H*i - Reference Letter - Electrical & Automation scope of RM no. 1 and water pumping station in Malogoszcz Lafarge Cement S.A. plant in Malogoszczhas commissioned AIUT Sp. z o.o. company, perform a thorough modemization of the electrical and automation Raw Mill No.1, and perform automation for water pumping station. To scope of responsibilities in this project was: . Engineering and design of changing the type of power network from type lT to TN-C in Substation . Engineering and design of power distribution system ( low voltage) . Engineering and design of control system (hardware, software , GFS, DFS) for about 600 physical l/Os . Delivery of: o Stańer for main drives of Raw Mill o LV switchgears o AY,DM, AM cabinets ( production of AIUT) o PLC controller o Measuring equipments o installations HVAC for electrical room o Wiring - MV, LV, control, data transmission . Preparation of controller PLC and visualisation software . Erection & Commissioning ln scope of contractor was to provide all equipments and works necessary to ensure the proper and unhindered realization the task, and proper operation of whole the task. Design, supplies, erection and commissioning peńormed by A|UT has fully met Lafarge Standards and expectations for this kind of installations. High quality of the works peńormed proves AIUT as professional contractor. The job was peńormed in full accordance with Lafarge safety stiandards resulting in clear safety record at the and of the pĄect. Total value of the works :3 226100 PLZ net Works peńormed in 2012' All of the above mentioned facts prove AIUT to be a reliable and skilful company worth to be recommended for peńorming similar jobs. Sincerely:

Upload: others

Post on 30-Apr-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: H*i - AIUT

H*i -Reference Letter - Electrical & Automation scope of RM no. 1 and

water pumping station in Malogoszcz

Lafarge Cement S.A. plant in Malogoszczhas commissioned AIUT Sp. z o.o. company, performa thorough modemization of the electrical and automation Raw Mill No.1, and performautomation for water pumping station.

To scope of responsibilities in this project was:

. Engineering and design of changing the type of power network from type lT to TN-Cin Substation. Engineering and design of power distribution system ( low voltage)

. Engineering and design of control system (hardware, software , GFS, DFS) for about600 physical l/Os. Delivery of:

o Stańer for main drives of Raw Millo LV switchgearso AY,DM, AM cabinets ( production of AIUT)o PLC controllero Measuring equipmentso installations HVAC for electrical roomo Wiring - MV, LV, control, data transmission. Preparation of controller PLC and visualisation software. Erection & Commissioning

ln scope of contractor was to provide all equipments and works necessary to ensure the properand unhindered realization the task, and proper operation of whole the task.

Design, supplies, erection and commissioning peńormed by A|UT has fully met LafargeStandards and expectations for this kind of installations. High quality of the works peńormedproves AIUT as professional contractor.

The job was peńormed in full accordance with Lafarge safety stiandards resulting in clear safetyrecord at the and of the pĄect.

Total value of the works :3 226100 PLZ net

Works peńormed in 2012'

All of the above mentioned facts prove AIUT to be a reliable and skilful company worth to berecommended for peńorming similar jobs.

Sincerely:

Page 2: H*i - AIUT

!E##f=

Reference Letter - Electrical & Automation scope of RM no. 1 andwater pumping station in Malogoszcz

Lafarge Cement S.A. plant in Malogoszczhas commissioned A|UT Sp. z o.o. company, peńorma thorough modemization of the electrical and automation Raw Mill No.1, and performautomation for water pumping station.

To scope of responsibilities in this project was:

. Engineering and design of changing the type of power network from type lT to TN-Cin Substation. Engineering and design of power distribution system ( low voltage)

. Engineering and design of control system (hardware, software , GFS, DFS) for about600 physical l/Os. Delivery of:

o Stańerfor main drives of Raw Millo LV switchgearso AY,DM, AM cabinets ( production of AIUT)o PLC controllero Measuring equipmentso installations HVAC for electrical roomo Wiring - MV, LV, control, data transmission. Preparation of controller PLC and visualisation software. Erection & Commissioning

ln scope of contractor was to provide all equipments and works necessary to ensure the properand unhindered realization the task, and proper operation of whole the task.

Design, supplies, erection and commissioning peńormed by A|UT has fully met LafargeStandards and expectations for this kind of installations. High quality of the works peńormedproves AIUT as professional contractor.

The job was peńormed in full accordance with Lafarge safety standards resulting in clear safetyrecord at the and of the project.

Works peńormed in 2012'

All of the above mentioned facts prove AIUT to be a reliable and skilful company worth to berecommended for peńorming similar jobs.

Sincerely:

Krynk u:* tnwestycji

G łszhowshi

Page 3: H*i - AIUT

List referencyjny - lnstalacja Elektryczna iAutomatyki dla MłynaSurowca nr.1 i Pompowni wody w Małogoszczu

Firma Lafarge Cement S.A. Zakład w Małogoszczu zleciła firmie AIUT Sp. z o'o. z Gliwic,wykonanie gruntownej modernizacji instalacji elektrycznej i automatyki Młyna Surowca nr.1,

oraz wyko na n ie auto m atyzaĄi pompowni wody.

Do zadań firmy wykonującej nalezało między innymi:

. Wykonanie projektu zmiany typu siecizasilającej zlT naTN-c w stacji oddziałowej

. Wykonanie projektów systemu dystrybucji niskiego napięcia,

. Wykonanie projektÓw systemu sterowania ( spzęt, oprogramowanie, GFs' DFS) dla ok.600 fizycznych WEAIVY. Dostawy

o Rozrusznika dla napędów głÓwnych Młyna Surowcao Rozdzielnic NNo Szaf napięÓ pomocniczych orazWEMY cyfrowych i analogowych (produkcja

własna AIUT)o Sterowników PLCo Aparatury kontrolno-pomiarowejo lnstalacji klimatyzacji dla stycznikownio Okablowanie Sn, nn, sterownicze, transmisji danych

. Wykonanie bezprzewodowej instalacji wymiany danych. Wykonanie oprogramowania dla sterownikÓw PLC orazwizualizaĄi

. Montaż i uruchomienie instalacji

W zakresie Wykonawcy było zapewnienie wszelkich koniecznych materiałów oraz pracniezbędnych do właściwej i niezagrożonĄ realizacji zadania a następnie prawidłowegodziałania całości realizowanego zadania.

Usługi projektowe, dostawy, montaż oraz prace uruchomieniowe świadczone przez A|UTrealizowane był W zgodzie ze Standardami Lafarge i całkowicie spełniły oczekiwaniainwestora, a wysoka ich jakoŚć potwierdza profesjonalizm Wykonawcy.

Prace na obiektiach wykonywane były w zgodzie z zasadami BHP obowiązującymi w Lafarge,co zaowocowało bezwypadkową pracąw trakcie realizacji projektu.

Roboty wykonano w 2012 roku.

Mając na uwadze powyższe fakty, możnaprofesjonalna, kompetentna technicznie,tego rodzaju projektów.

Z powaŻaniem:

z całąodpowiedzialnością stwierdziÓ że AlUT to firmaodpowiedzialna i godna polecenia jako Wykonawca

Grzłgorz I|ęes*nwski

Page 4: H*i - AIUT

ĘI\]!:!ĘE

List referencyjny - lnstalacja Elektryczna i Automatyki dla MłynaSurowca nr.1 i Pompowni wody w Małogoszczu

Firma Lafarge Cement S'A. Zakład w Małogoszczu zlec|ła firmie A|UT Sp. z o'o' z Gliwic,wykonanie gruntownej modernizacji instalacji elektrycznej i automatyki Młyna Surowca nr.1,oraz wykonanie automatyzaĄi pompowni wody.

Do zadań firmy wykonującej należało między innymi.

. Wykonanie projektu zmiany typu sieci zasilającej zlT na TN-c w stacji oddziałowej. Wykonanie projektów systemu dystrybucji niskiego napięcia,

. Wykonanie projektów systemu sterowania ( spzęt, oprogramowanie, GFs' DFs) dla ok.600 fizycznych WEMY. Dostawy

o Rozrusznika dla napędów głównych Mł'yna Surowcao Rozdzielnic NNo Szaf napięć pomocniczych orazWEMY cyfrowych i analogowych (produkcja

własna AlUT)o Sterowników PLCo Aparatury kontrolno-pomiarowejo lnstalacji klimatyzacji dla stycznikownio Okablowanie Sn, nn, sterownicze, transmisjidanych. Wykonanie bezprzewodowej instalacji wymiany danych. Wykonanie oprogramowania dla sterowników PLC orazwizualizacji. Montaż i uruchomienie instalacj

W zakresie Wykonawcy było zapewnienie wszelkich koniecznych materiałÓw oraz pracniezbędnych do właśc|wej i niezagrożonej realizaĄi zadania a następnie prawidłowegodziałania całości realizowanego zadania.

Usługi projektowe, dostawy, montaż oraz prae- uruchomieniowe świadczone przez AIUTrealizowane były W zgodzie ze Standardami Lafarge i całkowicie spełniĘ oczekiwaniainwestora, a wysoka ich jakoŚć potwierdza profesjonalizm Wykonawcy.

Prace na obiektach wykonywane były w zgodzie z zasadami BHP obowiązującymi w Lafarge,co zaowocowało bezwypadkową pracąW trakcie realizacji projektu.

Całkowita wańość robót: 3 226 100 zł netto

Roboty wykonano : 2012

Mając na uwadze powyższe fakty, można z całąodpowiedzialnością stwierdzić ze AIUT to firmaprofesjonalna, kompetentna technicznie, odpowiedzialna i godna polecenia jako Wykonawcatego rodzaju pĄektów.

Z poważaniem: