hendri cv - april 2013
TRANSCRIPT
-
7/23/2019 Hendri Cv - April 2013
1/4
HENDRI AGUS SETIAWAN-CURRICULUM VITAE 2013
PERSONAL DATA
Name : HENDRI AGUS SETIAWAN
Date of Birth : Jakarta, August 8, 1978
Address : KP. RAWA BEBEK, Rt/Rw 005/008
Kota Baru Bekasi Barat , 17134
Phone : 0812-85-350-378
e-mail : [email protected]
Sex : Male
Nationality : Indonesian
Religion : Moslem
Marital Status : Married
EDUCATION
Sistem informasi STMIK SWADHARMA S1 Manajemen Informatika -LP3I - DiplomaJakarta, graduated in 2000 MALAKA Technical High School majoring in Electrical Jakarta, graduated in 1996
KEY QUALIFICATION
I have worked as 5 (five) years in OIL & GAS projects and Mechanical & Piping Draftsman for 9 (nine) years
in High Rise building projects.
I have experiences in OIL & GAS project as a Piping Drafter. Responsibility for make a Piping Layout ,
Isometric drawing & material until preparing Material take off (MTO) for order and erection execution on
the site.
I also have experiences in Specialized both Mechanical & Piping system at High Rise Building Company
projects as a Mechanical & Piping Draftsman, so that I am be able to make all installation is clear and
prepare for detail and section drawing.
TRAINING
AutoCAD BMS (Buana Media Solutindo) - 1997 Mechanical-Electrical & Instrument - International Technical College 1997 PDMS PIPING AP-GREID , Oil & Gas Design Center Course 2009
COMPUTER LITERATE
Autocad R2008 / 2013 Autocad Plant 3D PDMS PIPING 11.6 Google SKETCH UP pro 8 Microsoft Office
-
7/23/2019 Hendri Cv - April 2013
2/4
HENDRI AGUS SETIAWAN-CURRICULUM VITAE 2013
Konsorsium WIKA - RABANA (KWR) Tempino ~ Plaju Pipeline
(15 Mei 2012 Ongoing)
Position : Piping Drafter
The work performed during this period included the following :
Piping Arrangement & Equipment Layout Pipe support detail Drawing. Isometric Drawing & Material List Spool Pipe drawing for Fabrication. Material Take Off ( MTO ) 3D drawing
HYUPJIN VINA Construction CO, LTD-JW MERRIOT - VIETNAM
(June 2011 April 2012)
Position : Mechanical &Piping Drafter
The work performed during this period included the following :
Piping Arrangement & Equipment Layout Pipe support detail Drawing. Isometric Drawing & Material List Spool Pipe drawing for Fabrication. Material Take Off ( MTO ) 3D drawing
PT. TOTAL BANGUN PERSADA, Tbk BANK MEGA Project
(13 April 2009 ~ Mei 2011)
Position : Mechanical & Electrical Drafter
The work performed during this period included the following :
Piping Arrangement & Equipment Layout Pipe support detail Drawing. Isometric Drawing & Material List Spool Pipe drawing for Fabrication. Material Take Off ( MTO ) 3D drawing
PT. Adhi Karya (Overseas Division) Doha City Center Expansion Phase III ( East ) - QATAR
(20 April 2008 ~ January 2009)
Position : Mechanical & Piping Drafter
The work performed during this period included the following :
Plumbing & Sanitary System. Chiller Piping Arrangement & Piping Riser. Fire Protection Piping Arrangement & Equipment Layout.
Pump Room Piping Layout & Section Detail. Preparations for Isometric Drawing & Material
-
7/23/2019 Hendri Cv - April 2013
3/4
HENDRI AGUS SETIAWAN-CURRICULUM VITAE 2013
PT. E & D Engineering Co.Ltd Three Tower Project Intercontinental Hotel & Casino - ANGOLA
(01 November 2006 ~ February 2008)
Position : Mechanical & Electrical Drafter
The work performed during this period included the following :
Plumbing & Sanitary System. Chiller Piping Arrangement & Piping Riser. Fire Protection Piping Arrangement & Equipment Layout. Pump Room Piping Layout & Section Detail. Preparations for Isometric Drawing & Material
RABANA CONTRACTOR Gas Pipeline Citarik ~ Tata Jabar
(01 February 2006 ~ 30 September 2006)
Position : Piping Drafter
The work performed during this period included the following :
Piping Arrangement & Equipment Layout Pipe support detail Drawing. Isometric Drawing & Material List Spool Pipe drawing for Fabrication. Material Take Off ( MTO ) 3D drawing
PT.RAKINTAM Cibubur Juction Shopping Center ( South Jakarta )
(1 Desember 2005 ~ 30 January 2006)
Position : Mechanical & Piping Drafter
The work performed during this period included the following :
Plumbing & Sanitary System. Chiller Piping Arrangement & Piping Riser. Fire Protection Piping Arrangement & Equipment Layout. Pump Room Piping Layout & Section Detail. Preparations for Isometric Drawing & Material
Shimizu Total Scbk J.O The Pakubuwono Residences South Jakarta
(1 Desember 2004 30 November 2005)
Position : Mechanical & Piping Drafter
The work performed during this period included the following :
Plumbing & Sanitary System. Chiller Piping Arrangement & Piping Riser. Fire Protection Piping Arrangement & Equipment Layout. Pump Room Piping Layout & Section Detail. Preparations for Isometric Drawing & Material
-
7/23/2019 Hendri Cv - April 2013
4/4
HENDRI AGUS SETIAWAN-CURRICULUM VITAE 2013
PT. Alpha Sarana The WESTIN Jakarta Hotel Central Jakarta
(1 April 1998 10 August 2001)
Position : Mechanical & Piping Drafter
The work performed during this period included the following :
Plumbing & Sanitary System. Chiller Piping Arrangement & Piping Riser. Fire Protection Piping Arrangement & Equipment Layout. Pump Room Piping Layout & Section Detail. Preparations for Isometric Drawing & Material
PT. Inti Prima Takeka Kintamani Condominium South Jakarta
(1 September 1996 30 August 1997)
Position : Mechanical & Piping Drafter
The work performed during this period included the following :
Plumbing & Sanitary System. Chiller Piping Arrangement & Piping Riser. Fire Protection Piping Arrangement & Equipment Layout. Pump Room Piping Layout & Section Detail. Preparations for Isometric Drawing & Material