hl resume

3
Harry Long Bin Junaidi Long Address : 10 Jalan Flora ¼ Taman Pulai Flora 81300 Skudai, Johor H/p No : 6017-7525321 Email : [email protected] Age : 26 years old Date of Birth : 5 May 1990 Marital status : Single Nationality : Malaysia 2009 - 2013 Level : Bachelor’s Degree Major : Electrical System Engineering Institute : University Malaysia Perlis (UniMAP) Grade : Second Class Company : Dialog Plant & Services Sdn Bhd Position Title : Instrument Engineer Industry : Oil & Gas Duration : August 2013 present PERSONAL PARTICULARS EDUCATION BACKGROUND EXPERIENCES

Upload: harry-long

Post on 15-Feb-2017

49 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: HL Resume

Harry Long Bin Junaidi Long Address : 10 Jalan Flora ¼ Taman Pulai Flora 81300 Skudai, Johor

H/p No : 6017-7525321

Email : [email protected]

Age : 26 years old

Date of Birth : 5 May 1990

Marital status : Single

Nationality : Malaysia

\ 2009 - 2013

Level : Bachelor’s Degree

Major : Electrical System Engineering

Institute : University Malaysia Perlis (UniMAP)

Grade : Second Class

Company : Dialog Plant & Services Sdn Bhd Position Title : Instrument Engineer Industry : Oil & Gas Duration : August 2013 – present

PERSONAL PARTICULARS

EDUCATION BACKGROUND

EXPERIENCES

Page 2: HL Resume

List of projects and work scopes: 1. Langsat Terminal One & Two MOV & Wireless Project In Tanjung

Langsat Terminal Pasir Gudang, Johor.

1.1. Prepare material take off for instrumentation scopes.

1.2. Prepare data sheet for instrument equipment i.e. pressure transmitter,

level switch and limit switch.

1.3. Design cable block diagram, cable schedule for the Motor Operated Valve

(MOV).

1.4. Involve during installation for existing hand valves with varies sizes to pair

with new actuator by Rotork (retrofitting work).

1.5. Involve during installation for Emerson wireless instrument equipment.

1.6. In charge in commissioning & testing to tie in the new MOV with the

existing Pakscan system and add in new loop for the MOV.

1.7. Involve in commissioning & testing Emerson wireless instrument

equipment etc: pressure transmitter, level switch and limit switch.

2. Engineering, Procurement & Construction for Langsat Terminal (LGT)

Pipeline Extension.

2.1. Involve in preparing data sheet for instrument equipments etc: pressure

gauge, temperature transmitter and temperature control valve.

2.2. In charge to clarify & evaluate with vendors technically with all the related

instrument equipments in the project.

2.3. Design the cable block diagram, cable schedule, cable routing drawing

and termination drawing for the instrument equipment involved.

2.4. Prepare the material take off for the instrument scopes of work.

3. Pengerang Fabrication Yard

3.1. Design scope involved is Fire Alarm system: Design cable routing,

prepare cable schedule and termination drawing.

3.2. In charge in technical clarification & evaluation for the fire alarm system.

3.3. Oversee the installation, commissioning and testing for the fire alarm

system.

3.4. Involved in the Bomba inspection for the fire alarm system also the fire

water pump functionality.

4. Engineering, Procurement & Construction for Langsat Bitumen Terminal

(LBT) BBU Hot Oil Dissipation.

4.1. Design scope involved are preparing data sheet for instrument equipment

etc: temperature control valve, pressure gauge and temperature

transmitter.

Page 3: HL Resume

4.2. Prepare the bill of quantity for the instrument scopes of work.

5. Petronas Penapisan Melaka Turn Around 2015

5.1 Oversee the maintenance progress and quality control of mechanical equipment during the turn around.

6. The Engineering, Procurement and Construction of A 120KT Plasticizer

Plant at Gebeng Industrial Estate and Port Tank Farm at Kuantan Port,

Kuantan, Malaysia

6.1 Involve in DCS system relocation work during BASF Petronas Chemical Turn Around.

6.2 Prepare material take off for instrumentation scopes. 6.3 Design the cable block diagram, cable schedule, cable routing drawing