Harry Long Bin Junaidi Long Address : 10 Jalan Flora ¼ Taman Pulai Flora 81300 Skudai, Johor
H/p No : 6017-7525321
Email : [email protected]
I/C No : 900503-01-6295
Nationality : Malaysia
\ 2009 - 2013
Level : Bachelor’s Degree
Major : Electrical System Engineering
Institute : University Malaysia Perlis (UniMAP)
Company : Dialog Plant & Services Sdn Bhd Position Title : Instrument Engineer Industry : Oil & Gas Duration : August 2013 – present
JANUARY 2016 – PRESENT
Position : Instrument Engineer
Project : The Engineering, Procurement and Construction of A 120KT
Plasticizer Plant at Gebeng Industriall Estate and Port Tank Farm
At Kuantan Port, Kuantan, Malaysia
Responsibilities
Oversee DCS system relocation work for UPC New Control Room in BASF Petronas Chemical.
Involve Engineering for Instrumentation scopes.
Design FAS cable block diagram, cable routing drawing and termination drawing.
PERSONAL PARTICULARS
EDUCATION BACKGROUND
WORK EXPERIENCE
Responsible in planning, technical issue & construction for Electrical & Instrumentation for Gebeng Tank Farm & Port Tank Farm.
SEPTEMBER 2015 – DECEMBER 2015
Position : Instrument Engineer
Project : Petronas Penapisan Melaka (PPM) Turn Around 2015
Responsibilities
Oversee the maintenance progress and quality control of mechanical equipment during the turn around.
April 2015 – AUGUST 2015
Position : Instrument Engineer
Project : Engineering, Procurement & Construction for Langsat Bitumen
Terminal (LBT) BBU Hot Oil Dissipation
Responsibilities
Design scope involved are preparing data sheet for instrument equipment etc:
temperature control valve, pressure gauge and temperature transmitter.
Prepare the material take off for the instrument scopes of work.
April 2015 – AUGUST 2015
Position : Instrument Engineer
Project : Permohonan Kelulusan Pelan Bangunan Bagi Cadangan Membina
Pembangunan Perindustrian Fabrications Facility
Responsibilities
Design scope involved is Fire Alarm system: Design cable routing, prepare cable
schedule and termination drawing.
In charge in technical clarification & evaluation for the fire alarm system.
Oversee the installation, commissioning and testing for the fire alarm system.
Involved in the Bomba inspection for the fire alarm system also the fire water
pump functionality.
NOVEMBER 2014 – NOVEMBER 2015
Position : Instrument Engineer
Project : Engineering, Procurement & Construction for Langsat Terminatl (LGT)
Pipeline Extension
Responsibilities
In charge preparing data sheet for instrument equipments etc: pressure gauge,
temperature transmitter and temperature control valve.
In charge to clarify & evaluate with vendors technically with all the related
instrument equipments in the project.
Design the cable block diagram, cable schedule, cable routing drawing and
termination drawing for the instrument equipment involved.
Prepare the material take off for the instrument scopes of work.
AUGUST 2013 – OCTOBER 2014
Position : Instrument Engineer
Project : Langsat Terminal One & Two MOV & Wireless Project In Tanjung Langsat
Terminal Pasir Gudang, Johor
Responsibilities
Prepare material take off for instrumentation scopes.
Prepare data sheet for instrument equipment i.e. pressure transmitter, level
switch and limit switch.
Design cable block diagram, cable schedule for the Motor Operated Valve
(MOV).
Involve during installation for existing hand valves with varies sizes to pair with
new actuator by Rotork (retrofitting work).
Involve during installation for Emerson wireless instrument equipment.
In charge in commissioning & testing to tie in the new MOV with the existing
Pakscan system and add in new loop for the MOV.
Involve in commissioning & testing Emerson wireless instrument equipment etc:
pressure transmitter, level switch and limit switch.