File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx October 15, 2015 Photos #1: Overall view of site showing proposed work Ref# 11139 SCP April 22, 2015 Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10 Photographs Showing Proposed Work, Project No. 86002-4502 Page 1 of 19 Highway #1, Slide 5 Area, Catch Fence and Berm Repair RFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 km LKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6 Repair north fence (2009) Repair catch fence (2013) on berm Repair south portion of berm Repair and adjust rubber tire mats on back of berm Remove large rock embedded in back of berm P1 P7 0.939 1.081 Replace and weld broken hanging plate at steel cap #1 Reconstruct rock armour at back of berm Replace two braking elements for upper bearing rope Weld two additional hanging plates on each steel cap #1 to 20 Steel cap #1 Remove existing 7.6 m long and 1.0 m thick gabion wall (2013) and construct new 24.6 m long gabion wall to south end of berm Steel cap #20 Install rubber tire mats Types 5, 6, 7 and 8 Embankment berm (2008) Install steel berm edge protectors 0.949 0.961 Braking elements Braking elements

Upload: lammien

Post on 10-Apr-2018

219 views

Category:

Documents


4 download

TRANSCRIPT

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Photos #1: Overall view of site showing proposed workRef# 11139 SCP April 22, 2015

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 1 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Repair north fence (2009)

Repair catch fence (2013) on berm

Repair south portion of berm

Repair and adjust rubber tire mats on back of bermRemove large rock embedded in back of berm

P1

P7

0.9391.081

Replace and weld broken hanging plate at steel cap #1

Reconstruct rock armour at back of berm

Replace two braking elements for upper bearing rope

Weld two additional hanging plates on each steel cap #1 to 20

Steel cap #1

Remove existing 7.6 m long and 1.0 m thick gabion wall (2013) and construct new 24.6 m long gabion wall to south end of berm

Steel cap #20

Install rubber tire mats Types 5, 6, 7 and 8

Embankment berm (2008)

Install steel berm edge protectors

0.9490.961

Braking elements

Braking elements

Photos #2: Overall view showing proposed workRef# 11324 SCP October 25, 2015

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 2 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Ferrabee Wall (1961)

Repair rubber tire matReplace broken hanging plate on cap #1

Weld two additional hanging plates on each of 20 caps

Fasten rubber tire mats to each new hanging plate

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Remove two mats Type 2 Install two mats Type 2 on caps between posts 2 and 3

Replace broken hanging plate on cap 1Total 41 extra hanging plates to be welded

Install steel mat plates under proposed new gabion wall

Reconstruct existing 7.6 m long gabion wall on berm

Remove existing 7.6 m long and 1.0 m thick gabion wall (2013) and construct new 24.6 m long gabion wall to south end of berm

Mat weight = 50 lb/ft2

Remove mats Type 1 as necessary

Photo #3: Overall view of site showing proposed workRef# 11247 SCP May 1, 2015

Ferrabee Wall (1961)

Repair north fence (2009)

Rock fall site of February 11, 2015

Repair catch fence (2013) on berm

P1

P7

0.939

1.081

Repair south portion of berm (2008)

Repair and adjust rubber tire mats

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 3 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Catchment cleanout complete

Additional 500 m3 debris accumulated in catchment about October 10, 2015 (not shown)

Remove large rock embedded in berm

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Remove existing gabion wall (2013) and construct new gabion wall to south end of berm

Photo #4: View showing proposed workRef# 11139 SCP April 22, 2015

0.939

Repair south portion of berm (2008)

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 4 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Remove boulders

Armour to top of concrete wall using > 1.5 m size boulders

Catchment cleanout in progress

Boulder armour to protect concrete Ferrabee wall

Remove large rock embedded in berm

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Remove existing gabion wall (2013) and replace with new gabion wall to south end of berm

Fasten 20 mats Type 1 to extra hanging plates

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 5 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Photo #5: View showing proposed workRef# 11247 SCP May 1, 2015

Replace and weld broken hanging plate Type 2 at steel cap #1

Remove 0.6 m rock

Reinstall mat at broken hanging plate

Rock fall site of March 14, 2015

Trumer 2000 kJ catch fence

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Install 41 extra hanging plates Type 2 (all steel caps)

Replace gabion wall on berm

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 6 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Photo #6: View showing proposed workRef# 11113 SCP March 16, 2015

Replace and weld broken hanging plate at steel cap #1

Reinstall mat at broken hanging plate

Rock fall site of March 14, 2015File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Repair catch fence (2013)

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 7 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Photo #7: View showing proposed workRef# 11139 SCP April 22, 2015

Re-install chain link (HPN) backing net using Geobrugg T3-clips on 0.6 m centres

Remove 0.6 m rock

Rock fall site of March 14, 2015

Catchment cleanout in progressEmbankment berm (2008)

