Introduction to HIPPI05Introduction to HIPPI05
- Few words on the life of HIPPI- A new HIPPI Management…- HIPPI 05 organization- Mandate for the ESAC- HIPPI at CARE05- Planning, milestones and deliverables
Maurizio Vretenar, 28.9.2005
2 HIPPI 05, Abingdon, 28.9.05
HIPPI for newcomersHIPPI for newcomers
HIPPI = High Intensity Pulsed Proton Injectors
Main objective:
Research and development of the technology for high intensity pulsed proton linear accelerators up to an energy of 200 MeV.
- First proposal in March 2003- Final proposal in September 2003- Start in January 2004 for 5 years
duration
HIPPI is at the end of its 2nd year, almost mid way to the end…
We are now in the real business !
3 HIPPI 05, Abingdon, 28.9.05
HIPPI Management ChangesHIPPI Management Changes
Purely CERN-related problem: in 2006 the CERN AB Department had to replace 6 Group Leaders out of 9…
Roland Garoby has been convinced to accept the responsibility of the BDI (=Beam Diagnostics and Instrumentation) Group (~85 people, LHC on sight…), effective from September 1st.
RG was forced to reduce his other responsibilities: he has convinced MV to accept the role of HIPPI coordinator from July 1st as well as the responsibility for the CERN contribution to HIPPI-related work (R&D for Linac4).
However, RG remains involved in CERN studies for future accelerators, keeps responsibility of the SPL work at CERN and contributes to BENE and HHH Networks inside CARE.
And he sends to HIPPI05 his greetings and his wishes for a good work!
Why change a well experienced team?
4 HIPPI 05, Abingdon, 28.9.05
New HIPPI ManagementNew HIPPI Management
From July 1st:
HIPPI Coordinator: Maurizio VretenarHIPPI Deputy Coordinator: Alessandra Lombardi
(deputy from same lab as coordinator, with experience in the JRA)
HIPPI WP Coordinators:WP2: J.M. De Conto (IN2P3, Univ. Grenoble)WP3: S. Chel (CEA)WP4: A. Lombardi (CERN, confirmed)WP5: I. Hofmann (GSI)
5 HIPPI 05, Abingdon, 28.9.05
HIPPI LifeHIPPI Life
- Preparation of reports and of this meeting went very smoothly thanks to the excellent communication inside the JRA.
- Scientific progress is constant.- We are (more or less) keeping up with our milestones and
deliverables.- Good number and quality of publications.- We are hiring people, mostly young and motivated, and we are
training them for a career in the field of accelerators.- HIPPI stands as a good example inside CARE.
A great thank to: All HIPPIes for the pleasant and effective working
atmosphere Our Work Package Coordinators for their excellent work in
driving and coordinating the activities, preparing the meetings, contributing to the reports, …
6 HIPPI 05, Abingdon, 28.9.05
HIPPI ProgressHIPPI Progress
- 2nd 2005 Quarterly Report finished on Aug. 30th (46 pages!). Note that in order to reduce the amount of paperwork, we have only 2 Quarterly Reports (April and August) plus the Annual report (December).
- Internal and External (collaboration) meetings proceed as scheduled, with good attendance and quality of presentations.
- Proposition for an additional member: INFN-Naples has experience of Side Coupled NC Structures for medical applications. They (Prof. Vaccaro + a small team) would like to join HIPPI WP2 from 2006, in case a common programme could be agreed with the partners (and with no financial contribution from EU).
7 HIPPI 05, Abingdon, 28.9.05
2005 Meetings2005 Meetings
Jan. Feb. March April May June July Aug. Sept. Oct. Nov. Dec. CARE & HIPPI
CSC meetings
5 CERN
5 & 6 Paris
Workshop WP2
2 &3 CERN
Workshop WP3
13 & 14 INFN-Mi
Workshop WP4
13 &14 RAL
Workshop WP5
14 & 15 RAL
HIPPI yearly meeting 28 - 30
RAL
CARE yearly meeting
23 - 25 CERN
Other workshops
High Power SC Linac
23 - 25 FNAL
Other collaborations
IPHI-SPL 27 & 28 CERN
???
