My name is Jukka Koskinen and I offer project services in
Marine and Offshore industry
PROJECT SERVICES
Marine & Offshore Industry
Project Management, Package Management, EPIC Management,
Turn-Key Management, Procurement Management, Purchasing,
Technical Purchasing, Engineering Management, Commissioning
Management, Inspections, Factory Acceptance Tests, Interface
Coordination, Supply Chain Management, Site Management
INTRODUCTION
I am a BSc Engineer (mechanical) and MSc Project Manager with over 25 year of work
experience in offshore and shipbuilding industry. I am multilingual with excellent
communication skills which I have adopted through my long career managing and
coordinating international and multicultural projects and site teams in various countries such
as Monaco, France, Norway, China, The Netherlands and Finland.
I consider myself as an expert managing complex hydro-electric-mechanical applications for
offshore and marine industry meeting the most stringent fabrication and instrumentation
requirements and standards. I have successfully completed Turn Key projects in owners’,
builders’ and manufacturers’ organizations. I am familiar with the relevant marine and
offshore rules of classification societies as DNV GL, ABS, LRS and BV. I have an extensive
experience working as a project manager, package manager, purchaser, EPIC manager and
designer within various large vessel projects (from 100MEUR to 1000MEUR) as CALM Buoy
Terminals, Subsea PLEMs, Navy vessels, Passenger Cruisers, Ferries, Container Carriers,
LNG tankers, Cable Layers, Subsea Pipe Layers, Topside removal/installation Vessels,
FPSOs, Drilling Ships, Platform Supply Vessels and Offshore Wind Farm Platforms.
LINE OF BUSINESS / POSITION
• Naval vessels, shipbuilding / Designer
• Commercial vessels, shipbuilding / Designer
• Commercial vessels, shipbuilding / Purchaser
• Commercial vessels, shipbuilding / EPIC (Turn-Key Contracts) Manager
• Offshore vessels / Package Manager
• Single Point Mooring (SPM) Terminals, Subsea Equipment / Package Manager
• Offshore cranes / Project Manager
Typical Standards and Rules; ISO 9001:2008, API Q1-9th Edition, API 6D (ISO 14313), API 6DSS (ISO 14723), ASME, ASTM, EN 10204, ISO 17292, ISO 10497, NACE MR0175 (ISO 15156), DNV 2.22, EN 13852, EU Machinery Directive, PSA, API 2C, NORSOK R-002, ISO 8383, EN81, ATEX, SOLAS, HSE standards in marine and offshore industry
Typical Equipment; Diesel engines, HVAC, valves, slewing rings, electrical and hydraulic motors, pipes, fire prevention systems and material, Offshore cranes, pipe handling equipment, lifting platforms, CALM BUOY emerged/submerged valves, PLEM subsea valves, Buoy HPUs, Buoy Central Pipe Units, Buoy Swivels and Chain Stoppers, marine elevators and escalators
Typical Tasks; Engineering Coordination, Interface Coordination, HSE Safety and Security, QA/QC Quality Control, Managing supply chain, Managing time-, cost- and scope baselines, Team management, Site management, Purchasing, Expediting, Invoicing & controlling cash flow, Managing communication, Inspections, FATs, SATs, Coordination of the final acceptance, Documentation, Preservation, Delivery and Logistics
FUNCTIONAL SKILLS
LANGUAGE
• English – fluent
• Swedish – good
• Norwegian – good
• German – fair
• Chinese – beginner
• Finnish – native
• French - beginner
ENVIRONMENT
• HSE knowledge
SOFTWARE
• Autocad
• Foran
• Microstation
• Windows
• MS Project
• Axapta
• SAP
• Safran
REFERENCES
Client
Dubai Petroleum Establishment (DPE),
TOTAL New Terminal Project (Djeno),
PETRONAS PENAPISAN SDN BHD (MELAKA)
Project localisation Imodco Terminals S.A.
(Building upon SBM Offshore Terminals Technology)
Project title
DPE, Upgrading of Fateh Field Offloading System
TOTAL Djeno, New CALM BUOY Terminal
MELAKA, PETRONAS PENAPISAN SDN BHD
Position : Package Manager
Mission’s objectives
Ensure that the assigned owner furnished equipment packages (CALM BUOY
and PLEM equipment such as Buoy emerged/submerged valves, PLEM
subsea valves, Buoy HPUs, Buoy Central Pipe Units, Buoy Swivels, winches)
are managed, designed, fabricated, installed, tested, preserved, packed,
delivered and transported to site and meet requirements stated in contract.
