOCO PIPELINE, L.P.

1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83

2. STATIONING IS BASED ON HORIZONTAL DISTANCES.

3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION

OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS

FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE,

LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN.

4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO

DIGGING.

5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440.

PENNSYLVANIA PIPELINE PROJECT

LEGEND

PERMANENT ROW

TEMPORARY CONSTRUCTION ROW

TEMPORARY WORKSPACE

TEMPORARY ACCESS ROAD

PERMANENT ACCESS ROAD

SPOIL SPACE ONLY

PROPOSED HDD

PROPOSED 20" PIPELINE

PROPOSED 16" PIPELINE

HDD ENTRY-EXIT

PEM WETLANDS

PSS WETLANDS

PFO WETLANDS

TO

TO

DWG NO DWG NO DESCRIPTION

DESIGN AND CONSTRUCTION:

1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON

THIS DRAWING.

2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS

THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED

PIPELINE.

3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4

4. CROSSING PIPE SPECIFICATION:

HDD HORZ. LENGTH (L=):

HDD PIPE LENGTH (S=):

16" x 0.438" W.T., X-70, API5L, PSL2, ERW, BFW

COATING: 14-16 MILS FBE WITH 40 MILS MIN. ARO (POWERCRETE R95)

5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGN FACTOR 0.50 (HOOP STRESS)).

6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD).

7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND

STREAM CROSSINGS.

8. CARRIER PIPE NOT ENCASED.

9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR

WRITTEN APPROVAL FROM THE ENGINEER.

10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG.

11. PIPELINE AND CROSSING TO BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH LAST APPROVED

AMERICAN RAILWAY ENGINEERING AND MAINTENANCE OF WAY ASSOCIATION SPECIFICATIONS FOR

PIPELINES CONVEYING FLAMMABLE AND NON-FLAMMABLE SUBSTANCES.

12. BLASTING NOT PERMITTED.

13. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT.

16

SHEET 2SHEET 13

ES-4.20 ES-4.04

SUSQUEHANNA RIVER

1"=300'

PA-YO-0063.0000-RRa-16

YORK COUNTY, PENNSYLVANIA - FAIRVIEW TOWNSHIP

DAUPHIN COUNTY, PENNSYLVANIA - LOWER SWATARA TOWNSHIP

S2-0280A-16

0 ISSUED FOR CONSTRUCTION MRS RMB AAW 01/19/1601/19/16 01/19/16

EP3 REVISED PER PADEP COMMENTS RECEIVED 01-30-17DLM RMB CAG02/01/17 02/01/1702/01/17

3 DESIGN CHANGE - RELOCATED DRILL ENTRY/EXIT MRS RMB AAW01/06/17 01/06/1701/06/17

2 REVISED PER ENGINEERING COMMENTSMRS RMB AAW08/31/1608/31/16 08/31/16

1 REVISED PER COMMENTS FROM REI REVIEWMRS RMB AAW02/19/1602/19/16 02/19/16

6706'

6735'

PROPOSED 16" PIPELINE

MA

TC

HL

IN

E S

TA

. 3

4+

00

SE

E P

A-Y

O-0

06

3.0

00

0-R

Rb

GEOTECH SB-03

-NG EL. 308'

-COMPLETION

DEPTH EL. 255'

-FILL (0.0' - 14.7')

-SILTSTONE \ SANDSTONE

(37.0' - 43.2')

-CL (14.7' - 37.0')

-MAROON SANDSTONE

(43.2' - 53.0')

NOTE: REFER TO TEST BORING LOG S2-0280

FOR COMPLETE SOIL MATERIAL DESCRIPTION

SUNOCO EASEMENT

LIMITS - NOT LOD

33+

30+

00

32+

00

34+

00

36+

00

38+

00

40+

00

42+

00

44+

00

46+

00

48+

00

50+

00

52+

00

54+

00

56+

00

58+

00

60+

00

62+

00

64+

00

66+

00

67+

06

HDD ENTRY / EXIT

N40.197553

W76.804492

GEOTECH SB-01

GEOTECH SB-01

APPROXIMATE LOCATION

NFSR RAILWAY

N40.198880

W76.799518

NFSR RAILWAY

N40.198895

W76.799460

PM

100

200

300

400

500

600

34+0036+0038+0040+0042+0044+0046+0048+0050+0052+0054+0056+0058+0060+0062+0064+0066+0068+00

GRADE

49+

92 E

DG

E O

F

SU

SQ

UE

HA

NN

A

RIV

ER

S

-A

22

65+

86 G

EO

TE

CH

S

B-01

35' R

T.

