hon’ble prime minister new railway new karnataka
TRANSCRIPT
New Railway
New Karnataka Chikkaballapur
Parliamentary Constituency
Shri Narendra ModiHon’ble Prime Minister
Indian Railways is the growth engine of the
nation and a catalyst for India's progress and
economic development. South Western
Railway (SWR) plays a significant role in the
socio-economic development of Karnataka
State. Railways have achieved many visible
milestones in Karnataka in the recent years.
331 km of new lines and 913 km of doubling
have been completed in last 7 years. 144
new Mail- Express and Passenger trains
have been introduced. Apart from this, many
trains have been extended and the
frequency increased. The Railway personnel
are vibrant and dedicated, ready to adapt to
changing scenario of the transport sector to
fulfil the requirements and expectations of
people of Karnataka. During the time of
Covid19 pandemic, Railway personnel have
contributed in various capacities to the
society. This brochure is aimed at listing out
some of the important accomplishments in
recent past and current projects in
Lok Sabha Constituency Chikkaballapur
in Karnataka State.
Gajanan MallyaGeneral Manager
South Western Railway
PREFACE
Introduction of new trains
Tr.No. 06565/66 KSR Bengaluru-Hindupur-KSR Bengaluru
Daily MEMU Spl.
Tr.No. 06561/62 Yelahanka –
Mysuru –
Yelahanka
Daily MEMU Spl.
New Stoppages Provided
Train
At
Bhubaneswar –
KSR Bengaluru –
Bhubaneswar Prashanti Express
Gauribidanur
Mysuru -
Bagalkot –
Mysuru Basava Express
Gauribidanur Dodballapur
KSR Bengaluru -
Hubballi –
KSR Bengaluru Fast Passenger
Nidvanda
KSR Bengaluru -
Kolhapur –
KSR Bengaluru Rani Chennamma Express
Dodbele
Kacheguda -
Yesvantpur –
Kacheguda Express
Dodballapur
Lokmanya Tilak Terminus -
Coimbatore -
Lokmanya Tilak Terminus Kurla Express
Gauribidanur
Tr.No 66524 Hindupur-KSR Bengaluru-Hindupur MEMU w.e.f 06-04-2019
Viduraswattha
Tr.No 56504 Vijayawada –
Bengaluru Cantonment Passenger w.e.f 06-04-2019
Extension of Train Services
Train
Extended to
Tr No. 22133/34 S holapur – Yesvantpur – Sholapur Daily Express extended with change in T.No. as 11311/11312 Sholapur – Hassan –
Sholapur Express
Hassan
Tr No.16534/33 Yesvantpur-Bhagat Ki Kothi – Yesvantpur extended Jodhpur
Tr No.06595/96 Yesvantpur-Devanahalli-Yesvantpur DEMU
Chikkaballapur
Tr.No.12785/86 Kacheguda –
KSR Bengaluru – Kacheguda Express
Mysuru
Tr.No.19301/02 Indore –
Yesvantpur – Indore Express
Dr Ambedkar Nagar
Chikkaballapur Lok Sabha Cons�tuency consists of Gauribidanur, Bagepalli, Chikkaballapur, Yelahanka, Hosakote, Devenahalli, Dodballapur and Nelamangala Vidhan Sabha Cons�tuencies. Important Railway Sta�ons in Chikkaballapur Cons�tuency are Yelahanka, Rajanukun�, Dodballapur, Oddarahalli, Makalidurga, Tondebavi, Someswara H, Gauribidanur, Viduraswa�ha, Doddajala,H, Devanahalli, Avathihalli H, Venkatagiri Kote H, Nandi H, Nelamangala, Solur, Devanagonthi and Gidnahalli H.
INPUTS BY RAILWAY IN CHIKKABALLAPUR PARLIAMENTARY CONSTITUENCY
Devangonthi
Foot Over Bridge
1.32 Crores
Extension of Rail Level Platform
18 Lakhs
Raising and Extension of High Level Platforms
70 Lakhs
Divyang Toilet provided
3 Lakhs
PF Shelter provided
8 Lakhs
WI-
FI (Under CSR)
Gauribidanur & Dodballapur
Provided Platform Shelter
1.26 Crores
Rajankunti
Raising and Extension of Platform
50 Lakhs
WI-
FI (Under CSR)
Gauribidanur
Raising and Extension of Platform
49 Lakhs
Soladevanahalli
Extension of Rail Level Platform
18 Lakhs
Muddalingana Halli Halt
New Station Building
11 Lakhs
Bhairanayakanahalli, Dodbele,
Muddalinganahalli, Nidvanda and Dobbspet
Raising and Extension of Rail Level Platforms
9 Lakhs
Dodballapur & Chikkaballapur
Public Announcement System
1.5 Lakhs
Yelahanka
Provision of 2 Nos Lifts
1.2 Crores
WI-
FI (Under CSR) Kempegowda International Airport
Halt Railway Station
New Halt station developed
3 Crores
Bhairanayakanahalli, Dodbele, Muddalinganahalli
Raising and Extension of High Level Platforms
4.75 Lakhs
Oddarahalli, Makalidurga, Someswara, Thondebavi, Gauribidanur, Vidurashwatha,
Foot Over Bridge
12.6 Crores
Yelahanka (85), Doddaballapur (25),Gauribidanur (25)
Provided Stainless steel benches for improved seating facility (135 Benches)
30 Lakhs
Amenities at Stations
Station Amenities Cost (in Rs.)
Infrastructure Improvements
New Line between Nelamangala -
Shravanabelagola
as a part of Bengaluru –
Hassan New line project
Rs. 86 Crores
Doubling between Yesvantpur–
Yelahanka
Rs. 44 Crores
Electrification between Yesvantpur -
Yelahanka.
Rs. 4 Crores
Doubling between Yelahanka –
Channasandra
Electrification between Yelahanka -
Channasandra.
Rs. 3 Crores
Electrification between Yelahanka –Penukonda
Rs. 45 Crores
Doubling with Electrification between Yelahanka-Devarapalle
(72 kms) as part of Yelahanka-Penukonda Doubling (120kms)
Total project cost in Rs.
860.43 Crores
Kempegowda International Airport Halt
(KIAD) -
New Halt Station commissioned between Yelahanka-
Devanahalli
Intermediate Block Signalling Post commissioned between Yelahanka-Chennasandra
Rs. 2.8 Crores
Electrification of Yelahanka –
Bangarapet line (149 Route KM) commenced
Project for work Cost (in Rs.)
Other Works
ROAD OVER BRIDGE CONSTRUCTED
Cost (in Rs.)
Between Yelahanka – Rajankunte
28 Crores
ROAD UNDER BRIDGE CONSTRUCTED
Near Devanahalli
1.37 Crores
Near Avathihalli
1.27 Crores
Near Nandi village
1.28 Crores
Near Oddarahalli
1.87 Crores
Near Someshwara
1.48 Crores
Near Bhairanayakanahalli
50 Lakhs
Dodballapur WI- FI (Under CSR)
Oddarahalli WI- FI (Under CSR)
Makalidurga
WI- FI (Under CSR)
Thondebhavi
WI-
FI (Under CSR)
Nelamangala
WI-
FI (Under CSR)
Golhalli
WI-
FI (Under CSR)
Dodbele
WI-
FI (Under CSR)
Nidavanda
WI-
FI (Under CSR)
Devanahalli
WI-
FI (Under CSR)
Chikkaballpour
WI-
FI (Under CSR)