home - gannawarra shire council - ordinary meeting minutes · 2015-11-26 · 7. oral health project...

53
Gannawarra Shire Council – Ordinary Meeting Agenda Ordinary Meeting Minutes Council Chambers, Kerang Wednesday 19 August, 2015 5.30pm

Upload: others

Post on 11-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

 

Gannawarra Shire Council – Ordinary Meeting Agenda 

Ordinary Meeting Minutes Council Chambers, Kerang Wednesday 19 August, 2015 5.30pm 

Page 2: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

Page 3: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

Gannawarra Shire Council Ordinary Meeting Minutes 

 Wednesday 19 August, 2015 

5.30pm    

1.  Opening Prayer  11862

2.  Apologies  11862

3.  Confirmation of Minutes  11862

4.  Declaration of Pecuniary Interest  11863

5.  Question Time  11865

6.  Assembly of Councillors  11866

6a.  Petitions – Public Holiday  11868

7.  Business Reports for Decision  11869

7.1  Quarterly Customer Service Charter Report  11871

7.2  Sale of Mystic Park Reserve Site  11876

7.3  Central Victorian Agribusiness Forum  11879

7.4  Waterway Rules on Council Managed Waterways  11882

7.5  Cohuna Future Vision Plan  11887

7.6  Bulk Solar Project – Joint Council Initiative  11890

8.  Information Reports  11893

8.1  Planning Report  11896

8.2  Building Report  11903

9.  Urgent Items  11905

10.  Notices of Motion  11905

11.  In‐Committee Reports  11906

12.  Delegates Reports  11909

Page 4: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

 

1 Opening Prayer 

At the opening of Council Meetings, the Mayor will ask all present to stand and pray – 

“Almighty God we humbly ask you to bless this Council. May we be worthy servants of yours and Her Majesty Queen Elizabeth II 

Direct and prosper our deliberations to the advancement of your glory and the true welfare of the people we serve. 

This we ask through Jesus Christ our Lord.  

AMEN”    The Deputy Mayor reads the Opening Prayer 

    

2 Apologies  

Nil 

    3 Confirmation of Minutes 

  

 

Recommendation  MOVED: CR GIBSON SECONDED: CR LEARMONTH That Council: 

1. Adopt the minutes from the Ordinary Council meeting held on 15 July 2015. CARRIED

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11862 of 11912

Page 5: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

 

4 Declaration of Conflict of Interest The Local Government Amendment (Councillor Conduct and Other Matters) Act 2008.  A Councillor, member of a special committee, or member of Council staff has a conflict of interest in a matter if he or she has a direct interest or an indirect interest in that matter  A  person  has  a  direct  interest  in  a matter  if  there  is  a  likelihood  that  the  benefits,  obligations, opportunities or circumstances of the person would be directly altered if the matter is decided in a particular  way.  This  includes  where  there  is  a  likelihood  that  the  person  will  receive  a  direct benefit  or  loss  that  can  be measured  in  financial  terms  or  that  the  residential  amenity  of  the person will be directly affected if the matter is decided in a particular way.  A person has an indirect interest in a matter if the person has: x a close association  in the matter because a family member, a relative or a member of their 

household has a direct or indirect interest in the matter x an indirect financial interest in the matter x a  conflicting  duty  –  although  there  are  circumstances  where  a  person  does  not  have  a 

indirect interest because of a conflicting duty x received an ‘applicable gift’ x become an interested party in the matter by initiating civil proceedings or becoming a party 

to civil proceedings in relation to the matter.   Disclosure of conflict of interest If a Councillor or member of a special committee has a conflict of  interest  in a matter which  is to be or is likely to be considered at a meeting of the Council or special committee, the Councillor or member must: x if he or she will be present at the meeting, make a full disclosure of that interest by advising 

of the class and nature of the interest to either – x the  Council  or  special  committee  immediately  before  the  matter  is  considered  at  the 

meeting, or x in writing  to the Chief Executive Officer  (CEO). Where the disclosure  is made to the CEO  in 

writing,  the Councillor or member need only disclose  the  class of  interest  to  the meeting, immediately before the matter is considered. 

x if  he  or  she  will  not  be  present  at  the  meeting, make  a  full  disclosure  to  the  CEO  or Chairperson  of  the  meeting,  in  writing,  of  the  class  and  nature  of  the  interest.  If  a Chairperson  is given a written disclosure, he or she must give the written disclosure to the CEO. 

x The  CEO must  keep written  disclosures  in  a  secure  place  for  3  years  after  the  date  the Councillor  or member  of  the  special  committee who made  the  disclosure  ceases  to  be  a Councillor or member, and destroy the written disclosure when the 3 year period expires. 

x While  the matter  is  being  considered  or  any  vote  taken,  the  Councillor  or member  of  a special committee with the conflict of interest must leave the room and notify the Mayor or Chairperson of the special committee he or she  is doing so. The Mayor or Chairperson must notify the Councillor or member that he or she may return to the room after consideration of the matter and all votes have been cast. 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11863 of 11912

Page 6: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

 x A CEO or Chairperson of a special committee must record in the minutes of the meeting the 

declaration  of  the  conflict  of  interest,  the  class  of  the  interest  and,  if  the  Councillor  or member has disclosed the nature of the interest to the meeting, the nature of the interest. 

x A  failure by a Councillor or member  to  comply with  section 79 of  the Act may  result  in a penalty of up to 100 penalty units and disqualification under section 29(2) of the Act. 

 NIL

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11864 of 11912

Page 7: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

 

5 Question Time Question Time at Council meetings enables an opportunity for members of the public in the gallery to address questions to the Council of the Shire of Gannawarra. 

  

QUESTIONS FROM THE GALLERY  1. All questions are to be directed to the Chair.  2. Members of the public may ask questions from the gallery and should provide their name 

(and organisation if relevant) at the beginning of their questions.  3. There is a maximum number of 3 questions of up to 2 minutes each.  4. Chair will respond or refer to Councillor or CEO  5. Sometimes a Councillor/officer may indicate that they require further time to research an 

answer.  In this case, the answer will be provided in writing generally within 10 days.  6. Where a question cannot be answered on the spot, the person is asked to write out their 

questions on a form provided to enable an accurate response to be prepared.  7. Questions will be answered at the meeting, or later in writing, unless the Chairperson has 

determined that the relevant question relates to:  

o Personal matters o The personal hardship of any resident or ratepayers o Industrial matters o Contractual matters o Proposed developments o Legal advice o Matters affecting the security of council property o An issue outside the Gannawarra Shire Council core business o Or any other matter which the Council considers would prejudice it or any person o A matter which may disadvantage the Council or any other person o Is defamatory, indecent, abusive or objectionable in language or substance o Is repetitive of a question already answered (whether at the same or an earlier 

meeting) o Is asked to embarrass an officer or another Councillor 

 8. No debate or discussion of questions or answers shall be permitted and all questions and 

answers shall be as brief as possible.  NIL 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11865 of 11912

Page 8: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

  

6 Assembly of Councillors 

Executive Chief Executive Officer 

 Author Executive Assistant to CEO and Councillors 

  

Purpose To present to Council the minutes for the Assemblies of Councillors held in the period 15 July to 19 August 2015. 

  

Conflict of Interest In accordance with  Section 80B of  the  Local Government Act,  the Officer preparing  this  report declares no conflict of interest in regards to this matter. 

  

Council Plan Governance and Leadership         Compliance with legislative requirements. 

  

Context In accordance with Section 76A of the Local Government Act 1989 the definition of an Assembly of Councillors is: 

 A meeting  at which matters  are  considered  that  are  intended  or  likely  to  be  the  subject  of  a Council  decision  or  the  following  exercise  of  a  delegated  authority  and which  is  either  of  the following: 

 1. A planned or scheduled meeting that includes half the Councillors and at least one Officer, or 2. A meeting of an advisory committee where at least one Councillor is present. 3. If a meeting fits either of these types the procedures applying to an Assembly of Councillors 

must be complied with,  irrespective of any name or description given  to the committee or meeting. Not  all  gatherings  or meetings  at  which  Councillors  are  present  will  constitute Assembly of Councillors. 

 The   requirement   for   reporting   provides   increased   transparency   and   the   opportunity   for Councillors to check the record, particularly the declaration of Conflict of Interest. 

  

Options Analysis 1. That Council note the Assemblies of Councillors records, as outlined in this report, with no 

changes. There are no policy, financial or resource implications with this option.  

Date:  Tuesday 4 August 2015   Location:  Council Chambers, KerangIn Attendance: (Councillors) 

Cr Goulding, Cr Gibson, Cr Gannon, Cr Learmonth, Cr Arians, Cr Aertssen   

Apologies  Cr den  Houting.In Attendance: (Officers) 

Mandy Hutchinson, Ken Leaming, Geoff Rollinson, David Pietsch, Jodie Basile, Brent Heitbaum, Roger Griffiths,  Kathleen Tonini, Narelle O’Donoghue 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11866 of 11912

Page 9: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

  

Matters Discussed:  1. CEO Update 2. Discussion on process for Mayoral Election 3. RMS Update 4. Public Holidays 5. Creek Remediation Works in Cohuna 6. Councillors Update 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10. Economic Development Update 11. Free Camping – RV Camping 12. GWM Water Presentation 13. Cohuna Masterplan Update 14. Bulk Solar Purchase Update 15. Mystic Park Recreation Reserve Sale 16. Role our of new Councillor iPads 

Conflict of Interest Disclosures (Councillors) 

Nil 

   Conflict of Interest Disclosures (Officers) 

Nil 

 

2. That Council note  the Assemblies of Councillors  records, outlined  in  this  report, with  the inclusion of requested changes. There are no policy, financial or resource implications with this option. 