61+

04 E

X. C

OLU

MB

IA

PIP

ELIN

E

HD

D E

NT

RY

/ E

XIT

67+

06

EL.492'

1637'

STA. 50+89

EL. 236'

STA. 48+38

EL. 216'

54'

51'

57'

4236'

52+

35 N

FS

R R

AILW

AY

52+

03 O

H P

OW

ER

52+

18 N

FS

R R

AILW

AY

R=16

00

'

L=

25

0'

S=

251'

ED

GE

O

F W

ET

LA

ND

W-B

B1

ED

GE

O

F W

ET

LA

ND

W-B

B1

59+

53 C

L S

TR

EA

M S

-H

56

37'

0150 150 300

FEET

-INCH HORIZONTAL DIRECTIONAL DRILL

REF. DRAWING

EROSION & SEDIMENT PLAN

AERIAL SITE PLAN

PLAN VIEW

PROFILE VIEW

NO. DESCRIPTION DATEBY CHK DATE

REVISIONS

DATEAPP

NOTES Sunoco LogisticsPartners L.P.

SUNOCO PIPELINE, L.P.

1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83

2. STATIONING IS BASED ON HORIZONTAL DISTANCES.

3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION

OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS

FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE,

LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN.

4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO

DIGGING.

5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440.

PENNSYLVANIA PIPELINE PROJECT

LEGEND

PERMANENT ROW

TEMPORARY CONSTRUCTION ROW

TEMPORARY WORKSPACE

TEMPORARY ACCESS ROAD

PERMANENT ACCESS ROAD

SPOIL SPACE ONLY

PROPOSED HDD

PROPOSED 20" PIPELINE

PROPOSED 16" PIPELINE

HDD ENTRY-EXIT

PEM WETLANDS

PSS WETLANDS

PFO WETLANDS

TO

TO

DWG NO DWG NO DESCRIPTION

DESIGN AND CONSTRUCTION:

1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON

THIS DRAWING.

2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS

THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED

PIPELINE.

3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4

4. CROSSING PIPE SPECIFICATION:

HDD HORZ. LENGTH (L=):

HDD PIPE LENGTH (S=):

16" x 0.438" W.T., X-70, API5L, PSL2, ERW, BFW

COATING: 14-16 MILS FBE WITH 40 MILS MIN. ARO (POWERCRETE R95)

5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGN FACTOR 0.50 (HOOP STRESS)).

6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD).

7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND

STREAM CROSSINGS.

8. CARRIER PIPE NOT ENCASED.

9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR

WRITTEN APPROVAL FROM THE ENGINEER.

10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG.

11. PIPELINE AND CROSSING TO BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH LAST APPROVED

AMERICAN RAILWAY ENGINEERING AND MAINTENANCE OF WAY ASSOCIATION SPECIFICATIONS FOR

PIPELINES CONVEYING FLAMMABLE AND NON-FLAMMABLE SUBSTANCES.

12. BLASTING NOT PERMITTED.

13. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT.

16

SHEET 2SHEET 13

ES-4.20 ES-4.04

SUSQUEHANNA RIVER

1"=300'

PA-YO-0063.0000-RRb-16

YORK COUNTY, PENNSYLVANIA - FAIRVIEW TOWNSHIP

DAUPHIN COUNTY, PENNSYLVANIA - LOWER SWATARA TOWNSHIP

S2-0280B-16

0 ISSUED FOR CONSTRUCTION MRS RMB AAW 01/19/1601/19/16 01/19/16

EP3 REVISED PER PADEP COMMMENTS RECEIVED 01-30-17DLM RMB CAG02/01/17 02/01/1702/01/17

3 DESIGN CHANGE - RELOCATED DRILL ENTRY/EXIT MRS RMB AAW01/06/17 01/06/1701/06/17

2 REVISED PER ENGINEERING COMMENTSMRS RMB AAW08/31/1608/31/16 08/31/16

1 REVISED PER COMMENTS FROM REI REVIEWMRS RMB AAW02/19/1602/19/16 02/19/16

6706'

