DESCRIPTION

HEP03. Advanced Neutrino Beams. Rob Edgecock RAL. Decay ring Brho = 1500 Tm B = 5 T L ss = 2500 m. SPL. SPS. Decay Ring. ISOL target & Ion source. Cyclotrons. Storage ring and fast cycling synchrotron. PS. Candidates……. Conventional super beam. Neutrino Factory. Beta beam. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: HEP03

HEP03HEP03

Advanced Neutrino BeamsAdvanced Neutrino BeamsRob EdgecockRob Edgecock

RALRAL

Page 2: HEP03

Candidates…….Candidates…….

• Conventional super beamConventional super beam

• Neutrino FactoryNeutrino Factory

e ,

• Beta beamBeta beam

PS

SPSISOL target & Ion source

SPL

Cyclotrons

Storage ring and fast cycling synchrotron

Decay

Ring

Decay ring

Brho = 1500 Tm

B = 5 T

Lss = 2500 m

MeV 86.1 Average

MeV 937.1 Average

189

1810

63

62

cms

cms

E

eFeNe

E

eLiHe

ee ,

Page 3: HEP03

OutlineOutline

• Introduction

• Proton driver

• Target and capture

• Muon frontend

• Acceleration

• Storage ring

• Conclusions

• Emphasis on problems and R&D to be done

• Discussion of options being considered

Page 4: HEP03

IntroductionIntroduction

• Idea for a Neutrino Factory: muon collider

• Concept of a muon collider: Tinlot (1960), Tikhonin (1968), Budker (1969), Skrinsky (1971)

Neuffer (1979)

• Many advantages over electron collider:

• But…….luminosity!

• Fast cooling technique – ionisation cooling – invented 1981:Skrinsky and Parkhomchuk

• Another problem…….neutrino radiation!

207emm

Neutrino Factory!Neutrino Factory!

Enough neutrinos to be a problem

Must be enough to do physics

Page 5: HEP03

Muon ColliderMuon Collider

Three stage scenario:Neutrino FactoryHiggs Factory

Muon Collider

Recently, much interest in Neutrino Factory alone.

5 different layouts:BNLCERNFNALJ-PARC

RAL

Page 6: HEP03

RAL LayoutRAL Layout

RAL Neutrino RAL Neutrino Factory layoutFactory layout

Page 7: HEP03

Proton DriverProton Driver

• Main requirements: 4 MW beam power* 1 ns bunch length50Hz

• Two types:LinacRCS

• Range of energies: 2.2 to 50 GeV

• R&D: HIPPI

* = F1 GP

Page 8: HEP03

Proton DriverProton Driver

30 GeV Rapid Cycling

Synchrotron in the ISR tunnel

Page 9: HEP03

Proton DriverProton Driver

CERN CERN SSuper-conducting uper-conducting PProton roton LLinac inac

Page 10: HEP03

Most advanced……J-PARCMost advanced……J-PARC

J-PARC FacilityJ-PARC Facility

Construction2001 ~ 2006 (approved)

JAERI@Tokai-mura(60km N.E. of KEK)

(0.77MW)

Super Conductingmagnet for beam line

Near detectors@280m and@~2km

1021POT(130day)≡ “1 year”

Page 11: HEP03

JHFJHF

~1GeV beamKamiokaJAERI

(Tokaimura)

0.77MW 50 GeV PS

( conventional beam)

Super-K: 22.5 kt

4MW 50 GeV PS

Hyper-K: 1000 kt

Phase-I (0.77MW + Super-Kamiokande)Phase-II (4MW+Hyper-K) ~ Phase-I 200

Plan to start in 2007

Kobayashi

Page 12: HEP03

JHF SuperbeamJHF Superbeam

Kobayashi

ProtonBeam

Target FocusingDevices

Decay Pipe

Beam Dump

,K

“Conventional” neutrino beam

TargetHornsDecay Pipe

Far Det.“Off-axis”

Page 13: HEP03

TargetTarget

Proposed rotating tantalum target ring

Many difficulties: enormous power density lifetime problems pion capture

Replace target between bunches:

Liquid mercury jet or rotating solid target

Stationary target:

RAL

CERN

Page 14: HEP03

Liquid Mercury TestsLiquid Mercury Tests

Tests with a proton beam at

BNL.

• Proton power 16kW in 100ns Spot size 3.2 x 1.6 mm

• Hg jet - 1cm diameter; 3m/s

0.0ms 0.5ms 1.2ms 1.4ms 2.0ms 3.0ms

Dispersal velocity ~10m/s, delay ~40s

Page 15: HEP03

Magnet TestsMagnet Tests

Tests with a 20T magnet at Grenoble.

B = 0T

1cm

Mercury jet (v=15 m/s)

B = 18T

Jet deflection Reduction in velocity Reduction in radius

Smoothing

Page 16: HEP03

Pion CapturePion Capture

20T 1.25T

Page 17: HEP03

Horn CaptureHorn Capture

Protons

Current of 300 kA

To decay channel

Hg target B1/R

B = 0

Page 18: HEP03

Target FacilityTarget Facility

Page 19: HEP03

Pion Production ExperimentsPion Production Experiments

The Hadron Production Experiment

Data taking:2001-2002

Proton energy:2-15 GeV

Targets:H2-Pb 2, 5, 100% Xo

X-section to few %

Optimise beam energy and target material for NF

Page 20: HEP03

Pion Production ExperimentsPion Production Experiments

Main Injector Particle Production Experiment

Data-taking:2003-200?