  

Consultation Consultation with Councillors and staff has occurred to ensure the accuracy of the Assemblies of Councillors records. 

  

Attachments There are no attachments for this report. 

 Conclusion To ensure compliance with Section 76A of the Local Government Act 1989 it is recommended that Council note the Assemblies of Councillors records as outlined in this report. 

  

Recommendation  MOVED: CR AERTSSEN SECONDED: CR GANNON That Council: 

1. Notes the record of Assemblies of Councillors as outlined in this report. CARRIED 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11867 of 11912

Page 10: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

 

6a  Petitions    MOVED: CR GIBSON SECONDED: CR GANNON 

That Council: 

1. Accept the Public Holiday petition as tabled by Cr Gibson on Wednesday 19 August, 2015. 

CARRIED 

 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11868 of 11912

Page 11: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

 

7 Business Reports for Decision 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11869 of 11912

Page 12: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11870 of 11912

Page 13: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

7.1 Customer Charter Quarterly Report  

Executive Director Corporate Services 

 

Author Customer Service Co‐ordinator 

  

Purpose To  report  to Council  the 4th quarter performance  for 2015  financial year against  the Customer Service Charter April to June 2015. 

  

Conflict of Interest In accordance with  Section 80B of  the  Local Government Act,  the Officer preparing  this  report declares no conflict of interest in regards to this matter. 

  

Council Plan Effective Leadership and Management 

 Council  maximises   its   financial  capability  whilst  paying  close attention to risk factors and statutory requirements. 

  

Context The  purpose  of  the  Customer  Service  Charter  is  to improve  access  to  Council’s  services  and promote quality  service delivery.  It does  this by  informing  customers of  the  standard  to expect, what  to do  if  their expectations aren’t met and how  to make  contact with Council. The Charter also  assists  employees  by  clearly  defining  the  range  of  services  that  Council  provides  and  the minimum standard to which those services should be provided. 

 The Customer Service Charter is an important element of the development of a customer focused approach to service delivery. 

 Given the significance of the Charter, it is important that the set standards are measurable and set benchmarks for achievement. 

 The below chart shows actual performance against targets set within the Charter. 

  

45 40 35 30 25

20 41 15 10

5 0

40 39 41

1 2 0 0

Achieved Not Achieved

Q1 2014/2015

Q2 2014/2015

Q3 2014/2015

Q4 2014/2015

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11871 of 11912

Page 14: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

Consultation Internal:  Council Officers nominated to produce data reports. 

  

Options Analysis This is an information report, no options are required to be considered 

  

Attachments 1. Detailed Quarterly Results. 

  

Conclusion A total of 41 standards make up Councils Customer Service Charter. Council performance has achieved 41 or 100% of these standards. 

 Council Officers continue to work towards maintaining this standard by reviewing and implementing new internal processes where appropriate to ensure standards are continually achieved. 

  

Recommendation  MOVED: CR LEARMONTH SECONDED: CR AERTSSEN That Council: 

1. Receive and note the Customer Service Charter Quarterly report. CARRIED

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11872 of 11912

Page 15: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

SERVICE  STANDARD RESULT COMMENTSBuilding and Planning       Process a building permit  Within seven 

business days of receiving fee and completed application

√   

Process building, planning and flood certificates 

Within 10 business days of receiving fee and completed application

√   

Process a planning application  Within 60 business days of receiving fee and completed application, unless required to go to Council for decision.

√  15 permits issued 

Process a subdivision application 

Within 60 business days of receiving fee and completed application, unless required to go to Council for decision. 

√  13 permits issued Six permits took greater than 60 days due to the complexity of two applications and the other four were due to referral authorities not responding in a timely manner. 

Community Care Services      Process client intake  Within 3 business 

days√  28 New Clients 

Conduct home assessment  Within 10 business days

√  146 client assessments conducted 

Provide after hours service for urgent matters 

Availability 24 hours, seven days per week 

√   

Community Engagement      Produce the Gannawarra News  As least once per 

month√   

Promote items of community interest through social media 

Five per week  √   

Update Council’s Community Directory 

Quarterly  √   

Produce council media release  12 per month √  Community Sustainability      Notify community grant applicants of Councils decision 

Within 10 business days of Council decision. 

√  8 successful, 18 unsuccessful Community Grant application letters mailed out within 10 days of Council’s decision

Continuous Improvement      Report to the community achievement of best value principles 

Annually  √   

Customer Service – Frontline       

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11873 of 11912

Page 16: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

First call resolution  70 % of the time  √  82% achieved – 1771 solved at first contact 

Answer telephones  Within 15 seconds  √  Average 7.1 seconds, total of 13,014 incoming calls 

Process disabled parking permits 

Within 10 business days 

√  25 new permits issued and processed within 10 business days

Environmental Health       Respond to food complaints  Within two business 

days√  1 complaint 

Inspect registered food premises 

Minimum once per year 

√  23 inspections 

Conduct immunisation clinics  Fortnightly √  Conduct school immunisation program 

Annually  √  2nd round completed in May 

Process septic tank application  Within five business days of receiving fee and completed application

√  8 applications processed 

Finance       Payment of accounts  Within 30 days of 

receiving invoice 90% of the time

√  96% of invoices paid within 30 days 

Respond to rates enquiries  Within two business days

√   

Respond to debtor/creditor enquiries 

Within two business days

√   

Process land information certificates 

Within five business days of receiving completed fee and application

√  76 land information certificates issued 

General Service       Reply to correspondence  Within 10 business 

days 90% of the time √  1623 documents received, 

91.43 % responded to within timeframe 

Respond to complaints  Within 10 business days

√   

Provide after hours service for Council emergencies 

Availability 24 hours, seven days per week

√   

Respond to enquiries through social media 

Within 1 business day 

√   

Governance       Respond to freedom of information requests 

Within 45 days of receiving a valid request

√   

Review Council plan and strategic resource plan 

Annual  √   

Submit annual report to the  30 September, √  

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11874 of 11912

Page 17: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

Minister  annually    Display documents for public submission 

28 days  √   

Adopt budget  31 August, annually √  Conduct Council meetings to which residents and ratepayers are invited to attend with an opportunity to ask questions 

Monthly, excluding January 

√   

Make Council meeting agendas available 

Two days prior to meeting

√   

Human Resources       Acknowledge receipt of all job applications 

Within seven business days

√  100% completed within 7 days of application 

Infrastructure Services       Respond to customer action requests 

Within 10 business days 

√  182 requests received with 86% compliance 

Local Laws       Respond to urgent domestic animal complaints 

Availability 24 hours, seven days per week

√  Responded to 131 complaints 

Respond to routine domestic animal complaints 

Within one business day 

√  Responded to 183 complaints 

Respond to livestock on road complaints 

Availability 24 hours, seven days per week

√  Responded to 184 complaints 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11875 of 11912

Page 18: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

7.2 Sale of Mystic Park Reserve site  

Executive Director Corporate Services 

 

Author Director Corporate Services 

  

Purpose To seek interest form Council  in disposing of the Mystic Park Recreation Reserve, known as Lot 1, TP409266  (CA Pt 14, Sec 6), Parish of Boga, Wilson Street, Mystic Park.  The  title particulars are V8489 F324. 

  

Conflict of Interest In accordance with Section 80B of  the  Local Government Act,  the Officer preparing  this  report declares no conflict of interest in regards to this matter. 

  

Council Plan Leadership and Governance 

Assets and Infrastructure 

 Demonstrate commitment to strong Corporate Governance and ethical behaviour. Rationalise and dispose of inefficient and/or unnecessary assets. 

Context Council officers regularly review council’s portfolio of assets  in order to  identify which  if any are surplus  to  council’s  requirements  and  no  longer  meet  councils  needs  or  services  delivery obligations. 

 Council has  identified a parcel of  land, known as the Mystic Park Recreation reserve being Lot 1, TP409266  (CA Pt 14, Sec 6), Parish of Boga, Wilson Street, Mystic Park, which  council no  longer uses or provides services to the community from. 

 Due  to  the  declining  usage  of  this  site,  council  is  not  putting  resources  into  the  property  and amenities  to  keep  it  maintained  at  the  appropriate  level  of  condition  expected  for  council reserves. This has led to the appearance of the parcel of land over recent years looking neglected. 

 It is understood the Sportsground was part of the land on which the Hotel is located. It was gifted to the Mystic Park Football Club for their use by the hotel owner at the time. 

 Interest in purchasing the land off council has been received from within the community. 

 The process  for  the  sale of  land by Council  is governed by  the  Local Government Act 1989  (the Act). Under  section  5(2)(d),  Council  is  able  to  acquire,  hold,  deal  with  or  dispose  of  property (including land) for the purpose of performing its functions and exercising its powers. 

 In accordance with the Act the outstanding requirements to enable the sale of this land include: 

1. Section 189 – Restriction on power to sell land.  This section requires Councils to do certain things before selling or exchanging land including: 

‐ Giving at least four weeks public notice of an intention to sell or exchange land ‐ Obtain a valuation of the land which is not more than 6 months prior to the sale or 

exchange 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11876 of 11912

Page 19: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

 ‐ Allow interested persons to make a submission under section 223 on the proposed 

sale or exchange  

2. Section  223  –  Right  to  make  a  submission.  This  section  requires  Council  to  provide interested persons an opportunity  to make a  submission.  In accordance with  this  section Council must give an interested person at least 28 days to make a written submission and if requested enable the interested person to be heard in support of the submission. 

