honda manufacturing: first step into...

32
Honda North America: Transition to Delmia V6 Brian Wynk, Staff Engineer – HNA New Model Virtual Maturation Team Melissa Vance, Staff Engineer – HNA New Model Virtual Maturation Team Honda Manufacturing: First Step Into PLM

Upload: ngohanh

Post on 26-Feb-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Honda North America: Transition to Delmia V6

Brian Wynk, Staff Engineer – HNA New Model Virtual Maturation TeamMelissa Vance, Staff Engineer – HNA New Model Virtual Maturation Team

Honda Manufacturing: First Step Into PLM

1970 1995 20001985

3DVirtual ProductModel

Product Process Resource

KnowledgeInside

3D Collaborative Tools

Product ContextScenario

2D

3D

DMU

3D PLM

CollaborativeBusinessProcess

RealisticSimulation

“Clay to Die”

DMC

V5 GMS

“CATI”

NaviHonda Projects

2005 2010

V6 GMS

“Global Manufacturing Simulation

2014

Honda Manufacturing: First Step Into PLM

Honda Manufacturing: First Step Into PLM

Agenda:

Honda North America: Company Overview

Business Objectives: Why Change?

Delmia V6 Advantages

Mobility

Robotics Technology | HondaJetAutomobiles Power sports | Power Equipment | Marine | Racing

Total Global Sales CY 2013

27 Million Units Sold WorldwidePowersports Automobile Power Equipment16,790,000 4,279,000 6,008,000

ChinaHonda Motor (China) Investment Co., Ltd.

JapanHonda Motor Co., Ltd.

Asia & OceaniaAsian Honda Motor Co., Ltd.

South AmericaHonda South America LTDA

North AmericaAmerican Honda Motor Co., Inc.

Europe/Africa/Middle EastHonda Motor Europe Ltd.

OhioHonda of America Mfg., Inc.

• Marysville Auto Plant• East Liberty Auto Plant

IndianaHonda Manufacturing of Indiana, LLCAlabamaHonda Manufacturing of Alabama, LLCCanadaHonda of Canada Mfg.MexicoHonda de Mexico S.A. de C.V

• El Salto Auto Plant• Celaya Auto Plant

North America Automobile Plants

East LibertyAuto Manufacturing

Marysville Auto Manufacturing

Honda Research and Development

Honda Engineeringof America

OHIO

Honda North America Inc

Honda North America

New Model Organization

New TechnologyAdministration Virtual

Maturation

New Model

Business Standardization

Body Materials Manufacturing Methods

Business SystemsInnovation and

Operational

Linking Of Business and IT

New Model Organization IT Organization

New TechnologyAdministration Virtual

Maturation

New Model IT Services

Enovia V6 CAD Delmia V6

Business Standardization

Body Materials Manufacturing Methods

Business Systemsand Innovation

Operational

Tech Support and Management

Tech Support and Management

Tech Support and Management of

V5 Applications

Virtual Maturation

Operational

Business Innovation

Virtual Maturation - Operational

Virtual Maturation

Operational

Business Innovation

Enovia V6

Delmia V6

Virtual Maturation – Business Innovation

Simulated 2-Inch Heel

Evolution of Delmia V5

Gallery Reviews

Process Reviews

Equipment Reviews

Install Methods

Collaboration with Factory Floor

Warranty Item Reviews

Total V5 Activity

Delmia Applications in NA 1- Process Sequence Build2- Process Development and Maturation 3- IP Joint Check 4- Die Go Evaluation 5- Theme Reviews 6- Process Check 7- Initial Associate Training 8- IQS PPH Studies

Ergo AnalysisTooling

Robotic Simulation

Process Sequence

Process Simulation Equipment Validation

Why Change

Why Change

Japan Design – Mfg 1st Japan Design– NA Mfg 1st

Global Design – Global Mfg but V5 only in Japan and OHIO

Global Design – Global Mfg – Global Data= The need for V6

Transition to V6

MBOM

Honda Manufacturing: First Step Into PLM

Honda Global V6 ProjectDelmia V6 Advantages

Melissa Vance

JPN NACurrent

Product

EquipProcess

System Integration Ongoing

Manufacturingdata

(JPN) (US)

CATIAJPN

(HCM)

