heydar ebrahimi - resume new-1 · lc#!!107" !! !!...

4
LC 107 www.linkedcivil.com.au Position Preferred xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Civil Designer Location Maroochydore, QLD Qualifications, Memberships and Licences Master’s Degree, Civil Eng. specialised at Road and Transportation T.M. University Bachelor’s Degree, Civil Engineering I.U.S.T. University Board of Professional Engineer of Queensland (B.P.E.Q) ID: 20841 Jul 2018 Professional Engineer Area of Civil National Engineer Register (N.E.R.) Jun 2018 Professional Engineer Engineering Australia (M.I.E. Aust.) ID:5810213 Sep 2017 Professional Engineer World Educational Services (W.E.S) Canada Assessment Organisation Licence:26337779 Oct.2014 Assessed Bachelor’s & Master’s Degree Engineering and Construction Organisation ID:103025851 Dec.2001 (TECO) Civil3D May.2015 Novin Parsian Institute Computer Skills CostX CCS Candy PRISM G2 Expert Estimator MS Office Suite SAP Primavera P6 (interpretation of data only) Buildsoft / BTOS Success Enterprise (Estimating)

Upload: others

Post on 15-Oct-2019

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Heydar Ebrahimi - Resume NEW-1 · LC#!!107" !! !! Position!Preferred&xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx"

 

 

LC  -­‐  107  

www.linkedcivil.com.au  

     

Position  Preferred  xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx  

Civil  Designer  

Location   Maroochydore,  QLD  

Qualifications,  Memberships  and  Licences  

Master’s  Degree,  Civil  Eng.  specialised  at  Road  and  Transportation  -­‐  T.M.  University  

Bachelor’s  Degree,  Civil  Engineering  -­‐    I.U.S.T.  University                

Board  of  Professional  Engineer  of  Queensland  (B.P.E.Q)  ID:  20841  -­‐  Jul    2018  

Professional  Engineer  Area  of  Civil  

National  Engineer  Register  (N.E.R.)  –  Jun  2018  

Professional  Engineer  

Engineering  Australia  (M.I.E.  Aust.)    ID:5810213  -­‐    Sep  2017  

Professional  Engineer  

World  Educational  Services  (W.E.S)  Canada  Assessment  Organisation  Licence:26337779  -­‐  Oct.2014  

Assessed  Bachelor’s  &  Master’s  Degree    

Engineering  and  Construction  Organisation          ID:10-­‐3-­‐0-­‐25851  -­‐  Dec.2001  

(TECO)              

Civil3D  -­‐  May.2015  

Novin  Parsian  Institute  

Computer  Skills  

CostX   CCS  Candy   PRISM  G2  

Expert  Estimator   MS  Office  Suite   SAP  

Primavera  P6  (interpretation  of  data  only)  

Buildsoft  /  BTOS   Success  Enterprise  (Estimating)  

 

 

 

 

 

Page 2: Heydar Ebrahimi - Resume NEW-1 · LC#!!107" !! !! Position!Preferred&xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx"

 

     www.linkedcivil.com.au  

LC  -­‐  107  

Personal  Summary  

Registered   and   experienced   professional   civil   designer   with   more   than   6   years   related   work   experience   in   Road  drainage,  Storm  water,  Flood  modelling.  Highly  organised  with  meticulous  attention  to  details.  Capable  of  working  in  teams   and   individually   and   Creative   problem   solver   who   has   consistently   completed   projects   on   time   and   within  budget.   Easily   instil   trust   and   confidence   in   fellow   engineers   and   clients,   with   a   career   path   built   on   knowledge,  lessons  learned,  value  engineering  humanistic  and  environmental  aspects.    