  

Consultation No consultation was undertaken in preparing this report 

  

Options Analysis Council could elect either: 

1. Sell the land 2. Not sell the land 3. Lease the land to and interested party, if one could be sought. 

  

Attachments A copy of the title and plan 

  

Conclusion Council should give public notice of its intention to sell the land and buildings described as Lot 1, TP409266 (CA Pt 14, Sec 6), Parish of Boga, Wilson Street, Mystic Park, by private treaty, obtain a valuation for the land and arrange the subsequent sale of the property. 

 

Recommendation  

MOVED: CR AERTSSEN SECONDED: CR GIBSON That Council: 

1. Agree  to  lift  Item  7.2  –  Sale  of  Mystic  Park  Reserve  Site  off  the  table  for  further discussion.  

CARRIED  MOVED: CR ARIANS SECONDED: CR LEARMONTH 

 1. Authorise  the  Chief Executive  Officer (“the  CEO”)  to  obtain a  valuation  for  the  site 

described as Lot 1, TP409266 (CA Pt 14, Sec 6), Parish of Boga, Wilson Street, Mystic Park from a qualified Valuer as specified under Section 130A(2) of the Valuation of Land Act 1960 to report on the value of the land and buildings. 

2. Commence  the  statutory procedures  to  sell  the  Land  and Buildings, by private  treaty following completion of an Expressions of Interest process, in accordance with the requirements of Section 189 of the Local Government Act 1989. 

3. Give public notice under Sections 82A and 223 of the Local Government Act 1989 (“the statutory advertising”) of the proposed sale of the Land in the appropriate newspapers and on Councils website. 

4. Hear any submissions pursuant to Section 223 of the Local Government Act 1989 (“Submissions”) following the statutory advertising period be considered by Council. 

5. In the event of no Submissions being received, authorise the CEO to enter into a Contract of Sale, on terms satisfactory to the CEO (“the Contract of Sale”).  The Contract of Sale will include  such  terms  as satisfactory  to the  CEO, including  but  not limited to the 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11877 of 11912

Page 20: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

following: a. all existing services, covenants, easements and encumbrances (if any) located on 

the Land are adequately protected and remain in place. b. Appropriate rezoning (if necessary) of the land prior to title transfer 

CARRIED

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11878 of 11912

Page 21: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

 7.3 Central Victorian Agribusiness Forum 

 

Executive Executive Manager Strategic Development 

 

Author Manager Economic Development 

  

Purpose To inform Council of the benefits of joining the Central Victorian Agribusiness Forum. 

  

Conflict of Interest In accordance with  Section 80B of  the  Local Government Act,  the Officer preparing  this  report declares no conflict of interest in regards to this matter. 

  

Council Plan Focus Economic development resources on areas where a competitive advantage exists. 

 Assist   agricultural  expansion/development  on   land   suited   to intensive farming practices 

  

Context Agriculture  has  strategic  importance  within  Australia  and  its  export  markets,  and  remains  a significant  employer  in  regional  Australia.  The  agribusiness  food  chain    currently  accounts  for approximately 12 per cent of GDP and it is predicted that agricultural food production must more than double by 2050 to meet the world’s increasing demand for food. 

 Victoria  is  positioned  as  the  highest  performing  food  export  state  in Australia with  competitive strengths  in dairy,  cereals and processed  grain,  red meat,  fresh  fruit  and nuts and wine  and  an established  reputation  as  “clean  green  and  safe”.  By  2030  the  Victorian  Government  aims  to double its food and fibre production. 

 Agriculture has  long been the driver of the  local economy  in the Gannawarra Shire and this trend is not expected to change in the short term as predicted world population growth and demand for protein from Asia’s emerging middle class drive agricultural growth. 

 The  value  of  agriculture  in  Gannawarra  is  around  $280m  per  annum  driven  by  irrigated  dairy farming followed by cropping and then  livestock. Agriculture employees around 1,100 people and supports a large range of support services and businesses. 

 Agriculture  in  the Shire has undergone a  significant  rationalisation over  the past 20 years driven mainly  by  the  introduction  of  permanent water  trading  in  1995,  changing  seasonal  conditions especially extended periods of drought,  the need  to  aggregate  land  for economies of  scale  and changing demographics highlighting a shift away from agriculture from younger people. 

 It  is  important  for  Council  to  maintain  a  strong  agricultural  focus  aligned  to  the  Economic Development Strategy, Loddon Mallee Strategic Plan and Council Plan. 

 Agribusiness forums are seeking to  improve connections between farmers, business, Government and associated stakeholders to raise the profile of agriculture and to seek new opportunities for 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11879 of 11912

Page 22: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

 diversity  and  development.  The  recent  Central  Victorian  Agribusiness  Forum  event  held  in Newbridge was a venture between the Central Victorian Agribusiness Forum and Loddon Shire and was attended by the Minister for Agriculture, highlighting the importance of agriculture within the local economy. The  Gippsland  Agribusiness  Forum  has  been  a  real  success  story  in  driving  new  industry investment and raising the profile of agriculture in the region. 

 The Gannawarra  Shire  is  facing  strong  competition  from  adjoining municipalities many of which have  significant  advantages  with  built  infrastructure,  distance  to  regional markets  and  natural resources. We  need  to maintain  a  competitive  position  and  to  use  our  land,  water  and  built infrastructure creatively to secure further agricultural growth and investment. This is critical to our ongoing economic viability. 

 The Central Victorian Agribusiness  Forum  can work  in our  favour  if we use  them  as  a  strategic resource. Examples include providing an added resource and network that will introduce us to international clients, assist  in developing pathways to various  levels of Government, assist  in providing support for specific agribusiness projects and develop a higher profile and  level of confidence within  the agribusiness  sector. We  should be utilising  their  services  to advocate  for greater access  into  the poultry, dairy and livestock industries, to make new connections in the international markets with current and potential agricultural sectors and to ensure we have broad support for agriculture into the future from State and Federal Governments. 

 The Central Victorian Agribusiness Forum has requested the Gannawarra Shire contribute $15,000 annually towards the operations costs of running the forum. The contribution is good value when considering our current level of human and financial resources Council is contributing to the most important aspect of business in the municipality. The Central Victorian Agribusiness Forum  is  currently  supported by  the City of Greater Bendigo, Loddon Shire and Central Goldfields Shire. 

  

Consultation Martin Szakal, EO of the Central Victorian Agribusiness Forum has previously presented to Council seeking support for the Forum and regular consultation has been maintained since the presentation. Martin and Cr James Williams from City of Greater Bendigo have also arranged meetings in the Gannawarra Shire with Sam Lim agribusiness investment facilitator. Sam has since visited the Shire on another three occasions working with Council on agribusiness investment opportunities. 

 The City of Greater Bendigo is keen to strengthen the linkages between Bendigo and the smaller rural Councils. Already we have seen the Bendigo City Council Agribusiness Advisory Group tour the Kilter operation along with representatives from the Central Victorian Agribusiness Forum. 

  

Options Analysis Council could: 

 

1. Support  the  request  to  participate  and  contribute  financially  to  the  Central  Victorian Agribusiness Forum. 

2. Not support the request to participate. 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11880 of 11912

Page 23: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

  

 

Attachments No attachments with this report 

  

Conclusion Participating and contributing  financially to the Central Victorian Agribusiness Forum  is certainly a positive move  towards  supporting  and  developing  agriculture within  the  Shire.  It will  provide  a new  range  of  potential  investment  opportunities  and  expose  the  region  to  many  emerging markets all aimed at enhancing and creating further diversity in agriculture. 

 With the many emerging growth opportunities being realized, Gannawarra needs  to place  itself  in the  best  possible  position  to  maximise  opportunities  and  provide  a  strong  collective  voice  in supporting agribusiness activity. 

  

Recommendation  MOVED: CR AERTSSEN SECONDED: CR GANNON That Council: 

 1. Agree  to  support  the  request   from  the  Central  Victorian  Agribusiness  Forum  and 

contribute $15,000  for a period of 3 years towards the operational costs of maintaining the Forum with a review after a 12 month period. 

CARRIED   Amendment to the Motion  MOVED: CR DEN HOUTING SECONDED: CR ARIANS  

1. Agree  to  support  the  request   from  the  Central  Victorian  Agribusiness  Forum  and contribute $15,000  for a period of 1 year with a review after the 12 month period towards the operational costs of maintaining the Forum. 

LOST  THE ORIGINAL RECOMMENDATION BECAME THE MOTION  

   

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11881 of 11912

Page 24: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

   7.4 Waterway Rules on Council Managed Waterways 

 Executive Director Infrastructure Services 

 Author Director Infrastructure Services 

  

Purpose To  inform  Council  of  the  results  of  rule  change  submissions  at  Kangaroo  Lake,  Lake  Charm  and Gunbower Creek, and seek direction on the future of the Gunbower Creek (Schedule 73) waterway rule. 

  

Conflict of Interest In accordance with Section 80B of the Local Government Act, 1989, the Officer preparing this report declares no conflict of interest about this matter. 

