hl resume 1

3
Harry Long Bin Junaidi Long Address : 10 Jalan Flora ¼ Taman Pulai Flora 81300 Skudai, Johor H/p No : 6017-7525321 Email : [email protected] I/C No : 900503-01-6295 Nationality : Malaysia 2009 - 2013 Level : Bachelor’s Degree Major : Electrical System Engineering Institute : University Malaysia Perlis (UniMAP) Company : Dialog Plant & Services Sdn Bhd Position Title : Instrument Engineer Industry : Oil & Gas Duration : August 2013 present JANUARY 2016 PRESENT Position : Instrument Engineer Project : The Engineering, Procurement and Construction of A 120KT Plasticizer Plant at Gebeng Industriall Estate and Port Tank Farm At Kuantan Port, Kuantan, Malaysia Responsibilities Oversee DCS system relocation work for UPC New Control Room in BASF Petronas Chemical. Involve Engineering for Instrumentation scopes. Design FAS cable block diagram, cable routing drawing and termination drawing. PERSONAL PARTICULARS EDUCATION BACKGROUND WORK EXPERIENCE

Upload: harry-long

Post on 15-Apr-2017

16 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: HL Resume 1

Harry Long Bin Junaidi Long Address : 10 Jalan Flora ¼ Taman Pulai Flora 81300 Skudai, Johor

H/p No : 6017-7525321

Email : [email protected]

I/C No : 900503-01-6295

Nationality : Malaysia

\ 2009 - 2013

Level : Bachelor’s Degree

Major : Electrical System Engineering

Institute : University Malaysia Perlis (UniMAP)

Company : Dialog Plant & Services Sdn Bhd Position Title : Instrument Engineer Industry : Oil & Gas Duration : August 2013 – present

JANUARY 2016 – PRESENT

Position : Instrument Engineer

Project : The Engineering, Procurement and Construction of A 120KT

Plasticizer Plant at Gebeng Industriall Estate and Port Tank Farm

At Kuantan Port, Kuantan, Malaysia

Responsibilities

Oversee DCS system relocation work for UPC New Control Room in BASF Petronas Chemical.

Involve Engineering for Instrumentation scopes.

Design FAS cable block diagram, cable routing drawing and termination drawing.

PERSONAL PARTICULARS

EDUCATION BACKGROUND

WORK EXPERIENCE

Page 2: HL Resume 1

Responsible in planning, technical issue & construction for Electrical & Instrumentation for Gebeng Tank Farm & Port Tank Farm.

SEPTEMBER 2015 – DECEMBER 2015

Position : Instrument Engineer

Project : Petronas Penapisan Melaka (PPM) Turn Around 2015

Responsibilities

Oversee the maintenance progress and quality control of mechanical equipment during the turn around.

April 2015 – AUGUST 2015

Position : Instrument Engineer

Project : Engineering, Procurement & Construction for Langsat Bitumen

Terminal (LBT) BBU Hot Oil Dissipation

Responsibilities

Design scope involved are preparing data sheet for instrument equipment etc:

temperature control valve, pressure gauge and temperature transmitter.

Prepare the material take off for the instrument scopes of work.

April 2015 – AUGUST 2015

Position : Instrument Engineer

Project : Permohonan Kelulusan Pelan Bangunan Bagi Cadangan Membina

Pembangunan Perindustrian Fabrications Facility

Responsibilities

Design scope involved is Fire Alarm system: Design cable routing, prepare cable

schedule and termination drawing.

In charge in technical clarification & evaluation for the fire alarm system.

Oversee the installation, commissioning and testing for the fire alarm system.

Involved in the Bomba inspection for the fire alarm system also the fire water

pump functionality.

NOVEMBER 2014 – NOVEMBER 2015

Position : Instrument Engineer

Project : Engineering, Procurement & Construction for Langsat Terminatl (LGT)

Pipeline Extension

Responsibilities

In charge preparing data sheet for instrument equipments etc: pressure gauge,

temperature transmitter and temperature control valve.

In charge to clarify & evaluate with vendors technically with all the related

instrument equipments in the project.

Design the cable block diagram, cable schedule, cable routing drawing and

termination drawing for the instrument equipment involved.

Page 3: HL Resume 1

Prepare the material take off for the instrument scopes of work.

AUGUST 2013 – OCTOBER 2014

Position : Instrument Engineer

Project : Langsat Terminal One & Two MOV & Wireless Project In Tanjung Langsat

Terminal Pasir Gudang, Johor

Responsibilities

Prepare material take off for instrumentation scopes.

Prepare data sheet for instrument equipment i.e. pressure transmitter, level

switch and limit switch.

Design cable block diagram, cable schedule for the Motor Operated Valve

(MOV).

Involve during installation for existing hand valves with varies sizes to pair with

new actuator by Rotork (retrofitting work).

Involve during installation for Emerson wireless instrument equipment.

In charge in commissioning & testing to tie in the new MOV with the existing

Pakscan system and add in new loop for the MOV.

Involve in commissioning & testing Emerson wireless instrument equipment etc:

pressure transmitter, level switch and limit switch.