hilca vertical cylindricaltank process
TRANSCRIPT
Hilca Hilca Vertical Vertical Cylindrical Tank Tank
Process Process Process Process
1, Babalola Daramola Street, Ibafo, Ogun State.
www.hilcagroup.com, [email protected],
Objectives; Resolve Conflicts in Calibration
Improve on Calibration Process & Standards
Reduce Product shortages
Meet Industry and Company calibration Standards
Enhanced Safety, Accuracy and Environment Enhanced Safety, Accuracy and Environment friendly
Improved usage and distribution efficiency
Reduced down time/cost and objectives
Improved Planning and Corporate image
Increased Customers Satisfaction
Promote management Confidence
Tank Covers with bolts are usually manipulated, Tires, balloon/spring etc must be checked. Take measurement of the tractor/tank suspension from the ground.
Scope Scope
from the ground. Calibrate tank compartment to designed nominal capacity to determine if it can contain the standard volume. New trucks must have allowable space of
200mm liquid height and neck height.
Safety of Personnel & equipment is important any injurysustain would affect operation. Three(3) levels of safety training must be undergone by allstaff. Put off equipment when not in use, check for clockwise.
Safety Precautions Safety Precautions
Put off equipment when not in use, check for clockwise. Install strainers & iron mesh before the flow meter. flow meter should moved gradually to avoid damage afterclose of business. Make sure you secured your equipment in a safe place.
Prepare the Temporal chart and the
Endorsements.
Prepare the Temporal chart and the Original charts after verifications for Endorsements.
Conduct inspection of site to assess extent of job & safety of the Operation.
Conduct an induction for the Operators on site by our EHSQ Lead & Premob of Equip.
Process To Vertical Tank Calibration Process To Vertical Tank Calibration –– Strapping MethodStrapping MethodProcess To Vertical Tank Calibration Process To Vertical Tank Calibration –– Strapping MethodStrapping Method
If Tank Cleaning is required? Then opening
Floor survey by physical method and then strap each course (ring) to get your true circumference of each course with other necessary measurements. This method is an approved standard of DPR and you are sure of 100%
Evacuate all the sludge in the tank which may be solid or liquid.
Carry out the cleaning proper which may involve entering if safe – Vertical or Surface
If Tank Cleaning is required? Then opening of tank manhole cover will be carried out 1st.
Replace the Seal/Parking and manhole covers with bolts & nuts
Commence the calibration proper by introducing same product into the cleaned tank with API 2550 - Strapping method & measurements taken.
standard of DPR and you are sure of 100% depending on who handle the job.
Prepare the Temporal chart and the
Endorsements.
Prepare the Temporal chart and the Original charts after verifications for Endorsements.
Conduct inspection of site to assess extent of job & safety of the Operation.
Conduct an induction for the Operators on site by our EHSQ Lead & Premob of Equip.
Process To Vertical Tank Calibration Process To Vertical Tank Calibration ––Metering/Strapping MethodMetering/Strapping Method
Process To Vertical Tank Calibration Process To Vertical Tank Calibration ––Metering/Strapping MethodMetering/Strapping Method
If Tank Cleaning is required? Then opening of tank manhole cover will be carried out
You have to meter water of intended liquid for calibration through a certify flow meter into the tank to determine critical levels of the floor. While metering you are to dip at this critical levels and other time to cross check your meter flow output
Evacuate all the sludge in the tank which may be solid or liquid.
Carry out the cleaning proper which may involve entering if safe – Vertical or Surface, Replace cover with bolts & nuts
of tank manhole cover will be carried out 1st.
other time to cross check your meter flow output with the tank volume/height. After you have gotten to your target, either when the floor has been totally covered or to part of tank cylinder you then stop and still go ahead and strap the shell of the tank one after the other, and take other measurements.
Commence the calibration proper by introducing same product into the cleaned tank with API 2555 – Metering/Strapping method & measurements taken
CALIBRATION PROPOSAL
ProfileHilca Company Limited is a Fleet Management Solutions Provider on;
Fleet Safety Standards – Daily Pre & Post loading, Point ofentry Assessment and Annual Truck Audit
Accident Investigation Audit & Reporting Tank Integrity Test (Leak or Pressure Testing) Tank Calibration – Road Tankers, Underground, AG/Vertical Tanks
Management of Tank Facilities – Bulk Terminals & VMI SitesTank Calibration – Road Tankers, Underground, AG/Vertical Tanks
Management of Tank Facilities – Bulk Terminals & VMI Sites Metering & Instrumentation services Flow Meter and Pipeline installations Service Station Construction & Maintenance Services Training & Supply Chain Management Consultancy Services
Hilca started operations in Oil & Gas Industry in 2004 with Sale of Petroleum Products and Management of Retail outlets.We have leveraged on our product knowledge and technical expertise to provide excellent services to our clients.
Head office Head office ::1, Babalola Daramola Street, 1, Babalola Daramola Street, IbafoIbafo, Ogun State,, Ogun State,
Nigeria.Nigeria.
Tel: Tel: +234 8064854237 or 08037041917Tel: Tel: +234 8064854237 or 08037041917
ee--mail: [email protected] mail: [email protected]
Website: www.hilcagroup.comWebsite: www.hilcagroup.com