  

Council Plan Strong  and  Diverse  Economy:  Our  Commitment  –  To  create  an  environment  supportive  of economic growth, stability and prosperity. 1.1.3 – Utilise the environs of the rivers, lakes and forests for new tourism developments. 1.5.2 –  Identify tourism  infrastructure opportunities along the rivers and  lakes  that have a broad economic benefit. Sustainable  Environments:  Our  commitment:  Through  our  operations  and  advocacy,  achieve outcomes which protect and enhance our environment. 2.2.4  ‐ Advocate and promote  the Shire’s wetlands and use of waterways  for  tourism and water sports activities. 

  

Context History of the waterway rules In December 2011, Transport Safety Victoria carried out a waterway audit on Gunbower Creek  in regard  to  the  vessel  operating  and  zoning  rules.  The  audit  identified  a  number  of  areas  of  non‐ compliance with navigational aids and inadequate signage. It also suggested the waterway manager review the waterway extents, references to zone boundaries, the purpose of the ski access lane and exclusive use/special purpose boating zones. 

 In April 2012, Council recommended temporary rules are put in place for Gunbower Creek to enable consultation and consideration of the waterway rules. The temporary rules (made under Section 15 of the Marine Act 1988) introduced a maximum speed  limit of 40 knots  in the area used for skiing and  removed  the  ski access  lane and  the area used  for  skiing upstream of Daltons Bridge.  These temporary rules were put in place until 30 May 2013. 

 On 7 March 2013, Council submitted a Notice of Intention to Request a Waterway Rule to Transport Safety Victoria for Kangaroo Lake, Lake Charm and Gunbower Creek. 

 1. The proposal submitted to amend the existing waterway rules for Kangaroo Lake was to:‐ 

x Remove all access lanes; 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11882 of 11912

Page 25: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

  

x Remove all non‐boating areas except the area to East of northern boat ramp;  and x Include a 5‐knot speed restriction area 50mx50m around  the  installed  fish habitats to  the 

South East.  2. The proposal submitted to amend the existing waterway rules for Lake Charm was to:‐ 

x Remove all access lanes;  and x Resize the non‐boating areas in front of the Pelican Waters and Foreshore Caravan Parks. 

 3. The proposal submitted to amend the existing waterway rules for Gunbower Creek was to:‐ 

x Retain permanently the temporary waterway rules that were in place in 2012/2013 that:‐ � introduced a maximum speed limit of 40 knots in the area used for skiing; and � removed the ski access lane and the area used for skiing upstream of Daltons Bridge. 

x Remove the area prohibited to vessels at the junction of Taylors Creek (clause 73.4(a)) within the Campaspe Shire Council area;  and 

x Include a prohibition of wake creating boats on the waters of Gunbower Creek.  After assessing the Notices, Transport Safety Victoria determined that the proposed rules were:‐ 

x within the powers of the Safety Director to make a rule;  and x of a material nature that is, not a correction of a minor error. 

 Given  the determination  that  the  request was within  the powers  of  the  Safety Director  and was material  in  nature,  Council was  required  to  undertake  the  following public  consultation  to  invite comments:‐ 

x publish a notice of the proposal in a newspaper circulating generally throughout the State; x publish details of the proposal on the waterway manager’s internet site; x make copies available to the public;  and x allow at least 4 weeks for receiving submissions. 

 Public  consultation  ran  from  27  August  2013  to  25  September  2013.  The waterway  user  groups were advised of the public consultation by Gannawarra Shire Council.  Following closure of the consultation period a Request  for Making a Waterway Rule (Request) was sent  to  Transport  Safety  Victoria  on  26  November  2013.  Further  clarification  was  sought  by Transport Safety Victoria and an amended Request was submitted on 9 October 2014. This included amendment to the proposed waterway rules following public consultation.  In November 2014 Council received notification that the rule change for Lake Charm was approved with  the Waterway  rule being gazetted  in  January 2015.  Signage and buoys were  installed and/or removed.  In December 2014 Council  received notification  the  rule  change  for Kangaroo  Lake was approved with the Waterway rules being gazetted on 28 April 2015. Signage and buoys were installed and/or removed. On 28 April 2014 Council  received notification  the  rule change  for Gunbower Creek was approved excluding  the  amendment  to  ban  wake‐enhancing  boats.  Council  is  awaiting  approval  of  grant funding to complete signage for the rule change except for banning wake‐enhancing boats. 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11883 of 11912

Page 26: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

    

In  relation  to  the wake‐enhancing  boats,  the  public  consultation  documentation  did  not  directly mention  a  proposal  to  prohibit  wake‐enhancing  boats  on  the  waters  of  Gunbower  Creek. Gannawarra Shire Council advised Transport Safety Victoria that they elected to omit this to gauge the public response and “allow the users to decide”. As Transport Safety Victoria deemed as there was no public consultation directly relating  to  the banning of wake boarding  the  rule change was not  approved.  Transport  Safety  Victoria  has  since  advised  that  the  amendment  to  ban  wake‐ enhancing boats is a material decision and needs to be advertised and invite public submissions. 

 Council  indicated  at  the  June  2015 Councillor Briefing  Session  that Council  officers  investigate  a waterway rule change on the Gunbower Creek to ban wake‐enhancing vessels or devices. 

  

Consultation The  required public consultation ran  from 27 August 2013  to 25 September 2013. The waterway user groups were advised of the public consultation by Gannawarra Shire Council. 

 Waterway  rules were discussed at  the Councillor Briefing Session on 2 October 2013 and 2  June 2015. 

 Council  has  consulted  with  North  Central  CMA,  Goulburn  Murray  Water  and  other  Waterway Managers regarding the impacts of wake‐enhancing watercraft. 

 The  ‘Scoping Study on  the Causes of Bank Erosion on  the Murray River’ prepared by  the Murray Darling Association Inc includes an extract from Executive Summary 

“The scoping study identified three issues that stand out above all others.  They are: x river regulation is the most profound cause of bank erosion, x bank erosion  is a natural process, although  somewhat  exacerbated by human  intervention, and, x banning of wake boats will not stop erosion.” 

  

Options Analysis There are a number of options to consider. 

 1. Council relinquishes as Waterway Manager for Gunbower Creek 

Council has been the default Waterway Manager of the 4 waterways in Gannawarra Shire since the passing of the Marine Act 1988 and possibly since the Marine Act 1958 and Motor Boating Act 1961 despite waterway management not being a core part of Councils responsibilities. 

 If  Council  choses  to  discontinue  its  role  as  the  Waterway  Manager  for  Gunbower  Creek, Transport Safety Victoria would require another body or group to take on the management. If a new manager cannot be  found,  it  is  likely the waterway would revert  to a 5 knot  limit  like all other unmanaged waterways. 

 2. Council enforces bans of wake‐enhancing vessels or devices on a waterway. 

Council write to Transport Safety Victoria proposing a new rule change around banning wake‐ enhancing vessels. 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11884 of 11912

Page 27: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

   

If Council wishes  to proceed with banning wake‐enhancing boats  from  the Gunbower Creek, the proposed  rule change would need  to be submitted  to Transport Safety Victoria and enter into a period of public consultation. 

 3. Council bans all activity other than water skiing. 

An option may be to ban all activity on Gunbower Creek other than water skiing and re‐classify the Gunbower Creek as a water skiing area only. Water skiing would need to be defined  ie. a person standing on one or two water skis etc.  This may not allow any other activity  including bare foot skiing. 

 Council would  need  to  apply  to  Transport  Safety  Victoria  to  change  the waterway  rule  and enter into a period of public consultation. 

 4. Council bans all high speed activity. 

The Gunbower Creek could be considered too narrow and therefore too dangerous (submerged trunks, dead trees) to conduct any high speed activity on the creek. 

 An alternative    is  to  consider  the   Bridgewater‐on‐Loddon rule  which  allows  for  high speed movement in one direction only, and 5 knot movement in the opposite direction. 

 Council would apply to Transport Safety Victoria to change the waterway from the high speed areas  back  to  5  knots  and  potentially  relinquish  being  the  Waterway  Manager  for  the Gunbower Creek. 

 5. Status Quo 

Council has the option to retain the current Waterway rule as approved  in April 2015. Council Officers continue to monitor the Waterway as part of their function as Waterway Manager. 

  

Attachments There are no attachments with this report. 

  

Conclusion Council has  followed  the process  to enable the waterway  rule changes  to  take place on Kangaroo Lake, Lake Charm and the Gunbower Creek and works to  finalise these rule changes are complete for Kangaroo  Lake and  Lake Charm with all  signage now  in place.  Once  the  signage  installation  is complete for Gunbower Creek the new rules will be fully gazetted. 

 If Council wishes  to proceed with a  rule change  to ban wake‐enhancing vessels on  the Gunbower Creek thorough community consultation will be required as the option to ban wake‐boarding could have a significant impact on visitation to the area. To ban wake‐enhancing vessels appears to be at odds with points 1.1.3, 1.5.2 and 2.2.4 in the Council Plan 2013‐2017. 

  

 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11885 of 11912

Page 28: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

   

 

Recommendation  MOVED: CR  SECONDED: CR That Council: 

1. Apply  to  Transport  Safety  Victoria  for  a waterway  rule  change  around  banning wake enhancing vessels on the Gunbower Creek and conduct appropriate public consultation. 

2. Apply to Transport Safety Victoria to redefine  the waterway  rule area  from  the Cohuna Weir to 700m upstream of Daltons Bridge and conduct appropriate public consultation. 

