WELCOME
ToHOLI II SMALL HYDRO PROJECT
(PROJECT VALLEY)
DISCLAIMER
This document is being made available in good faith and for information purposes only and has been
prepared solely based on information as of November 2014. Receiving this document may not be
lawful in certain jurisdictions. In other jurisdictions, only certain categories of person are allowed to view
the document. By accepting this document you confirm that you are allowed as per local law in
receiving this document.
The document does not constitute nor does it form part of any offer or invitation to buy, sell, exchange
or otherwise dispose of, or issue, or any solicitation of any offer to sell or issue, exchange or otherwise
dispose of, buy or subscribe for, any securities, nor does it constitute investment, legal, tax,
accountancy or other advice or a recommendation with respect to such securities, nor does it constitute
the solicitation of any vote or approval in any jurisdiction, nor shall there be any offer or sale of
securities in any jurisdiction in which such offer, solicitation or sale would be unlawful prior to
registration or qualification under the applicable securities laws of any such jurisdiction (or under
exemption from such requirements).
The information contained in the document is subject to change without notice and Company does not
undertake any duty to update the forward-looking statements, and the estimates and assumptions
associated with them, except to the extent required by applicable laws and regulations.
For any queries, kindly reach us at:
Krishna Hydro Projects Pvt Ltd.
12-D, Racecourse
Dehradun – 248001, Uttarakhand
Web: www.krishnahydro.in
2
Strictly Private and Confidential
F.I. TEACHINGS A SUSTAINABLE
PARTNER
Viability Capacity
Researcher Ethical
Managing Transparency
Honest Trustworthy
Practice Integrity Jump to Execute
Move with Precaution
Professional Responsibility
Energy Next SHP Cost Divorced from Reality
3
Strictly Private and Confidential
PROJECT LOCATION MAP 4
Name of Tributary – Holi Nallah
Name of River – Ravi
Name of Village – Gwala
Name of Panchayat – Kuleth
Name of Tehsil – Holi
Name of Distt. – Chamba
Name of State – Himachal Pradesh
Name of Country – India
Geological Coordinates -
1. Weir Site
Long – 760 32’ 15” E
Lat – 320 17’ 45” N
2. Power House Site
Long – 760 32’ 45” E
Lat – 320 18’ 34” N
Strictly Private and Confidential
ACCOMODATION DISTANCE 5
Strictly Private and Confidential
PROJECT AREA – AERIAL VIEW
HOLI – II Small Hydro Project
6
Weir Site – Elv. 2350m
Type – Trench Weir
Water Conductor System
Feeder Channel – 240m
Type – Box (1.5m x1.5 m)
Desilting Tank
Size – 24 L x 6 W x 2.7 D m
Power Channel – 110 m
HRT – 1410 m
Size – 1.8 m x 2.1 m
Surge Tank – Orifice Type
Size – 22 m L x 2 m dia
Penstock – 410 m x 1 m dia
Branch – 10m L x 0.7m dia
Power House – Elv. 2033 m
Size – 34 L x19 W x 11 H m
Net Head – 313 m
Design Discharge – 2.7 cum
Turbine – Pelton 3 jet
Tail Race – 24 L x 2 W x 1.5 H
Strictly Private and Confidential
HOLI – II HEP – SHP
District – Chamba, Himachal Pradesh
7
Dhauladhar Range
Strictly Private and Confidential
HOLI – II HEP – SHP
District – Chamba, Himachal Pradesh
8
Strictly Private and Confidential
WEIR SITE OF HOLI-II SHP 9
Weir Axis
Strictly Private and Confidential
HOLI-II SMALL HYDRO PROJECT
PROJECT OVERVIEW:
Project Name: HOLI-II Small Hydro Project
Project Company: M/s Om Energy Generation Pvt. Ltd.
Capacity: 7 MW + 20% COL2
Total Project Land: 4.1595 Hectares (Forest Land)
Type of Scheme: Run of River (Snow Fed)
MoU Sign Date: 17th July, 2007
DPR Prepared By: AHEC, Indian Institute of Technology (IIT), Roorkee
Major Component: Weir, Water Conductor system, Power House, Muck
Disposal Sites, Switch Yard
Grid Connectivity: Holi-I 33Kv Sub-Station (Control Room Ready)
Project Cost: INR 64. 90 crores (US$ 10.8 million)1
LADA Money: 1st Installment Paid (Rs 3.50 Lacs in March 2010)
Implementation Agreement: Signed on 8th October, 2010
Note: (1) FX Rate: 1 USD = INR 60(2) COL denotes “Continuous Over Load"
10
Strictly Private and Confidential
SALIENT FEATURES OF DPR1
Location: District – Chamba, Himachal Pradesh
Design Discharge: 2.70 cumecs
Net Head: 313 meters
Diversion Weir : Trench Type (Elevation: 2,349 meters)
Feeder Channel: Rectangular (240 meters)
DesiltingTank: 24 m X 6 m X 2.7 m
Power Channel: Rectangular (110 meters)
WC System: 1,410 meters
Surge Tank: 2 m diameter X 21.7 m Height
Penstock: 1 m diameter & 410 m long
Power House: Surface (Elevation: 2,033 meter)
Turbine: 3 Jet Pelton Type ( 2 X 3500 kW) + 20% COL*
Tail Race Channel: Rectangular (25 meter long)
Note: DPR denotes “Detailed Project Report”
COL denotes “Continuous Over Load"
11
Strictly Private and Confidential
• District Administration
– ADM Bharmour/Tehsildar/Patwari
• Gram Panchayat – Kuleth
– Gram Pradhan/ Panchayat Member
• Project Administration
– Director, Om Energy Generation P. Ltd.