IPNO
Russia (ISTC)
18 - 22 Russia
17 – 19 CERN (DTL)
10 – 14 CERN
(CCDTL)
5 – 11 CERN (DTL)
Miscellaneous
INTC 10 - 14 CERN
PAC05 16 - 20 Knoxville
ICIS05 12 -16 Caen
8 HIPPI 05, Abingdon, 28.9.05
2005 Annual Meeting2005 Annual Meeting
The Cosener's HouseAbbey CloseAbingdon, UK
- Many thanks to the local organisers for the perfect preparation.
- 44 registered participants, 20% more than the 38 of HIPPI04.
- Very good performance of our speakers: slides of 27 out of 31 presentations (87%) were received by last Thursday at noon !
Few words on the organisation
- Programme structured in sessions, chaired by the Work Package Coordinator.
- Time for talks and time for questions & discussion (specially from the ESAC).
9 HIPPI 05, Abingdon, 28.9.05
HIPPI 05 Programme - 1HIPPI 05 Programme - 1
Wednesday 28, September, morning
9h00 9h15
9h45 10h00 10h30 11h00 11h30 11h50 12h05 12h20 12h30
Welcoming address Status of HIPPI and introduction to the meeting
WORK PACKAGE 4 (Chopper)
Introduction (10’+5’) Status of the CERN chopper (25’+5’)
Coffee Break Status of the RAL ‘Fast-Slow’ beam chopper development programme (25’+5’) The FETS: Front End Test Stand (15’+5’) Beam dynamics studies and design options for the RAL FETS chopper line (10’+5’) Status of the CERN Chopper line (10’+5’) Design of a rebunching cavity for the RAL FETS chopper line (10’)
End of session
C. Prior M. Vretenar
A. Lombardi M. Paoluzzi M. Clarke-Gayther A. Letchford G. Bellodi A. Lombardi C. Plostinar
Wednesday 28, September, afternoon
14h00 14h10 14h50 15h20 15h40 16h10 16h50 17h20 17h40 18h00
WORK PACKAGE 2 (Normal Conducting RF struct.)
Introduction (10’) Progress on DTL design for CERN (30’+10’) Waveguide RF coupler for NC structures (20’+10’) Preliminary DTL studies at RAL (15’+5’)
Coffee Break Status of the RT CH-DTL development and beam dynamics layout of the GSI Proton Linac CCDTL design and prototype measurements (20’+10’) Side Coupled Linac design at CERN (15’+5’) Side Coupled Linac analysis at LPSC (15’+5’)
Adjourn
J.M. De Conto F. Gerigk Bernaudin /Deconto C. Plostinar G. Clemente M. Pasini M. Pasini J.M. De Conto
10 HIPPI 05, Abingdon, 28.9.05
HIPPI 05 Programme - 2HIPPI 05 Programme - 2Thursday 29, September, morning
WORK PACKAGE 3 (Superconducting RF structures)
Introduction (10’) Status report of coaxial tuner design (25’+5’) Status of HIPPI activities at CEA-Saclay (35’+5’) Measurements with the 760 MHz Triple Spoke Cavity (15’+5’)
Coffee break Final Mechanical Design of the 352 MHz Cavity and Options for Tuning (15’+5’) Status of spoke cavities activities at IN2P3-IPNO (25’+5’) Status of the superconducting CH-Structure at IAP-FU (25’+5’) Super-conducting slot-finger structure with RF focusing (10’+10’)
End of session
S. Chel P. Pierini G. Devanz R. Eichhorn E. Zaplatine G. Olry H. Podlech Y. Senichev
Thursday 29, September, afternoon
WORK PACKAGE 5 (Beam Dynamics)
Introduction (10’+5’) Development of non-intercepting longitudinal and transverse beam profile monitors (15’+5’) High Intensity beam dynamics in the slot-finger structure (15’+5’) Status of diagnostics development at FZJ (10’+5’) Progress in HIPPI code benchmarking (15’+5’)
Coffee break Status report on the beam shape and halo monitor (15’+5’) Beam dynamics in the Linac4 (10’+5’) Measurements & simulations on emittance growth due to space charge along the DTL of the GSI UNILAC (20’+5’) Status of LORASR Code Development and Recent Benchmarking Results (20’+5’)
I. Hofmann P. Fork N. Vasyukhin R. Tölle A. Franchi M. Hori A. Lombardi L. Groening / W. Bayer R. Tiede
11 HIPPI 05, Abingdon, 28.9.05
HIPPI 05 Programme - 3HIPPI 05 Programme - 3
Friday 30, September, morning
Meeting on HIPPI administrative matters and planning for 2006 (in parallel with ESAC deliberations) ESAC preliminary assessment Concluding talk
Friday 30, September, afternoon: Visit to Rutherford Laboratory
Friday morning:
- Presentation on dissemination by Alessandra.