3. Apply  to  Transport  Safety  Victoria  for  a waterway  rule  change  around  restricting  high speed  boating  in  one  direction  only  and  implement  a  5  knot  limit  in  the  opposite direction, and conduct appropriate public consultation. 

4. Apply  to Transport Safety Victoria  to  implement a  seasonal  rule change around ceasing high  speed  activity  due  to  the  reduced  depth  of  the  Gunbower  Creek  during  the  off irrigation season. 

5. Receive an update as  the year progresses on  the waterway  rule changes  for Gunbower Creek. 

LOST  Amendment to the Motion  MOVED: CR LEARMONTH SECONDED: CR GIBSON  That Council: 

1. Apply  to  Transport  Safety Victoria  for  a waterway  rule  change  around  banning wake enhancing vessels on the Gunbower Creek and conduct appropriate public consultation and to bring back to Council at the November Council meeting. 

2. Apply to Transport Safety Victoria to redefine the waterway rule area from the Cohuna Weir to 700m upstream of Daltons Bridge and conduct appropriate public consultation. 

3. Apply to Transport Safety Victoria for a waterway rule change around restricting high speed boating in one direction only and implement a 5 knot limit in the opposite direction, and conduct appropriate public consultation. 

4. Receive an update as the year progresses on the waterway rule changes for Gunbower Creek. 

 CARRIED   THE AMENDMENT BECAME THE MOTION

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11886 of 11912

Page 29: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

 7.5 Cohuna Future Vision Plan 

 

Executive Acting Executive Manager Strategic Development 

 

Author Acting Executive Manager Strategic Development 

  

Purpose The  purpose  of  this  report  is  to  seek  authorisation  from  Council  to  present  the  draft  Cohuna Future Vision Plan to the community prior to Council adopting the Plan. 

  

Conflict of Interest In accordance with  Section 80B of  the  Local Government Act,  the Officer preparing  this  report declares no conflict of interest in regards to this matter. 

  

Council Plan Healthy Liveable Communities    Our community has access to a range of facilities and 

opportunities that promote active lifestyles.  

 

Context Council in conjunction with Hirst Projects and Terroir have undertaken a focussed consultation and engagement exercise  in Cohuna  to  identify opportunities, synergies and priorities  for  investment in key public open space areas. 

 The exercise was  intended  to  re‐engage with  the community at a  time when community debate had  become  focussed  on  individual  projects,  rather  than  proactively  setting  a  shared  vision  or framework for the future. 

 The Plan sets out  the priorities  for development and use of critical community spaces such as parks, recreation facilities, streetscapes, tourist facilities and community facilities in Cohuna. 

 The draft Plan presents the  ideas generated by a variety of stakeholders and  is now ready to be presented back to the community prior to Council adopting the Plan. 

  

Consultation In July this year, Gannawarra Shire Council held a series of four community consultation sessions at the Gateway Centre in Cohuna to engage with a number of stakeholders including local residents, visitors and business operators to discuss their thoughts on how best to utilise and develop key public open space areas in town. 

 Each of the sessions was very well attended and many great concepts and ideas emerged surrounding future opportunities in Cohuna. 

 The consultation sessions were informative and ideas raised are clearly presented in the Cohuna Future Vision Plan. 

  

 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11887 of 11912

Page 30: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

  

 

Options Analysis 1. That  Council  authorise  the  draft  Cohuna  Future  Vision  Plan  to  be  presented  to  the 

community. Bringing the Plan back to the community prior to Council adoption has already been considered in the scope of the project and is anticipated by the community. 

2. That  Council  not  present  the  draft  Cohuna  Future  Vision  Plan  to  the  community  at  this time. This option will be in opposition to established community expectations. 

  

Attachments 1. Cohuna Future Vision Plan (Plan). 2. Cohuna Future Vision Plan (Separate Document). 

  

Conclusion The Cohuna Future Vision Plan has been formulated with input from the Cohuna community. Information gathered at the consultation sessions has been collated and presented in a draft master plan format representing the aspirations of the community. 

 It is anticipated that the findings of the project be brought back to the community prior to Council adopting the Plan. 

 As such, it is recommended that Council officers go back to the community to present these findings in accordance with the recommendation below. 

  

Recommendation  MOVED: CR AERTSSEN SECONDED: CR That Council: 

 1. Place the Cohuna Future Vision Plan on public display for a period of 28 days. 2. Receive a report following the consultation period. LOST   Amendment to the Motion  MOVED: CR LEARMONTH SECONDED: CR GIBSON That Council; 

1. Endorse the draft Cohuna Future Vision Plan and include the following three points: a. Creating a RV Free Camping area at the former netball courts, for the upcoming 

summer season. b. Better defining the potential Free Camping areas within the Recreational Reserve 

and at the former Sawmill site.   c. Upgrade the Civic Hub plan to enhance the War Memorial forecourt and retain 

and upgrade the existing public toilets rather than build new facilities. 2. Put the draft Cohuna Future Vision Plan out for community consultation.  

 CARRIED

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11888 of 11912

Page 31: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

V I S I O N

The essence of Cohuna can be summarised in four words:

FORESTThe town is a gateway to the nationally significant Gunbower river red gum forest

FARMSThe town is surrounded by farmland, significantly contributing to the state’s dairy industry

FACTORIESThe town is bordered by businesses that support the regional and state economy

FAMILYThe town is bound a strong sense of community and belonging

Making the most of this special place and enhancing the opportunities for the already active community drives the Future Vision Plan

P R O J E C T SFLORA PARKThis site will be transformed into a nature park attraction inspired by the Gunbower red gum forest. This would bring the essence of Cohuna’s natural attractions - the waterways, fish, the bush and the wildlife right into the heart of town.

Planting, sculpture, rest and play areas and trails will be designed to create a new landscape giving the visitor a taste of the riches that surround the town. The space will be planned for small children, allowing the local schools and kindergartens to use it in their programs. It will suit older people providing gentle walks and relaxing areas for those for who love the outdoors. The park will be supported by new toilet facilities and lighting.Garden Park and Flora Park will celebrate people who have contributed to Cohuna through history to the present day. Contributions from groups and individuals from the earliest times will be honoured on plaques that will form a specialist walk, with opportunities to shine light on these on special occasions throughout the year.

RIVER ROOMS Quirky ‘loungerooms’ will be an added attraction between town and the Ski Run making Cohuna a favoured place to settle in and enjoy a prime waterside view.

Cohuna’s river walk illustrates the family side of this town. Make-shift ‘lounges’ already populate the river bank where locals sit down to enjoy food, family, fishing, boating and swimming, illustrating the real pleasures of staying in this particular part of the Murray region. A set of new loungerooms will allow locals and residents to enhance that family feeling and better enjoy their unique surrounds.

FACTORY AND FARM ART TRAILA walk along the southern edge of Cohuna will showcase the farms and ‘factories’ with a set of art installations that interpret the activity of the workplace and bring alive the concept of modern farming and all that supports it.

Farms and factories are special places. They are workplaces and service centres and for visitors they are intriguing; they accommodate activities that are out of the ordinary to an urban dweller. This walk, through areas of bush, park and townscape will raise awareness of the region’s farming resources. Professional artists, using local materials relevant to the site, will create a series of sculptures and landscape treatments that are visually appealing and make a great photo opportunity, putting the town on the tourist map and engendering pride in the town’s contribution to the economy.

THE CIVIC HUBIn the heart of town a cluster of cultural and community spaces will be redeveloped around a town square – a vibrant meeting space for locals and a visitor attraction that reflects many of the ‘family’ aspects of Cohuna.

The key services that locals use frequently for health, education and enjoyment will be located at the Civic Hub. This will include the library and gallery, community health services and childcare. The Hub will exemplify civic pride and commemorate significant events and historic moments. Within the Hub precinct the Memorial Hall, the cenotaph and the new WW1 memorial will be prominent, linking this site with the Flora Park ‘contributions’ walk.The Hub will extend to the street giving it a higher profile, engaging with visitors and supporting the existing Town Walk. A new Civic Square will enhance the experience of the memorials, support Anzac day traditions and offer a pleasant, landscaped setting for visitors.

CENOTAPH MEMORIAL HALL NEW WWII MEMORIAL LIBRARY & GALLERY

OLD SCHOOL BUILDING the red brick building is being considered as the site for a Cohuna cultural centre with programmed arts (visual, digital, music) and education activities and classes.This attractive building has indoor spaces that may be suited to classes and activities, and outdoor space that has potential for gardening and environmental programs aligned with the town’s rural setting. Its proximity to the school may provide opportunities for younger members to take a role in its set-up and operation.

RECREATIONAL VEHICLE (RV) PARKINGRV Owners will find a hidden spot at the rear of the Cohuna’s recreation facilities and near the new Tan Track for overnight stays. This will be a location where they can be self-sufficient and feel more of a sense of adventure.

This site, close to RV amenities and within walking distance from town will be developed and marketed to attract this growth market and encourage a longer stay.Overflow caravan parking will also be provided for peak events eg Easter in the powered sites nearby around the existing football ground.

STREETSCAPEMajor streets in Cohuna will be given a facelift

Main Street: the streetscape is an important component of the trader and consumer experience. Improved pedestrian access, places to sit, attractive but appropriate plantings and places to place merchandise external to the shopfront would contribute to the attraction of the main street and, importantly the view from across the street.Channel Street: enhanced planting will enhance the residential and walking experience across town along this wide country ‘boulevard’. It will create an entry to the Civic Hub and special access to the childcare facilities.Market Street: the new Civic Hub will reach across to the cenotaph in Market Street and ne enhanced to support the Hub amenity

CROSSINGS Crossings on the Murray Valley Highway will be reviewed and designed to ensure safe passage for pedestrians, cyclists, ‘gopher’ drivers and drivers.