• Pollution Control Board
– Asst. Environment Engineer, Chamba
• Forest Department
– ACF Bharmour
• IPH Department
– Asst. Engineer, Bharmour
• PWD Department
– Asst. Engineer, Garola Sub Division
• Mining Department
– Mining Inspector, Chamba
12JOINT INSPECTION OF PROJECT
Held on 5th May, 2010
Strictly Private and Confidential
13JOINT INSPECTION OF PROJECT
Held on 5th May, 2010
Strictly Private and Confidential
CURRENT STATUS OF THE PROJECT
NO OBJECTION CERTIFICATES RECEIVED
Gram Panchayat
Wildlife
Fisheries
I&PH
PWD
PCB
Forest Land
Explosive License
Project ready for construction; Land Cost –100% paid
Lease Deed of Land Sanctioned for 40 years
Construction Power Available
Connectivity Agreement Executed for Open Access.
SBI Cap Trustee Company appointed as Security
Trustee for Facility of Term Loan in January 2014
Bridge and Approach Road Construction to begin
CRISIL Rating of Om Energy
Generation Private Limited:
B+ Stable
Zero Date – 7th April 2014
Debt Financing: Financial
Closure achieved from
SBI,IFB Branch Chennai,
Tamil Nadu, India
14
Strictly Private and Confidential
WHY INVEST IN HOLI-II SHP?
Upstream of HOLI -I SHP (3MW) of HPSEB – Running & Generating Power from year 2002
Grid connectivity available before project goes into Construction Phase
100% Land /NOC’s / Explosive License – AVAILABLE
Sale of Power PPA with HPSEB on APCC or Preferential Tariff
− Captive Sale & SWAP Possible
Demand of power locally envisaged to grow
− Kuther HEP (260MW) of JSW
− Bajoli Holi HEP (180MW) of GMR
− Bara Bangal HEP (200MW) of Bhilwara
Promoters Invested (1 Million)
Debt Agreement executed with State Bank of India
Upside of capitalization opportunity
Climate Credit / CSR
Inclusive Growth in Kuleth Panchayat
Zero Submergence
Free from Rehabilitation & Resettlement Issue
Strong Project Team / Consultants
Civil + Electro-mechanical Contracts Awarded
15
Strictly Private and Confidential
FINANCIAL CONSIDERATIONS
Yearly Generation
(MU) by (AHEC, IIT
Roorkee) @ PLF 55%
Yearly Net Saleable
Units (MU)Tariff (Per Unit)
Yearly Projected
Revenue ($)
33.72 27.65INR 3.17 (5.28 Cents)(Himachal Pradesh Electricity
Board Tariff)
14,60,841.67
33.72 27.65INR 4.25 (7.08 Cents)(Captive Commercial Average) 19,58,541,.67
33.72 27.65INR 5.00 (8.33 Cents)
(Captive in 2017)23,04,166.67
Relevant information
regarding Project
HOLI –II developed
by M/s Om Energy
Generation Pvt. Ltd.
Debt to Equity Ratio: 60 : 40
Power Purchase Agreement (PPA) of HOLI-II SHP signed with Reliance Power
Trading Limited, Mumbai in August 2013 for trading
65% Power Supply Agreement at Industrial Tariff to Base corporation (Panasonic
Japan)
Grid connectivity between OM Energy and Himachal Pradesh Power
Transmission Corporation Limited executed on 2nd May 2014
− Concession period is of 40 years
− Open access allowed; Project connected to National Grid of India
Project Risk Management – Planner “AON Global”, New Delhi
Consultants – VERKIS Iceland; Synergics Hydro India, Krishna Hydro Projects
Pvt Ltd
17
Strictly Private and Confidential
STRATEGIC INVESTOR SHARING
• Participate in construction phase
• Value to grow on Commercial Operations Date (COD)
• Confirmed Dividend/Interest on Investment
• Buy Back option by Promoter Agreed with Bullet Premium.
• Sale of 30% strategic holding to Institutional Investors can be mutually agreed after COD
• CER and CDM credits available in Project
18
Strictly Private and Confidential
NATIONAL GRID CONNECTIVITY
APPROVAL & PPA 20
Strictly Private and Confidential
NATIONAL GRID CONNECTIVITY
APPROVAL & PPA1 21
Strictly Private and Confidential
Note: “PPA” denotes Power Purchase Agreement
ECO-FRIENDLY DEVELOPMENT
Acceptable & TEC Condition
22
Undertaking regarding release of 15% water inaccordance with Govt. of H.P. Notification No. PC-F(2)-1/2005 dated 16-07-2005 as amended videNotification No. PC-F (2) -1/2005 dated 09/09/2005.
Strictly Private and Confidential
ECO-FRIENDLY DEVELOPMENT
Acceptable & Submitted
23
Undertaking to install the real-time online continuousflow measurement and data logging device formeasuring 15% flow down-stream of the river/streambefore coming into operation.
Strictly Private and Confidential
ECO-FRIENDLY DEVELOPMENT
• In House Muck Utilization in Project Construction
– Fine Aggregate
– Crushed Coarse
– Wire Crates
• Develop Filled up Land for Switch Yard
• PCB Consent to Establish Available (2014-15)
• Saving of Forest Corridor in Power System
24
Strictly Private and Confidential
CDM REGISTRATION FOR PROJECT 25
Consultant:
Agrinergy Consultancy Pvt. Ltd.
1stFloor, Mathuradas Mills Compound,
N M Joshi Marg, Lower Parel (w),
Mumbai –400013 (India)
Website: www.agrinergy.com
Present Status
Pre-Consideration Process Completed with
UNFCCC
Website: www.cdm.unfccc.int
Strictly Private and Confidential
CHALLENGE TO LAYOUT 26
Strictly Private and Confidential
Water Conductor System
TYPE OF RISK EXAMPLE INSURABLE / DOABLE
Country Risk (or Political Risk) • Risk of nationalization
• Change in law affecting status orfinancial position of projectcompany
May be insurable through guarantees(e.g. MIGA – Multilateral InvestmentGuarantee Agency)
Commercial Risks • Risk to revenue such as change inregulation or difficulties inenforcing payment from HimachalPradesh State Electricity Board.
Partially insurable & 65% of Powercommitted to Base Corporation underLetter of Credit.
Project Risks • Site-specific risks such as cost andtime overruns during construction
• Difficulties in obtaining necessaryenvironmental permits andclearances
• Uncertainty of addressing socialissues which may arise
• Hydrological risk
• Transmission interconnection
Not usually insurable but asDeveloper we have identified andaddressed adequately with riskmitigation plan of Aon Global.
RISKS 27
Strictly Private and Confidential
DISCHARGE SITE – HISTORY 28
OCT 2008
Strictly Private and Confidential
SOCIO ECONOMIC SURVEY 29
DEC 2008
Kuleth Panchayat
Strictly Private and Confidential
CDM AWARENESS MEETING 30
MAY 2011
Kuleth Panchayat
Strictly Private and Confidential
TOPOGRAPHY SURVEY 31
Held in Year 2008-09
Strictly Private and Confidential
TRANSMISSION LINE SURVEY &
INTERCONNECTION POINT32
Held in Year 2008-09
Strictly Private and Confidential
Holi II
Bay Area
SNOW FALL AT PROJECT AREA 33
Strictly Private and Confidential
SNOW FALL AT PROJECT AREA 34
Strictly Private and Confidential
CSR ACTIVITY IN PROJECT AREA 35
Temple Renovation at Village Jabbal
in Kuleth Panchayat
New Temple at Village Gwala
in Kuleth Panchayat
Strictly Private and Confidential
Promoter Ravi Kumar Gupta
Date of Birth 11 May, 1957
Father’s Name O. P. Gupta
Present Address No 9, L.R.N. COLONY, SARADA COLLEGE ROAD, HASTHAMPATTI,SALEM PIN - 636007
Permanent Address No 9, L.R.N. COLONY, SARADA COLLEGE ROAD, HASTHAMPATTI,SALEM PIN - 636007
Telephone/ Mob No. +91-80-22583345
E-mail [email protected]
PAN No/ GIR No AADPG3089J
Educational Qualifications Bachelor of Commerce
Experience Details Managing Director of Om Energy Generation Pvt. Ltd.
Membership in boards of other companies Salem Food Products Ltd.Sonal Vyapar LimitedKanishk Steel Industries Ltd
Special Awards/ Achievements
Membership of other organizations/ associations Member of Hindustan Chamber of Commerce, Steel FurnaceAssociation of India and Confederation of Indian Industry inTNSC(SR) ,Serving the community as Promoters and Trustees ofOm Prakash Medical Research Trust, Maharaja Agrasen Hospital inthe medical field, and Sri Vidya Mandir in Salem which have 5Schools with 7000 students.
DIRECTORMr. DALIP DUA [MBA (Marketing), M. Com]
Introduction : Managing Director : Krishna Hydro Projects Pvt. Ltd.
OPG Group Directorship : Om Energy Generation Pvt. Ltd. : OPG Power & Infrastructure Pvt. Ltd.
Website : www.krishnahydro.in / www.omenergy.in
• An Entrepreneur/Consultant on Hydro projects in India and SAARC.• Director of Indo-Icelandic Business Association (IIBA) , 2011 – 2013.• Chairman of Indo-Icelandic Business Association (IIBA) , 2014 – 2016.• Originating hydro power initiatives in India on a Joint Venture basis.• Life member of “International Hydro Association” (IHA).• Vice President, “Himalayan Power Producers Association”.• Life Member of “Doon Club Ltd” access to 84 Social Clubs of India.• Member of Confederation of Indian Industry - Renewable Task Force.• Member of Confederation of Indian Industry - Gulf Committee.• Member of Indian National Hydro association.
Professional Experience• Architect of International Strategic MOUs and Co-operation Agreement for IPP Concessions.• Participated and presented paper in World Bank regional cooperation conference in Brazil organized by IHA and government of Brazil
(on energy sector and transmission).• In hydro, closely coordinating with Engineering Companies VERKIS Iceland and Synergics India.• Preparation & site assignment for DPR of Holi –II (7MW) with AHEC, IIT Roorkee; securing approvals from Himachal Government,
clearances and final land acquisition for green field development. The project is ready for construction, all clearances and pre-projectdevelopment activities completed under his Direction.
• Worked with clients like Polyplex Corporation Ltd., DCM Shriram Company Ltd., Absolute & Ultima, B Fouress (P) Ltd., Larsen &Toubro, Sunflag Power Ltd., Regency Group, Uttarbharat Hydro, Super Hydro Electric and OPG Power Group for Hydro & TransmissionProjects Development in Himalayas and SAARC.
• Presently doing Business Development of Hydro Projects of Nepal for OPG Group.• Renewable Energy Portfolio initiation for OPG Group Globally.
KEY MANAGEMENT TEAM 38
S. No. Name of the Employee Designation Education University Experience (Brief)
1 Dalip Dua Director M. Com. HNBG University An Entrepreneur who is life member of “International HydroAssociation”. Networking in Globe with Various Institutions,Companies and Business Sectors created over 2 decades –Concessions Structuring for Project Developments.
MBA (Marketing) Dehradun
2 Sanjay Saklani General Manager B.Sc. In Maths & Physics HNBG University Over 6 years experience in Hydro field both in Govt. &Private Sector at Sr. Level and Approx 6 years in Computerfield such in Education, Hardware & Software fields.Post Graduate in Computer HNBG University
SHP Development Certificate AHEC, IIT, Roorkee
MBA (Project Management) Alagappa University
3 Piyush Kumar Singh Manager (Mon. Cell) B.E. Chemical Engg. Thapar University Worked in Era Infra Engineering Head Office in TenderingDeptt (For GAIL,DMRC, NHAI Bidding) & currently look afterthe monitoring cell in OPG Hydro Projects since last 7months.
MBA in Infrastructure Management UPES, Dehradun
SHP Development Certificate AHEC, IIT, Roorkee
4 Anoop Mishra Manager (PR) ITI Certificate Govt. ITI Dehradun Over 6 years experience in the field of Hydro such inlisioning with Govt. departments and local people forproject clearances and land cases.Certificate in Hydro Plant Operations
& Maintenance AHEC, IIT, Roorkee
Diploma Civil Shreedhar University Pilani Rajasthan
Strictly Private and Confidential
KEY MANAGEMENT TEAM 39
5 Siddharth Garg Dy. Manager(Elec.) B.Tech in Power System Engg UPES, Dehradun Pursued a Short term training at Khodri HPP (120MW) & Management Training at NTPC NCR HQ in the Fuel Management DepartmentMBA in Power Management
6 Navneet Singh Dy. Manager(Civil) B.Tech Civil engg UPTU, Lucknow Pursued training at PWD Thrali and also pursuing auto cad
7 Sanjay Kumar Site Supervisor Intermediate Himachal Board Involve from last 6 years in the Hydro field such as gaugereader for discharge measurement and various projectdevelopment activities.
Strictly Private and Confidential
DEVELOPMENT CONSIDERATION
We
Believes in Hydro Power Development Channels Multi-Region
& Bipartisan Support
for
“Renewable Power”
40
Strictly Private and Confidential
Presented By:Dalip Dua
M/s Krishna Hydro Projects Pvt. Ltd.
Website: www.krishnahydro.in email: [email protected] Mob: +91-9837063844
THANK YOU