- Common definition of the planning for 2006.
- Budget status (at CARE and at HIPPI level).
- Few more administrative matters (CARE05, HIPPI06).
- Question time…
12 HIPPI 05, Abingdon, 28.9.05
External Scientific Advisory External Scientific Advisory CommitteeCommittee
The ESAC plays a very important role in our work !
We have read carefully the 2004 ESAC Report and we have used it as a reference in the continuation of our work. It was a balanced document that has started reaction to some critical issues, and we are grateful to the ESAC members for the time and work devoted to its preparation.
We regret that Prof. Yamazaki is not able to attend this meeting, due to a last minute management problem at JAERI, but we hope that he will be able to contribute from Japan.
From the ESAC, we expect as usual a summary talk on Friday with a short draft document.
A longer document should be prepared before the end of October, to be presented and discussed at the CARE05 Meeting, and to be part of the HIPPI Annual Report to be sent to Brussels.
13 HIPPI 05, Abingdon, 28.9.05
ESAC ChargesESAC Charges
The External Scientific Advisory Committee for the HIPPI JRA inside CARE has been nominated to analyse the work done and planned in the frame of HIPPI and to give advice to the HIPPI management, by making assessments and by providing recommendations. More specifically, the following questions have to be addressed: # 1 (general) Please review and comment the overall scientific quality of the research carried out. What were the most important accomplishments of the past year? How does the work compare with the international level? # 2 (labs & groups) Does the work presented by the different labs match with the HIPPI work plan? Is it consistent and sufficiently transparent scientifically? Comment on the proper use of resources. Is it clear how the groups proceed in the following year? # 3 (WP's) Comment on the effectiveness of interaction within WP's. Is there enough visibility of WP collaboration? Comment on what needs to be strengthened.
