hl resume
TRANSCRIPT
Harry Long Bin Junaidi Long Address : 10 Jalan Flora ¼ Taman Pulai Flora 81300 Skudai, Johor
H/p No : 6017-7525321
Email : [email protected]
Age : 26 years old
Date of Birth : 5 May 1990
Marital status : Single
Nationality : Malaysia
\ 2009 - 2013
Level : Bachelor’s Degree
Major : Electrical System Engineering
Institute : University Malaysia Perlis (UniMAP)
Grade : Second Class
Company : Dialog Plant & Services Sdn Bhd Position Title : Instrument Engineer Industry : Oil & Gas Duration : August 2013 – present
PERSONAL PARTICULARS
EDUCATION BACKGROUND
EXPERIENCES
List of projects and work scopes: 1. Langsat Terminal One & Two MOV & Wireless Project In Tanjung
Langsat Terminal Pasir Gudang, Johor.
1.1. Prepare material take off for instrumentation scopes.
1.2. Prepare data sheet for instrument equipment i.e. pressure transmitter,
level switch and limit switch.
1.3. Design cable block diagram, cable schedule for the Motor Operated Valve
(MOV).
1.4. Involve during installation for existing hand valves with varies sizes to pair
with new actuator by Rotork (retrofitting work).
1.5. Involve during installation for Emerson wireless instrument equipment.
1.6. In charge in commissioning & testing to tie in the new MOV with the
existing Pakscan system and add in new loop for the MOV.
1.7. Involve in commissioning & testing Emerson wireless instrument
equipment etc: pressure transmitter, level switch and limit switch.
2. Engineering, Procurement & Construction for Langsat Terminal (LGT)
Pipeline Extension.
2.1. Involve in preparing data sheet for instrument equipments etc: pressure
gauge, temperature transmitter and temperature control valve.
2.2. In charge to clarify & evaluate with vendors technically with all the related
instrument equipments in the project.
2.3. Design the cable block diagram, cable schedule, cable routing drawing
and termination drawing for the instrument equipment involved.
2.4. Prepare the material take off for the instrument scopes of work.
3. Pengerang Fabrication Yard
3.1. Design scope involved is Fire Alarm system: Design cable routing,
prepare cable schedule and termination drawing.
3.2. In charge in technical clarification & evaluation for the fire alarm system.
3.3. Oversee the installation, commissioning and testing for the fire alarm
system.
3.4. Involved in the Bomba inspection for the fire alarm system also the fire
water pump functionality.
4. Engineering, Procurement & Construction for Langsat Bitumen Terminal
(LBT) BBU Hot Oil Dissipation.
4.1. Design scope involved are preparing data sheet for instrument equipment
etc: temperature control valve, pressure gauge and temperature
transmitter.
4.2. Prepare the bill of quantity for the instrument scopes of work.
5. Petronas Penapisan Melaka Turn Around 2015
5.1 Oversee the maintenance progress and quality control of mechanical equipment during the turn around.
6. The Engineering, Procurement and Construction of A 120KT Plasticizer
Plant at Gebeng Industrial Estate and Port Tank Farm at Kuantan Port,
Kuantan, Malaysia
6.1 Involve in DCS system relocation work during BASF Petronas Chemical Turn Around.
6.2 Prepare material take off for instrumentation scopes. 6.3 Design the cable block diagram, cable schedule, cable routing drawing
and termination drawing.