Placement of the pedestrian crossings to optimise safety and reduce unsafe behaviour is of critical importance. These will link to parking and to the most frequent journeys between Garden Park, the Gateway and the recreation facilities and the shops.

SIGNSThe road entries to Cohuna will signal to visitors that the town is welcoming and thriving.

Signage directing vehicles out of town will be located at sites that do not mar views and experiences at the centre. Improved, and accurate signage and landscape treatment will raise the profile of the town as a place to stop, rather than pass through. Directional and destination signage, both public and private, that is redundant will be removed.

GARDEN PARKThis is Cohuna’s ‘showroom’. Here the town shows off to visitors, puts on events, performances and activities and generally celebrates country living and the people who have made major contributions to the town and region.

Minor modifications to Garden Park will support these uses by better defining spaces, promoting the activities and delivering increased functionality and visual appeal. These modifications include shoring the banks and developing the creek edge to give visitors spaces to relax and enjoy the views, enhancement of the Performance Shelter, re-positioning of the seating and drinking fountain and repainting of the Cohuna Clock.Garden Park will have a special connection to the Civic hub on Anzac day when crosses are erected to commemorate those who died in wars.

THE GATEWAY CENTREThe Gateway Centre is the ideal place to celebrate everything about Cohuna.

For tourists The Gateway Centre is already a well-used tourist information centre. It will be programmed to feature more strongly as a place for seasonal seminars, classes and meetings utilising the indoor and outdoor space and connections to the creek and the parks.

THE COHUNA TAN TRACK A major track looping around the northern side of Cohuna will encourage group walks, use of ‘gophers’, walks with pushers, as well as fun-runs and cycling.

This broad trail at 3.8 km long will be developed by linking, extending and expanding existing tracks through forest and farm settings. This will be a bookable space that will act as a regional partner to ‘The Tan’ around Melbourne’s King’s Domain and Botanic Gardens hosting events and encouraging healthy exercise.

7

8

9

6

5

1

2

3

410

1011

12

6

8

7

25

5

1

4

9

3

Reinstated pedestrian bridge at site of former rail bridge, to create walkway between Town and Farms

Gilrude Park Loop

Improved street lighting at major arterial roads intersection

C O H U N A V I S I O N

FA

RM

FA

MI

LY

F

AC

T O R I E S

FO

R

ES T

1 0

1 1

1 2

New Link Building

Child Care

RSL

Library

Community Health Services

Community Services

GalleryCivic Square

New WWII MemorialCenotaph

Forecourt

Memorial Hall

NewToilets

Page 32: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

   7.6 Bulk Solar Project – Joint Council Initiative 

 Executive Director Infrastructure Services 

 Author Environment/Traffic Engineer 

  

Purpose To inform Council of the progress and seek a resolution to proceed with the solar panel installations under the Local Government Aggregated Solar Project 

  

Conflict of Interest In accordance with Section 80B of the Local Government Act, 1989, the Officer preparing this report declares no conflict of interest about this matter. 

  

Council Plan Sustainable  Environments:  Our  commitment:  Through  our  operations  and  advocacy,  achieve outcomes which protect and enhance our environment 2.1.1  –  Develop  and   implement  energy  efficient  programs  across  Council  buildings,  building alterations and other assets 

 Effective Leadership and Management: 4.3.4 – Deliver efficiency gains through continuous improvement initiatives 

  

Context During May 2013 Council committed  to buy  the Bendigo and Ballarat solar parks, as  installed, as part of the Central Victoria Solar Cities Project.  The solar parks included:‐ 

x 1 x 13kW – 8 array system – currently being installed at Sir John Gorton Library precinct; and x 1 x 16kW – 8 bay system – currently  installed at a site on  the Murray Valley Highway near 

Reedy Lake.  This project  is a  trial  to determine  the ability  to use  solar  to drive  the water delivery pumps. 

 Other recent installations and retrofits include:‐ 

x Heat pump installation in the Kerang indoor heated pool; x LED light installations at a number of Council buildings;  and x replacing all the 80W Mercury Vapour street  lights with 18W LED street lights through the 

Lighting the Regions Project.  Since  August  2014  Council  officers  have  been  working  with  the  Central  Victorian    Greenhouse Alliance (CVGA) partnering  in the Local Government Aggregated Solar Project for solar  installations on  council  buildings. The  Project  involves  eight  other  Councils  within  the  CVGA  region  and  will allow participating councils to maximise their collective purchasing power to install solar panels at a very low cost over the next few years. 

 The Project  is delivered  in  two  stages.   The  first being CVGA and participating Councils  to work together to ascertain which buildings are appropriate for solar energy and produce a draft feasibility 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11890 of 11912

Page 33: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

   assessment.  The  second  stage  is  to  develop  specifications,  coordinate  procurement  processes, delivery and installation. 

 For  Stage One,  Council  supplied  the  consumption  data  for  our  20  biggest  energy  using  buildings which were evaluated  in a business case scenario.  From here seven buildings were selected  to be included in the draft feasibility assessment.  These buildings were:‐ 

x Kerang Memorial Hall x Kerang Depot x Cohuna Council Office x Cohuna Memorial Hall 

x Gateway Centre x Kerang Council Office x Sir John Gorton Library 

 

The draft assessment was received in November 2014 detailing:‐ x Capital costs x Optimal size x Simple payback period x Annual consumption x Annual financial cost x Annual cost saving 

 Council  officers  utilised  the  assessment  to  build  a  capital  project  submission  for  the    2015/16 financial  year.  This  project  was  successful  with  $110,000  being  allocated  for  the    year.    This allocation means that Council will go out to tender with eight other Councils to obtain solar panel installs on the following buildings:‐ 

x Kerang Memorial Hall; x Kerang Depot; x Cohuna Council Office; x Cohuna Memorial Hall;  and x Gateway Centre. 

 The Kerang Council Office has been removed from Stage One of the project due to the size of the solar  installation  required  and  further work with  Powercor  to  ensure  its  feasibility. The  Sir  John Gorton Library has also been removed as a solar park is currently being installed at this location. 

  

Consultation Council  staff  worked  in  conjunction  with  Central  Victorian  Greenhouse  Alliance  (CVGA)  staff  to partner in the Local Government Aggregated Solar Project. 

  

Options Analysis Council  could  consider  including other buildings other  than  the  recommended  sites, however  the selected sites offer the best return on investment. 

 Council could  look at  implementing the Kerang Council Office first however the structural  integrity of the Patchell Plaza roof would need to be assessed due to the  increased weight  load by a  large ~30kW  system.  Council  staff are  investigating a  large  scale  installation at  the  rear of  the Patchell Plaza complex which would be done as an extension of the Kerang CBD redevelopment. 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11891 of 11912

Page 34: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

   

 

Attachments Draft Solar Feasibility Assessment (separate). 

  

Conclusion The  draft  feasibility  assessment  indicates  there  are  some  very  good  opportunities  to  install  solar panels at a number of Council buildings with good payback periods.  This information is contained in the attachment.  On  ground works,  at  this  stage,  are not  anticipated  to occur until 2016.  Council officers will update Councillors periodically as the year progresses. 

  

Recommendation  MOVED: CR DEN HOUTING SECONDED: CR GIBSON That Council: 

1. Receive and note the progress of the bulk solar projects. 2. Commence  the  process  of  solar  panel  installations  as  part  of  the  Local  Government 

Aggregated  Solar  Project  on  the  Kerang Memorial  Hall,  Kerang  Depot,  Cohuna  Council Office, Cohuna Memorial Hall and Gateway Centre. 

3. Continue to investigate a future bulk solar installation at the Kerang Council Offices. CARRIED

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11892 of 11912

Page 35: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

8 Information Reports 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11894 of 11912

Page 36: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11895 of 11912

Page 37: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

8.1 Planning Report  

Executive Executive Manager Strategic Development 

 

Author Manager Planning 

  

Purpose To present to Council Planning Permit applications under consideration and permits issued for the month of July 2015. 

  

Conflict of Interest In accordance with Section 80B of  the Local Government Act,  the Officer preparing  this  report declares no conflict of  interest  in  regards  to  this matter. 

  

Council Plan Strong and Diverse Economy  Facilitate the timely processing of planning applications 1.4.2. 

  

Context    App. No  Proposal/Address  Notice

Paper Neighbour

Referral  Status/Comments  Decision and Date and Date 

Received Authority  Date 

Referred Reply 

ReceivedP14.009 

4/02/2014 

Use and development of a dwelling ‐Lot  2  PS305252,  18  Punt  Road Koondrook 

  EHO 

ENG 

Building  NCCMA 

12/08/2014  19/08/2014 27/05/2015 13/08/2014 18/09/2014 

  Application Withdrawn 

P15.006 

12/01/2015 

Development  of  three  (3)  dwellings and  four  (4)  lot  subdivision  ‐  Lot  1, LP204810S,  45  Channel  Street, Cohuna.

