helix resources limited · helix resources limited ... detailed aeromag survey and depth modeling...

13
HELIX RESOURCES LIMITED “Creating shareholder value through exploration and development”

Upload: doankhanh

Post on 28-Jul-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

HELIX RESOURCES LIMITED

“Creating shareholder value through exploration and development”

DISCLAIMER

FORWARD LOOKING STATEMENTS

This presentation contains “forward-looking statements”. Such forward-looking statements may include, without limitation:-• Estimates of exploration targets, resources, reserves and statements regarding future exploration results;• Estimates of future earnings and cashflows, and the sensitivity of earnings and cashflows to metals prices and foreign exchange movements;• Estimates of future metal production and sales;• Estimates of future opex and capex

Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, forward looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to metals price volatility, currency fluctuations, increased production and capital costs and variances in ore grade or recovery rates from those assumed in mining plans, as well as political and operational risks in the countries and states in which we operate or sell product to, and governmental regulation and judicial outcomes.

For a more detailed discussion of such risks and other factors, see the Company’s Annual Reports, as well as the Company’s other filings. The Company does not undertake any obligation to release publicly any revisions to any “forward looking statement” to reflect events or circumstances after the date of this presentation, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws.

Listed on ASX May 1986Shares on issue: 114 Million (Top 20 Shareholders - 46%)Listed Options: 14 Million (30c @ 30th June 2009)Market Capitalisation: $ 48 MillionCash at 30 September ’07: $ 2.7 Million

Directors:Gregory Wheeler Executive ChairmanMichael Wilson Executive Technical DirectorJohn Den Dryver Non Executive DirectorGordon Dunbar Non Executive Director

Exposure To:Iron Ore: Yalleen JV (Aquila/AMCI 70%, Helix 30%)Gold: Glenburgh (100% HLX), Tunkillia JV (Minotaur earning 51%) and

Greenfields ProjectsBase Metals: West Pilbara, Adelaidian, Gascoyne & Northampton (100% HLX)Uranium: Gawler JV (Toro earning 51%)Diamonds: West Pilbara (100% HLX)

Approximately 10,000 km² of tenure in WA and SA

COMPANY SNAPSHOT

Project Portfolio – September 2007Project Portfolio – September 2007

GoldGold Iron OreIron Ore

Tunkillia JV –SAMinotaur earning 51%

Primary: 8.6Mt @ 2.1g/t Au – 570,000ozOxide: 5.7Mt @ 1.3g/t Au – 230,000oz

(June 2007)

Tunkillia JV –SAMinotaur earning 51%

Primary: 8.6Mt @ 2.1g/t Au – 570,000ozOxide: 5.7Mt @ 1.3g/t Au – 230,000oz

(June 2007)

West Pilbara Diamonds

3 Kimberlites, 6 Anomalies

West Pilbara Diamonds

3 Kimberlites, 6 Anomalies

Glenburgh - WA1.09Mt @ 3.1g/t Au - 108,000oz (May 2005)

Additional mineralisation identifiedTargeting +400,000oz resource

Glenburgh - WA1.09Mt @ 3.1g/t Au - 108,000oz (May 2005)

Additional mineralisation identifiedTargeting +400,000oz resource

Yalleen Iron Ore JVAPI (Aquila/AMCI) earning 70%

CIDs & Mara Mamba Fe10,000m Drilling Underway

Yalleen Iron Ore JVAPI (Aquila/AMCI) earning 70%

CIDs & Mara Mamba Fe10,000m Drilling Underway

UraniumUranium

Gawler Uranium JVToro Energy earning 51%

Palaeo Channel U

Gawler Uranium JVToro Energy earning 51%

Palaeo Channel U

Gascoyne Region WACu, PGM, U Targets

Gascoyne Region WACu, PGM, U Targets

PROPOSED EXPLORATION SPEND FROM NOVEMBER 2007 TO JUNE 2008: APPROX $3M (~70% Externally Funded)

Base metals and Generative Projects

Base metals and Generative Projects

Northampton ProjectPb-Cu-Zn-Ag Targets

Northampton ProjectPb-Cu-Zn-Ag Targets

West Pilbara Gold &Base Metal ProjectCu, Au, Ni Targets

West Pilbara Gold &Base Metal ProjectCu, Au, Ni Targets

Adelaidian Projects SACu, Au, U Targets

Adelaidian Projects SACu, Au, U Targets

YALLEEN IRON ORE JV

YALLEEN IRON ORE JV

HIGHLIGHTS

• 600km² of tenements located in the Robe River catchment,30km east of Pannawonica.