6735'

PROPOSED 20" PIPELINE

SUSQUEHANNA RIVER

S-A22

PROPOSED 16" PIPELINE

MA

TC

HL

IN

E S

TA

. 3

4+

00

SE

E P

A-Y

O-0

06

3.0

00

0-R

Ra

PA-YO-0062.0001

EXISTING COLUMBIA

GAS PIPELINE

PA-YO-0063.0000

NOTE: REFER TO TEST BORING LOG S2-0280

FOR COMPLETE SOIL MATERIAL DESCRIPTION

-SM (9.0' - 14.0')

-NG EL. 487'

-ML (2.0' - 9.0')

-TOPSOIL (0' - 0.2')

-COMPLETION

DEPTH EL. 465'

-GROUNDWATER (13.0')

GEOTECH SB-01

-SM (14.0' - 20.0')

-SANDSTONE (20.0' - 21.7')

CLEARING

ROW ONLY

SUNOCO EASEMENT

LIMITS - NOT LOD

Y

O

R

K

C

O

U

N

T

Y

,

P

A

D

A

U

P

H

I

N

C

O

U

N

T

Y

,

P

A

+00

LEGEND:Geotechnical Soil Boring (SB) Locations

GEOTECHNICAL BORING LOCATIONSHDD S2‐0280YORK COUNTY, FAIRVIEW TOWNSHIP, ANDDAUPHIN COUNTY, LOWER SWATARA TOWHSHIP, PASUNOCO PENNSYLVANIA PIPELINE PROJECT

TB‐02

240 Continental Drive, Suite 200 Newark, Delaware 19713302.738.7551fax: 302.454.5988

Project Name: SUNOCO PENNSYLVANIA PIPELINE PROJECT Project No.: 103IP3406

Project Location: WHITE HOUSE LAND, HIGHSPIRE, PA (HARRISBURG AIRPORT PROPERTY) Page 1 of 1

HDD No.: S2-0280 Dates(s) Drilled: 11-05-14 Inspector: E. WATT

Boring No.: SB-01 Drilling Method: SPT - ASTM D1586 Driller: S. HOFFER

Drilling Contractor: HAD DRILLING Groundwater Depth (ft): 13.0 Total Depth (ft): 21.7

Sample Sample Depth (ft) Strata

No. From To From To (USCS)

0.0 2.0

1 3.0 5.0 2.0 14 1 3 7 9 10

9.0

2 8.0 10.0 9.0 14.0 15 SM 2 2 12 17 14

3 13.0 15.0 14.0 19 1 4 6 6 10

4 18.0 19.0 12 2 50/6" >50

20.0

5 21.5 21.7 20.0 2 50/2"

21.7

Notes/Comments:Pocket Pentrometer Testing DR: DECOMPOSED ROCKS1: 2.5 TSF

Strata (USCS) Designations are approximated based on visual review, except where indicated in Description of Materials.

* Number of blows of 140 lb. Hammer dropped 30 in. required to drive 2 in. split-spoon sampler in 6 in. increments.N: Number of blows to drive spoon from 6" to 18" interval.

DR WEAHERED TO A GREENISH BROWN, GRAY, AND REDDISH BRWN

TETRA TECH TEST BORING LOG

Strata Depth (ft)

Rec

ov.

(in)

Description of Materials 6" Increment Blows * N

ML

SM

TOPSOIL (24")

MOTTLED ORANGE AND REDDISH BROWN SILT WITH A LITTLE

FINE SAND.

DARK GRAY FINE TO MEDIUM SAND WITH SOME SILT.

WATER LEVEL THROUGH AUGERS AT 14.5'.

FINE SAND AND SILT, TRACE FINE GRAVEL.

DR WEATHERED TO A VARI-COLORED (GRAY, BROWN, WHITE) FINE

TO MEDIUM SAND WITH SOME SILT.

GRAY AND BROWN MEDIUM TO COARSE SAND AND FINE TO COARSE

SANDSTONE GRAVEL (PARTIALLY WEATHERED SANDSTONE).