Adjoining Owners and Onsite

Powercor 

Coliban 

29/04/2015  19/05/2015 18/05/2015 

  Notice of Decision Issued 

15/07/2015 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11896 of 11912

Page 38: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

  App. No  Proposal/Address  NoticePaper 

Neighbour

Referral  Status/Comments  Decision and Date and Date 

Received Authority  Date 

Referred Reply 

Received    Notice  NCCMA 

Building 

ENG 

  7/05/2015  4/05/2015 

27/05/2015 

   

P15.031 

10/3/2015 

Development  of  the  Koondrook wharf  in  accordance  with  the endorsed plan ‐ Allot. 5A, Sec 1, Main Street, Township of Koondrook 

  NCCMA  Building 

ENG 

DELWP 

VicTrack 

30/03/2015  7/04/2015 

13/04/2015 

7/04/2015  14/04/2015

17/04/2015

20/04/2015

19/06/2015 

  Permit Issued 

7/08/2015 

P15.041 

23/04/2105 

Development  of  a  Dwelling inaccordance with  the endorsed plan  ‐ Lot 4, PS205475Y, 57 Park Road, Lake Charm 

  NCCMA  Building 

ENG 

GMW 

EHO 

29/04/2015  7/05/2015  4/05/2015 

27/05/2015

18/05/2015

8/05/2015 

Further information has beenforwarded  to  GMW  for  their consent. 

 

P15.042 

24/04/2015 

Six  (6)  lot  subdivision  in  accordance with  the  endorsed  plan  ‐  Allot  73, Sec D, Parish of Cohuna, 185 Cohuna Island Road 

Adjoining Owners 

NCCMA  Coliban 

Powercor 

GMW 

DELWP 

26/05/2015  15/06/2015 25/06/2015

17/06/2015

12/06/2015

30/06/2015 

  Permit Issued 

14/07/2015 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11897 of 11912

Page 39: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

  App. No  Proposal/Address  NoticePaper 

Neighbour

Referral  Status/Comments  Decision and Date and Date 

Received Authority  Date 

Referred Reply 

Received     

Building 

ENG 

EHO 

  27/05/2015

1/06/2015 

   

P15.048 

13/05/2015 

Development  of  an  Agricultural Building  (Machinery  Shed)  ‐  CA  2B, Parish  of Gannawarra,  198 Buckland Road, Gannawarra. 

  NCCMA 

Building 

ENG 

23/06/2015  6/07/2015  23/06/2015

24/06/2015 

  Permit Issued 

14/07/2015 

P15.050 

18/05/2015 

Use and development of a Store ‐ Lot 1, TP202649, Murray Valley Highway, Lake Charm. 

  VicTrack 

ENG 

Building 

EHO 

VicRoads

21/05/2015  29/07/2015 

3/08/2015  25/05/2015

1/06/2015 

Waiting  for  referral  authority responses due 26/08/2015. 

 

P15.051 

27/05/2015 

Development  of  an  extension  to  a dwelling  in  accordance  with  the endorsed  plan  ‐  Lot  1,  TP953506M, 73 Browns Road, Gannawarra. 

  GMW 

NCCMA 

DELWP 

Building 

ENG 

EHO 

29/05/2015  12/06/2015 5/06/2015 

3/06/2015 

2/06/2015 

1/06/2015 

3/06/2015 

DELWP   have   requested   further information. 

 

P15.052  Development of an agricultural shed GMW 4/06/2015  27/07/2015 Permit 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11898 of 11912

Page 40: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

  App. No  Proposal/Address  NoticePaper 

Neighbour

Referral  Status/Comments  Decision and Date and Date 

Received Authority  Date 

Referred Reply 

Received 28/05/2015 

(Dairy Shed)  in  accordance with theendorsed plan  ‐ Lot 1, TP173501, 96 Mead Road, Mead. 

  NCCMA 

ENG 

Building  EHO 

  15/06/2015

4/06/2015 

9/06/2015 

5/06/2015 

  Issued 27/07/2015 

P15.054 

1/06/2015 

Development  of  an  extension  to  a dwelling  in  accordance  with  the endorsed plan  ‐  Lot 1,  LP131179, 84 Vallences Road, Cohuna. 

  GMW 

ENG 

Building  EHO 

12/06/2015  22/06/2015 15/06/2015

30/06/2015 

  Permit Issued 

29/07/2015 

P15.055 

10/06/2015 

Development  of  an  outbuilding  in accordance with  the endorsed plan  ‐ Lot 1, TP6683110, 20 Murray Parade, Koondrook. 

  NCCMA 

ENG 

Building  EHO 

25/06/2015  21/07/2015 26/06/2015

30/06/2015

14/07/2015 

  Permit Issued 

29/07/2015 

P15.056 

9/06/2015 

Development of an agricultural  shed (Machinery/Hay Shed)  in accordance with  the  endorsed  plan  ‐  Lot    1, TP233125R,  4811  Murray  Valley Highway, Leitchville. 

  VicRoads 

NCCMA 

ENG 

Building  EHO 

26/06/2015  17/07/2015 6/07/2015 

26/06/2015

30/06/2015

14/07/2015 

Applicant  has  requested  the application be put on hold. 

 

P15.057  Development of an agricultural shed Adjoining VicRoads 26/06/2015  17/07/2015 Application 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11899 of 11912

Page 41: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

  App. No  Proposal/Address  NoticePaper 

Neighbour

Referral  Status/Comments  Decision and Date and Date 

Received Authority  Date 

Referred Reply 

Received 10/06/2015 

(Machinery Shed)  in accordance withthe endorsed plan ‐ Lot 1, TP374978, Potter Lane, Lake Meran. 

Owners  Building 

ENG 

EHO 

  30/06/2015

26/06/2015

14/07/2015 

  Withdrawn 

P15.058 

25/06/2015 

Two   (2)   lot   subdivision   ‐   Lot   1, PS715414,  146‐150  Grigg  Road,Koondrook. 

Adjoining Owners 

Powercor 

LMW 

NCCMA 

VicRoads 

Building 

ENG 

EHO 

2/07/2015  21/07/2015 10/07/2015

14/07/2015

6/07/2015 

14/07/2015 

Waiting  for  referral  authority responses  due  16/07/2015. Reminder  sent  on  22/07/2015, 27/07/2015,      31/07/2015      and 7/08/2015. 

 

P15.059 

29/06/2015 

Development  of  two  (2)  dwellings  ‐ Lot  1,  LP122550,  59A    Scoresby Street, Kerang. 

Adjoining Owners  & Onsite 

ENG 

Building 

EHO 

16/07/2015  26/07/2015

16/07/2015 

Waiting for notice to expire.  Objection   received.  Mediation meeting to be arranged. 

 

P15.060 

16/07/2015 

Consolidation  ‐  CA  14, Sec 5,Township  of  Murrabit,  Parish  of Murrabit  West  and  CA  15,  Sec  5, Township  of  Murrabit,  Parish  of Murrabit  West,  15  Gonn  Ave, Murrabit. 

        Consolidation of land.  No Permit Required 

P15.061  Consolidation ‐ Lot 2, PS306131F and Lot   1,   TP188464Q,   9503   Murray

        Consolidation of land.  No Permit Required 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11900 of 11912

Page 42: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

  App. No  Proposal/Address  NoticePaper 

Neighbour

Referral  Status/Comments  Decision and Date and Date 

Received Authority  Date 

Referred Reply 

Received16/07/2015  Valley Highway, Kerang. P15.062 

31/07/2015 

Variation of easement – CA 67, Sec E,Township  of  Koondrook,  Parish  of Murrabit,  Penglase  Street, Koondrook. 

        Application under consideration.   

  July 2015 July 2014 July 2013Applications Received for Month  3 9 11Applications Received Year to Date  62 61 59Refusal  0 0 0Withdrawn/Lapsed 0 0 0Notice of Decision 1 0 0Not Required  2 1 3Permits Issued for Month  5 5 3Permits Issued this Year to Date  64 46 33Total Estimated Value for Month  $133,500 $1,120,500 $100,000Total Estimated Value Year to Date  $6,496,779 $3,882,600 $92,180,470

Abbreviations of Terms  

DEPI  Department of Environment & Primary Industries  EPA  Environment Protection Authority NCCMA  North Central Catchment Management Authority AAV Aboriginal Affairs VictoriaGMW  Goulburn Murray Water  EHO Environmental Health OfficerLMW  Lower Murray Water  CASA Civil Aviation Safety AuthorityENG  Engineering CFA Country Fire AuthorityVWA  Victorian Workcover Authority  GWMW Grampians Wimmera Mallee WaterBS  Building Surveyor  LCA Land Capability AssessmentDPI  Department of Primary Industries MED Manager Economic DevelopmentNVIRP  North Victorian Irrigation Renewal Project VCAT Victorian Civil and Administrative TribunalDCS  Director Community Services     

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11901 of 11912

Page 43: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

  

 

Consultation No consultation was required to occur for this matter. 

  

Options Analysis No policy, financial or resource implications exist for this option. 

  

Attachments There are no attachments for this report. 

  

Conclusion Application numbers were down for the month of July 2015, however, the applications received for the year to date are still on target with previous years and the permits issued for the year to date are still significantly higher than previous years. 

  

Recommendation  MOVED: CR AERTSSEN SECONDED: CR LEARMONTH That Council: 

 1.  Note the actions of the Manager Planning in approving the Planning Permit applications as detailed. 

 CARRIED

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11902 of 11912

Page 44: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

 8.2 Building Report 

 

Executive Executive Manager Strategic Development 

 

Author Manager Planning 

  

Purpose To present to Council the Building Permit applications received and  issued for the month of July 2015. 

