history of pak railway

Upload: waseemzahoor

Post on 06-Apr-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/2/2019 History of Pak Railway

    1/32

  • 8/2/2019 History of Pak Railway

    2/32

  • 8/2/2019 History of Pak Railway

    3/32

    UMER MANNAN

  • 8/2/2019 History of Pak Railway

    4/32

    History of PAK RAILWAY

  • 8/2/2019 History of Pak Railway

    5/32

    The network has 7,791 route km and 559 stations

    it has an annual revenue of around Rs.20 Billion (2007-2008)

    In 1947, it was named as Northwestern Railways had11,088 routes Km of which 3043 were transferred to India

    In 1961, it was named as Pakistan Western Railway

    and in 1974 as Pakistan Railways

    Pakistan has a rich railway heritage spanning almost 200years

    . Sir Henry Edward Frere

    The first railway line

    http://en.wikipedia.org/wiki/Pakistanhttp://en.wikipedia.org/wiki/Pakistanhttp://en.wikipedia.org/wiki/Henry_Bartle_Frerehttp://en.wikipedia.org/wiki/Henry_Bartle_Frerehttp://en.wikipedia.org/wiki/Henry_Bartle_Frerehttp://en.wikipedia.org/wiki/Pakistanhttp://en.wikipedia.org/wiki/Pakistan
  • 8/2/2019 History of Pak Railway

    6/32

    Major Routes the total length of railway tracks in Pakistan is

    5,072 miles (8,162 km). The busiest routes

    include: Peshawar-Karachi Route

    Peshawar-Quetta Route

    Lahore-Sialkot Route

    Lahore-Faisalabad Route

    Faisalabad-Khanewal Route

  • 8/2/2019 History of Pak Railway

    7/32

    Major Stations and JunctionsPeshawar,DaryaKhan,Mianwali,Bhakkar,Kaloorkot

    Nowshehra , Attock city, Rawalpindi, Jhelum,

    Lalamusa Jn., Gujrat, Wazirabad Jn., Gujranwala,Lahore, Lahore Cantt., Raiwind Jn., Okara, Sahiwal,

    Chichawatni, Mianchannu, Khanewal Jn., Multan

    cantt., Lodhran Jn., Bahawalpur, Samasatta Jn.,

    Khanpur, Rahim Yar Khan, Sadiqabad, Pannu AqilCantt., Rohri Jn., Khairpur, Bhiria Road,

    Nawabshah, Tandu Adam, Hyderabad Jn., Kotri

    Jn.,Jangshahi, Landhi Jn., Karachi cantt. And

    Karachi City

  • 8/2/2019 History of Pak Railway

    8/32

    Passenger Traffic Passenger traffic comprises 50% of the railway's

    total revenue

    Pakistan Railways carries 65 million passengersannually and daily operates 228 mail, express andpassenger trains

    Freight Traffic

    The Freight Business Unit, with 12,000 personnel, operates over 200 freight stations on the railway

    network

  • 8/2/2019 History of Pak Railway

    9/32

    SYED FAZEEL

  • 8/2/2019 History of Pak Railway

    10/32

    Generally arrive late and passengers finding inconvenience

    Normally use single track system while double track system is limited

    Railway organization is over staffed, which is a financial burden and effects position of railways.

    Corruption and misutilisation of funds have also affected the development projects.

    The wages paid to workers are low. Majority of workers form hand to mouth.

    Inadequate facilities have been provided to passengers.

    there is a shortage of funds to increase the number of locomotives, to start development projects andto provide facilities to the passengers.

    Railway is suffering huge losses for maintaining un-remunerative lines. Losses on railwaysoperation need to be minimized by closing un-remunerative lines where strategic and otherconsideration do not warrant such services and where there is no potential for improvement and farerationalization.

    Railways are operating at low rates. A flexible policy for rates and fare requires to be adoptedwhereby freight rates could be varied according to the type of commodities as well as direction.

    The operational efficiency of the railways is very low.