STARTED GRINDING AT 20'.

AUGER REFUSAL AT 21.5'.

WET ON SPOON AT 13'.

CAVED AT 10', WATER LEVEL ON CAVE AT 4'.

240 Continental Drive, Suite 200 Newark, Delaware 19713302.738.7551fax: 302.454.5988

Project Name: SUNOCO PENNSYLVANIA PIPELINE PROJECT Project No.: 103IP3406

Project Location: WHITE HOUSE LAND, HIGHSPIRE, PA (HARRISBURG AIRPORT PROPERTY) Page 1 of 2

HDD No.: S2-0280 Dates(s) Drilled: 11-05/06-14 Inspector: E. WATT

Boring No.: SB-03 Drilling Method: SPT - ASTM D1586 Driller: S. HOFFER

Drilling Contractor: HAD DRILLING Groundwater Depth (ft): NOT ENCOUNTERED Total Depth (ft): 53.0

Sample Sample Depth (ft) Strata

No. From To From To (USCS)

1 3.0 5.0 0.0 20 6 8 5 6 13

2 8.0 10.0 12 3 2 2 2 4

3 13.0 15.0 17 WH 1 1 1 2

14.7

4 18.0 20.0 14.7 24 1 4 6 10 10

5 23.0 25.0 24 1 3 6 9 9

6 28.0 29.5 18 6 21 50 >50

7 33.0 34.4 14 6 13 50/5"

37.0

8 38.0 38.6 37.0 8 30 50/2"

9 43.0 43.2 43.2 2 50/2"

SEE PAGE 2 FOR ROCK CORE DATA

Notes/Comments:Pocket Pentrometer Testing DR: DECOMPOSED ROCKS4: 3.5 TSFS5: 2 TSF

Strata (USCS) Designations are approximated based on visual review, except where indicated in Description of Materials.

* Number of blows of 140 lb. Hammer dropped 30 in. required to drive 2 in. split-spoon sampler in 6 in. increments.N: Number of blows to drive spoon from 6" to 18" interval.

HIS

TO

RIC

FIL

L (M

L/S

M)

CL

PARTIALLY WEATHERED MAROON SANDSTONE.

MOTTLED GRAY AND BROWN SILTY CLAY, TRACE FINE SAND, AND

A TRACE FINE GRAVEL (USCS: CL)

REDDISH BROWN TO MAROON SILTY CLAY WITH A LITTLE FINE SAND,

AND A LITTLE FINE GRAVEL.

DR WEATHERED TO A REDDISH BROWN MICACEOUS SILTY CLAY,

TRACE FINE SAND, AND TRACE UNWEATHERED GRAVEL.

DR WEATHERED TO A REDDISH BROWN SILTY CLAY WITH A LITTLE TO

SOME FINE SAND, TRACE UNWEATHERED FINE GRAVEL (USCS: CL).

WEATHERED REDDISH BROWN SILTSTONE.

DARK GRAY TO BLACK SILT AND FINE TO MEDIUM SAND WITH A LITTLE

GRAVEL AND COAL (FILL)

TETRA TECH TEST BORING LOG

Strata Depth (ft)

Rec

ov.

(in)

Description of Materials 6" Increment Blows * N

NO DISCERNABLE TOPSOIL

DARK GRAY TO BLACK SILT AND FINE TO MEDIUM SAND WITH A LITTLE

GRAVEL AND COAL (FILL)

DARK GRAY TO BLACK SILT AND FINE TO MEDIUM SAND WITH A LITTLE

GRAVEL AND COAL (FILL)

240 Continental Drive, Suite 200 Newark, Delaware 19713302.738.7551fax: 302.454.5988

Project Name: SUNOCO PENNSYLVANIA PIPELINE PROJECT Project No.: 103IP3406

Project Location: WHITE HOUSE LAND, HIGHSPIRE, PA (HARRISBURG AIRPORT PROPERTY) Page 2 of 2

HDD No.: S2-0280 Dates(s) Drilled: 11-05/06-14 Inspector: E. WATT

Boring No.: SB-03 Drilling Method: SPT - ASTM D1586 Driller: S. HOFFER

Drilling Contractor: HAD DRILLING Groundwater Depth (ft): NOT ENCOUNTERED Total Depth (ft): 53.0

Sample Sample Depth (ft) Strata

No. From To From To (USCS)

RUN 1 44.0 48.0 44.0 46

45.2

45.2 45.4

45.4

47.0

47.0 47.2

47.2

48.0

RUN 2 48.0 53.0 48.0 54

49.5

49.5 49.7

49.7

51.5

51.5 51.9

51.9 52.4

52.4 52.5 MAROON SANDSTONE.