CATIAHAM

CATIAHSCI

Regional / Local system

GMS data

Product

ResourceProcess

PLANTLINE

DPM/GMS collaboration

Process/ST dataglobal sharing

BODY №工程名部品名内作部品治工具

Equip data global sharing

JPNA Europe

ChinaAsian

SouthAmerica

•Global sharing of process info 14 items

•Global standardization of equip modeling rules

Global Service

Internet Service

SNS connection

Thin Client

ICT

Cloud Service

Connect to 3DFaster, Lower price

Support the Change Business Process

Verification

ENOVIA V6

CATIA V6Design

DELMIA V6

MfgSIMULIA V6

3D SWYM

EXA LEAD

Req. List

Engineering Know HowEnterprise Data Base

Big dataData mining

Data analysisFAQ/QA

3D VIA

Sales3D Live

Smart device

Mfg Req.

Comment

Business Advantages- Global PlatformLong Term IT Strategy-Provide a Global Platform for New Model Development

Centralized control & organization of manufacturing data. (Process, resource, equipment, requirements/characteristics)

Mature specs. while confirming factory

By-factory verificationLine A

#1

#201

#202

#2

Global masterLine A Type 1 Line A Type 2 Line B Type 1 Line B Type 2 Line C Line E

#210

Line FLine DCentrally control basic data per model

#120 #140#150

#201Part + Equip.

#201

Cross-factory verification

Line A#220

Line B#150

Line C#?Line D

Reuse the master data

V6

Line A Type 1

Equip. data

‥L4

(ENG mount example)

Part + Equip. #150Part + Equip. No data

Line A Type 2

Cross-verif.Line A Base

Line A Base

#1

#201

#202

#2

Verify

System

Global correlation for optimal method

Enable cross-factory verification

Business Advantages- Global Platform

Cross-verification for New Model Programs produced across regions

Business Advantages- Project Preparation

Configure by Factory

Configure by Factory and Type

Configure by Type

Configure by Type

• More effectively manage factory MBOM•One evolving System (assembly operation) structure used through program development.

• Improved process development with 3D representation.

Business Advantages- Project Preparation

• Open a ‘favorite’ in the session allowing for quick recall of data session.

Business Advantages- Project User

User Favorites

Folder Organization

• DELMIA V6 User Defined ‘Smart’ Completion – promotes Intelligent ‘Loading’

Start from any Product, MBOM, Operation or Resource

Load correct context

What products are used in this station?Understand Manufacturing context

accurately & quickly

Where is this assembly built?

Business Advantages- Project User

Where is the resource located?

Business Advantages- Project User

•Enhanced Search capabilities, by light 3D representations or geometry allow for improved results

Innovative 3D based proximity

search

Search beyond PPRs

Found it

Used in which factory?

Supplier/cost

Attached doc

Search the resource

Resource engineer (where is this Resource used?)

Factory 1

Engineering

Designer

Factory 2

Factory 1

Factory 2

EngineeringDesigner

DELMIA V6 Business Advantages-Analysis

•Validations shared across the organization in single database environment

Create the Simulation once

Original Simulation with updated part

DELMIA V6 Business Advantages-Analysis

•Simulation context recognizes product data revisions.

•Natural human movements are programmed into DELMIA.

Key Prep Activity:Implementation of V6 OLP

For Paint Sealer

Future Path for DELMIA V6: Off-Line Teaching-Paint Sealer

Static

Dynamic

Inline condition

$$

Common Investment

Future Path for DELMIA V6: Resource Management

Accuracy for Detailed Judgments Mfg Requirements

Product Design to Best Match Factory

DesignerKey Prep Activity:Improved resource

management and verification

Automated relationships within DELMIA

DELMIA V6 Business Advantages-Future

V6 provides Designer with automated Fastener functions (time savings)

•Use V6 Fastener to automate tool and robot coordinate positioning verification.

Reduce Change Requests & Tooling cost through global Part + Factory understanding

GMS data

EquipProcess

PLANTLINE

ZONE

Product (DPM)

Global common data model

DELMIA V6 Business Advantages-Future

•MBOM viewed by Design.•Resource relationship to product viewed by Design.•Early design maturation effectiveness.

Transition to V6

MBOM

Global MBOMNew Model

Configure for each Plant