hiload during dp operation – november 2010
DESCRIPTION
Docking and Attachment Test Norway - December 13, 2010. HiLoad during DP Operation – November 2010. Approach to Submersible Barge on DP. Attachment System Activated Maneuvering of Barge by HiLoad DP. HiLoad during DP Operation – November 2010. First Ballast Test – Oct 2010. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: HiLoad during DP Operation – November 2010](https://reader034.vdocument.in/reader034/viewer/2022051316/568158a8550346895dc5fbf3/html5/thumbnails/1.jpg)
1HiLoad during DP Operation – November 2010
Docking and Attachment Test Norway - December 13, 2010
![Page 2: HiLoad during DP Operation – November 2010](https://reader034.vdocument.in/reader034/viewer/2022051316/568158a8550346895dc5fbf3/html5/thumbnails/2.jpg)
2Approach to Submersible Barge on DP
![Page 3: HiLoad during DP Operation – November 2010](https://reader034.vdocument.in/reader034/viewer/2022051316/568158a8550346895dc5fbf3/html5/thumbnails/3.jpg)
3
Attachment System Activated Maneuvering of Barge by HiLoad DP
![Page 4: HiLoad during DP Operation – November 2010](https://reader034.vdocument.in/reader034/viewer/2022051316/568158a8550346895dc5fbf3/html5/thumbnails/4.jpg)
4HiLoad during DP Operation – November 2010
![Page 5: HiLoad during DP Operation – November 2010](https://reader034.vdocument.in/reader034/viewer/2022051316/568158a8550346895dc5fbf3/html5/thumbnails/5.jpg)
5
First Ballast Test – Oct 2010First Ballast Test – Oct 2010
![Page 6: HiLoad during DP Operation – November 2010](https://reader034.vdocument.in/reader034/viewer/2022051316/568158a8550346895dc5fbf3/html5/thumbnails/6.jpg)
6HiLoad during DP Operation – November 2010
![Page 7: HiLoad during DP Operation – November 2010](https://reader034.vdocument.in/reader034/viewer/2022051316/568158a8550346895dc5fbf3/html5/thumbnails/7.jpg)
7HiLoad DP No. 1 in Transit to Test Location on the West Coast of NorwayHiLoad DP No. 1 at “Sea Trial Base” in NorwayHiLoad DP at 42 m draught (138 feet)
HiLoad DP No. 1 – In OperationHiLoad DP No. 1 – In Operation
![Page 8: HiLoad during DP Operation – November 2010](https://reader034.vdocument.in/reader034/viewer/2022051316/568158a8550346895dc5fbf3/html5/thumbnails/8.jpg)
8HiLoad DP No. 1 in Transit to Test Location on the West Coast of NorwayHiLoad DP No. 1 at “Sea Trial Base” in Norway
28.0 m 27.0 m
42.0 m42.0 m
Min draught17.0 m