52.5 52.9 CONGLOMERATE LENS, ANGLED FRAC. 52.54-52.65.

52.9 53.0 MAROON SANDSTONE

CORE TESTING RESULTS (DEPTH 49'):

CAVED AT 41', DRY.

Notes/Comments:Pocket Pentrometer Testing

Strata (USCS) Designations are approximated based on visual review, except where indicated in Description of Materials.

* Number of blows of 140 lb. Hammer dropped 30 in. required to drive 2 in. split-spoon sampler in 6 in. increments.N: Number of blows to drive spoon from 6" to 18" interval.

COMPRESSIVE STRENGTH: 13,090 PSI

UNIT WEIGHT: 146.8 PCF

REDDISH BROWN SANDSTONE, ANGLED FRACTURES 45.88-45.94,

TETRA TECH TEST BORING LOG

Strata Depth (ft)

Rec

ov.

(in)

Description of Materials 6" Increment Blows * N

ROCK CORING

MAROON SANDSTONE. ANGLED FRACTURE 44.65 TO 44.73, FRAC.

ZONE 45.08 TO 45.26.

CONGOMERATE LENSE.

TCR: 96%, SCR: 83%, RQD: 72%

TCR: 90%, SCR: 57%, RQD: 48%

RO

CK

CONGLOMERATE LENS, ANGLED FRAC. 49.55-49.63

RB SANDSTONE, FRAC. 50.2, ANGLED FRAC. 50.4-50.5, 50.57-50.66,

FRAC. 50.73.

MAROON SANDSTONE.

CONGLOMERATE LENS, FRAC. 52.0, ANGLED FRAC. 52.12-52.2.

FRACTURE ZONE 46.28-46.34. CALCITE VEIN 46.9.

CONGOMERATE LENSE.

REDDISH BROWN SANDSTONE. MECHANCICAL BREAK 47.63, FRAC.

ZONE 47.87 TO 48.0.

REDDISH BROWN SANDSTONE, FRAC. ZONE 48-48.5, ANGLED FRAC.

48.79-49.63.

Test Water Percent USCS

HDD Boring Sample Content, % Silts/Clays, % Liquid Plastic Plasticity Classif.

No. No. No. From To (ASTM D2216) (ASTM D1140) Limit, % Limit, % Index, % (ASTM D2487)

1 3.0 5.0 23.4 89.5 - - - -

2 8.0 10.0 16.3 24.9 - - - -

3 13.0 15.0 40.0 47.8 - - - -

4 18.0 19.0 29.8 28.8 - - - -

2 8.0 10.0 31.2 57.9 - - - -

4 18.0 20.0 22.4 96.8 32 17 15 CL

6 28.0 29.5 9.6 91.4 - - - -

7 33.0 34.4 11.6 80.2 30 20 10 CL

8 38.0 38.6 7.0 55.7 - - - -

Boring Core UnitNo. Run Weight (pcf)

SB-03 2 146.8

Notes:

1) Sample depths based on feet below grade at time of exploration.

S2-0280

SB-01

SB-03

Rock Core Testing ResultsApproximate Compressive

Depth (ft) Strength (psi)49.0 13,090

GEOTECHNICAL LABORATORY TESTING SUMMARYSUNOCO PENNSYLVANIA PIPELINE PROJECT

HDD S2-0280

Atterburg Limits (ASTM D4318)

Depth of Sample (ft.)

Tetra TechNewark, Delaware

HDD No. NAMEBORING NO.

