hero honda motors ltd. digital plant tour
TRANSCRIPT
Hero Honda Motors Ltd.Dharuhera and Gurgaon Plants
Digital Plant Tour
Production & Operations Management
Dharuhera Plant Layout
Engine AssemblyFrame Assembly Final InspectionSteel Machining
Direct-on-Line (DOL)
Aluminium Machining
Paint Shop Weld ShopFinal Frame Assembly Line
The supplies from the vendors
The inventory in the plant lasts maximum 2 to 3 hours during production
The Robotized Machining Lines
Standard Operating Procedures (SOPs)
A U-shaped Manufacturing Cell
The Engine Assembly
The Press Tool Operation
The SMED process is used for exchange of dies in the pressing machine
The robots used for precise welding
The fabrication of body frame through welding
The Painting Process
The Tools Inventory Automated Warehouse
Controls
Tables used for comparison with standard production
The “Part-Feed” Carriers
Single Piece Flow
SOP
The “Feeder” lines leading to the main assembly line
The Final Assembly Line
The Quality Checkpoints
The Visual Inspection
The “Ride-Mode” Inspection
The “Emissions” Inspection
The Finished Goods Inventory
Acknowledgements
Special Thanks to:Mr. Rakesh Kapoor, Vice-President and Mr. Mahesh Kaikini, AGM, Hero Honda Motors Ltd.
Background Music Score Courtesy:“Born to Win“ - Shaun Harris, Shaun Harris Music. BMI (www.RoyaltyFreeMusic.com)
Thank You!