Proton energy:5-120 GeV

Targets:NuMI Be, C,H2, N2, Be, C,Cu, Pb

Re-use existing detectors

Page 21: HEP03

Phase RotationPhase Rotation

Beam after drift plusadiabatic buncher – Beam is formed intostring of ~ 200MHz bunches

Beam after ~200MHz rf rotation;Beam is formed into string of equal-energy bunches;matched to cooling rf acceptance

Page 22: HEP03

Transverse CoolingTransverse Cooling

• Cooling >10 increase in muon flux

• Existing techniques can’t be used ionsation cooling

RLEm

xdz

dE

Edz

d

3

2NN,

2

MeV/c6.13

• Cooling is delicate balance:

beam in

beam out

Page 23: HEP03

Transverse CoolingTransverse Cooling

• Cooling cells are complex

• R&D essential: MuCool, MuScat and MICE

Page 24: HEP03

Transverse CoolingTransverse Cooling

• Recent development: ring coolers

Main advantages:shorterlongitudinal cooling

Tetra Ring Quadrupole RingRFOFO Ring

S = solenoid, A = absorber, 36 cavities in blocks of 3

RAL Ring

• Main problem: kicker!

Page 25: HEP03

MuScatMuScat

• Measurement of muon multiple scattering:only relevant data – e- scattering, Russia, 1942

• Input for cooling simulations and MICE

• First (technical) run at TRIUMF summer 2000, M11 beam

• Run2: April 2003

Page 26: HEP03

MuCoolMuCool

• Design, prototype, test all cooling cell components

• High beam-power test of a cooling cell

• Preparations for MICE

NCRF cavities with sufficient gradient in multi-T fields

Be windows

Up to kW power deposition in absorbers

Safety considerations

Low non-absorber thickness in beam: - Absorber windows- Safety windows- RF windows

Cost effective design and construction

Page 27: HEP03

MuCoolMuCool

Absorber window development

200MHz cavity development

MuCool Test Area

Page 28: HEP03

MuCoolMuCool

Original area Stage 2 construction

What it will look like when it is finished

Page 29: HEP03

MICEMICEMICEMICE

T.O.F. IIIT.O.F. IIIPrecise timingPrecise timing

Electron IDElectron IDEliminate muons that decay Eliminate muons that decay

Tracking devices: Tracking devices: He filled TPC-GEM (similar to TESLA R&D)He filled TPC-GEM (similar to TESLA R&D)or sci-fior sci-fiMeasurement of momentum angles and positionMeasurement of momentum angles and position

T.O.F. I & IIT.O.F. I & IIPion /muon Pion /muon IDIDprecise precise timingtiming

201 MHz RF cavities

Liquid H2 absorbersor LiH ?

SC Solenoids;Spectrometer, focus pair, compensation coil

Muon Ionisation Cooling Experiment

Page 30: HEP03

MICEMICEMuon AccelerationMuon Acceleration

• Needs to be fast – muon lifetime

• Needs to be a reasonable cost – not linacs all the way

• Baseline: Recirculating Linear Accelerators

• Other possibilities……FFAGs & VRCS

Page 31: HEP03

MICEMICEFFAGsFFAGs

• Fixed Field Alternating Gradient magnets not ramped

krB ~

• Cheaper/faster RLAs/RCSs

• Large momentum acceptance

• Large transverse acceptance less cooling required!

Page 32: HEP03

MICEMICEFFAGsFFAGs

Proof Of Principle machine built and tested in Japan.

50keV to 500keV in 1ms.

150MeV FFAG under construction at KEK.

Page 33: HEP03

MICEMICEFFAGsFFAGs

Page 34: HEP03

Staging in JapanStaging in Japan

Staging

• High Power Proton Driver– Muon g-2

• Muon Factory (PRISM)– Muon LFV

• Muon Factory-II (PRISM-II)– Muon EDM

• Neutrino Factory– Based on 1 MW proton beam

• Neutrino Factory-II– Based on 4.4 MW proton beam

• Muon Collider

Physics outcomesat each stage

Page 35: HEP03

MICEMICEFFAGsFFAGs

R&D:

• Injection and extraction

• Magnets – 10-20 GeV ring (120m radius): 6T SC

• RF – low frequency (6.5MHz), 1MV/m

Page 36: HEP03

MICEMICEVRCSVRCS

• Fastest existing RCS: ISIS at 50Hz 20ms

• Proposal: accelerate in 37s 4.6kHz

• Do it 30 times a second

• 920m circumference for 4 to 20 GeV

Combined function magnets 100micron laminations of grain oriented silicon steel 18 magnets, 20T/m

Eddy currents iron: 100MW 350kW Eddy currents cu : 170kW

RF: 1.8GV @ 201MHz; 15MV/m

Muons: 12 orbits, 83% survival

Page 37: HEP03

MICEMICEStorage RingStorage Ring

Main requirement: Main requirement: underground lab(s) at large distancesunderground lab(s) at large distances

Longyearbyen ~ 3520km Pyhasalmi ~ 2290km Tenerife ~ 2750km

15 degrees for straight sections

Page 38: HEP03

MICEMICEConclusionsConclusions

• Neutrino oscillations: one of most important physics results

• Many new experiments conceived

• New beam neutrino facilities required :- Superbeams

- Neutrino Factory- Beta beams

• All require extensive R&D

• For Neutrino Factory:- proton driver- target- frontend (MuCool, MICE)- acceleration

• World Design Study (WDS1) planned