Steel cap #20

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 8 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Photo #8: View showing proposed workRef# 11139 SCP April 22, 2015

Weld 41 extra hanging plates Type II on caps #1 to 20 and hang mats on existing and extra plates

Catchment cleanout in progress

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Photo #9: View showing proposed workRef# 10880 SCP October 25, 2013

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 9 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Place mats Type 2 on berm between posts #2 and 3

Connecting cable for upper mat

Remove two mats Type 2

Type 5 mats replace Type 2 mats on gabion wall

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Cap on berm (2008)

Post P1

Remove gabion wall on berm

Repair catch fence (2013)

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 10 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Photo #10: View showing proposed workRef# 11316 SCP October 15, 2015

Re-install chain link (HPN) backing and reinforce remaining net using Geobrugg T3-clips on 0.6 m centres

Place mats Type 2 between posts #2 and 3

Existing apron net to be placed on top of Type 2 mats

Replace two braking elements Trumer AVT phx 80/30-3.5 for upper bearing ropeFile: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Upper bearing rope

Replace braking element

Trumer AVT phx 80/30-3.5

See Trumer Installation Manual

Looking north

Bearing rope tension 1000 to 2000 lb (at the point when braking elements begin to activate)

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 11 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Photo #11: View showing proposed work – south endRef# 11113 SCP March 16, 2015

Re-tension all four bearing ropes as required

Rock fall site of March 14, 2015

Embankment berm (2008)

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Photo #12: View showing proposed work – north endRef# 11113 SCP March 16, 2015

Upper bearing rope

Replace braking element

Trumer AVT phx 80/30-3.5

See Trumer Installation Manual

Looking south

Bearing rope tension 1000 to 2000 lb (at the point when braking elements begin to activate)

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 12 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Re-tension all four bearing ropes as required

Rock fall site of March 14, 2015

Embankment berm (2008)

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Remove large rock embedded in berm

Looking North

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 13 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Photo #13: View showing proposed workRef# 11316 SCP October 15, 2015

Patch hole with 3 m by 3 m gabion mesh panel and refill with gabion stones 100 to 200 mm size

Remove outer gabion layer and 14 conveyor belts

Cut #7 bars (36 bars) flush with top of berm

Gabion mesh patches to overlap 0.6 m all around and fasten with T3 clips on 0.1 m centres

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Patch all holes in berm as required with gabion mesh panels and refill with gabion stones 100 to 200 mm size

Photo #14: View showing proposed workRef# 11097 SCP February 17, 2015

Repair berm (2008)

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 14 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Wrap section0.9390.949

Wrap top two layers with one gabion roll 26 m long by 3 m wide

Push with excavator bucket to restore face angle to 80 degrees

Protect gabion wires with wooden planking

Push with excavator bucket to restore face angle to 90 degrees

2 m size boulder removed after photo taken

South fence (2010)

Reinforcement mesh layer to be tensioned against berm

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Berm (2008)

Photo #15: View showing proposed workRef# 11092 SCP February 12, 2015

Do not repair slightly damaged south fence

Protect gabion wires with wooden planking

Push with excavator bucket to restore face angle to 90 degrees

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 15 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Berm (2008)

Photo #16: View showing proposed workRef# 11316 SCP October 15, 2015

Push with excavator bucket to restore face angle to 90 degrees

Protect gabion wires with wooden planking

Push with excavator bucket to restore face angle to 80 degrees

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 16 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

South fence (2010)

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Berm (2008)

Photo #17: View showing proposed workRef# 11110 SCP March 10, 2015

Infill any gaps in south portion of berm

Catch fence repair in progress

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 17 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Remove outer gabion layer and 14 conveyor belts

Cut 36 steel bars (#7 size) flush with top of berm

Remove large rock embedded in berm

Embankment berm (2008)

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Photo #18: View showing proposed workRef# 11113 SCP March 16, 2015

Repair north fence (2009)

HPN mesh patch to be 1.2 m by 1.2 m between existing cable net and HPN

Rock fall site of March 14, 2015

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 18 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

Embankment berm (2008)

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015

Photo #19: View showing proposed workRef# 11113 SCP March 16, 2015

Repair north fence (2009)

Rock fall site of March 14, 2015

HPN mesh patch to be 1.2 m by 1.2 m between existing cable net and HPN

Temporarily remove bottom lacing cable to install patch

Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/4502.10Photographs Showing Proposed Work, Project No. 86002-4502

Page 19 of 19Highway #1, Slide 5 Area, Catch Fence and Berm RepairRFI Landmark No.: 1865264, RFI Landmark Name: Hell's Gate Tunnel West Side, RFI Offset: 0.939 to 1.081 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 53.4 to 53.6

File: 4502_Slide_5_Berm_Repair_Photos_Proposed_Work_Oct_15_2015.pptx

October 15, 2015