    The bulk of railways earnings are drawn from freight services which are not being accorded thepriority they deserve.

    Pakistan Railways still suffers from a mixture of gauges

  • 8/2/2019 History of Pak Railway

    11/32

    Management problem Passenger get very tied due to uncomfortable seats

    It consume more time of their customers. .

    There is no cleanliness with the rush of people.

    There is no proper check of tickets in Trains.

    Train gets too much stops during the Journey. The staff of Pakistan Railway is In-efficient thats they give the tickets of same seat

    to The 2 customers.

    Its Shipment facility is not so good.

    Lack of focusing on the Pakistan Railway

    The expenditure of Pakistan Railway is very high as compare to revenue

    Other problems faced by Pakistan railways: Shortage of advanced locomotives,

    Railroad cars,

    Mismanagement,

    Single railway track

    Lack of technique-oriented staff, including railway minister.

  • 8/2/2019 History of Pak Railway

    12/32

    Productivity of Pakistan railway: Productivity of railway as compared to china,

    Thailand and India

    Effecting factors in productivity of railways

    capital

    quality

    technology

    management.

  • 8/2/2019 History of Pak Railway

    13/32

    NAYAB GOHAR

  • 8/2/2019 History of Pak Railway

    14/32

    Strategy: Lack of flexibility

    Pakistan has already completed prefeasibility study for establishing a rail link with China

    Pakistan Railways has signed contract with Chinese supplier for the maintenance of Chineselocomotives to improve reliability and availability of locomotive.

    Pakistan Railway is encouraging private sector to bring rolling stock for running of passenger and

    freight trains by paying track access charges. Rehabilitation of 400 old coaches is underway with 80 coaches expected to be rehabilitated during

    the current financial year.

    Another ongoing development project is the doubling of tracks from KhanewalRaiwind (246 km

    Doubling of track will be completed from Chichawatni to Okara stations during the period underreview.Other on-going projects1) Rehabilitation of 101 DE Locos.

    2) Procurement of 69 DE Locos.3) Procurement/manufacture of 175 passenger coaches.4) Procurement of 1300 high capacity wagons.5) Islamkot/Mirpur Khas/Thar rail link line.6) Rehabilitation of 450 passenger coaches.7) Doubling of track between Lodhran and Raiwind.

  • 8/2/2019 History of Pak Railway

    15/32

    Models for Railway strategy

  • 8/2/2019 History of Pak Railway

    16/32

    Information TechnologyDepartment:

    The following locations have been inducted to the computerized network:-

    1) Peshawar2) Lahore Cantt

    3) Quetta4) Hyderabad5) Faisalabad

    Other important projects which have taken in hand for computerization:-

    1) Freight management system

    2) Asset management system3) Personnel system4) Legal system5) Track management system6) Financial system for public relation department7) Electric billing system

    8) Timetable system

  • 8/2/2019 History of Pak Railway

    17/32

    HIRA

  • 8/2/2019 History of Pak Railway

    18/32

    PEST Analysis Political factors

    political instability

    Investors are not reluctant to invest in Pakistan railways

    Economic factors

    Economic conditions are not very sound

    increasing inflation imposition of new taxes,

    rising fuel charges

    changes in government economic policies has discouraged investment in railway

    Social factors Attitudes

    Desires

    Expectations

    Technological factors Electrical engines

    New railway tracks

    Setup of such system that improves the efficiency

    Online ticketing

    System that finds defaults in railway tracks

  • 8/2/2019 History of Pak Railway

    19/32

    Forecasting presented a deficit budget of 62 billion rupees

    for 2011-12 with earnings forecast at 20

    billion rupees and expenditure at a high 82billion rupees.