Key  Skills:  

• Highly  accomplished  modelling  by  Civil  3D,  AutoCAD,  and  ACAD  land  development    • An  expert  user  of  12D,  Flow  master,  Sewer  and  M.S.  Office  • The  expert  designer  of  Site  Location  layout,  Land  development,  Earthwork,  Rough  Grading,  Fencing,  and  

Pavement    • Advanced  knowledge  of  designing  Road  drainage,  Storm  water,  Flood  modelling,  Sewer,  Catchment  hydrology,  

Waste  Water,  and  Contaminated  accidentally  oily  water  • Has  proven  ability  to  generate  documents  for  Oil  &  Gas  pipeline,  refinery,  compressor  stations,  clusters,  and  

Wellhead  Facilities    • Designed  and  executed  commercial,  industrial  and  residential  development  civil  projects  • Self-­‐taught  and  fully  conversant  of  Queensland  design  codes  (QUDM,  SEQ  WS&S  D&C,  ARR)  • Practical  Knowledge  of  PMBOK  and  analytical  ability  of  cost  management  of  civil  works  • Ability  to  identify  and  mitigate  the  environmental  impact  of  civil  works  (EIA  report)  • Perfect  communication  skills  and  knowledge  about  stockholder  management  • Proficient  time  management  and  organisation  skills  and  abilities  to  meet  the  deadline  • Proven  leadership  skills  and  strategic  thinking  within  the  organisation  to  shape  the  company’s  future  • Liaise  with  clients,  other  consultants,  and  third  party  • Flexibility  to  co-­‐ordinate  with  the  multi-­‐disciplinary  design  team    • Excellent  training  skills  with  a  passionate,  innovative  character  as  and  mentor  for  junior  members  

 

Industry  Experience  

Job  Title   Civil  Designer   Dates   Apr  2019-­‐Current   Company    

Key  Responsibilties:    

• Participated  in  the  Feasibility,  Conceptual,  Basic  and  Detail  design  studies  of  residential  projects  • Prepared  technical  specifications,  criteria,  procedures  and  work  instructions  for  Civil  work  • Designed  of  Site  location  layout  and  Rough  Grading,  urban  drainage,  storm  water  and  catchment  hydrology  

                 

Page 3: Heydar Ebrahimi - Resume NEW-1 · LC#!!107" !! !! Position!Preferred&xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx"

 

     www.linkedcivil.com.au  

LC  -­‐  107  

 Job  Title  

Civil  Designer   Dates   Feb  2013-­‐Apr  2019   Company   T.O.P  COMPANY                                                                                                                    

From  the  outset  since  1980,  T.O.P  Engineering  Company  has  been  a  leading  provider  in  the  field  of  Oil,  Gas  and  Petrochemical  and  renewable  energy  industry.  T.O.P  has  successfully  performed  and  delivered  major  projects  in  the  form  of  E.P.C.C.  (Engineering,  Procurement,  Construction,  and  Commissioning)  or  Project  Supervision.    

Key  Responsibilities:  

• Participated  in  the  Feasibility,  Conceptual,  Basic  and  Detail  design  studies  • Prepared  technical  specifications,  criteria,  procedures  and  work  instructions  for  Civil  work  • Conducted  major  technical  analyses  of  site  surveys  to  develop  topographical,  soil,  hydro-­‐logical  and  other  

information  and  prepared  the  due  technical  reports  • Designed  of  Land  development,  Site  location  layout  and  Rough  Grading    • Planned  urban  drainage,  STORM  WATER,  Flood  modelling,  Catchment  hydrology,  Road  drainage  • Planned  and  maintained  Waste  Water  System  and  Contaminated  oily  water  • Governed  surface  grading  and  High  Point  Floor  Level  of  sites  (H.P.F.L.)    • Improvised  and  planned  Restricted  or  Unrestricted  road  in  sites  • Designing  of  precast  concrete  slabs  and  Concrete  slab  on  grade  including  Pavement  and  Joints    • Improvised  plans  for  Detention  and  Retention  Basins,  Bond  wall,  retaining  wall  and  culvert  • Designed  and  upgraded  of  Underground  composite  layout  and  related  crossing  schedule  • Designed  OSD  tank,  Manholes,  pits,  Dry  boxes,  Catch  basins,  Grease  trap,  API  separator,  …  • Circulated  plans  of  Fence  and  Gate  (chain  link,  concrete  or  masonry  type)  • Conducted  and  developed  of  P.D.M.S  model  • Organised  and  completed  of  EIA,  QRA,  HAZOP,  HAZID  reports  • Reviewed  the  designs  and  drawings  to  estimate  the  required  materials  for  various  parts  of  the  project  • Monitored  changes  to  designs,  assessed  effects  on  the  cost,  and  measured,  valued  and  negotiating  variations  

