health and safety executive construction (design and management) regulations 2007 proposed revision
TRANSCRIPT
![Page 1: Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision](https://reader035.vdocument.in/reader035/viewer/2022071709/56649d9f5503460f94a8a8f3/html5/thumbnails/1.jpg)
Health and Safety Executive
Construction (Design and
Management) Regulations 2007
Proposed revision
![Page 2: Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision](https://reader035.vdocument.in/reader035/viewer/2022071709/56649d9f5503460f94a8a8f3/html5/thumbnails/2.jpg)
Contents
Why HSE is consulting on amending CDM
Summary of process to date
Key changes
Developing guidance
Forward process
![Page 3: Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision](https://reader035.vdocument.in/reader035/viewer/2022071709/56649d9f5503460f94a8a8f3/html5/thumbnails/3.jpg)
Why we’re amending CDM
evaluation
anecdotal feedback on shortcomings
small sites – lack of bite
better regulation agenda, Löfstedt
under-implementation
over-implementation
need to remove ‘gold plating’
![Page 4: Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision](https://reader035.vdocument.in/reader035/viewer/2022071709/56649d9f5503460f94a8a8f3/html5/thumbnails/4.jpg)
Summary of process to date
evaluation 2009-11
HSE Senior Management Team – November 2011
HSE Board – December 2011
development of draft regulations – February 2012 May 2013
HSE Board – May 2013 – draft package agreed
Government clearance - ongoing
![Page 5: Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision](https://reader035.vdocument.in/reader035/viewer/2022071709/56649d9f5503460f94a8a8f3/html5/thumbnails/5.jpg)
Key changes
• Four key areas of change for consultation– ACOP– CDM co-ordinator/Principal Designer– Reg. 4/Appendix 4 requirements– domestic clients
![Page 6: Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision](https://reader035.vdocument.in/reader035/viewer/2022071709/56649d9f5503460f94a8a8f3/html5/thumbnails/6.jpg)
Key changes
• Four key areas of change for consultation– ACOP– CDM co-ordinator/Principal Designer– Reg. 4/Appendix 4 requirements– domestic clients
![Page 7: Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision](https://reader035.vdocument.in/reader035/viewer/2022071709/56649d9f5503460f94a8a8f3/html5/thumbnails/7.jpg)
Key changes
• Four key areas of change for consultation– ACOP– CDM co-ordinator/Principal Designer– Reg. 4/Appendix 4 requirements– domestic clients
![Page 8: Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision](https://reader035.vdocument.in/reader035/viewer/2022071709/56649d9f5503460f94a8a8f3/html5/thumbnails/8.jpg)
Key changes
• Four key areas of change for consultation– ACOP– CDM co-ordinator/Principal Designer– Reg. 4/Appendix 4 requirements– domestic clients
![Page 9: Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision](https://reader035.vdocument.in/reader035/viewer/2022071709/56649d9f5503460f94a8a8f3/html5/thumbnails/9.jpg)
Key changes
• Four key areas of change for consultation– ACOP– CDM co-ordinator/Principal Designer– Reg. 4/Appendix 4 requirements– domestic clients
![Page 10: Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision](https://reader035.vdocument.in/reader035/viewer/2022071709/56649d9f5503460f94a8a8f3/html5/thumbnails/10.jpg)
Key changes
• other changes:– substantially simpler structure– Part 2 – Part 3 falls out– PC – PD symmetry– amended notification threshold– formal co-ordination threshold lowered– H&S plans on all projects
![Page 11: Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision](https://reader035.vdocument.in/reader035/viewer/2022071709/56649d9f5503460f94a8a8f3/html5/thumbnails/11.jpg)
no changes in some areas
• PC, contractor duties largely unchanged
• designer duties largely unchanged
• technical ‘nuts and bolts’ requirements unchanged
![Page 12: Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision](https://reader035.vdocument.in/reader035/viewer/2022071709/56649d9f5503460f94a8a8f3/html5/thumbnails/12.jpg)
Developing guidance
• Guidance will replace ACOP
• Tailored towards needs of small businesses/sites
• Shorter than L144 (the current ACOP)
• Combination of HSE, Industry, and CITB authoring
• CONIAC steering group established
![Page 13: Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision](https://reader035.vdocument.in/reader035/viewer/2022071709/56649d9f5503460f94a8a8f3/html5/thumbnails/13.jpg)
Forward process
• 10 week consultation
• analysis, amendment
• SMT/Board sign off
• Ministerial sign off
• Guidance development and publication timing
• industry publicity
![Page 14: Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision](https://reader035.vdocument.in/reader035/viewer/2022071709/56649d9f5503460f94a8a8f3/html5/thumbnails/14.jpg)
www.hse.gov.uk/consult/condocs/cd261.htm