Realised tasks
From builder’s point of view review and comment vendors’ documents such
as drawings, calculations, equipment/material specifications and functional
descriptions etc. Review and comment ITP-/FAT- and commissioning
procedures. Create/reply reports, NCRs, change requests and technical
queries. Monitor and control vendor’s performance and quality accuracy
against project time-, cost- and scope baselines. Participate tests,
commissioning, and approval process. Coordinate logistics and final delivery.
Software/Methods/Environment : MS Project, Windows Office, Autocad
Achieved results Material received on site in time, budget and with acceptable quality.
Client Petrobras
Project localisation Jurong Shipyard in Singapore, Poland, Norway
Project title
Offshore cranes for Drilling ship.
• 2x Electro Hydraulic Wire luffing Offshore Pedestal Crane,
63T@48M/7,5T@50M
• 2x Electro Hydraulic Knuckle boom Offshore Pedestal Crane, 85T@45M
Position : Project Manager
Mission’s objectives Manage signed project to meet the contractual requirements
Realised tasks
From manufactures point of view review and comment internal engineering.
Review and comment suppliers’ engineering. Create documents such as
schedules, specifications and functional descriptions prior procurement, surface
preparation and painting procedures, ITP-/FAT- and commissioning procedures
and manuals. Create logical equipment packages for procurement, confirm the
accuracy of the offered technical and commercial content. Ensure timely and
accurate submittal of approval document packages to classification society and
client. Create and communicate reports. Create/reply NCRs, changes requests
and technical queries. Monitor and control the manufacturing. Ensure safe
execution of the project. Monitor and control project performance and quality
accuracy against time-, cost- and scope baselines. Coordinate tests,
commissioning, approval process, logistics and final delivery. Manage project
closure process, reports and lessons learned.
Software/Methods/Environment : Inventor, Autocad, MS Project, Windows Office
Achieved results Succesfull deliveries in time and budget
Client Total
Project localisation Huyndai Heavy Industries, Korea
Project title Offshore cranes to Moho Nord FPU project.
• 2x Electro-Hydraulic Stiff-Boom Offshore Pedestal Crane, 27T@19M / 8T@33M
Position : Project Manager
Mission’s objectives Manage signed project to meet the contractual requirements
Realised tasks As above.
Software/Methods/Environment Inventor, Autocad, MS Project, Windows Office
Resultats obtenus Succesfull deliveries in time and budget
Client Allseas Engineering B.V.
Project localisation Delft The Netherlands / DSME South Korea / Shanghai China
Project title Pioneering Spirit (a vessel for single-lift installation and removal of large offshore oil
and gas platforms, and the installation of subsea oil and gas pipelines, 403342 GT).
Position : Package Manager
Mission’s objectives
Ensure that the assigned owner furnished equipment packages are managed, designed,
fabricated, installed, tested and transported to site and meet requirements stated in
contract.
Offshore Pedestal Crane, 600T@20m / 50T@58m
2x Offshore Pedestal Crane, 50T@33m / 24T@58m
Multipurpose Offshore Travelling Crane, 50T@33m / 24T@58m
Electric pipe handling Offshore Gantry Crane, 100T/10T
Electric pipe handling Offshore Gantry Crane, 50T/10T
4x Electric pipe handling Overhead Crane, 100T/10T
Electric pipe handling Overhead Crane, 50T/10T
4x Electro-Hydraulic platform lifts, 2.5T
Realised tasks
From owner’s point of view review and comment vendors’ documents such as drawings,
calculations, equipment/material specifications and functional descriptions etc. Review
and comment ITP-/FAT- and commissioning procedures. Create/reply reports, NCRs,
changes requests and technical queries. Monitor and control vendor’s performance and
quality accuracy against project time-, cost- and scope baselines. Participate tests,
commissioning, and approval process. Coordinate logistics and final delivery.
Software/Methods/Environment : Autocad, MS Project, Windows Office
Achieved results Material received on site in time, budget and with acceptable quality.
