Pascal Fillion, Eng. PMP
Chief Project Manager
HOLISTIC APPROACH TO THE
ELECTRIFICATION OF A 500HP RATED
POWERTRAIN IN COMMUTER EXPRESS
COACHBUS & PARATRANSIT CONFERENCE
MAY 8 2017
2 Doc Title | Confidential | 2017-05-08
PREVOST IS PART OF THE VOLVO GROUP FAMILY
3 Doc Title | Confidential | 2017-05-08
OTHER FAMILAR IMAGES
4 Doc Title | Confidential | 2017-05-08
THE OBJECTIVE OF ELECTRIFICATION
Maximum uptime
Easy maintainability
Efficiency
5 Doc Title | Confidential | 2017-05-08
THE CONDITIONS
Long range trips
Urban driving
6 Doc Title | Confidential | 2017-05-08
A DELICATE BALANCE
Increased
Electrification
level
Technology
readiness
Up-time &
autonomy
7 Doc Title | Confidential | 2017-05-08
TECHNOLOGY AWARENESS
Technology readiness level (TRL)
8 Doc Title | Confidential | 2017-05-08
THE STARTING POINT: A PROVEN PLATFORM
9 Doc Title | Confidential | 2017-05-08
ENERGY MANAGEMENT FOR SYSTEM ELECTRIFICATION
10 Doc Title | Confidential | 2017-05-08
More Potential
for energy recovery
increasedelectrical
generation
Adapted energy storage
better fuel economy
Increased electrification
level
THE ELECTRIFICATION CYCLE
Energy
efficiency
11 Doc Title | Confidential | 2017-05-08
WHERE WAS THE BEST OPPORTUNITY??
12 Doc Title | Confidential | 2017-05-08
INTRODUCTION OF ELECTRIC FAN COOLING SYSTEM
13 Doc Title | Confidential | 2017-05-08
STRONG DIGITAL VALIDATION PLAN
14 Doc Title | Confidential | 2017-05-08
STRONG PHYSICAL VALIDATION
15 Doc Title | Confidential | 2017-05-08
WINTER TESTING
16 Doc Title | Confidential | 2017-05-08
HIGH AMBIENT OPERATING CONDITIONS
Normal driving
Wide open throttle upgrade
Downgrade with retarder
17 Doc Title | Confidential | 2017-05-08
Reliability Program
9 test units
Over 500 000 miles
5 SW generations
18 Doc Title | Confidential | 2017-05-08
THE RESULT
19 Doc Title | Confidential | 2017-05-08
SIMPLE SYSTEM – EFFICIENT AND EASILY MAINTAINED
Red and Yellow fans in 2
Independent circuits
Each fan is
individually protected
Fans controled in
speed
CAC and Radiator fans work separately
20 Doc Title | Confidential | 2017-05-08
SYSTEM DIAGNOSTICS
▪ Cooling fans keep record of
overheating history
▪ All fans are reset (homing) at startup
for status check
▪ The radiators are kept automatically
clean by the fan operation logic
▪ Automatic fan Reversing at startup and
depending of the season.
▪ Minimal cleaning is needed
▪ Radiator can be accessed by opening
the fan panel
▪ Simple visual diagnostics can be
performed without tools
▪ From front instruments menu and
straight visual inspection
▪ If needed a much deeper
investigation can be performed.
21 Doc Title | Confidential | 2017-05-08
THE RESULT -
23 Doc Title | Confidential | 2017-05-08
KEY TAKEAWAYS
It takes a lot of hard work to make something simple.
(Steve Jobs)
The integration effort resulted in a
simple system with easy
maintenance.
The strong collaboration with the
engine manufacturer resulted into
reduced operation cost
A solid validation plan with a 500hp
in mind makes the system reliable in
any kind of conditions and maximizes
up-time
.
24 Doc Title | Confidential | 2017-05-08
▪ Come see our coach outside
▪ Engineering experts: Christophe Lemarechal & Jeff Gagné