headline 110

24
Supplier Opportunities SaskPower Swift Current Combined Cycle Plant

Upload: lamdung

Post on 10-Feb-2017

224 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Headline 110

Supplier Opportunities

SaskPower Swift Current Combined Cycle Plant

Page 2: Headline 110

A B O U T BU R N S & M C D O N N E L L

Presenter
Presentation Notes
You can change this photo to be of your local Burns & Mac office. Just make sure to keep the image the same size as the sample above.
Page 3: Headline 110

Who We Are

100% EMPLOYEE- OWNED

TOP 5% TOP 500

DESIGN FIRMS

MORE THAN

5,300 PROFESSIONALS

STRENGTH

EXCELLENCE EXCELLENCE

SERVICE

TOP 1% SAFETY RANKING

35+ OFFICES

WORLDWIDE

STRENGTH

Page 4: Headline 110

What We Do

MILITARY BASE

HYDROELECTRIC DAM

SOLAR FARM WIND FARM

MGP SITE

Among the Industries and Markets We Serve

TRANSMISSION LINE

ELECTRIC POWER

GENERATION

NUCLEAR POWER PLANT

EXPORT TERMINAL

WETLANDS

RAIL

AIRPORT

WATER TREATMENT PLANT

CLEAN COAL POWER PLANT

FOOD PROCESSING

PLANT

REFINERY

GAS PROCESSING

PLANT

HIGHWAY

RETAIL, OFFICE, MIXED USE URBAN

FACILITIES

BRIDGE

Presenter
Presentation Notes
We are moving away from listing our global practices and long lists of what we do and instead showing our clients the industries and markets we serve.
Page 5: Headline 110

5

Canada Experience

Presenter
Presentation Notes
CCR/ELG is a big market for the Energy Group this year and next. In our brochures, SOQs, ads and related materials, we will be emphasizing our project execution approach. In 2015 we emphasized our knowledge of the CCR/ELG regulations. In 2016 we are emphasizing that we can deliver safe projects on time and on budget.
Page 6: Headline 110

Queen Elizabeth Power Station Expansion Project: ► Increase Generation Capacity from 430

MW to 600 MW ► Addition of 6 heat recovery boilers to

increase efficiency by 15 to 20 percent ► Increased capacity will serve 205,000

additional households ► Joint Venture with Alberici ► ISD – Sep, 2015 Our Scope: ► EPCM Services

Engineering, Procurement, Field Engineering, Construction Management

► (2013-2015)

SASKPOWER | Saskatoon, Saskatchewan

Page 7: Headline 110

TransCanada | Halton Hills, Ontario Project: ► 670 MW 2 SW 501F

CC Natural gas ► 100% Air Cooled ► Fully enclosed HRSGs

and steam turbine ► EPC Joint Venture ► Online August 2006 - 2010 Our Scope: ► Engineering ► Procurement ► Construction

Halton Hills Gas

Page 8: Headline 110

Project: ► New 350MW, 1x1 Combined Cycle

Natural Gas Power Plant Our Scope: ► EPC Contractor (Responsible for

Engineering, Procurement, Construction, Start-Up)

SASKPOWER | Swift Current, Saskatchewan

Swift Current CC Gas Turbine Facility

Page 9: Headline 110

9

Presenter
Presentation Notes
CCR/ELG is a big market for the Energy Group this year and next. In our brochures, SOQs, ads and related materials, we will be emphasizing our project execution approach. In 2015 we emphasized our knowledge of the CCR/ELG regulations. In 2016 we are emphasizing that we can deliver safe projects on time and on budget.
Page 10: Headline 110

Swift Current CC Gas Turbine Facility

Presenter
Presentation Notes
Aaron, if there’s a way to just show the part within the boundaries (and not the writing along the bottom and the left side) that would be ideal. And then delineate the labels that Dave put on it and sent to us Wednesday (I’m not sure why they don’t show up on the version that’s pasted here).
Page 11: Headline 110

