Offshore Wind Helicopters OOA 13 1 Helicopter Flight Operations to Offshore Windfarms Offshore/Onshore Aviation Conference 2 nd – 3 rd September 2013, Kuala Lumpur Steffen Bechtel windpark heliflight consulting GmbH Am Kiel-Kanal 1 24106 Kiel Germany www.windpark-heliflight.de © windpark heliflight consulting GmbH

Upload: haanh

Post on 30-Mar-2018

255 views

Category:

Documents


14 download

TRANSCRIPT

Offshore Wind Helicopters OOA 13 1

Helicopter Flight Operations to

Offshore Windfarms

Offshore/Onshore Aviation Conference

2nd – 3rd September 2013, Kuala Lumpur

Steffen Bechtel

windpark heliflight consulting GmbH

Am Kiel-Kanal 1

24106 Kiel

Germany

www.windpark-heliflight.de

© windpark heliflight consulting GmbH

Offshore Wind Helicopters OOA 13 2

Content

1. Offshore Wind in Germany

2. Flight Operations

3. Specifics for offshore wind

4. Facts & Data

Offshore Wind Helicopters OOA 13 3

Offshore Wind in Germany

North Sea

Baltic Sea

Offshore Wind Helicopters OOA 13 4

1. Offshore Wind in Germany

North Sea 2 windfarm in operation

23 are licensed

47 in licensing process

Offshore Wind Helicopters OOA 13 5

1. Offshore Wind in Germany

Baltic Sea 1 windfarm in operation

5 are licensed

8 in licensing process

Offshore Wind Helicopters OOA 13 6

Content

1. Offshore Wind in Germany

2. Flight Operations

3. Specifics for offshore wind

4. Facts & Data

Offshore Wind Helicopters OOA 13 7

2. Flight Operations

Transport of personnel and cargo

Offshore Wind Helicopters OOA 13 8

Transport to helidecks (Landing)

2. Flight Operations

A109“S“

Offshore Wind Helicopters OOA 13 9

Transport to helidecks (Landing)

2. Flight Operations

S-76B

Offshore Wind Helicopters OOA 13 10

Transport to helidecks (Landing)

2. Flight Operations

AW-139

Offshore Wind Helicopters OOA 13 11

Transport of personnel and cargo

Definition of a „corridor“ for approach and

departure day/night

2. Flight Operations

Offshore Wind Helicopters OOA 13 12

Transport of personnel and cargo

Lighting of WTG Towers either side of the corridor

for safe navigtation

2. Flight Operations

Offshore Wind Helicopters OOA 13 13

2. Flight Operations

Transport of personnel and cargo

Offshore Wind Helicopters OOA 13 14

Transport to windturbines (Hoist Ops)

2. Flight Operations

EC-135 P2+

Offshore Wind Helicopters OOA 13 15

Legal requirements

Air Traffic Act (Luftverkehrsgesetz, LuftVG)

JAR-OPS3 (commercial passenger transport)

General administrative regulations (Allgemeine

Verwaltungsvorschriften)

HSE requirements

usually not sufficient to cover all cases

2. Flight Operations

Offshore Wind Helicopters OOA 13 16

2. Flight Operations

Operational requirements

Demand of windfarm operators are higher than

legal requirements

Part of the HSE concept

Presentation of procedures and risk assessments

Offshore Wind Helicopters OOA 13 17

2. Flight Operations

Legal / Operational requirements

Offshore equipment

IFR (Instrument Flight Rules)

Performance Class 1

Offshore Wind Helicopters OOA 13 18

2. Flight Operations

Requirements for hoist operations

„Single-engine-capability“

acc. JAR-OPS 3.005(h)

Offshore Wind Helicopters OOA 13 19

2. Flight Operations

Requirements for hoist operations

JAR-OPS 3.005(h)

„During HHO, the helicopter must be

capable of sustaining a critical power unit

failure with the remaining engine(s) at the

appropriate power setting, without hazard to

the suspended person(s)/cargo, third

parties, or property.“

Offshore Wind Helicopters OOA 13 20

2. Flight Operations

Requirements for hoist operations

Performance charts

Increased power

demand

Limited payload

Offshore Wind Helicopters OOA 13 21

2. Flight Operations

Requirements for hoist operations

5m min.

5-7m

Aimimg System

Offshore Wind Helicopters OOA 13 22

2. Flight Operations

Requirements for hoist operations

Hoisting on a

„Dead Turbine“

Positioning of the

WTG not always

possible

Calculated for 0kts

wind (worst case)

Offshore Wind Helicopters OOA 13 23

2. Flight Operations

Requirements

Offshore Wind Helicopters OOA 13 24

2. Flight Operations

Requirements

Procedures

Risk Assessements

Standard operating

procedures (SOP)

Offshore Wind Helicopters OOA 13 25

Content

1. Offshore Wind in Germany

2. Flight Operations

3. Specifics for offshore wind

4. Facts & Data

Offshore Wind Helicopters OOA 13 26

Distances

Weather

New courses and qualifications

Development of new procedures

3. Specifics for offshore wind

Offshore Wind Helicopters OOA 13 27

3. Specifics for offshore wind

Distances

30NM

17min

Offshore Wind Helicopters OOA 13 28

3. Specifics for offshore wind

Distances

Refueling

Alternate airfield

Routing System

Rescue

Offshore Wind Helicopters OOA 13 29

3. Specifics for offshore wind

Weather

Offshore Wind Helicopters OOA 13 30

3. Specifics offshore

Weather

Offshore Wind Helicopters OOA 13 31

3. Specifics for offshore wind

New courses and qualifications

Offshore Wind Helicopters OOA 13 32

3. Specifics for offshore wind

Development of new procedures

Offshore Wind Helicopters OOA 13 33

Content

1. Offshore Wind in Germany

2. Flight Operations

3. Specifics for offshore wind

4. Facts & Data

Offshore Wind Helicopters OOA 13 34

4. Facts & Data

OWF connected: 3

OWF under construction: 8

OWP licensed: 29

OWP planned: 97

Presently 89 turbines in operation

Equals 385 MW

2020: 10.000 MW planned

Offshore Wind Helicopters OOA 13 35

4. Facts & Data

Hoist Cycles: > 9.000

Hoist PAX: > 6.500

Accident free so far!

Offshore Wind Helicopters OOA 13 36

“There are old pilots and there are

bold pilots.

There are, however, no old bold

pilots!”