to  designs  • Analysed  the  comment  sheets  issued  by  the  clients  in  order  to  apply  their  comments,  in  case  • Encouraged  Health  and  safety  considerations,  obtained  approval,  and  informed  the  stakeholders  • time  management  and  organisational  skills  and  abilities  to  meet  the  deadline  • Maintained  all  input  and  output  checklist    • Supervised  junior  colleagues’  output  and  mentored  their  promotion    • Considered  verification  and  validation  procedure  for  all  prepared  civil  documents  according  to  approval  

distribution  matrix  and  work  in  the  multi-­‐disciplinary  design  team  

Key  Achivements:  

• Meet  Milestone  Avg.  5%  quicker  than  forecasted:  - By  using  Input,  output  Checklist,  work  instructions,  and  design  procedures      - Prepared  a  distribution  Matrix  and  verification  and  validation  forms  - Civil  design  process  control  (QC/QA)  and  Worked  in  a  dynamic  model    

• Reduced  designing  cost  by  10%:  - Reviewed  Lessons  learned  list  and  updated  it  /  decrease  Earthwork  Volume    

• Reduced  Construction  and  Procurement  cost  by  5%:  - good  interaction  between  the  design  and  construction  team    - designed  gravity  systems  without  pump  station  and  achieved  the  best  different  elevations  of  platforms  

• Decrease  Environmental  Impact:  - provided  retaining  walls  and  stabilized  berms  by  geotextile  to  increase  green  area  /  Suggested  H.D.D  

Page 4: Heydar Ebrahimi - Resume NEW-1 · LC#!!107" !! !! Position!Preferred&xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx"

 

     www.linkedcivil.com.au  

LC  -­‐  107  

method  - Quick  learner  and  creator  of  a  well-­‐managed  and  knowledge-­‐oriented  teams  - Prepared  a  method  to  observe  how  my  junior  colleagues  being  promoted  and  updated  gradually  and  train  

during  the  projects    - Promote  me  from  junior  civil  designer  to  Head  of  Civil  Department  

Projects  

 • Hovea  -­‐Templestowe  residential  Houses  (situated  in  Melbourne)  -­‐  2019  –  2019  

 • West  KARUN  Oil  Transmission  Capacity  Increase  -­‐  2016  –  2019    

- In  order  to  increase  the  capacity  of  transmission  of  heavy  and  light  crude  oil  network  for  approximately  1,000,000  B.P.D  the  client  (PEDEC)  has  defined  this  project.  This  project  was  including  2  Pump  stations  and  400  Km  oil  Pipeline.  (completion  cost  App:  500  million  Euro)  

• NISOC  Gas  Pipelines  Replacement  -­‐  2015  –  2017    - The  client  was  NISOC  and  the  project  was  including  detail  design42”,30”,12”  pipelines  (600  Km)  and  related  stations  (earthwork:  2.9  million  m3,  concrete:  20,000  m3      and  completion  cost  App:  108  million  Euro)    

•  NISOC  Oil  Pipelines  Replacement-­‐  2015  –  2018    - The  client  was  NISOC  and  the  project  was  including  detail  design  24”  ~8”  pipelines  (240  Km)  and  related  stations  and  107  wellheads  (earthwork:  23.3  million  m3,  concrete:  30,000  m3      and  completion  cost  App:  148  million  Euro)    

•  SIAH  MAKAN  Sludge  Catcher  and  Pipelines    -­‐  2015  –  2016 - The  client  was  NISOC  and  the  project  was  including  4  gas  production  unit,  sludge  catcher  (vessel  Type)  and  80  km  pipelines  from  B.B.H  1&2  and  R.G.S  2.  (completion  cost  App:  40  million  Euro)

• KISH  Gas  Field  Development  (phase  1&2)  -­‐  2013  –  2015  

- The  client  was  PEDEC  and  the  project  was  including  a  huge  refinery  in  200  hectares,  2clusters  facilities  with  20  wellheads,  56"  (94Km)  gas  transmission  onshore  pipeline  and  32”  (17  Km)  gas  transmission  Marine  pipeline