Client Abu Dhabi National Oil Company, RCCL, Color Line, Norilsk Nickel
Project localisation STX Finland (now Meyer Turku)
Project title LNG Tankers, Ferries, Cruise ships, Container carrier
Position : Buyer, System Coordinator, Turn-Key Contract Engineer
Mission’s objectives Execute procurement activities, coordinate ITT, create specifications to
equipment packages, test-commission-deliver the equipment packages on site
Realised tasks
Define content and budget to new project proposals. Create content to ITT.
Manage bidding contest and supplier selection. Identify, monitor and control
risks. Approve vendor invoices. Monitor and control vendor performance and
ensure deliverables (motors, valves, pipes, lifting devises etc) are received in
time and budget. Participate FATs, inspections, coordinate equipment
commissioning (lifting devises, engine rooms, elevators, escalators) in vessel
at yard and onboard during sea trial.
Software/Methods/Environment : MARS, Windows Office, MS Project, Safran, Jira, Autocad, Foran, Kronodoc
Achieved results Material received on site in time, budget and with acceptable quality.
Client Royal Dutch Navy
Project localisation Royal Schelde Shipyard (now DAMEN Vlissingen)
Project title Air Defense and Command Frigate
Position : Designer
Mission’s objectives Outfitting design for military equipment
Realised tasks Design workshop drawings in connection to hull design and special equipment.
Software/Methods/Environment : Microstation
Achieved results Drawings completed in assigned time and quality.
Client International Cableship Pte. Ltd., Singapore
Project localisation SCHEEPSWERF DE HOOP LOBITH B.V.
Project title Multipurpose cable layer
Position : Designer
Mission’s objectives Outfitting design, General Arrangement, Insulation Schema, Fire Class Schema, interior
layouts etc.
Realised tasks Design workshop drawings in connection to hull design and special equipment.
Software/Methods/Environment : Autocad
Achieved results Drawings completed in assigned time and quality.
Helsinki shipyard (STX Finland) EPIC Engineer, System Coordinator in following projects: 505 MMC Norilsk Nickel, Arctic container vessel, Norilsk Nickel, 2006, 14500 GT
Turku shipyard (Wärtsilä Marine, Masa-Yards, Kvaerner Masa-Yards, Aker Yards, STX Finland) EPIC Engineer, System Coordinator in following projects: 1 364 M/S Allure of the Seas, Cruise ship, RCCL, 2010, 225000 GT 1 363 M/S Oasis of the Seas, Cruise ship, RCCL, 2009, 225000 GT 1 354 M/S Independence of the Seas, Cruise ship, RCCL, 2008, 158000 GT 1 353 M/S Liberty of the Seas, Cruise ship, RCCL, 2007, 158000 GT 1 355 M/S Color Magic, Passenger ferry, Color Line AS, 2007, 74600 GT 1 352 M/S Freedom of the Seas, Cruise ship, RCCL, 2006, 158000 GT Lengthening of M/S Enchantment of the Seas, Cruise ship, RCCL, 2005 1 351 M/S Color Fantacy, Passenger ferry, Color Line AS, 2004, 74600 GT 1 348 M/S Mariner of the Seas, Cruise ship, RCCL, 2003, 137300 GT 1 347 M/S Navigator of the Seas, Cruise ship, RCCL, 2002, 137300 GT Purchaser in following projects: 1 346 M/S Adventure of the Seas, Cruise ship, RCCL, 2001, 137300 GT 1 345 M/S Explorer of the Seas, Cruise ship, RCCL, 2000 137300 GT
1 344 M/S Voyager of the Seas, Cruise ship, RCCL, 1999, 137300 GT
1 330 - 1 333 M/S Mubaraz, LNG-carrier, Abu Dhabi National Oil Company, 1996, 135000 m3 1 336 Cable Innovator, Cablelayer, International Cableship Pte. Ltd., Singapore, 1995, 14000 GT Designer in following projects: 1 320 M/S Nils Holgersson, Ro/Ro-Ferry Conversio, TT-Line, 1993, 17500 GT 1 302 M/S Cinderella, Passenger ferry, Oy SF Line Ab, 1989, 46400 GT 1 301 M/S Silja Serenade, Passenger ferry, Oy Silja Line Ab, 1990, 58000 GT 1 298 M/S Kalypso, Passenger ferry, Rederi AB Slite, 1990, 39500 GT 1 297 M/S Athena, Passenger ferry, Rederi AB Slite, 1989, 39500 GT
Kiitos
Thank you
Merci beaucoup
Danke schoen
Dank u well
Tusen takk
Xièxiè