  • 8/2/2019 History of Pak Railway

    20/32

    Product service design

  • 8/2/2019 History of Pak Railway

    21/32

    WASEEM ZAHOOR

  • 8/2/2019 History of Pak Railway

    22/32

    Capacity planning Ghulam Ahmed Bilour said the Pakistan Railways

    needed 410 locomotives for day-to-day operations

    but had only managed to purchase 122locomotives during the last 20 years.

    automatic signaling system would be installed

    The system would be imported from Sweden orCanada through a loan from the Islamic

    Development Bank Railways need 410

    locomotives for daily operations

  • 8/2/2019 History of Pak Railway

    23/32

    FINANCIAL DATA

    REVENUE RECEIPTS

    Year

    Passenger Freight Other

    Earning

    s

    (Rs)

    Overall

    Earnings

    (Rs)

    PKMs

    Earni

    ng

    (Rs)

    TKMs

    Earni

    ng

    (Rs)

    2003-04 22.8 8.2 4.9 4.6 1.7 14.5

    2004-05 23.2 8.6 5.5 5.2 1.9 15.7

    2005-06 23.7 9.0 6.3 5.9 2.0 16.9

    2006-07 24.3 9.5 7.3 6.9 2.3 18.7

    2007-08 25.0 10.0 8.4 7.9 2.5 20.4

    2008-09 25.8 10.7 9.6 9.0 2.8 22.5

    2009-10 26.8 11.7 11.1 10.4 3.1 25.2

    2010-11 27.9 12.9 12.7 11.9 3.6 28.4

    FUTURE REVENUES

  • 8/2/2019 History of Pak Railway

    24/32

    Passengers

  • 8/2/2019 History of Pak Railway

    25/32

  • 8/2/2019 History of Pak Railway

    26/32

    Inventory managementTotal Wagons Owned by Pakistan Railways

    Type of Wagons Nos Carrying

    Capacity

    Tons

    Capacity Max Size

    L X W X H

    Covered Wagons 4

    - Wheeler

    13,216 22.0 23.5 x 9.75 x 8.25 inner

    volume 1809.3 cft.Covered Wagons 8 -

    Wheeler

    43.7 45 x 8.25 x 9.75 inner

    volume 3456.9 cft.

    Open Wagons 4 -

    Wheeler

    5,253 22 23.5 x 10 x 4.5 inner

    volume 1075.5 cft.

    Open Wagons 8 -

    Wheeler

    44 40 x 9.3 x 5 inner volume

    1866.5 cft.

    Special Wagons 4

    Wheeler for

    containers

    5,663 22 26 x 9.3 for 20 feet

    containers

    Special Wagons 8

    Wheeler for

    containers

    46 45 x 9.3 for 40 feet

    containers

    Inventory management Total Wagons Owned by Pakistan Railways

  • 8/2/2019 History of Pak Railway

    27/32

    THE PRIMARY STRUCTUREDown train

    arriving at

    platformDrawn out of the

    platform

    Engine

    detached

    The rake stabled

    at the yard or

    sent for

    maintenance

  • 8/2/2019 History of Pak Railway

    28/32

    THE MAINTENANCE OF THE

    TRAINS: -

    Primary Maintenance

    Round trip/Turn Around Maintenance

    Secondary Maintenance

  • 8/2/2019 History of Pak Railway

    29/32

    Upcoming projects Enterprise Resource Planning (ERP)

    Purchase

    Inventory

    Asset Management System

    Maintenance Management System

    Electronic Document Management System

    Human Resource Management System

    Fuel Management System

    RFID Based Freight Wagons / Freight Management System.

    Future projects Up gradation of Reservation & Ticketing System

    Automation of Railway Police

    Access Control through Turnstile

    Revival of e-Ticketing System

    Computerization of new Reservation Office at Lahore

  • 8/2/2019 History of Pak Railway

    30/32

    KHUBAIB AHMED

  • 8/2/2019 History of Pak Railway

    31/32

    Conclusion needs a good leader and a sincere minister

  • 8/2/2019 History of Pak Railway

    32/32

    Suggestion to Improve thePerformance of the PakistanRailway

    - Privatization of Pakistan railway

    - Railway Aviation Authority

    The Production Unit should give Autonomy

    Issue of Tickets to Private Sector

    Introduction of Fast Trains Development Schemes:

    Modernization Activities: