helly hansen - picontent.pi.tv/events/pi apparel berlin 2016/presentations/1043_1345... ·...
TRANSCRIPT
Helly HansenImplementing PLM, a support towards a
One-Source of Truth Model
Ferdinand DienerProcess and Quality
Robert ReumkensProduct Operations
Trusted by Professionals since 1877When Helly Juell Hansen created our first ever waterproof clothing
A history of innovation and award winning products…
… leadership with professionals on Oceans and Mountains around the world
OUR MISSION
OUR VISION
In house design/development in NorwayHigh focus on fit and construction – in house pattern dept.Merchandising team in HKUpgrade our data management system to help with speeding up the development process
Evaluation for choosing Gerber YuniqueUpgrade from WebPDMMoving over to a Cloud solution10 year relationshipGerber AccumarkEasy data transferLink to AdobeModular solution
Assortment selection
Design / concept → Approval
Tech pack creation → Dev specs Pattern development
Product spec to vendor
1st Prototype evaluation
Pattern revision
More prototyping
SMS feedback
PP approval
PO placed
ProductionQC
Documents for shipment
Shipping
WHS
Category direction
ProductionQC
Documents for shipment
Shipping
WHS
Category direction
Assortment selection
Design &concept
Tech pack creation
SMS feedback
Pattern development
1st Prototype evaluation
PP approval
Assortment selection
Design / concept → Approval
Tech pack creation → Dev specs Pattern development
Product spec to vendor
1st Prototype evaluation
Pattern revision
More prototyping
SMS feedback
PP approval
PO placed
ProductionQC
Documents for shipment
Shipping
TIMELINE FUNCTION: • Build timeline• Identify duration and dependencies related to
each task
WHS
Category direction
Tech pack creation → Dev specs Pattern development
Product spec to vendor
1st Prototype evaluation
Pattern revision
More prototyping
SMS feedback
PP approval
PO placed
ProductionQC
Documents for shipment
Shipping
LINELIST FUNTION: • Quick product setup/creation by drag and drop
Category direction
Assortment selection
WHS
Pattern development
Product spec to vendor
1st Prototype evaluation
Pattern revision
More prototyping
SMS feedback
PP approval
PO placed
ProductionQC
Documents for shipment
Shipping
• Dynamic Integration point with Adobe Illustrator • Line List drag and drop colours / images• Palette Edit for Colours → Pantone colour palette
system
Category direction
WHS
Assortment selection
Design &concept
Pattern development
Product spec to vendor
1st Prototype evaluation
Pattern revision
More prototyping
SMS feedback
PP approval
PO placed
ProductionQC
Documents for shipment
Shipping
LINE LIST FUNCTION • drag and drop Main Fabric and Raw Materials• Line List to build a BOM quickly and easily • Material images/FSS spec direct link in BOM
Category direction
WHS
Assortment selection
Design / concept → Approval
Tech pack creation
Product spec to vendor
1st Prototype evaluation
Pattern revision
More prototyping
SMS feedback
PP approval
PO placed
ProductionQC
Documents for shipment
Shipping
ACCUMARK LINK:• Dynamic Integration point with Accumark• Full Pattern, Model Integration with Accumark• Marker import → Consumption control• Measurement Forms linked from Accumark
Category direction
WHS
Assortment selection
Design / concept → Approval
Tech pack creation → Dev specsPattern
development
Pattern revision
More prototyping
SMS feedback
PP approval
PO placed
ProductionQC
Documents for shipment
Shipping
• Material price → Direct link to costing in BOM• Full image integration with Adobe Illustrator• Standardised Raw Material folders, with changes
fully tracked• Pattern comments – image view of pattern pieces
Category direction
WHS
Assortment selection
Design / concept → Approval
Tech pack creation → Dev specs Pattern development
1st Prototype evaluation
Pattern revision
More prototyping
PP approval
PO placed
ProductionQC
Documents for shipment
Shipping
• YUSNAPP MOBILE APP• Direct feedback from a meeting• Allows for images to be uploaded
Category direction
WHS
Assortment selection
Design / concept → Approval
Tech pack creation → Dev specs Pattern development
Product spec to vendor
1st Prototype evaluation
SMS feedback
Pattern revision
More prototyping
PO placed
ProductionQC
Documents for shipment
Shipping
TIMELINE FUNCTION: • Build timeline according to capacity booking• On time tech pack release• Accountability on deliverables
Category direction
WHS
Assortment selection
Design / concept → Approval
Tech pack creation → Dev specs Pattern development
Product spec to vendor
1st Prototype evaluation
PP approval
SMS feedback
Why is Helly Hansen moving over to PLM
• Rapid growth within HH• Current low integration possibilities with other platforms• Looking for one source of truth• Weak communication flow• Decreased efficiency due to manual updates
Sourcing
List
Lineplan
Final Line collection
import
Capacity
Sample Tool
Operations: Main process Area
Operations: Support process Area
Duty files
CatalogueTemplate
Price Tools
Sample Comments
BuyTools
P&PNews
DATABASE
Pros
• Although we work in excel and access it does provide us huge amounts of flexibility with the possibility to build whatever we need in the confounds of our abilities.
• With the current structure of KPI data we are able to foresee marginal impacts from internal manufacturing or global currency impacts very quick and we can act correctly upon them in order to protect our margin.
• Assistance on multiple departments is possible with custom tools that are based on the main data source.
Cons
• Regarding formulas and structures are quite complex, it will take some time to build.
• Working from access and excel is often delicate and error sensitive especially when working from a platform with multiple users. Errors can easily happen on active formulas and text/number format issues can block vital components.
• No source of truth so we are also comparing systems to each other in order to maintain a healthy “source of truth” in multiple systems.
• Time consuming to maintain and to update all different tools in case of changes.
• Most knowledge is stored within this position so it has a certain liability if something ever happens to the position.
Desired process/goals towards PLM
• One source of truth • Move/integrate more of the support processes into PLM• Maintain flexibility in terms of handling and processing data• Import and export functionality • In system customization options• Scenario options line planning• Integrated cost module functions • Easy to use, worldwide platform• Offline use
To one solution!
Questions?
Thank you