14 HIPPI 05, Abingdon, 28.9.05
CARE05 at CERNCARE05 at CERN
ANNUAL MEETING
Coordinated Accelerator Research in Europesupported by the European Community (FP6
Research Infrastructures Action)
Nov. 23-25, 2005, CERN Geneva, Switzerland
15 HIPPI 05, Abingdon, 28.9.05
CARE05 Preliminary ProgrammeCARE05 Preliminary ProgrammeWednesday, November 23 Thursday, November 24 Friday, November 25
08:00 Registration
09:00 PLENARY (Auditorium) 09:00 PLENARY 09:00 PLENARY (Auditorium)Introduction session Networking/Joint Research Activities JRA Activity Reports
Aud Chair: Aud Chair: Aud Highligh talks
10 Welcome - From the Lab. Director hosting 30 + 5 Report on SRF Activities (D.Proch/T. Garvey)the general CARE meeting (R. Aymar) 20 + 5 Report on PHIN Activities (A. Ghigo)
20 + 5 Report on HIPPI Activities (M. Vretenar)20+5 CARE General Status & Plans - 20 + 5 Report on NED Activities (A. Devred)
by CARE coordinator (R. Aleksan)
20+5 CARE Dissemination Activities -by Dissemination Board Chair (O. Napoly)
10:00 Coffee Break 10:30 Coffee Break 10:50 Coffee Break10:30 PLENARY 11:00 PARALLEL 11:10 PLENARY (Auditorium)
Networking Activities Networking/Joint Research Activities JRA Activity Reports
Aud Highligh talks Aud Chair:
20 + 5 Report on ELAN Activities (F. Richard)R? N1: ELAN 20 + 5 Report on BENE Activities (V. Palladino)R? N2: BENE 20 + 5 Report on HHH Activities (F. Ruggiero)R? N3: HHH (ABI)) FP7 presentation?R? JRA3: HIPPI (+SRF+PHIN?) 15 Concluding remarksR? JRA4: NED
12:30 Lunch 12:30 Lunch 12:40 Lunch
Networking Activities Networking/Joint Research Activities Governing BoardAud Chair:
R? N1: ELAN (ANAD?) R? N1: ELAN (+SRF)R? N2: BENE (+HIPPI) R? N2: BENER? N3: HHH (AMT) R? N3: HHH (APD)R? JRA1: SRF R? JRA2: PHINR? JRA2: PHIN R? JRA3: HIPPI
R? JRA4: NED
16:00 Coffee Break 16:00 Coffee Break 16:00 Coffee Break16:30 PARALLEL 16:30 PARALLEL 16:30 CARE SC and DB
Networking Activities Networking/Joint Research Activities
R? N1: ELAN (ANAD?) R? N1: ELAN (+SRF)R? N2: BENE R? N2: BENER? N3: HHH (AMT) R? N3: HHH (APD)R? JRA1: SRF R? JRA3: HIPPIR? JRA2: PHIN R? JRA4: NEDR? JRA3: HIPPI (+HHH/APD)
18:30 Adjourn 18:30 Adjourn 18:00 Adjourn
19:30 CARE Dinner
14:0014:00 PARALLEL14:00PARALLEL
16 HIPPI 05, Abingdon, 28.9.05
HIPPI at CARE05HIPPI at CARE05
1. For the first time, 2 sessions of highlight talks (15’-20’), with 2-3 talks from HIPPI, can be a repetition of talks at HIPPI05 (Wed+Thu morning).
2. 20’ report from the coordinator, Friday morning 25.11.
3. Open meeting of HIPPI Steering Board (Management+WP Coordinators) Thursday 24.11 afternoon, 14:00. To discuss the ESAC report and finalise planning for 2006. Open to anybody interested.
4. Joint meeting HIPPI-SRF on SC Developments on Thursday 24.11 morning, 11:00. Representatives of WP3 labs are invited to join.
5. Joint meeting HIPPI-BENE-HHH on Wednesday 23.11 16:00 (overview of work done in partner laboratories, to look for further synergies…).
Expected attendance:
- WP coordinators (or replacement) on Thursday afternoon.
- Speakers for Wednesday and Thursday sessions.- Some WP3 representatives on Wednesday morning.- Everybody interested on all other sessions.
17 HIPPI 05, Abingdon, 28.9.05
HIPPI Milestones and DeliverablesHIPPI Milestones and Deliverables
0
2
4
6
8
10
12
14
16
18
2004 2005 2006 2007 2008
Deliverables
Milestones
“Measurable” indication of our progress (and perhaps the only thing checked by Brussels…).