REGIONAL GEOLOGY DESCRIPTIONGENERAL 

TOPOGRAPHIC SETTING

BEDROCK FORMATION

GENERAL ROCK TYPEAPPROX MAX FM THICKNESS 

(FT)

DEPTH TO ROCK (Ft bgs) based on nearby well drilling logs

NOTES / COMMENTS

SB‐01Upland to river bank

 5‐10

SB‐02Floodplain, Lowland, W. bank of river

SB‐03Lowland, W. of 

RR tracks 

Note : Source of well log data ‐ http://www.dcnr.state.pa.us/topogeo/groundwater/pagwis/records/index.htm.  All other sources as referenced in comments section.

 20‐30

16,000S2‐0280Susquehanna 

River

SUNOCO PENNSYLVANIA PIPELINE PROJECTREGIONAL GEOLOGY SUMMARY

HDD S2‐0280

Gettysburg Fm ‐  reddish‐brown to maroon silty mudstone and shale and soft, red‐brown, medium‐ to fine‐grained sandstone, with minor amounts of yellowish‐brown shale and sandstone and thin beds of impure limestone.

Gettysburg FmSilty mudstone‐shale‐sandstone w/ some impure limestone

Tetra Tech, Inc.Newark, Delaware

BeddingLocation Boring No. Core Run From To TCR (%) SCR (%) RQD (%) From To Weathering Classification Thickness (ft) Color Discontinuity Data

44 45 Slight Silty Sandstone Massive RedSingle fracture, approximately 25°

45 45.5 Moderate ConglomerateLaminar thin beds, well graded

Red Near horizontal bedding

45.5 52 Slight Silty Sandstone Massive RedOccasional conglomerate lens, fractures ranging from 0° to 45°, Avg. 21°

52 53 Moderate ConglomerateThin beds, less 

than 1"Red to dark red

Bedding dip approximately 28°; few fractures along bedding surfaces

90 57 48

S2‐0280 SB‐3

2 48 53

ROCK CORE DESCRIPTION SUMMARYSUNOCO PENNSYLVANIA PIPELINE PROJECT

HDD S2‐0280

Core Depth (ft) Depth (ft)

96 83 721 44 48

Tetra Tech, Inc.Newark, Delaware

FIELD DESCRIPTION AND LOGGING SYSTEM FOR SOIL EXPLORATION

GRANULAR SOILS (Sand, Gravel & Combinations)

Density N (blows)* Very Loose 5 or less Loose 6 to 10 Medium Dense 11 to 30 Dense 31to 50 Very Dense 51 or more

Relative Proportions Description Term Percent Trace 1 - 10 Little 11 - 20 Some 21 - 35 And 36 - 50

COHESIVE SOILS (Silt, Clay & Combinations)

ROCK (Rock Cores)

Rock

Quality Designation (RQD), %

Rock Quality Descripti

on 0-25 Very Poor

25-50 Poor 50-75 Fair 75-90 Good

90-100 Excellent *N - Standard Penetration Resistance. Driving a 2.0" O.D., 1-3/8" I.D. sampler a distance of 18 inches into undisturbed soil with a 140 pound hammer free falling a distance of 30.0 inches. The number of hammer blows to drive the sampler through each 6 inch interval is recorded; the number of blows required to drive the sampler through the final 12 inch interval is termed the Standard Penetration Resistance (SPR) N-value. For example, blow counts of 6/8/9 (through three 6-inch intervals) results in an SPR N-value of 17 (8+9).

Groundwater observations were made at the times indicated. Groundwater elevations fluctuate throughout a given year, depending on actual field porosity and variations in seasonal and annual precipitation.

Particle Size Identification Boulders 8 in. diameter or more Cobbles 3 to 8 in. diameter Gravel Coarse (C) 3 in. to ¾ in. sieve Fine (F) ¾ in. to No. 4 sieve Sand Coarse (C) No. 4 to No. 10 sieve

(4.75mm-2.00mm) Medium

(M) No. 10 to No. 40 sieve (2.00mm – 0.425mm)

Fine (F) No. 40 to No. 200 sieve (0.425 – 0.074mm)

Silt/Clay Less Than a No. 200 sieve (<0.074mm)

Consistency N (blows)* Very Soft 3 or less Soft 4 to 5 Medium Stiff 6 to 10 Stiff 11 to 15 Very Stiff 16 to 30 Hard 31 or more

Plasticity Degree of Plasticity Plasticity Index None to Slight 0 - 4 Slight 5 - 7 Medium 8- 22 High to Very High > 22