• Large tonnage CID & BID exploration target potential

• 10,000m drilling program underway - $2.3M budget to Q2-2008

• JV Partner & Manager API (Aquila/AMCI) –Iron ore focused technical team, market support and solid development plans

• Pre-feasibility studies already underway on surrounding API JV’s

• HLX maintain 30% of iron ore rights and 100% ownership of tenements

YALLEEN IRON ORE JV

GLENBURGH PROJECT

HIGHLIGHTS

• First stage of regional exploration completed, four areas assessed with exploration drilling

• +1g/t Au intersected at all four areas tested, North East 3 and Barracuda Prospect areas showing the most promise.

• North East 3 – Four out of five holes intersected +1g/t Au, 20-30m wide mineralised zone (>0.1g/t Au) with up to 8m @ 2.5g/t Au in recent drilling (100m spaced drill lines)- Surface geochem and geological mapping suggest up to 2km of untested strike length- Additional surface geochem sampling, mapping and follow up drilling in Q4 2007

• Barracuda – Several holes intersected +1g/t intervals over structurally complex target with variable regolith covering the area. Additional structural mapping and auger geochemistry planned to assist in defining targets

• Q4 2007 Drilling (5,000m) to focus on building up resource potential at all known and new prospects

• Current inferred resource of 1.09Mt @ 3.1g/t Au for 108,000oz, aiming to increase to greater than 400,000oz by mid 2008 to coincide with internal study into possible development scenarios.

GLENBURGH PROJECTPROSPECT LOCATION MAP

Exploration and Resource focus for Q42007 & 2008

TUNKILLIA PROJECT JV

GENERATIVE PROJECTS

HIGHLIGHTS

West Pilbara Project

• Targeting VMS/VHMS base metal mineralisation - Infill geochemical sampling and field mapping undertaken during September-October (Results are pending)• Hyperspectral survey interpretation identifies possible zoned hydrothermal alteration systems in area.• Granting of tenement with Radio Hill Style nickel targets paves way to carry out detailed aeromag survey and depth modeling of targets.

Adelaidian Projects

• Parachilna - New exploration model for copper around Blinman area; Presence of significant alteration mineral assemblages; morphology of the known copper mineralisation may be related to hydrothermal activity in the area.

• Olary – alteration associated with historic gold prospects on our tenements suggest hydrothermal influence from late stage granites in structural corridors.

HELIX STRATEGIC OBJECTIVES

• Secure large exploration ground holdings in prospective mineral provinces• Utilise geological capabilities/skills to efficiently explore with our available funds• Create value for shareholders through our exploration and development activities• Maintain an ethical and professional environment that attracts and retains talented professionals

EXPECTED SIGNIFICANT MILESTONES TO DEC 2008*

Qtr Dec 2007 Qtr Mar 2008 Qtr Jun 2008 Qtr Sep 2008 Qtr Dec 2008Glenburgh Project• 5,000m Drilling tooutline resource potential

• Infill resource drilling• Commence desktop scoping studies

• Estimate new resource• Conclude internal scoping study

• External confirmation of scoping study results

• Commission PFS for project development

Yalleen Project• RC and DDH drilling at Kumina Ck and Robe Exit Prospects

• Commence desktop scoping studies• Assess results of W. Pilbara PFS on Yalleen JV

• Estimate first resource for YalleenJV• Consider and approve development budget

• External confirmation of scoping study results

• Development decision

Other Projects• PACE funding application for Parachilna Project

• W.Pilbara and Parachilna - Geochemand geophysical surveys

• W.Pilbara and Parachilna - Drilling to test targets and confirm exploration models

• Project assessment and decision to progress or JV

(*see disclaimer)

PROJECT LOCATION MAP

www.helix.net.auASX:HLX