What we have in Helwan HV Power system SY 2527 Universal Multichannel Power Supply
System with HV modules and High Voltage Power Supply (0-3 KV)
(ORTEC 456) for scintillator.
LV system --> SY 2527 Universal Multichannel Power Supply System with LV modules.
GAS system ..> Gas Mixer, Freon bottle and Ar-CO2 bottle. We need to switch to RPC standard mixture.
Electronic for trigger -->
QUAD Discriminator (Model 621AL)
CMS RPC Receiver.
Discriminator (Model 620AL)
Coincidence Unit (Model 465)
QUAD SCALER AND PRESET COUNTER TIMER (MOD.N1145)
Linear FAN-IN/FAN-OUT (Model 428F)
Linear FAN-OUT (Model 128L)
Four Scintillators (50x50 Cm)
GWINSTEK GDS-2204 Digital storage Oscilloscope (200 MHZ 1G Sa/a). 2
3
What we have in Ain Shams PC equipped with the required software.
VME crate 8 slot (32).
TDC
PCI OpticalLink (A2818 + AY2705).
VME-PCI Bridge (V2718).
5 Cable (WA967XAAAAAA A967 - 32 Channel Cable Adapter (1x32 to 2x16) 4 135,00 2 529,20 NI8A forV767, V862, V1190, VX1190, V1495 30D 90D).
All this equipments will trnsport to Helwan By this Sunday.
4
What we miss ECL-NIM-ECL module
linear Fan-out
Gas Mixture
Coincidence unit
Scalar
Dual Timer.
5
What we did
Gap tests.
Gas leak test.
Spacer Test.
HV Test.
6
7
Results at 904 (scintillators HV scan)
0
1000
2000
3000
4000
5000
6000
7000
1500 1550 1600 1650 1700 1750 1800 1850 1900 1950 2000 2050 2100 2150 2200
Co
un
t / 1
00
Se
c
HV (v)
HV Scan
1
2
8
HV scan for RPC parts
0
200
400
600
800
1000
1200
1400
1600
6000 6500 7000 7500 8000 8500 9000 9500 10000 10500
Co
un
ts H
z
Hv
B21
B22
C11
C12
C21
C22
9
chamber performance test with
cosmic:
Scintillator1 DISCR.
SCALER
Scintillator2 DISCR.
RECIEVERRPC
COINCIDENC
E
FAN
OUT
COINCIDENC
E
SCALER
10
Calibration of scintillator
11
Our plan Transfer the hardware to Helwan.
Complete the installation of the all hardware needed.
Complete the set-up of the telescope (hardware and software).
run the DAQ system (the same used in GIF) and applied the necessary modifications.
test the RPC performance with cosmic muon (spare chambers from CMS Endcap have been requested to CMS- RPC collaboration).