17 in 2005 (16 milestones and 1 deliverable)
Milestones Deliverables Total2004 1 0 12005 16 1 172006 4 8 122007 5 9 142008 1 13 14
58
18 HIPPI 05, Abingdon, 28.9.05
WBS # Title Due date in Annex 1 Status Revised delivery date 5.1.2 LORASR development: intermediate report December 2005 On time
5.3.1 Profile measurement by fluorescence prototype
March 2005 Ready
5.3.3 Non-interceptive meas. preparation June 2005 80% Ready October 2005 5.3.5 Halo measurement device prototype ready June 2005 Ready
5.3.5 Final report on Halo measurement device June 2005 Done (CARE/HIPPI Document-05-005)
WBS # Title Due date in Annex 1 Status Revised delivery date 4.1.1 Chopper A design report June 2005 delayed December 2005
4.1.2 Intermediate test report March 2005 Waiting for task 4.1.5
March 2006
4.2.2 Dump design report June 2005 pending October 2005 4.3.1 Chopper B intermediate report June 2005 Delivered July2005
Milestones and deliverables 2005Milestones and deliverables 2005
WBS #
Title Due date in
Annex 1 Status Revised delivery date
3.1.4 Cavity A tuner: intermediate report December
2005 On time
3.2.2 Report on evaluation of 760 MHz prototype
March 2005 Delivered
3.2.3 Report on evaluation of 352 MHz 2gaps-proto
October 2005 On time
3.2.6 Design report on 352 MHz n-gaps resonator
May 2005 Results available August 2005
3.3.1 Report on CH tuners June 2005 Delayed September 2005
WBS #
Title Due date in
Annex 1 Status Revised delivery date
2.2.5 Test of CH model cavity: intermediate report
December 2005
On time
2.2.8 Design report on beam dynamics in the CH-DTL
June 2005 Delayed September 2005
2.4.1 Construction of CCDTL pre-prototype: intermediate report
June 2005 Delayed December 2005
19 HIPPI 05, Abingdon, 28.9.05
Detailed planning and progressDetailed planning and progress
ID Task Name Milestones Deliverables
1 WP2: NORMAL CONDUCTING STRUCTURES
2 2.1 Drift Tube Linac
3 2.1.1 DTL design
4 2.1.2 Decision on prototyping
5 2.1.3 DTL coupler prototype design
6 2.1.5 DTL coupler prototype construction and testing
7 2.1.4 DTL beam dynamics design
8 2.2 H-mode Drift Tube Linac
9 2.2.1 RF model CH tank1 RF design
10 2.2.2 RF cold model design & construction
11 2.2.3 RF model construction
12 2.2.4 Beam dynamics design CH tank1
13 2.2.5 CH model cavity tests Dec-05 Intermediate report
14 2.2.6 CH-prototype design
15 2.2.7 CH-prototype construction Dec-06: Prototype ready
16 2.2.8 CH-DTL beam dynamics study Jun-05 Design report
17 2.3 Side Coupled Linac
18 2.3.1 RF model RF design
19 2.3.2 RF model mechanical design
20 2.3.3 RF model construction and testing
21 2.4 Cell Coupled Drift Tube Linac
22 2.4.1 Pre-prototype construction Jun-05 Intermediate report
23 2.4.2 Pre-prototype high-power RF tests
24 2.4.3 Contribution to ISTC prototype construction Jun-06 Prototype ready
25 2.4.4 Revision of design after prototype testing Dec-06: Design report
26 WP3: SUPERCONDUCTING STRUCTURES
27 3.1 ELLIPTICAL CAVITIES
28 3.1.1 Cavity A vertical tests
29 3.1.2 Tuner design
30 3.1.3 Integration of piezo design
31 3.1.4 Tuner construction and testing Dec-05 Intermediate report
32 3.1.5 Design cavity B
33 3.1.6 Construction cavity B Jun-06: cavity B ready