HRSG

Page 12: Headline 110

Gas / Steam Turbine

Page 13: Headline 110

Air Cooled Condenser

Page 14: Headline 110

Pipe racks / Piping

Page 15: Headline 110

Major Electrical

Page 16: Headline 110

Schedule: ► 2017 – Enclose HRSG, Gas Turbine

Building ► 2018 – Build out Powerhouse, Water

Treatment Building ► Early 2019 – Commissioning,

Completion

Swift Current CC Gas Turbine Facility – Project Schedule

Page 17: Headline 110

1 7

Schedule

Sept

embe

r-16

Oct

ober

-16

Nov

embe

r-16

Dece

mbe

r-16

Janu

ary-

17

Febr

uary

-17

Mar

ch-1

7

April

-17

May

-17

June

-17

July

-17

Augu

st-1

7

Sept

embe

r-17

Oct

ober

-17

Nov

embe

r-17

Dece

mbe

r-17

Janu

ary-

18

Febr

uary

-18

Mar

ch-1

8

April

-18

May

-18

June

-18

July

-18

Augu

st-1

8

Sept

embe

r-18

Oct

ober

-18

Nov

embe

r-18

Dece

mbe

r-18

Janu

ary-

19

Febr

uary

-19

Mar

ch-1

9

April

-19

May

-19

June

-19

July

-19

Augu

st-1

9

Sept

embe

r-19

Oct

ober

-19

Clearing and grubbing / gen sitework

Piling

Foundations / underground utilities

Building steel erection

HRSG Erection

Piperack / piping erection

Gas turbine erection

Steam turbine erection

Air Cooled Condenser

Water Treatment building

Electrical installation

Start-up / commissioning

Presenter
Presentation Notes
CCR/ELG is a big market for the Energy Group this year and next. In our brochures, SOQs, ads and related materials, we will be emphasizing our project execution approach. In 2015 we emphasized our knowledge of the CCR/ELG regulations. In 2016 we are emphasizing that we can deliver safe projects on time and on budget.
Page 18: Headline 110

1 8

EPC Lump Sum Contractor

Presenter
Presentation Notes
CCR/ELG is a big market for the Energy Group this year and next. In our brochures, SOQs, ads and related materials, we will be emphasizing our project execution approach. In 2015 we emphasized our knowledge of the CCR/ELG regulations. In 2016 we are emphasizing that we can deliver safe projects on time and on budget.
Page 19: Headline 110

1 9

Purchasing Process

Presenter
Presentation Notes
CCR/ELG is a big market for the Energy Group this year and next. In our brochures, SOQs, ads and related materials, we will be emphasizing our project execution approach. In 2015 we emphasized our knowledge of the CCR/ELG regulations. In 2016 we are emphasizing that we can deliver safe projects on time and on budget.
Page 20: Headline 110

2 0

Major Opportunities Prefabrication / Modularization

• Air cooled condenser fan deck and steam duct / distribution • Pipe rack modules • Pump skids • Electrical buildings / PDCs • Stack prefabrication • HRSG platforming / Transition Duct • Fire protection building • Valve stations

Material supply

• Piping • Structural steel • Cable / tray • Valves

Misc. services, supplies

Presenter
Presentation Notes
Aaron, from this slide remove steel, electrical and mechanical and then combine all the icons from the next slide onto here and make it all one slide.
Page 21: Headline 110

2 1

Major Opportunities

Presenter
Presentation Notes
Aaron, from this slide remove steel, electrical and mechanical and then combine all the icons from the next slide onto here and make it all one slide.
Page 22: Headline 110

2 2

Presenter
Presentation Notes
One of our better campaigns in terms of the contacts we generated. Bench Mark: 12 contacts; digital ads, 3 contacts; email campaign, 16 contacts.
Page 23: Headline 110

We Want You to Work with Us

www.burnsmcd.com/suppliers

Page 24: Headline 110