heathrow terminal 3 integrated baggage, apm programme management sig conference 2017, 02 march 17,...
TRANSCRIPT
![Page 1: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/1.jpg)
March 2017
Terminal 3 Integrated Baggage
Darren Colderwood
![Page 2: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/2.jpg)
Integrating Heathrow Baggage
• First of type baggage installation
• Delivered whilst Terminal 3 was operating (30k bags per day)
• Circa £600m programme of overall works
• 6 years to develop and build
• T3IB building - 200m long, 50m wide, 35m high
![Page 3: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/3.jpg)
Wha
t’s insid
e T
3IB
![Page 4: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/4.jpg)
![Page 5: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/5.jpg)
T3IB and Multiple Associated Projects
First baggage facility to be connected
to the enterprise service bus
T3/T5
baggage tunnel
Traffic information
screensBaggage check-in
refurbishment
Container stores
Roads and blast
screens
Tug charging Baggage control
rooms and HBS
screening
Relocation of VIP
suite (T3 to T5)
![Page 6: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/6.jpg)
Managing the Complexity of Change
New processesNew ways of
working
New and multiple
handlers
New technologies
and systems
New facilities &
environments
Integration with wider
airport programmes
Complex transition
over 16 months20+ airline partners
![Page 7: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/7.jpg)
The Challenge of Complexity
T5
Te
ch
no
log
y
Infrastructure
No change
Some change
Change for most
Some new
New for most
Som
e ch
ange
Cha
nge
for m
ost
Som
e ne
w
New
for m
ost
T3IB
T2 PT5TBS
T5C
T1T
T3IB
T5
![Page 8: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/8.jpg)
Stakeholder Communication and Engagement
![Page 9: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/9.jpg)
Getting the Balance Right……
![Page 10: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/10.jpg)
How we created a Large Multi-Faceted Team
Programme Team
FinanceProject
Management
Vanderlande
Mace
IT
Planning
Operations
Operational
Readiness
Risk
Management
Run as a Programme with funding agreed at board level, enabling
the team to manage the overall objective across the projects
![Page 11: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/11.jpg)
Safety on Site
• Circa 5 million cumulative manhours
worked across 10 sites
• Only 2 reportable incidents since
construction began in 2011
• An outstanding safety performance
for a complex project in a constrained
location
![Page 12: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/12.jpg)
Managing Construction Complexity
![Page 13: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/13.jpg)
Jun 2016Check -in
move 5
(zone A)
T3IB Transition Plan
Fin
al co
nn
ectio
n f
rom
ch
eck-in
to
T3
IB
All
bag
s p
roce
sse
d th
rou
gh
new
fa
cili
ty
Transfer bags Checked –in bags
Mar 2015Check-in
moves 1 & 2
(zone G)
Apr 2015Check-in
moves 1 & 2
(zones E2,F,G)
Mar 2015Transfers
move 3
(Building 139)
May 2015Transfers
move 4
(Building 139)
Sep 2015Check-in
move 3
(zones C2,D,E1)
Feb 2016Check-in
move 4
(zones B, C1)
Mar 2015Transfers
move 2
(Lima 18)
Mar 2015Transfers
move 1
(Building 139)
*
![Page 14: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/14.jpg)
Multi-layered Operational Readiness Solution
Final Drills: Live Trials
Show Me You Know: Rehearsals
Practice: Proving Participation
Training & Familiarisation
Employee
Engagement
Early Training & Familiarisation
Optimisation & Embedding
Go-Live
TimeIncreasing
Assurance
SME support
![Page 15: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/15.jpg)
Making sure we were ready – integrated trials programme
![Page 16: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/16.jpg)
Key Learning from the Programme
• T3IB was not initially recognised as a
technology programme.
• The programme was set up to be
managed in the standard way (risk
provision)
• T3IB was constrained by real estate
availability so had to be built
vertically
• The baggage system supplier had
not built a baggage system like this
before
• New technology meant new work
practices so new skills were required
![Page 17: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/17.jpg)
Key Learning from the Programme
• The T3IB programme was not just a
construction programme but a major
business change programme too
• Effective stakeholder management and
collaboration between all teams was
absolutely pivotal to the success
• T3IB has brought people, processes,
infrastructure and technology together to
• keep baggage flowing smoothly
• improve baggage performance
• enhance the baggage experience for
passengers
![Page 18: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/18.jpg)
Business Benefits
![Page 19: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/19.jpg)
Our partners
![Page 20: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/20.jpg)
March 2017
Terminal 3 Integrated Baggage
Thank you
![Page 21: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/21.jpg)
![Page 22: Heathrow Terminal 3 Integrated Baggage, APM Programme Management SIG Conference 2017, 02 March 17, Derby](https://reader031.vdocument.in/reader031/viewer/2022021417/58cefef21a28abab738b62c9/html5/thumbnails/22.jpg)