34 3.1.7 Power coupler design & engineering
35 3.1.9 RF coupler construction
36 3.1.8 RF source order & preparation
37 3.1.10 Modulator preparation for 700 MHz test stand
38 3.2 SPOKE CAVITIES
39 3.2.1 Test stand preparation at FZJ
40 3.2.2 Evaluation of 760 MHz resonator in vertical cryostatMar-05 Intermediate report
41 3.2.3 Evaluation of 352 MHz 2-gap res. in vertical cryostatOct-05 Intermediate report
42 3.2.4 Design of coupler prototype
43 3.2.5 Test of coupler prototype
CEA,CERN,LPSC
26/04
CEA,LPSC
CEA,LPSC
RAL
IAP-FU
IAP-FU
IAP-FU
IAP-FU
IAP-FU
IAP-FU
IAP-FU
LPSC,CERN
LPSC
LPSC,CERN
CERN
CERN,LPSC,CEA
CERN
CERN
INFN-MI,CEA
INFN-MI
INFN-MI
INFN-MI
CEA
CEA
CEA
CEA,LPSC
CEA
CEA
FZJ
IN2P3-Orsay
IN2P3-Orsay
IN2P3-Orsay
12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 122003 2004 2005
20 HIPPI 05, Abingdon, 28.9.05
Detailed planning and progressDetailed planning and progress ID Task Name Milestones Deliverables
44 3.2.6 RF design of 352 MHz multi-gap resonator May-05 Design report
45 3.2.7 Engineering of resonator, coupler and tuner
46 3.2.8 Final design of 352 MHz multi-gap prototype
47 3.3 CH RESONATOR
48 3.3.1 Design of tuning system Jun-05 Intermediate report
49 3.3.2 Construction of CH tuning system
50 WP4: CHOPPING
51 4.1 CHOPPER STRUCTURE A
52 4.1.1 Pre-prototype construction Jun-05 Design report
53 4.1.2 Pre-Prototype testing Mar-05 Intermediate report
54 4.1.3 Driver construction, testing
55 4.1.4 Full scale prototype design
56 4.1.5 Full scale prototype construction Aug-06: Prototype ready
57 4.1.6 Pre-prototype testing w/o beam
58 4.2 CHOPPER LINE
59 4.2.1 Dump design
60 4.2.2 Dump construction Jun-05 Intermediate report
61 4.2.3 Beam line assembling
62 4.3 CHOPPER STRUCTURE B
63 4.3.1 Pre-prototype design and test Jun-05 Intermediate report
64 4.3.2 Prototype design Jun-06 Design report
65 4.3.3 Prototype construction
66 WP5: BEAM DYNAMICS
67 5.1 Code development
68 5.1.1 3D space charge routines dev., testing
69 5.1.2 LORASR development Dec-05 Intermediate report
70 5.1.3 Neutralization and ECR source modelization study
71 5.1.4 Improvement, modell ing high current
72 5.1.5 Code preparation for 3 MeV test stand Jun-06 Intermediate report
73 5.1.6 Codes preparation for SC linacs
74 5.1.7 Code comparison and benchmarking
75 5.2 Experiment at UNILAC
76 5.2.1 Preparation, simulations
77 5.2.2 First experiment campaign
78 5.3 Diagnostics and collimation
79 5.3.1 Profi le measurement prototype design, constructionMar-05 Prototype ready
80 5.3.2 Profi le measurement testing
81 5.3.3 Non-interceptive bunch measurement design
82 5.3.4 Non-interceptive bunch measurement const. and testingJun-05 Components ready
83 5.3.5 Halo meas. device design, construction Jun-05 Prototype ready Jun-05 Final report
84 5.3.6 On-l ine transmission control
85 5.3.7 Beam profi le monitor design
86 5.3.8 Collimators study
FZJ
FZJ,IN2P3-Orsay
FZJ,IN2P3-Orsay
IAP-FU
IAP-FU
CERN
CERN
CERN
CERN
CERN
CERN
CERN,CEA,LPSC
CERN,CEA,LPSC
RAL
RAL
RAL
RAL
IAP-FU
CEA
GSI
CERN
FZJ
GSI,RAL,IAP-FU,CEA,CERN,LPSC
GSI
GSI
GSI
GSI
GSI
GSI
CERN
GSI
FZJ
CERN
12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 122003 2004 2005