  

Conflict of Interest In accordance with  Section 80B of  the  Local Government Act,  the Officer preparing  this  report declares no conflict of interest in regards to this matter. 

  

Council Plan Effective Leadership and Management 

 Our community has access to  information,  is kept  informed and has the opportunity to participate in the decision making process. 

  

Context    July 2015 July 2014 July 2013

No. of Permits 

Value of Permits

No. of Permits

Value of Permits

No. of Permits 

Value of Permits

Residential  1  $183,000 3 $804,210 1  $242,083Alterations/Additions  2  $157,163 2 $60,050 3  $46,401Outbuildings  1  $18,000 8 $178,781 8  $116,540Commercial/Industrial  3  $568,114 1 $60,057 3  $544,000Public Buildings  1  $385,000 1 $646,250 1  20,537,958Demolition  1  $11,000 1 12,000 0  NilTotal Value  9  $1,322,277 16 $1,761,349 17  $21,491,982

   Total for 2015 Total for 2014 Total for 2013

No. of Permits 

Value of Permits 

No. of Permits 

Value of Permits 

No. of Permits 

Value of Permits 

Residential  26  $7,735,674 15 $4,100,196 10  $2,637,721Alterations/Additions  20  $912,733 21 $1,336,715 16  $548,398Outbuildings  33  $689,343 33 $726,241 31  $543,444Commercial/Industrial  16  $2,398,821 9 $292,502 19  $2,502,567Public Buildings  1  $385,000 4 $747,628 13  $22,494,310Demolition  11  $79,395 1 $12,000 6  $29,600Total Value  107  $12,200,966 83 $7,209,671 95  $28,756,040Note a building permit for the Kerang Hospital was issued valued at $20,537,958 in the month of July 2013. 

 Legend Residential – New dwellings and units Alterations / Additions – To dwellings only Outbuildings – Sheds, carports, swimming pools, fences and signs Commercial / Industrial – Shops, offices, industrial buildings, factories, and alterations and additions to same Public Buildings – Health care, halls, assembly, education, and alterations and additions to same Demolitions – All types of buildings 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11903 of 11912

Page 45: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

  

 

Consultation No consultation was required to occur for this matter. 

  

Options Analysis No analysis was required for this matter 

  

Attachments 1.  “There are no attachments for this report”. 

  

Conclusion The  residential  sector has  slowed  in  the month of  July, however,  the  total number and value of building  permits  issued  for  the  year  are  up  from  this  time  last  year.  There  has  also  been  an increase of commercial building activity in the month of July. 

  

Recommendation  MOVED: CR GIBSON SECONDED: CR GANNON That Council: 

1. Note the Building Permits report for the month of July 2015. CARRIED 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11904 of 11912

Page 46: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

 

9 Urgent Items  Nil 

           

10 Notices of Motion 

Nil 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11905 of 11912

Page 47: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

  

11 In Committee Items  Nil

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11906 of 11912

Page 48: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

 11  In Committee Items 

 Executive Chief Executive Officer 

 

Author Chief Executive Officer 

  

Purpose The purpose of this report  is to seek Council consent to close the meeting to the public so that matters of a contractual nature can be discussed. 

  

Conflict of Interest In accordance with  Section 80B of  the  Local Government Act,  the Officer preparing  this  report declares no conflict of interest in regards to this matter. 

  

Council Plan Effective Leadership and Management 

 To  ensure  responsible  management  of  Council’s  resources through  effective  and  transparent  governance,  visionary leadership and full accountability. 

  

Context Council  has  the  power  to  close  the meeting  to  the  public  under  Section  89  (2)  of  the  Local Government Act 1989 when it is discussing any of the following items: 

x Personnel matters x The personal hardship of any resident or ratepayer x Industrial matters x Contractual matters x Proposed developments x Legal advice x Matters affecting the security of Council property x Any other matter which  the Council or special committee considers would prejudice  the 

Council or any other person  When Council decides to close the meeting to the public it must be recorded  in the minutes the reason for doing so. 

  

Consultation No consultation is required on this matter 

  

Options Analysis 1. Council may choose not to close the meeting to the public but then allows for contractual 

information to become public. 2. Council may choose to close the meeting to the public to consider all options 

  

Attachments 1. There are no attachments for this report 

  

Conclusion Council should close the meeting to the public to hear matters of a contractual nature. 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11907 of 11912

Page 49: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

  

 

Recommendation  

That Council:  

1. Close the meeting to members of the public according to Section 89 (2)(d)(e) of the Local Government Act 1989 so that it can consider a matter of a contractual nature. 

  THERE WAS NO IN‐COMMITTEE REPORTS TO DISCUSS

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11908 of 11912

Page 50: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

 

12  Delegates Reports 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11909 of 11912

Page 51: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

 

Cr Neville Goulding 

  16 July 2015  Quambatook Mens Shed Opening   16 July 2015  Citizenship Ceremony in Kerang   18 July 2015  Waterbird Wonderland Ball in Kerang   20 July 2015  ABC Interview   20 July 2015  Meeting with Executive Officer of LMWRR 

Group   20 July 2015  Cohuna Progress Association   22 July 2015  VEC Review Meeting   23 July 2015  Visit to Kinross Farms in Euroa   24 July 2015  Meeting with Central Victorian Greenhouse 

Alliance   24 July 2015  Audit Meeting with LMWRR Group   25 July 2015  Volunteered at Gateway to Gannawarra   26 July 2015  Lake Charm Primary School 100 year 

celebrations   27 July 2015  Meeting with CEO   27 July 2015  Quambatook Development Committee   28 July 2015  Cohuna Model Aero Club Meeting   29 July 2015  Central Victorian Greenhouse Alliance 

Committee Meeting   29 July 2015  Interview with the Weekly Times re Solar   30 July 2015  Meeting with Dr Mohan   3 August 2015  Loddon Campaspe Councils meeting   4 August 2015  Council Briefing Session   4 August 2015  Community meeting regarding Fluoride   5 August 2015  Interview with WINTV re Solar at the Library   5 August 2015  MRGC Dinner in Mildura   6 August 2015  MRGC Mayors and CEO Meeting in Mildura   6 August 2015  Dinner with Directors of LMWRR Group   7 August 2015  LMWRR Group Board Meeting   10 August 2015  Macorna Recreation Reserve Committee 

Meeting   11‐12 August 2015  Waste and Resource Recovery Expo Cr Lorraine Learmonth 

  29 July 2015  Early years Board in Cohuna   4 August 2015  Councillor Briefing Session   4 August 2015  Oral Health Community Consultation in 

Cohuna   5 August 2015  CWA Conference in Kerang   5 August 2015  Leitchville Progress Association Annual 

Meeting   6 August 2015  Cohuna Seniors Annual Meeting   10 August 2015  Meeting with CEO in Cohuna   12 August 2015  Meeting with NDCHS re Building in Cohuna   13 August 2015  Leitchville Seniors Birthday   13 August 2015  Meeting regarding the role of Red Cross in 

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11910 of 11912

Page 52: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

    Gannawarra Shire held at the Uniting Church. 

  17 August 2015  Cohuna Progress Association Meeting Cr Neil Gannon 

  15 July 2015  Quambatook Mens Shed Opening   17 July 2015  Quambatook Lions Club Changeover Dinner   21 July 2015  Lake Charm Mystic Park Lions Club 

Changeover Dinner   26 July 2015  Lake Charm School Anniversary   27 July 2015  Quambatook Progress Association Annual 

Meeting   27 July 2015  Meeting with new CEO in Kerang   28 July 2015  Quambatook Amity Club Changeover   3 August  Lalbert Progress Association meeting   4 August  Councillor Briefing Session Cr Oscar Aertssen 

  17 July 2015  Change it up program in Kerang   31 July 2015  Loddon Murray Community Leadership 

Program in Kerang   10 August 2015  Tour of Murray Ward with CEO   10 August 2015  MMLLEN Board meeting   14 August 2015  MDA Board Meeting Cr Keith den Houting 

  21 July 2015  Kerang Senior Citizens Annual General Meeting 

  22 July  VEC Public Information Meeting in Kerang   27 July 2015  Meeting with new CEO in Kerang Cr Brian Gibson 

  15 July 2015  MFMP Committee Meeting in Kerang   24‐26 July 20105  MAV Councillor Development Weekend in 

Torquay   27 July 2015  Meeting with CEO in Kerang   4 August 2015  Council Briefing Session   11 August 2015  Meeting with CEO in Kerang   11 August 2015  Audit Committee Meeting Cr Mark Arians 

  25 July 2015  Refugee Support Meeting   27 July 2015  Meeting with CEO   4 August 2015  Council Briefing Session   18 July 2015  Meeting with CEO in Kerang   19 July 2015  Council Meeting 

  

    

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11911 of 11912

Page 53: Home - Gannawarra Shire Council - Ordinary Meeting Minutes · 2015-11-26 · 7. Oral Health project Presentation 8. Annual Report Draft 1 9. Wakeboarding on the Gunbower Creek 10

 

                                    

Meeting Closed at 6.30pm Confirmed this Sixteenth Day of September, 2015 

                      

Cr Neville Goulding ‐ Mayor  

Gannawarra Shire Council - Ordinary Council Meeting Minutes 19 August 2015

Our Values...Collaborative, Resourceful, Innovative, Flexible, Integrity... Page 11912 of 11912