Health Monitoring of Rotating Equipment from Torsional Vibration Features Martin W. Trethewey Department of Mechanical and Nuclear Engineering Penn State University April 13, 2007 College of Engineering

Upload: others

Post on 16-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

Health Monitoring of Rotating Equipment from Torsional

Vibration Features

Martin W. Trethewey Department of Mechanical and Nuclear Engineering

Penn State University

April 13, 2007

College of Engineering

Page 2: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 2

Project Participants• Penn State University

– Applied Research Laboratory– Mechanical & Nuclear Engineering– Engineering Science & Mechanics

• Tennessee Valley Authority• Electricité de France• Southern Company• Dominion• Framatome ANP - Jeumont• EPRI

Page 3: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 3

Electric Power Generation Mechanical Equipment

• Subject to:– High loads– Thermal gradients– High operating hours– Corrosion– Radiation

• Results– Fatigue cracks

Page 4: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 4

Fossil Boiler Feed Pump Blades

Fatigue CracksFatigue

Cracks

Page 5: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 5

Hydro Turbine Driveshaft

Page 6: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 6

• NRC Information Note 2005-08 – April 2005

• Many Byron Jackson (now Flowserve) RRP shafts have been inspected– ALL have some thermal cracking at thermal barrier– Axial cracks – Generally benign

• Dangerous Circumferential Cracks – Axial thermal cracks change direction under mechanical loading– Fast growing – Can cause catastrophic shaft failure

• General Electric recommends ALL pumps with 80,000 hours service be inspected and monitored for cracks

Nuclear BWR Recirculation Pumps

Page 7: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 7

TVA Nuclear Shaft Crack History

• Browns Ferry - Reactor Feed Pump– October 1979

• Browns Ferry - Recirculation Pump– January 1984

• Watts Barr - Main Feed Pump– April 1997– June 1997

• Sequoyah - Centrifugal Charging Pump– July 1981– January 1994– April 1999

• Sequoyah - Reactor Coolant Pump– October 2000– April 2002– Spring 2005

Page 8: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 8

TVA Sequoyah RCP 2-1 June 2002

Page 9: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 9

Post Mortem

Page 10: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 10

TVA Sequoyah RCP 1-4 2000

Page 11: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 11

Torsional Monitoring• As a crack propagates

– Stiffness decreases– Decrease in torsional natural frequency

• Torsional domain less susceptible to– Seal rubs– Changes in film bearing stiffness– Thermal growth– Misalignment

• If a torsional natural frequency change is observed– A change in the line shaft dynamics occurred

Page 12: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 12

Laboratory Feasibility EvaluationFatigue Cycling NDE Crack Inspection

Torsional Vibration Signature Analysis

Torsional Stiffness

Page 13: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 13

Post Mortem Crack Inspection

X

Y

a/D = 65%

a/D = 50%

a/D = 5%

C

RL

Page 14: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 14

Torsional Natural Frequency versus Fatigue Crack Depth

%

X

Y

a/D = 65%

a/D = 50%

a/D = 5%

Page 15: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 15

Objective 2 41% Scale Seeded Fault

RCP Tests

Pump Bowl

Motor Stand

Motor

Page 16: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 16

AREVA 41% Reduced Scale RCP Loop

Page 17: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 17

Reduced Scale 93A RCP

Page 18: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 18

Circumferential Cut Testing

• 5 sequential cuts– 4 mm (10% of the diameter)– 8 mm (20% of the diameter)– 12 mm (30% of the diameter)– 16 mm (40% of the diameter)– 20 mm (50% of the diameter)

2002 TVA Sequoyah RCP 2-1

Page 19: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 19

Circumferential Cuts 1st Torsional Frequency

102

103

104

105

106

107

108

109

110

111

112

0 5 10 15 20 25

Cut Depth (mm)

Freq

uenc

y (H

z) 3-Probe ProcessProbe 1Probe 2Probe 3

Page 20: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 20

PWR Reactor Coolant PumpPump Description Vertical shaft

Single stageSuction diffuser typeLimited leakage system

Flow 20,200 m3/h

Net Pump Head 80 - 90 m

Nominal Operating Temperature

About 290 degree C

Speed 1,190 RPM

Nominal Motor Power

4,480 kW6,000 HP

Page 21: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 21

93A RCP Torsional Hardware

Page 22: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 22

Mechanical Installation

Page 23: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 23

Torsional Vibration Feature Trending

• Started after November 2004 refueling outage

• Acquired on two pumps • 20 minutes data snapshots• Acquired twice a day

– At different times throughout the day

Page 24: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 24

Project Status Based on TVA Data Assessment

• Crack sensitive torsional features observable

• Provides critical design and installation experience – Will guide changes to improve performance

• Acquired torsional data sufficient for– FEM Refinement– Trending– Variation assessment

Page 25: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 25

Project Status• Potential – a technology capable of detecting

and monitoring shaft crack growth– Early detection of cracks– Significantly superior to existing technology– Readily adaptable to other pumps and rotating

equipment

Page 26: Health Monitoring of Rotating Equipment from Torsional Vibration …cjl9:trethewey_me.pdf · Post Mortem. 4/14/2007 10 TVA Sequoyah RCP 1-4 2000. 4/14/2007 11 Torsional Monitoring

4/14/2007 26

Acknowledgements

This work was supported by the Electric Power Research Institute (EPRI Contract EP-P9801/C4961).

The content of the information does not necessarily reflect the position or policy of the EPRI, and no official endorsement should be inferred.